E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals

Similar documents
PROTECTO SILL WINDOW SEALING SYSTEM. Product. Scope. Appraisal No. 444 [2017]

TRADE SILL FLASHING TAPE. Product. Scope. Appraisal No. 712 [2012] Appraisal No. 712 (2012) Amended 19 July BRANZ Appraisals

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017]

JAMES HARDIE RIGID AIR BARRIERS

GORILLA GRIP ADHESIVES. Product. Scope. Building Regulations. Appraisal No. 575 [2014]

NULINE PLUS WEATHERBOARD DIRECT FIXED CLADDING SYSTEM. Product. Scope. Appraisal No. 640 [2015]

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

GOLDENEDGE MDF PANELBRACE WALL BRACING SYSTEMS. Product. Scope. Building Regulations. Appraisal No. 779 [2018] Logo

NULINE PLUS WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 641 [2015]

The WANZ Guide to Window Installation

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

BBS Rusticated & Splaycut Cavity System

STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL

4256HM JAMES HARDIE MONOLITHIC CLADDING

VIKING CERTAINTEED ASPHALT ROOFING SHINGLES. Product. Scope. Building Regulations. Appraisal No. 276 [2012]

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017

System for 2+ Level Buildings


TEKTON WEATHERIZATION SYSTEM SPECIFICATION

SHADOWCLAD SPECIFICATION & INSTALLATION GUIDE

STEEL FRAMING WEATHERBOARD SYSTEM

A-lign Technical Manual

Installation Instructions

STOLITE CONSTRUCTION SYSTEM EXT.CORNER - MANUF.STONE/STOLITE

Timber Cavity Batten Technical Specifiction

BARRIER. Specification & Installation Guide. September 2015

Bevel back. Technical & installation manual. Component details & drawings installation guide maintenance & care warranty

Window Frame Installation Instructions For Nail-on and Block Frames

How-To-build guide Garden shed

DURABARRIER RIGID SHEATHING / AIR BARRIER

A-lign Technical Manual

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

ForceField Air & Water Barrier System. installation instructions

Technical Specification MARCH 2015 I NEW ZEALAND

9.0 PS Pacbld Sidings

Acceptable Standards of Domestic Construction

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit

CEILING BATTEN SYSTEM. Appraisal No.981 [2017] Installation Guide

All Window Installation Instruction

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

Regarding the code-compliance of CCA treated laminated veneer lumber

COMPOSITE SIDING INSTALLATION GUIDE

ROOFING City of Grand Rapids Building Safety Division

LE7000 Provincial Built-in (Zero Clearance) Kit Instructions.

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

WO OD LOCK W E AT H ERBOARDS & FASCIA Installa tion info r m at ion and t echnic al draw ings

Installation instructions: Elements Vulcan+ Newport Hector Cladding

INTERNAL LININGS INSTALLATION GUIDE

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

Regarding the durability of New Zealand grown European oak timber to be used internally in a new dwelling at 350 Jones Road, Blenheim

Ash Brook Golf Course Scotch Plains, New Jersey

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Technical Specification MARCH 2017 I NEW ZEALAND

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors

EzyBrace Systems. Specification and installation manual CBI 5113

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Shingle Installation Guide

Asphalt Shingle Roofing NZ PO Box , Royal Oak Auckland

Technical Information

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

ALPINE TRAY. To get the best from this product please follow these recommendations.

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

DurasheetTM Fibre Cement

Vinyl Windows Manufactured by VPI Quality Windows

Installation guide for 20/20

Series 9000 Vinyl Fixed Window

B. Related Sections: The following Sections contain requirements that relate to this Section:

Vinyl Windows and Doors Manufactured by VPI Quality Windows

NZQA Expiring unit standard version 2 Page 1 of 5. Describe roof shingle preparation and installation procedures

EzyBrace For Light Steel Frame Systems

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Dear Contractor, I am glad that you are interested in our window rebate program.

