CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

Similar documents
CALL FOR ARTISTS REQUEST FOR QUALIFICATIONS

Public Art Accession, Selection Criteria and Gift Policy

PUBLIC ART PLAN FOR THE NEW PATIENT TOWER, ETOBICOKE GENERAL HOSPITAL CAMPUS 101 HUMBER COLLEGE BLVD. TORONTO ONTARIO

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

Art in Public Spaces Policy. City of Burlington

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Infrastructure Funding Panel

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

PUBLIC ART POLICY AND PROCEDURES FOR REZONED DEVELOPMENTS

City of Oshawa Public Art Policy

This Call for Qualifications does not require the preparation of a design proposal.

MUNICIPALITY OF SIOUX LOOKOUT. Policy Manual POLICY REVIEW DATE NO. OF PAGES REVISIONS ADMINISTERED BY. Economic Development Office

Public Report. Community Services. The purpose of this report is to present and obtain approval of the Public Art Policy.

PUBLIC ART PROGRAM Guidelines for Site Plan Projects

The Continuous Improvement Fund (CIF)

Public Art Network Best Practice Goals and Guidelines

Pismo Beach Public Art Program Outline

Radiocommunication Facility Review Protocol

Interoperable systems that are trusted and secure

Graffiti Management Strategy Update

City of Sparks. Fiscal Year 2008 Strategic Plan Progress Report

EXECUTIVE SUMMARY. St. Louis Region Emerging Transportation Technology Strategic Plan. June East-West Gateway Council of Governments ICF

CORPORATE COUNSEL SYMPOSIUM XXIV OCTOBER 22, 2013

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or

Office of Small and Medium Enterprises (OSME) Bureau des petites et moyennes entreprises (BPME)

Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017

ICAD Public Engagement Strategy

British Columbia s Environmental Assessment Process

Advancing Health and Prosperity. A Brief to the Advisory Panel on Healthcare Innovation

REQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer

CITY OF LOVELAND VISUAL ARTS COMMISSION ACQUISITION POLICY

CALL TO ARTISTS DC PUBLIC LIBRARY REQUEST FOR QUALIFICATIONS PUBLIC ART COMMISSION - VESTIBULE OF THE MLK LIBRARY

Toronto Reference Library Premium Rental Space Renovation Award of Tender

CALL TO ARTISTS DC PUBLIC LIBRARY REQUEST FOR QUALIFICATIONS PUBLIC ART COMMISSION - VESTIBULE OF THE MLK LIBRARY

A National Collaboration Initiative for the Canadian Aerospace Industry

Smart Cities. Wednesday, May 16, :30 a.m. - 12:00 p.m. (EDT) What is a smart city? Are we ready for it? What are the challenges?

UCL CULTURE. Artist Brief 1. Permanent commission for public access areas Destination artwork

Husky Energy - Development Plan Amendment Application. White Rose Extension Project. Public Review. Noia s Submission

TALENT AS CANADA S COMPARATIVE ADVANTAGE Digital Talent Strategy: Road to 2020 and Beyond Ottawa March 9 th Namir Anani President & CEO

Louisville-Southern Indiana Ohio River Bridges Project

The Edward V. Lofstrom Collection M/A

HALDIMAND COUNTY OBJECTIVE: RECOMMENDATIONS: EXECUTIVE SUMMARY: BACKGROUND:

Proposed Urban Art Park/Safe Graffiti Space at Donevan Recreation Complex

2016 Smart Cities Survey Summary Report of Survey Results

Canadian Technology Accreditation Criteria (CTAC) CIVIL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

PERCENT FOR ART PROGRAM IMPLEMENTATION PROCEDURES

TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

PUBLIC ART PROCUREMENT GUIDELINES

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

Applications should be ed to:

Water, Energy and Environment in the scope of the Circular Economy

GZ.:BMWF-8.105/5-II/1/2010

Executive Summary. Introduction:

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley

Applications should be ed to:

Radio Technology Overview. January 2011

Scotian Basin Exploration Drilling Project: Timeline

Why execution is everything in modern Australian infrastructure projects

Pan-Canadian Trust Framework Overview

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the

The Forestville/ Goodwood Tram Overpass Murals Project (Good Forest Murals) 1 PROJECT AIMS AND OBJECTIVES

