6m x 12m CREST INSTRUCTIONS

Similar documents
MARQUEE INSTALLATION HANDBOOK. Curved Structures

50 W ide. Future Trac G able E nd. Installation Instructions AIGE

SHELTER ASSEMBLY MANUAL MODEL # 1326P. L8.0xW4.0xH3.8m

SHELTER ASSEMBLY MANUAL Model # 3085GL-17P

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

CARPORT/SHELTER MODEL: JIT L12.0xW6.2xH4.0M Installation Manual

Construction Instructions for Continental and Quickfit Clearspan Frame Marquees

flex Installation multiflex

Tensile Traditional Marque Installation Manual

Manual for Shelter W3,5xL8,0xH3,8m

Double Truss Shelter Model# SST W9.14xL14.2xH4.88m Assembly Instructions

CARPORT/SHELTER JIT-1333HZ. L10.0xW4.0xH4.5M Installation Manual MODEL:

Installation Manual. for. Kroftman Storage Tent T520

Installation Manual. T1220 Storage Shelter. v

SHELTER ASSEMBLY MANUAL. Model #

Clopay Models 835/837 Sliding Door System Installation Guide

12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.

SHELTER ASSEMBLY MANUAL CONTAINER COVER

20 x 20 / 3.35M x 6M EVENT CANOPY Assembly Manual

SHELTER ASSEMBLY MANUAL MODEL: SIZE:24X12X6M

Standard 25 Wide Structure

Assembly Instructions

OWNER'S MANUAL. Parts list Check that all of the following items are present ENGLISH GERMAN FRENCH ITALIAN SPANISH. Before installation.

DUTCH GABLE FREESTANDING CARPORT

Assembly Instructions

Walk-in Greenhouse. Assembly instructions. 8x6. 8x8. 8x10. 8x12. Model GH1399A Model GH1400A. Model GH1402A Model GH1403A. Model GH1405A Model GH1406A

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)

ClearSpan Grab Bag Canopy

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO

Gable Greenhouse Instructions

11 x 20 ALL SEASON GARAGE / 3.35M x 6M Carport Assembly Manual

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

DASHLEY COLLECTION GAZEBO

EASY-IN POOL STEP SYSTEM NE132

GLOSSARY OF TERMS SECTION 8

INSTALLATION INSTRUCTIONS

Opslagtent/Lagerzelt/Storage tent/abri de stockage. Kroftman T825. (7,90 x 25 m)

REV: 1.2 TRAMPOLINE MANUAL

TRIMLINE CANOPY 10' x 20'

10' W x 8' H or 10' H Round Style Shelter Assembly Instructions

Sonoma Hardtop Gazebo 10 X 12. Owner s Manual

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

12x24x10 Run-In Shed #51451

LAWN AND GARDEN GREENHOUSE

ROUND TOP RV SHELTER

LAWN AND GARDEN GREENHOUSE

ClearSpan End Frame Kit 26' Wide x 12' High

10 x 20 / 3.35M x 6M Carport Assembly Manual

Page 1. Step 3: Unfold your DreamHouse into 2 panels. Shown Above. Step 1: Remove your DreamHouse from the pack.

The Festival Assembly Instructions

Greenhouse Assembly Instructions

Tradewinds Amplify Display System Instructions

Walk-in Greenhouse. Assembly instructions. 6x4. 6x6. 6x8. Model GH0490 Model GH0491 Model GH1040. Model GH0492 Model GH0493 Model GH1041

User Guide. 10ft (3.05m) Jumpking Classic Premium. Got a Problem building your trampoline? Call us on and we can help

6' x 8' x 6'6" Quad-Vent Greenhouse-in-a-Box Assembly Instructions

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

22'W x 13'H Peak Style Shelter Frame Assembly Instructions

8 x 10 GREENHOUSE. Visit our website at:

WeatherShield Daddy Long Legs Canopy

MONKEY BARS OVERHEAD RACK INSTALLATION

Pergola YJSG-108C Assembly Instructions

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Assembly Instructions 60x40x18 Domed Style Truss Building. ASSEMBLY INSTRUCTIONS DOMED STYLE 60x40x18

ASSEMBLY INSTRUCTIONS 10 X14 HIGGINS HARDTOP GAZEBO ITEM# L-GZ212PST-4

ClearSpan End Frame Kit 30' Wide x 11' High

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

S H E D A S S E M B L Y I N S T R U C T I O N S

8 Ft Wide Enclosure Assembly Guide

GIRTS ON BACK OF BUILDING

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Mount to the Wall INSTALLATION MANUAL

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

WARNING. Not suitable for children under 36 months Contents

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height

English/French 06/04

ClearSpan Mini Grab Bag Shelters

W6 series greenhouse

Assembly Instructions 30x40x15 Round Style Portable Building With Single Door. ASSEMBLY INSTRUCTIONS ROUND STYLE 30x40x15 WITH SINGLE DOOR