Innova. Concealed frame doorsets. Installation instructions

Installation Instructions for TruWood Reversible Trim

In the 30-plus years that I ve been a remodeling contractor, I ve

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

8x8 Shed Plans and Building Guide

PROJECT INSTRUCTIONS Roofing

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

Installation Instructions for Panel Siding and Soffit

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

ASS 70 FD folding/sliding door installation guide

12x12 Shed Plans and Building Guide

Series 6000 Vinyl Horizontal Slider

Site Preparation Information for:

Slate Shingle Specifications

Transcription:

E2 REDWAY FLASHINGS BRANZ Appraisals Technical Assessments of products for building and construction. Redway Developments Limited 162 Kendal Ave Burnside Christchurch Tel: 03 358 5775 Email: info@e2flashings.co.nz Web: www.e2flashingsolutions.co.nz BRANZ 1222 Moonshine Rd, RD1, Porirua 5381 Private Bag 50 908 Porirua 5240, New Zealand Tel: 04 237 1170 branz.co.nz Product 1.1 E2 Redway Flashings are a range of upvc back flashings designed for use in a variety of wall construction details to meet the flashing requirements for both direct-fixed and cavity cladding systems. The range also includes the E2 Redway Flashings Sill Tray System for window and door joinery. Scope 2.1 E2 Redway Flashings have been appraised for use as back flashings on timber and steel framed buildings within the following scope: the scope limitations of NZBC Acceptable Solution E2/AS1, Paragraph 1.1 with regards to building height and floor plan area; and, with direct fixed or cavity-based wall cladding systems complying with NZBC Acceptable Solution E2/AS1 or with proprietary direct fixed or cavity-based cladding systems covered by a valid BRANZ Appraisal; and, situated in NZS 3604 Wind Zones, up to and including Extra High. (Note: E2 Redway Flashings can also be used on buildings subject to specific weathertightness design. Weathertightness design and detailing of these installations is the responsibility of the designer and is outside the scope of the Appraisal). 2.2 The E2 Redway Flashings Sill Tray System has been appraised for use as a sill tray in joinery openings of buildings within the following scope: timber framed buildings constructed in accordance with the scope limitations of NZBC Acceptable Solution E2/AS1, Paragraph 1.1, with direct fixed timber or fibre cement horizontal weatherboard wall claddings in accordance with NZBC Acceptable Solution E2/AS1; or constructed with concrete masonry, in-situ concrete, pre-cast concrete or EPS block systems up to 3 storeys in height with a maximum height from ground to eaves of 10 m, and with a floor plan area only limited by seismic and structural joints, all designed and constructed in accordance with the NZBC; and situated in NZS 3604 Wind Zones up to, and including, Very High. 2.3 The E2 Redway Flashings Sill Tray System is appraised for use with aluminum window and door joinery that is installed with vertical jambs and horizontal heads and sills. (Note: The Appraisal of the Sill Tray System relies on the joinery meeting the requirements of NZS 4211 for the relevant Wind Zone.) Pg 1