MURAL GUIDELINES. Design and Review Criteria for Murals

Strategic Transport Technology Plan

Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE. Arts North West Creative Opportunities 2012

1. Approve activating the art installation at Pioneer Village Station upon implementation of the five mitigation principles noted below:

A STRATEGY TO IMPROVE CANADA S MINERAL EXPLORATION INVESTMENT CLIMATE

April 2015 newsletter. Efficient Energy Planning #3

Climate Change Innovation and Technology Framework 2017

United Nations Framework Convention on Climate Change UNFCCC EXPERT GROUP ON TECHNOLOGY TRANSFER FIVE YEARS OF WORK

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Digital Identity Innovation Canada s Opportunity to Lead the World. Digital ID and Authentication Council of Canada Pre-Budget Submission

OPEN CALL FOR NIGHT LIGHTS AS PART OF SINGAPORE NIGHT FESTIVAL 2016

Operational Objectives Outcomes Indicators

The Sherwin-Williams Company

The Canada Foundation for Innovation: assessing the impact of funded research infrastructure

IV/10. Measures for implementing the Convention on Biological Diversity

Memorandum. FROM: Toni J. Taber, CMC City Clerk TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: SEE BELOW DATE:

Current Initiatives Regarding Pedestrian Interaction with Equipment

Inclusively Creative

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

Guide to the Requirements for Public Information and Disclosure GD-99.3

Statement of Corporate Intent

The Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages

POLICIES AND PROCEDURES FOR PROCESSING ARTWORK PURCHASES

DESIGN OF ART TREATMENT FOR ARCHITECTURAL GLASS ELEMENTS AT DOWNTOWN BERKELEY BART PLAZA

Preliminary Findings for Innovation Case Study on Canadian Fuel Cell Technology

RESOLUTION NO xxx

MENA CONGRESS WRAP UP REPORT

Smart Cities. Smart Cities Indicator Survey Highlights

Customer Service, Operations and Security Committee. Action Item III-A. May 11, 2017

Government Policy Statement on Gas Governance

At its meeting on 18 May 2016, the Permanent Representatives Committee noted the unanimous agreement on the above conclusions.

Esri and Autodesk What s Next?

MSMEs' Competitiveness and Innovation in the Digital Age

The ESA SME Initiative

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

Sparking a New Economy. Canada s Advanced Manufacturing Supercluster

Mining Innovation: The Importance of Science Entreprise

Transcription:

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE Dennis Gratton Manager, Rail planning, Rail Implementation Office & Annie Hillis Public Art Coordinator, Rail Implementation Office November 7, 2013

OVERVIEW Project Overview Procurement Process RTG Roles Funding Public Art Initiative Observations

THE CHALLENGE

Network and Project 2008 Transportation Master Plan (TMP) 4

THE PROJECT

BENEFITS Train every 3:15 (potential to increase to every 1:45) Can meet City s projected ridership beyond 2031. 10 million litre diesel reduction per year Opportunity to reshape the downtown streetscape 3.2 billion in economic activity and 20,000 person years of employment during construction alone

PROJECT OVERVIEW (CONT D) 2008: Initiated the EA for the Downtown Ottawa Transit Tunnel (DOTT) project & Updated the City s Transportation Master Plan (TMP). 2011: Phase 1: RFQ and RFP processes initiated and completed for DBFM contract. 2010-2012: Preliminary design (30% completion). 2012: Council approval of RTG s proposal December 2012. 2013: Commercial Close and construction begins. 7

CONCURRENT COORDINATED CASH ALLOWANCE PROJECTS 8

COUNCIL APPROVALS REQUIRED Scope of Work Innovation Zone Recommended Plan Stations & Alignment Proponents & Contract 9

ADDITIONAL PROJECT APPROVALS Approval was obtained under both provincial and federal EA Acts NCC board approval required for land use, design, and transfer of federal lands EA processes entail comprehensive overview of environmental impacts Identification Assessment Mitigation 10