Gardman Lean-to Greenhouse Assembly Instructions

Piazzola Pergola Awning Manufacturing and installation guide

POP PLUS / SPIDER SET-UP INSTRUCTIONS

WEIGHT ADJUSTABLE ESPREE. Model 2ESP-WA-C48- Model 2ESP-WA-C60- 2ESP-WA Rev B 8/17 ASSEMBLY AND OPERATION


ASSEMBLY INSTRUCTIONS

User Guide. 12ft (3.66m) Jumpking Classic Premium. Got a Problem building your trampoline? Call us on and we can help

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

Assembly Instructions 30x65x15 Industrial Round Style Building

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m

WeatherShield Covered Walkway and Connect-A-Building

12'W x 20'L x 10'H Run-in-Shed Assembly Instructions

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

TROLLA LEAVY 97 CM Lawn sweeper

Lakeside Gazebo. Assembly Instructions. Product No

Transcription:

WARNING READ INSTRUCTIONS CAREFULLY BEFORE USE Recommended procedure below. For safety reasons it is recommended that four persons set up any marquee. Ensure area is free from any sharp objects & overhead objects. This is a feature image and not specific to the order.

Instruction of Installation 6m Span Tent Page 2

No. Item No. Item A001 Girder Roof Beam A013B Inner Connector of Fabric Controlling Bar B A002 Left & Right Pole A014 Round Bottom Fabric Wall Controlling Bar Bar of Sidewall A003 Tie-in A015 Round Bottom Fabric Wall Controlling Bar Bar of Gable Sidewall A004 Square Tube A016 Groundwork Foot Plate of Left and Right Pole A005 Side Purline A017 Groundwork Foot Plate of Gable Pole A006 Side Purline of Gable A018 Screw of Fabric Controlling Bar A007 Pole of Gable A019 Cable Wire Wire Cable A008 Cross Strut Base B001 Roof Covering A011 Fabric Tension Controlling Bar Bar of Roof Covering B002 Gable Fabric A012 Fabric Tension Controlling Bar Bar of Gable B004 Sidewall on Two Length Sides A013A Inner Connector of Fabric Controlling Bar A B005 Sidewall on Two Width Sides Page 3

Page 4

Page 5

Distribution Diagram of Groundwork Distance is from middle to middle As shown in the figure, find the position of each footplate. Since the footplate of the marquee is fixed to the pole, you don t need to fix the footplate to the ground at the beginning. When the tent installation is finished, use the steel pins or expansion bolt or loading plate to fix the marquee. Page 6

2. Fix tent partl The space betw Fixing on the ground 1. Fasten all footplates to the ground with expansion bolts. 1. Fasten all gr expansion bolts 2. The distance between foot plates is per drawing Distribution Diagram of Groundwork Page 7

For Cable Wire Page 8

Page 9

Page 10

Page 11

Page 12

Assembly Drawing of Structure Assembly Drawing of Structure Drawing 1 Drawing 2 Drawing 3 1. Once the all frame sections have been assembled. Assembly Drawing Lift of Frame Structure 1 up into the upright position. 1.List Piece 1 up after all parts of it 2.Lift Frame 2 up while keep first section upright. has been connected to each other. (for safety reasons three to four installers required to 2.List Piece 2 up while keep piece support the sections whilst being installed, ropes are upright. (Support the poles by three included for bracing) ( See Drawing 1) or four installers) (Drawing 1) 3.Connect Piece 2 3.Connect to Piece 1 by Frame cross 2 to frame 1 by installing the cross struts and fasten them braces, to the fasten right part the cross braces on to the uprights of Piece 1 and Piece using 2. the fastening points. ( See Drawing 3) 4.Fix side purline. Fasten square tubes to girders of Piece 4. 1 Attach and Piece side 2. purlins to Frame 1 and then attach (Drawing 2) Frame 2. Fasten square tubes to girders of Frame 1 5.Lift Piece 3, then and connect Frame it to 2. the (Drawing 2) unit of Piece 1 and Piece 2 by side purlines and square 5. tubes. Lift remaining List the frame sections and repeat assembly rest Pieces up and process. fix them one by one in the same way. 6.Fasten the rest four 6. Fasten struts when the remaining l braces when frame is ast piece is set up. assembled. 7.Fix wire cable in the first room and 7. Fix wire cable between Frame 1 and 2 on roof last one. (Drawing 3) beams in a cross section. (Drawing 3) For more detail refer to the following pages. Step Page 413

