Western Region enavigation Sub- Committee Report

Similar documents
Government Agency Perspectives & Initiatives Canadian Coast Guard Laurent Tardif, Director, Safe Shipping

GUIDANCE FOR THE PRESENTATION AND DISPLAY OF AIS APPLICATION-SPECIFIC MESSAGES INFORMATION

Recent developments in Portable Pilot Units and e-navigation Mariners Workshop 2016, Montreal

Recent Developments in NOAA s Real- Time Coastal Observing Systems for Safe and Efficient Maritime Transportation

RADIO AIDS TO MARINE NAVIGATION (Pacific and Western Arctic) CANADIAN COAST GUARD. Marine Communications and Traffic Services. Annual Edition 2007

United States Coast Guard Office of Navigation Systems

BookletChart. Intracoastal Waterway Grassy Key to Bahia Honda Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters

FOREWORD. IHO S-100 Working Group

Paper for Consideration by S-100WG3. Report on S-100 Sea trial of KHOA

2. CHARTS. 2.1 Chart projections Mercator projections. Maps which are used for marine or aeronautical navigation are called charts.

BookletChart. Chesapeake Bay Pocomoke and Tangier Sounds NOAA Chart A reduced-scale NOAA nautical chart for small boaters

BookletChart. Sacramento River Andrus Island to Sacramento NOAA Chart A reduced-scale NOAA nautical chart for small boaters

IMO ACTIVITIES AFFECTING HSSC

Real-Time Monitoring of Currents and Water Level at Second Narrows to Improve Port Efficiency in Vancouver Harbour

INGESTION OF JALBTCX ALB DATASET INTO NOAA'S CHART PRODUCTION

How Automatic Identification System (AIS) Is Being Used to Improve Navigation Safety Lock Operations Management Application Michael Winkler

Notice to Mariner No. 213

e-navigation Progress and trends: the IHO perspective

there is a description of the vessel, you will substitute the prop description of your boat. VHF Booklet

THE ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) IN CHINA

PROGRESS UPDATE AND FUTURE DIRECTIONS OF THE MARINE ELECTRONIC HIGHWAY (MEH)

BookletChart. Port-au-Prince (Haiti) NGA Chart A reduced-scale NGA nautical chart for small boaters

Hugh D. Halkett Fonds

BookletChart. Sacramento River Sacramento to Fourmile Bend NOAA Chart A reduced-scale NOAA nautical chart for small boaters

MARITIME SAFETY INFORMATION

GUIDELINES ON THE DESIGN AND USE OF PORTABLE PILOT UNITS INTERNATIONAL MARITIME PILOTS ASSOCIATION

AIS Binary Messages RIP The move to Social Media

BookletChart. Approaches to Cap-Haitien and Bahia de Monti Cristi NGA Chart A reduced-scale NGA nautical chart for small boaters

A guideline for establishing feature and symbol standard management system for national HOs

IALA S WORK IN E-NAVIGATION. Michael Card

PRODUCTS AND SERVICES FOR THE MARITIME COMMUNITY. Ed Martin, Chief Customer Affairs Branch Navigation Services Division Monday, 27 October, 2008

Paper for Consideration by DIPWG

ECDIS ENC Accuracy. Contents. Introduction LOSS PREVENTION BRIEFING FOR NORTH MEMBER SHIPS / MAY Introduction... 1

Marine Weather Program

RESOLUTION MSC.230(82) (adopted on 5 December 2006) ADOPTION OF AMENDMENTS TO THE EXISTING MANDATORY SHIP REPORTING SYSTEM "IN THE STOREBÆLT (GREAT

Rutter High Resolution Radar Solutions

Passages Between Acklins Island, Haiti and Caicos Islands NGA Chart A reduced-scale NGA nautical chart for small boaters

Baie de L Acul and Approaches (Haiti) NGA Chart A reduced-scale NGA nautical chart for small boaters