APPROVALS REQUIRED Provincial EA complete Approved Environmental Project Report (2010) amended by the City in 2012 to reflect design changes. Federal Approval Complete Approval Provided to the City July, 2012. 11

ASSESSMENT OF EFFECTS Urban environment, conversion of existing rapid transit system to new technology Assessment based on updated existing conditions material and 30% design drawings Supporting documents available for review 28 Valued Environmental Components (VEC) considered Approach involved: Identification of project components and activities Identify VECs in area Assess potential interaction between project activities and VEC Identification of mitigation measures 12

SCHEDULE 13

MOBILITY DURING CONSTRUCTION Primary Objectives Maintaining current levels of transit ridership during construction Maintaining transit user satisfaction during construction Effectively disseminate information during construction Encouraging sustainable travel use Use of widened Highway 417 14

MOBILITY DURING CONSTRUCTION Examples of Transportation Demand Management (TDM) measures: Reduce single occupancy vehicles Encourage car-pooling High occupancy vehicle lanes Pedestrian and cycling paths Efficient transit networks Flexible work arrangements Maintaining TDM initiatives after OLRT construction Build upon existing TDM programs like Presto Card, Ridematch, and Sustainable Transportation Week Transportation web-portal 15

UNDERSTANDING ROLES AND RESPONSIBILITIES RTG: Design, Build, Finance and Maintain this project according to the terms, conditions, legal, legislated and technical specifications outlined in the Project Agreement and Output Specifications (this includes commissioning, testing and 30 year maintenance); obtain all necessary permits and approvals. City of Ottawa (Rail Implementation Office): Acquire needed property, make payments to RTG, work with RTG in an effort to minimize the impact of construction and maintain the mobility of vehicular and pedestrian traffic during construction; obtain NCC approvals related to federal land requirements; City of Ottawa (OC Transpo): Collaborate with City staff and RTG to coordinate transit detours during construction, alter BRT stops as necessary to facilitate passenger flow around LRT stations, purchase and install fare payment terminals and public telephone system in stations; post construction operation of the system. 16

FUNDING $2.1B budget $600 million federal contribution $600 million provincial contribution Balance financed from: gas tax revenues development charges capital contributions from the transit levy

ALTERNATIVE PROCUREMENT MODEL (P3) The City retained Infrastructure Ontario (IO) who served as the City s commercial procurement lead. Able to leverage IO s experience with the Alternative Financing and Procurement (AFP) approach. The approach generates: opportunities to transfer risk; performance based specifications and a formal process to respond to contract variations. For more info: http://www.infrastructureontario.ca/doing- Business-With-Us/AFP-Business-Development/ 18

PROCUREMENT PROCESS DESIGN BUILD FINANCE MAINTAIN 19

PROCUREMENT METHOD The RFP closed in September 2012. 3 private sector pre-qualified consortiums bid on the contract and Council approved the winning bid in December 2012. Construction commenced in early 2013 and the system will be operational in 2018. The federal Environmental Screening Report was submitted in June 2012 and is approved 20

PROCUREMENT TIMELINES Item Timeline Council Directive to Implement January 2010 Preliminary Engineering Commencement September 2010 Procurement Model Selection May 2011 RFQ release June 2011 Shortlist Selection October 2011 RFP Release October 2011 Submissions Received September 2012 Submission Evaluation September December 2012 Council Approval of Winning Submission December 2012 Financial and Commercial Close February 2013

PROJECT COSTS Capital Cost Area Cost $M Property, Engineering, (City works) Project Management 275 Tunnel & Stations 681 Track work/ Systems/ M&S Facility 551 Civil Works 102 Vehicles 344 Financing & Transaction Costs 177 TOTAL 2,130 O&M Costs Cost Area Current (annual) Train and Infrastructure Maintenance 28 Operations - Driver Labour 4 Operations - Energy 3 TOTAL $35M

INCENTING PERFORMANCE The RFP was designed in sections to use financial incentives and disincentives to achieve desired outcomes: Operations matters Mobility matters Energy matters