Building Regulations New Zealand Building Code (NZBC) 3.1 In the opinion of BRANZ, E2 Redway Flashings, if designed, used, installed, and maintained in accordance with the statements and conditions of this Appraisal, will meet or contribute to meeting the following provisions of the NZBC. Clause B2 DURABILITY: Performance B2.3.1 (a) not less than 50 years, B2.3.1 (b), 15 years and B2.3.2. E2 Redway Flashings meet these requirements. See Paragraphs 8.1 and 8.2. Clause E2 EXTERNAL MOISTURE: Performance E2.3.2. E2 Redway Flashings contributes towards meeting this requirement. See Paragraphs 10.1 and 10.2 Clause F2 HAZARDOUS BUILDING MATERIALS: Performance F2.3.1. E2 Redway Flashings meet this requirement and will not present a health hazard to people. Technical Specification 4.1 E2 Redway Flashings are extruded from upvc plastic by Redway Developments Limited. All E2 Redway Flashing profiles are supplied in 2.7 m lengths. 4.2 The E2 Redway Flashings covered by the Appraisal are: Product Code RDCC15 RDCC19 RDCC21 RDCC40 RDCC45 RDCC50 RDTV20 RDWBC25 RDWBC30 RDWBC33 RDWBC35 RDCSE30 RDCS47 RDWBJ40 RDCS55 RDCS85 RDCS105 RDZF7 RDZF17 RDFB40 RDFB135 RDFB160 RDBKF45 RDCNS100/42 RDCNS150 RDCNS100 RDSE RDST87 RDTJ RDSW50 Description 15 mm Flat Panel Cavity Closer 19 mm Flat Panel Cavity Closer 21 mm Flat Panel Cavity Closer 40 mm Flat Panel Cavity Closer 45 mm Flat Panel Cavity Closer 50 mm Flat Panel Cavity Closer 20 mm Top Vent Cavity Closer 25 mm Weatherboard Cavity Closer 30 mm Weatherboard Cavity Closer 33 mm Weatherboard Cavity Closer 35 mm Weatherboard Cavity Closer Cavity Stop End for Weatherboard Closer Weatherboard Cant Strip (Starter) 40 mm Weatherboard Jamb 55 mm x 55 mm Internal / External Corner Flashing 85 mm x 85 mm Internal / External Corner Flashing 105 mm x 105 mm Internal / External Corner Flashing Ecoply Barrier Horizontal Jointer Ecoply Barrier Steel Horizontal Jointer 40 mm Flat Back Flashing 135 mm Flat Back Flashing 160 mm Flat Back Flashing Brick Kickout Flashing 50 mm x 42 mm x 50 mm Cavity to Non-Cavity Flashing 50 mm x 19 mm x 100 mm Cavity to Non-Cavity Flashing 50 mm x 19 mm x 50 mm Cavity to Non-Cavity Flashing Sill Tray Stop End (supplied in pairs left and right) Sill Tray 87 mm Sill Tray Jointer Sill Tray Window Support Wedges 50 mm Pg 2

Handling and Storage 5.1 Handling and storage of all materials supplied by Redway Developments Ltd, whether on site or off site, is under the control of the installer. E2 Redway Flashings must be protected from physical damage and must be stored in clean, dry conditions. The E2 Redway Flashings Sill Tray system components shall be stored in a manner that avoids contamination of the glue joint surfaces. Technical Literature 6.1 Refer to Redway Developments Ltd for details of the current Technical Literature for E2 Redway Flashings. The Technical Literature must be read in conjunction with this Appraisal. All aspects of design, use, installation and maintenance contained in the Technical Literature and within the scope of this Appraisal must be followed. Design Information General 7.1 E2 Redway Flashings are a range of back flashings for use on walls of buildings. They are designed for use as a secondary line of defence to assist in the weathertightness of wall cladding and window systems by providing a direct path for any water infiltration to be directed back out to the external face of the cladding. When paired with suitable cladding types, E2 Redway Flashings will contribute to the prevention of the ingress of moisture and vermin into buildings. 7.2 E2 Redway Flashings can be used as alternatives to back flashings specified within NZBC Acceptable Solution E2/AS1. Where used otherwise than in accordance with E2/AS1 detailing, the use of E2 Redway Flashings shall be by way of specific weathertightness design and is outside the scope of this Appraisal. 7.3 E2 Redway Flashings must not be exposed to the weather or ultra violet light for a total of more than 90 days before being covered by the wall cladding. 7.4 Where a proprietary cladding proprietor specifies a specific flashing as part of their system, permission must be obtained from the cladding proprietor before the flashing system is substituted with E2 Redway Flashings. 7.5 Where E2 Redway Flashings are used with other cladding systems not covered by this Appraisal (refer to Appraisal Paragraph 2.1), designers must detail the junction between the E2 Redway Flashings and the cladding to meet their own requirements and the performance requirements of the NZBC. Details not included within the Technical Literature have not been assessed and are outside the scope of this Appraisal. 7.6 The E2 Redway Flashings Sill Tray System is designed to fit directly under aluminium joinery, sloping forward to divert water to the building exterior. Water sources include leaking joinery, failed jamb seals or flashings, condensation or wind driven rain. The E2 Redway Flashings Sill Tray system must only be used where the sloping portion of the sill tray starts beyond the joint between the timber reveal liner and the aluminium joinery extrusion to pick up any leakage through the mitre joints in the window joinery. 7.7 Jamb flashings, where used, must extend and lap over the end sections of the sill tray. 7.8 Building designers incorporating the E2 Redway Flashings Sill Tray System into their design must ensure that adequate support for the aluminium joinery is provided in addition to that provided by the support wedges. 7.9 The E2 Redway Flashings Sill Tray system is not designed to overcome poor detailing and workmanship of aluminium joinery installation. The system must not be considered in isolation, but be considered as part of the wall cladding system. The E2 Redway Flashings Sill Tray system is designed to be used in conjunction with airseals and joinery flashing systems, not as a substitute. Pg 3

