Clopay Models 835/837 Sliding Door System Installation Guide

Similar documents
Assembly Instructions 10 X 10 Aluminum Roof Support

Dura-Lock Roof System

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Installation Guidelines

Installation Instructions - Model V4JSD 1

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

ALL SEASON PATIO COVER

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

Installation Guidelines

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

Greenhouse Assembly Instructions

GLOSSARY OF TERMS SECTION 8

MARQUEE INSTALLATION HANDBOOK. Curved Structures

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

Standard 25 Wide Structure

Zero Threshold TM. Hints and Tips Handbook. Birdlip. Burford. Blockley. Bourton

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

S H E D A S S E M B L Y I N S T R U C T I O N S

E-Z GROW HOBBY GREENHOUSE. I n s t r u c t i o n M a n u a l & D i s c l a i m e r s

ALDoor DOUBLE DOOR INSTALLATION

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

S H E D A S S E M B L Y I N S T R U C T I O N S

INSTRUCTION MANUAL FOR MULTIBUILD VERTICAL CLAD QUAKER BARN WITH OR WITHOUT OUT MEZZANINE FLOOR UP TO 12 METRE SPAN

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

Gardman Lean-to Greenhouse Assembly Instructions

DOCK WEDGE - STANDARD

ASSEMBLY INSTRUCTIONS

BIKE FILE (301)

WPS crew Doors Installation instructions

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

ASSEMBLY INSTRUCTIONS FOR "GA" MODULAR BUILDINGS ALL MODELS

Oxford Stalls Installation Instructions

Assembly Instructions

96 (Standard Length)

GIRTS ON BACK OF BUILDING

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

Walk-in Greenhouse. Assembly instructions. 8x6. 8x8. 8x10. 8x12. Model GH1399A Model GH1400A. Model GH1402A Model GH1403A. Model GH1405A Model GH1406A

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

CRYSTEEL S. this manual must be included with the vehicle after completing the installation.

Track Rack. * Track Racks are not lockable

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

LAS VEGAS PATIO COVER INSTALLATION INTSRUCTIONS

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

General Guidelines:

12 x 12 Flat Top Pergola

Assembly Instructions 10 X 10 Aluminum Frame Building

Flex Fence Instruction Manual

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

Vertical Offset Base and Safety Rail System Installation Instructions

8 Ft Wide Enclosure Assembly Guide

Cabinet Mount Lifter Instructions

DUTCH GABLE FREESTANDING CARPORT

GROWING BETTER THROUGH DESIGN. Regent Royale Rosette Regal GREENHOUSE. Assembly Instructions 04/02

CTTR Tire Rack Required tools

Santa Fe Cover INSTALLATION GUIDE. Alumawood TM Newport with MAXX Panel TM Installation Guide

Qwik-Fence Installation Instructions

MODULAR HIGH TUNNEL INSTALLATION GUIDE

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Sliding Door Kit

3 BRACKET TO GUIDE ATTACHMENT. RIGHT END Figure 1. EXTENDED BRACKET (for doors taller than 8-8 ) SERIES 650. RIGHT END COTTER PIN Figure 6

Potting Store Assembly Instructions

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

MULTISPAN GABLE WITH HIP END ATTACHED PATIO

INSTALLATION INSTRUCTIONS

ClearSpan End Frame Kit 26' Wide x 12' High

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

installation guide

ASSEMBLY INSTRUCTIONS TF Tent Flooring System. 125 Taylor Parkway Archbold, Ohio Phone: (419) Fax: (419)

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

10 x 10 Arch Top Pergola

Strata. urniture. Addison Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

Aluminum Full View Models 464, 451, 452

HD installation guide

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

10x10 Trellis Pergola

10 Wide AMATEUR CEDAR GREENHOUSE

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERTICALLY SHEETED GARAGE BUILDINGS BUILDING WIDTHS: 12, 20, 24, AND 30

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE FRONTIER GARAGE BUILDINGS

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

Gared Pro-S Portable Backstop

KENECO FLOW RACK INSTALLATION INSTRUCTIONS

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

Absco Premier Garden Shed Assembly Instructions Model: J30302G

-Always de-energize the circuit and/or equipment before connecting to, disconnecting from or servicing the equipment.

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

Transcription:

Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available this instruction is written in a generic form, but should provide sufficient details for you to complete your task successfully. In conjunction with this instruction you should refer to specification sheets and details where provided by your local distributor. 1. Ensure that you have familiarized yourself with all components, that being the description, function and application of each item. Attached are sketches that will aid with this task. CARRIAGE MOUNTING BLOCK CLADDING/SHEETING CORNER BRACE PUSH RAIL BACKING RAIL PUSH RAIL BACKING RAIL BACKING RAIL DOOR GUIDE 2. During the construction of the building s frame, ensure that headers or door bearers are placed to which the door track support brackets can be fitted. 3. For doors fitted to the eave side of the building this header may take the form of an additional eave purlin. 4. Where doors are to be fitted to the gable end of your building a sliding door bearer beam should be fitted web side out and connected to the flange of the side wall support columns. 5. The Sliding Door bearer beam should be supported with hangers from the roof truss, which should be fitted whilst supporting the centre of the beam to ensure it is level and straight. The hangers should be fitted no more than 10ft apart.