ACHIEVING RISK TRANSFER Thorough geotechnical investigation of project s tunnel alignment Include supporting works to provide consortia with maximum control over schedule: Cash Allowance Projects Highway 417 Widening Provide flexibility to the consortia in the design process to allow them to leverage their expertise and innovation Secured a fixed price contract as per Council direction

THE WINNING TEAM 25

RTG TEAM STRUCTURE

RTG S EXPERIENCE A PROVEN TRACK RECORD Canada Line Barcelona Line Ankara Metro Seville Line Start/End: 2005-2009 Completion: On budget. Ahead of schedule. Start/End: 2003-2013 Progress: On budget. On schedule. Start/End: 1993-2003 Completion: On budget. On schedule. Start/End: 2003-2009 Completion: On budget. On schedule. 27

STATION CONCEPTS

STATION CONCEPT: PARLIAMENT/PARLEMENT INTERIOR ENTRY 29

STATION CONCEPT: UOTTAWA STATION 30

STATION CONCEPT: TUNNEY S STATION EXTERIOR ENTRANCE 31

STATION CONCEPT: TUNNEY S STATION BIRDS EYE VIEW - PLATFORM LEVEL 32

STATION CONCEPT: TREMBLAY STATION 33

STATION CONCEPT: MAINTENANCE & STORAGE FACILITY Construction of the MSF will begin in the spring of 2013 with expected completion by the summer of 2015 34

PUBLIC ART INITIATIVE

CREATING A PUBLIC ART PROGRAM World class systems all include prominent public art Value added, enhances user experience and comfort Cultural tourism and economic development Create meeting places Provides points of reference and wayfinding Deterrent to vandalism

PERCENT FOR ART POLICY & BUDGET Capital projects over $2 million allocate 1% of the capital budget for public art Integrates site-specific, permanent public art The allocation must cover costs of releasing calls, competitions, art commissions, administration costs, and ongoing maintenance

COMMUNITY/STAKEHOLDER INVOLVEMENT As part of the overall station design, public art will be part of public review at key junctures in the design process Stakeholder involvement for art selection and design review processes

AOO COMMUNITY/STAKEHOLDER INVOLVEMENT Pimisi Station, at Lebreton Flats, has an Algonquin theme AOO has been fully involved in the design and selection processes A separate Call for Algonquin Artists and Artisans was released, with extensive outreach and assistance by AOO Artists are selected by First Nations jury members and will engage in continued outreach and consultation

PUBLIC ART PROGRAM OBJECTIVES: Ensure artistic excellence vis a vis stakeholder and public interests Develop 3-phased approach to public art opportunities Maximize budget opportunities from architecture and landscape architecture Design broad, open, fair, transparent procurement process

PHASE 1: INTEGRATED ARTWORK Artists on Design Team Integration with architectural signature Multiple opportunities available

INTEGRATED ARTWORKS Integrated artworks are those projects that are inextricably linked to the architectural and/or landscape design of the station. Artists will work directly with the design teams to design, develop, produce and install integrated artworks. These projects include: Roofs and Windscreens Landscape Architecture Design Platform Walls Station Tunnels Escalator Chambers

PHASE 2: STATION-SPECIFIC NON-INTEGRATED OPPORTUNITIES Integration with architecture/landscape, community engagement and urban design Freestanding opportunities within and adjacent to stations

PHASE 3: ONGOING PROGRAMMING OPPORTUNITIES Station as Gallery Electronic Information Systems Smartphone Art Guides Interactive Artworks Print material

SCHEDULING/ARTIST PROCUREMENT: Retention of Artists on Station Design Teams will coincide with the design build process, optimizing system wide opportunities (2013) Open Calls to Artists will continue on into construction for stand-alone station-specific opportunities (until 2017) The scope of each Call will be determined by the context of each artistic approach

OBSERVATIONS ---- LESSONS LEARNED Federal and Provincial Governments are P3/AFP advocates and their funding policy is adapting to P3 payment models. P3 project design evolution is not yet well understood so communication with elected officials and stakeholders of these principles early on in the process is key. The results of the competitive process showed the value of being less prescriptive and resulted in very good submissions.

QUESTIONS http://confederationline.ca/