Durability 8.1 Assessment of durability to meet the NZBC is based on difficulty of access and replacement, and the ability to detect failure of E2 Redway Flashings both during normal use and maintenance of the building. Serviceable life 8.2 Provided they are not exposed to the weather or ultra-violet light for a total of more than 90 days, and provided the exterior cladding is maintained in accordance with the cladding manufacturer s instructions and the cladding remains weather resistant, E2 Redway Flashings are expected to have a serviceable life equal to that of the cladding. Maintenance 8.3 No maintenance is required for E2 Redway Flashings. Annual inspections must be made to ensure that all aspects of the cladding system, aluminium joinery and any sealed joints remain in a weathertight condition and water cannot penetrate the cladding. Any damaged areas or areas showing signs of deterioration which would allow water ingress must be repaired immediately. Prevention of Fire Occurring 9.1 Separation or protection must be provided to E2 Redway Flashings from heat sources such as fire places, heating appliances, flues and chimneys. Part 7 of NZBC Acceptable Solutions C/AS1 C/AS6 and NZBC Verification Method C/VM1 provide methods for separation and protection of combustible materials from heat sources. External Moisture 10.1 E2 Redway Flashings when installed in accordance with this Appraisal and the Technical Literature assist in preventing the penetration of moisture that could cause undue dampness or damage to building elements. 10.2 Where a cladding proprietor specifies the use of a sill tray around window openings as part of their system, or specify the use of a sill tray that complies with NZBC E2/AS1, Paragraph 9.1.10.5, the E2 Redway Flashings Sill Tray system may be used. 10.3 The details given in the Technical Literature for weather sealing are based on the design principle of having a first and second line of defence against moisture entry for all joints, penetrations and junctions. The ingress of moisture must be excluded by detailing flashings and wall interfaces as shown in NZBC Acceptable Solution E2/AS1 and the Technical Literature. Weathertightness details that are developed by the designer are outside the scope of this Appraisal and are the responsibility of the designer for compliance with the NZBC. Installation Information Installation Skill Level Requirements 11.1 Installation of E2 Redway Flashings must be completed by, or under the supervision of Licensed Building Practitioners with the relevant License Class, in accordance with instructions given within the E2 Redway Flashings Technical Literature and this Appraisal. System Installation E2 Redway Flashings Installation 12.1 E2 Redway Flashings can be cut to length on site. Back flashings must be installed in a continuous length where possible, but to avoid wastage, the back flashings can be lapped 100 mm. The direction of the lap must ensure that water is shed to the outer face of the flashing. 12.2 E2 Redway Flashings must be used and installed in conjunction with the selected cladding system in accordance with the installation methods and requirements of NZBC Acceptable Solution E2/AS1, or the proprietary cladding system manufacturer. Pg 4