WWNWS9/3/2/XVII_XVIII Meeting 9 21 July 2017 Agenda Item 3.2. MSI Self Assessment NAVAREA XVII_XVIII. Submitted by Canada (Canadian Coast Guard)

BookletChart. Cap-Haitien NGA Chart A reduced-scale NGA nautical chart for small boaters

A Report On Tide Gauges In Singapore. 1 The Republic of Singapore is an island city-state situated at the southern tip of

Tide & Meteorological Data over AIS

COMMUNICATIONS FOR MARITIME SAFETY AND EFFICIENCY. Francis Zachariae, Secretary-General, IALA

Maritime Geo-Fence Letter Report

The Future for the AIS AtoN. Michael Card Zeni Lite Buoy Co., Ltd., Japan

E-NAVIGATION AND BEYOND

Roberts Bank Terminal 2 Project Field Studies Information Sheet

EGYPTIAN HYDROGRAPHIC DEPARTMENT THE EGYPTIAN HYDROGRAPHIC FRAMEWORK

World-Wide Navigational Warning Service Sub-Committee WWNWS-5 Monaco, 1-4 October S-100 Basics Background Brief

Object Detection for Underwater Port Security

Improvement of GPS Ambiguity Resolution Using Height Constraint for Bathymetric Surveys

LT Matthew Forney, NOAA Navigation Manager Alaska Region Bering Strait MaritimeSymposium. Office of Coast Survey

Dissemination of enhanced Marine Safety Information (emsi) via AIS: Requirements for an AIS transmit service

STANDING NOTICE TO MARINERS

02 Issue. e-navigation News. GNSS Vulnerability. Dublin Bay Digital Diamond. e-navigation. Demonstrator Update International. e-navigation.

MARINE ELECTRONIC HIGHWAY IN STRAITS OF MALACCA AND SINGAPORE. Development of Supporting Element for Future & Sustainable Operation

DEVELOPMENT OF A DEFINITION FOR MSPS AND CONSIDERATION FOR THE HARMONIZATION OF THE FORMAT AND STRUCTURE OF MSPS

Functional Requirements Study

MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS

IENC production at the Flemish Hydrography. HYDRO12, 15 th November 2012 Jasmine Dumollin

The human touch in technology. ECDIS ECS Conning screen Ship speed info system

IHO Colours & Symbols Maintenance Working Group (C&SMWG) 15th Meeting, BSH, Rostock, Germany, 2-4 May 2005

The Role of Automatic Identification System (AIS) in Enhancing Vessel Traffic Management By Capt. Ehab Ibrahim Etman

Port Security and Technology - the U.S. Perspective. Michael S. Bruno Stevens Institute of Technology March 14, 2012

Re: Roberts Bank Terminal 2 Project - consultation approach for marine shipping within the federal environmental assessment process

L AGENCE NATIONALE DES FREQUENCES (ANFR) From Titanic to satellite from Morse to digital Entry in a new era for the maritime community

Kordil Surveying & Engineering Services

Expanded use of Automatic Identification System (AIS) navigation technology in Vessel Traffic Services (VTS) B. J. Tetreault 1

Results of the AIS AtoN International Survey Conducted by the Canadian Coast Guard November 2016

AAPSilver System Performance Validation

VHF Data Exchange System (VDES)

Trans Mountain Pipeline (ULC) Trans Mountain Expansion Project Volume 8A Marine Transportation Page 8A 51

Questionnaire about the Depiction of the Quality of the Data in Nautical Charts

Consolidation of Navigation Safety Regulations IMO - NCSR / MSC Updates

RADIO AIDS TO MARINE NAVIGATION (Atlantic, St. Lawrence, Great Lakes, Lake Winnipeg and Eastern Arctic) CANADIAN COAST GUARD

Towards a Canadian Integrated Ocean Observing System

Using a Pilot Laptop with the AIS pilot plug - observed errors and difficulties

There are not any on site emergency medical facilities in Holberg.

S-100 Overlays: A Brave New World?