6. Where the entire gable end is to be opened, Outriggers can be fitted. This can be formed by fixing two columns web to web. A brace is then fitted from no more than half way down the length of the outrigger columns and the other end embedded in the outrigger brace pier. This brace should be at approximately 45 degrees to the outrigger columns. All outrigger columns and braces should be embedded in the concrete piers, and have a bracket fitted to the end that prevents the members from sliding when under load once concrete has cured. ASSEMBLY OF S 7. Layout the lengths of perimeter door framing and backing rail supports ready for assembly as shown below.

8. Position the perimeter frame sections, check height and width, and fasten with one tek screw in each corner. Square by checking diagonals, and fix with a second tek screw. 9. Position top corner angle braces, then horizontal backing rail supports. Fix with one tek screw only each end. 10. Position vertical push rails. Fit carriage mounting blocks.

11. Finish TEK screwing frame together with 2 TEK screws per connection or joint, then drill 5/8 hole through top frame centered through carriage block for carriage pin 12. Fit door carriages and screw full length angle door guide to bottom of door frame. 13. Turn over and check for square again, and place a tek screw in each corner only. Fit cladding within the frame recess, tek screw to the frame and horizontal braces. LARGE DOORS MAY BE TOO HEAVY WHEN CLADDED AND WE WOULD RECOMMEND FITTING THE CLADDING AFTER THE S HAVE BEEN INSTALLED ON THE BUILDING. 14. As previously detailed, the sliding door header should have been fitted during the construction of the building. Cladding should be fitted to the wall (but not fastened to the header) prior to the fitting of sliding door track brackets. External gutters should normally be fitted after sliding door tracks and flashings are in place.

15. Single track systems will have a track carrying bracket welded to the track support brackets. Double track systems will have a track carrying brackets that are to be bolted on using dome headed bolts. Single Track Bracket Double Support Bracket Bolt on Bracket 16. Sliding door track support brackets are then loosely fitted under the cladding into the sliding door header prior to the gutter and flashing being attached to the building. Each bracket is fitted using bolts and should not be tightened until tracks have been positioned. 17. All brackets must be evenly spaced and generally at approximately 30 centre to centre, with the first and last support brackets located approximately 2 from each end. 18. The height of the brackets can be cross-checked by working up from the floor or concrete slab. To the length of the door frame opening add 3 for top and bottom ground clearance. The result of this equation will provide a measurement equal to the distance from the footing to the underside of the assembled sliding door support bracket. 19. After all support brackets have been placed in position slide the door tracks into the support brackets and confirm their location before tightening the track support bracket bolts. Where multiple lengths of track are to be connected, track joining brackets must be used. 20. ENSURE ALL BOLTS, BRACKETS AND CONNECTORS ARE TIGHT BEFORE PROGRESSING ANY FURTHER. DOUBLE CHECK THAT ALL STEPS IN ASSEMBLING THE S HAS BEEN FOLLOWED.

21. With help, stand doors upright and move into place, you may need two people to lift the doors (one each end) and another at the top of the doors to guide the rollers into the tracks. 22. Level and height of the door frame is adjusted using the adjuster nuts on the end of the carriage, leaving the guide at the bottom of the frame 3/8 clear of the footing. Once adjusted properly ensure the lock nut is tight against the adjuster nut. 23. Floor Guide Pads are fixed to the footing or concrete floor using 5/16 sleeve anchors. A chalk line should be used to mark the line of the door guides. Floor guides are spaced evenly and that spacing should not exceed 50% of the width of the door panels. Floor guides should extend to the extremes of the door travel ensuring that a block is located at both ends and the centre of the door when it is fully opened or closed. 24. Where a double track system has been supplied it is advisable to fit the rear door or doors first. The track bolt on brackets may also need minor adjustment to ensure the correct clearance between doors; the rear of the front doors must be clear of the front of the rear doors by no less than 9/16, and no greater than 1-3/8. 25. The over door weather flashing if used, may now be fitted over the door tracks. 26. Track stops are fitted to both ends of every track. This will stop the doors from rolling off the end of tracks.

The following illustrations indicate some typical bracket installation detail for single and double tracks. 27. Test doors by pushing all frames through the full extent of travel, and make any adjustments that may be required. The action of the door should be smooth and attention should be paid to any bumps that you notice. 28. Cladding may now be fitted to door panels if not done during the assembly of the door frames. Again working on the rear doors first will reduce the risk of damage. Cladding may need trimming. 29. Once the cladding of doors is complete, retest the action of all doors and make any final adjustments.