E2 Redway Flashings Sill Tray System Installation 12.3 The Technical Literature provides full details for the installation of the sill tray, including aluminium joinery opening details. The following is a summary of the main points of installation: The sill trimmer must be level. The sill tray is cut to length to suit the opening width. Stop ends are fitted to the ends of the sill tray with a PVC solvent cement. Flexible wall underlay and flexible flashing tapes must be installed in accordance with NZBC Acceptable Solution E2/AS1, prior to the installation of the sill tray system. The sill tray system is fixed to the studs through the fixing holes provided in the stop ends, with either galvanised plasterboard clouts or screws. Screws are recommended to allow for adjustments. The Sill Tray System is fixed to the sill trimmer through the upstand support section at the rear of the tray (a scribed line is provided). The fixings must not penetrate through the sloping part of the tray, as this will compromise the water shedding capability of the sill tray. When the aluminium joinery is installed, care must be taken to ensure the sloping portion of the sill tray is not penetrated by the sill reveal fixings. The gap formed between the Sill Tray System and the aluminium joinery flange must not be sealed, so moisture can drain to the exterior. Basis of Appraisal The following is a summary of the technical investigations carried out: 13.1 BRANZ expert opinion on NZBC E2 code compliance for E2 Redway Flashings was based on evaluation of all details within the scope and as stated within this Appraisal. The details contained within the Technical Literature have been reviewed, and an opinion has been given by BRANZ technical experts that the back flashings will meet the performance levels of NZBC Acceptable Solution E2/AS1. 13.2 The practicability of installation of E2 Redway Flashings has been assessed by BRANZ. 13.3 The Technical Literature for E2 Redway Flashings has been examined by BRANZ and found to be satisfactory. Investigations 14.1 An assessment was made of the durability of E2 Redway Flashings by BRANZ experts. 14.2 Site visits have been carried out by BRANZ to assess fit for purpose and the practicability of installation, and to assess in service performance. 14.3 Weathertightness detailing of the E2 Redway Flashings has been assessed by BRANZ and found to be satisfactory. Quality 15.1 The manufacture of E2 Redway Flashings has not been examined by BRANZ, but details regarding the quality and composition of the materials used were obtained by BRANZ and found to be satisfactory. BRANZ undertakes an ongoing review of product quality on an inwards goods basis. 15.2 The quality of materials, components and accessories supplied to the market is the responsibility of Redway Developments Ltd. 15.3 Quality on site is the responsibility of the installer. 15.4 Designers are responsible for the building design, and building contractors are responsible for the quality of installation of the framing systems, wall underlays, cavity battens and cladding system in accordance with the instructions of the designer. 15.5 Building owners are responsible for the maintenance of the cladding system in accordance with the instructions of cladding manufacturer and designer. Pg 5

Sources of Information NZS 3604: 2011 Timber Framed Buildings. Acceptable Solutions and Verification Methods for New Zealand Building Code External Moisture Clause E2, Ministry of Business, Innovation and Employment, Third Edition July 2005 (Amendment 7, 01 January 2017). Ministry of Business, Innovation and Employment Record of amendments - Acceptable Solutions, Verification Methods and handbooks. The Building Regulations 1992. Pg 6

In the opinion of BRANZ, E2 Redway Flashings are fit for purpose and will comply with the Building Code to the extent specified in this Appraisal provided they are used, designed, installed and maintained as set out in this Appraisal. The Appraisal is issued only to Redway Developments Limited, and is valid until further notice, subject to the Conditions of Appraisal. Conditions of Appraisal 1. This Appraisal: a) relates only to the product as described herein; b) must be read, considered and used in full together with the Technical Literature; c) does not address any Legislation, Regulations, Codes or Standards, not specifically named herein; d) is copyright of BRANZ. 2. Redway Developments Limited: a) continues to have the product reviewed by BRANZ; b) shall notify BRANZ of any changes in product specification or quality assurance measures prior to the product being marketed; c) abides by the BRANZ Appraisals Services Terms and Conditions; d) warrants that the product and the manufacturing process for the product are maintained at or above the standards, levels and quality assessed and found satisfactory by BRANZ pursuant to BRANZ s Appraisal of the product. 3. BRANZ makes no representation or warranty as to: a) the nature of individual examples of, batches of, or individual installations of the product, including methods and workmanship; b) the presence or absence of any patent or similar rights subsisting in the product or any other product; c) any guarantee or warranty offered by Redway Developments Limited. 4. Any reference in this Appraisal to any other publication shall be read as a reference to the version of the publication specified in this Appraisal. 5. BRANZ provides no certification, guarantee, indemnity or warranty, to Redway Developments Limited or any third party. For BRANZ Chelydra Percy Chief Executive Date of Issue: Pg 7