Page 14

Page 15

Assembly Drawing of Fabric Roof Covering Fabric Unpack the Roof-Cover and put it onto a ground to avoid Roof it getting Covering dirty or Fabric damaged; 1.Put roof covering near each two poles one by one. 2.Put one piece of fabric pulling pole to roof covering fabric (one of the width side), in where there is a fabric channel. Tie a hemp rope to each end of the fabric pulling pole, then throw the ropes to the contrary side of tent. 3.Put the length side of roof covering fabric to the channels in girders, then pull the rope which has been threw to the contrary side toward the direction which is pointed out by arrowheads Throw 2 pieces of Setup-Ropes over the one bay of the frame; oof Covering Fabric.Put Tie roof one end covering of one rope near onto each the D two ring at poles the corner one of by one. the roof cover. Repeat on other roof fabric..put one piece of fabric pulling pole to roof covering fabric Lift Roof-Cover up to the eaves and feed Keder ne of the width side), in where there is a fabric channel. Tie track rope into the grooves of the Roof-Beams hemp rope to each end of the fabric pulling pole, then throw Slowly slide Roof-Cover into the bay by pulling on the e ropes other shows end to of the each in contrary drawing. rope. Care is side required of to tent. ensure that the.put ropes the 4.Put are length pulled the 5m uniformly side fabric of and roof controlling together; covering bar when fabric fabric to reaches the channels the in contrary side. irders, Pull until then Roof-Cover reaches the opposite eaves; 5.Finish pull the the rest rope pieces which of roof has covering been fabric threw one to by the one contrary in taking care not to drag the sheet on the ground. de toward the way the shows direction above. which is pointed out by arrowheads ows Repeat in drawing. the procedure until all Roof-covers have been pulled on..put the 5m fabric controlling bar when fabric reaches the ontrary 6m side. x 12m CREST INSTRUCTIONS Page 16.Finish the rest pieces of roof covering fabric one by one in e way shows above. CAUTION: Roof-Cover has to be completely inserted into the groove of the Roof-Beam. Gable Fabric Divide the Gable cover in to two pieces; Pulling each triangle up the Keder grooves. Connect the two triangles together with the chords. Gable Fabric 1..One installer on the ro 2..Put the side of the gab the relative channels one Gable Fabri 1..One insta 2..Put the si the relative (Start from 3.. Zip up th Step (Start from the wider sid 3.. Zip up the slide faste

Assembly Drawing of Fabric Side Fabric Wall Fabric 1.Select gable sidewall fabric apart from the rest sidewall fabric,whose width is about 5m. the side walls. Put wall to the side. 2.Put the sides of sidewall fabric in the channels in poles. (The side with plastic 2. To buckles attach the should walls to the be frame in the top side) 3.Put fabric buckles to relative side purline. 4.Zip up the slide fastener round tracking. the center of each piece of sidewall fabric. 1.Select walls for the Front and Rear, width could be different to 2.1) Select the inside and outside of wall. Top of the wall has the 2.3) Working from top of the frame to the ground. Insert the side wall into the upright post tracking. Page 17

Side Triangle Roof Cover Side Triangle Tensioning the Roof Covers & Triangle Covers Once all Roof-Covers and Gable Ends attached, simply slide in the Tension-Bars into the pocket of the Roof-Cover and Gable-Triangle cover. Then, fix the connection of the Tension-Bar by tensioning the rigging screws as below drawing. Page 18

Assembly Drawing of Fabric Controlling Round Bar As show in Drawing 1, infix Assembly Drawing of Fabric the Bottom Fabric Controlling Round of Wall Bar Bar to the hole, after all completed; use screw to fasten Sliding the steel bars into the bottom the wall panels and then fix to it uprights. as show in Drawing 2. As per the below illustrations 1 and 2. Step 8 Page 19

Caution 1. Don t put heavy items on the components when they are being transported. 2. The PVC should be cleaned with neutral detergent other than any acidic or alcohol solutions. Only pack the pvc when it is dried thoroughly 3. Keep the storage house clean and dry, and check the goods regularly when the tent has not been used for a long time. 4. Choose the appropriate method of ground fixings according to the type of surface. A. Concrete ground(the thickness of concrete layer should be not be less than 17cm),expansion bolt M16x100 is suggested. 5. Wind rating as per engineering certificate, please review for weather conditions. 6. If in snowy areas please remove snow when more then 10cm thick. 7. Do not attach roof and wall fabric until frame is assembled and secured. 8. When the marquee is in use, do not leave your marquee unattended. 9. When the Marquee is use and if part of the structure looks damaged or not fit for purpose the marquee should be dismantled at once for safety reasons. B. Grass or Sand, Steel Pins are suggested. C. DO NOT USE Expansion bolts and steel nails on grass or sand surfaces. Foot Weight plates are suggested and the correct use of weight as per Engineering Certificates. Page 20

1 4 2 5 Assembly of Door 3 1. Put the top end of the door pole into the channel of side purlin. See picture 1. 2. Fix the door frame to the first door pole which was just fitted, then fasten the screw. 3. Put the fabric of the door to the right place according to picture 3. 4. Fix the second door pole according to what shows on picture 4. 5. Fix left sidewall of door. The door can be fixed to tent before or after the sidewall of tent has been fixed. NOTE: The drawing is for reference only, the actual item is the standard. Page 21

Assembly of Roof Lining 1. Spread out the lining. Install the snap clips in the middle of the lining fabric. See Drawing A. One person on a ladder/ scaffolding or cherry picker. Put snap clips into channel of the square tube on the highest part of the roof. Keep the space between each snap clip evenly spaced. 2. Install the snap clips on each end of the lining and put the snap clips into the channel of side purlin. See drawing C. Do the same of the girder side. Page 22

Assembly of Gable Lining Spread the gable lining, then put the snap clips of side lining into the channel girder. See drawing D. Page 23

Assembly of Side Lining Spread the side lining, then put the snap clips of the side lining into channel on the other side of purlin. See drawing E. Page 24