High precision hydrography The St. Lawrence River channel HD Bathymetry, Production, Distribution and Updating

RESOLUTION MSC.229(82) (adopted on 5 December 2006) ADOPTION OF A NEW MANDATORY SHIP REPORTING SYSTEM "IN THE GALAPAGOS PARTICULARLY SENSITIVE SEA

Nordic Hydrographic Commission 60th Conference - Stavanger - Norway April New national ENC service for leisure craft users

Procedure VHF Communication VTS and HCC Port of Rotterdam Authority Harbour Master's Division

Display of e-navigation information

11 th CHRIS MEETING IHB, Monaco, November Draft - - -

Thomas F. Bayard Collection

Joining New Zealand Land and Sea Vertical Datums (JLAS) Graeme Blick Group Manager Positioning and Resilience

Myanmar Naval Hydrographic Centre. National Report for 13 th North Indian Ocean Hydrographic Commission Meeting

Roberts Bank Terminal 2 Project Field Studies Information Sheet

Digital broadcasting systems under development within ITU-R of interest for the maritime community

NOTICES TO MARINERS PUBLICATION WESTERN EDITION

COOK INLET NAVIGATION CHANNEL

Canadian Coast Guard Review to Implement a Resilient Position, Navigation and Timing Solution for Canada. Mariners Workshop January 31 st, 2018

Korea s Strategy for e-navigation. SMART-Navigation. Presented by. Bu Young, Kim. 28 May Ministry of Oceans and Fisheries Republic of Korea

Roberts Bank Terminal 2 Project Field Studies Information Sheet

e-navigation Underway International February 2016 Kilyong Kim(GMT Co., Ltd.) Co-author : Seojeong Lee(Korea Maritime and Ocean University)

A Study on Developing Image Processing for Smart Traffic Supporting System Based on AR

GNSS (GPS) buoy array in the Pacific for natural disaster mitigation. Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan

Updated Project Information Document (PID) Report No: AB93. EAST ASIA AND PACIFIC - 4E-Marine Electronic Highway Region.

(P.27)

Transcription:

Western Region enavigation Sub- Committee Report

Western Region enavigation meeting - Jan 12 18 BC Ferries BC Coast Pilots BCIT Marine Campus Canadian Coast Guard Canadian Hydrographic Services Canadian Marine Pilots Fraser River Pilots Pacific Pilotage Authority Port of Vancouver Port of Prince Rupert Shipping Federation of Canada

enavigation Conference, Seattle, Dec 6-7, 2017 - Regulations, Standards, and Policies for e-navigation, Automation, and Cybersecurity - Automation in the Operational Environment - Cybersecurity and e-navigation, Applied - The Impact of Automation on Bridge Resource Management - Dynamic Underwater Keel Clearance Project Update - Technical Developments in Automation, Navigation and Cybersecurity - Advances in Data Collection and Dissemination

Canadian Coast Guard Update - AIS Met/Hydro message - test locations - standardized display - survey regarding AIS display on ECDIS and PPUs - potential for transmitting air draft information - AIS AtoN - testing reference points at Trail Island (near Victoria, BC) - Port Collaborative Decision Making (CDM)

Canadian Hydrographic Services Update - Additional hydrographic surveys using OPP funding - Berthing scale ENCs - Bathymetric Overlays - Dynamic Products, including o obtaining SMART buoy data to support navigation, o phase in of dynamic tide & current e- navigation at Kitimat, Vancouver, and Fraser River. o Develop S-100 e-nav services: bathymetry, tides, and currents. o Develop dynamic web portal and web services to distribute e-navigational information o Provide data to support e-navigation requirements

Vancouver Fraser Port Authority o Water Level Stations (9) o Tidal Current Stations 2 nd Narrows, future First Narrows o Port ehub real time data including future air draft calculator for CN s Second Narrows Rail Bridge o Met/Hydro Stations in collaboration with CHS o Hydrographic Surveys

Vancouver Fraser Port Authority (con t) 1. First Narrows Traffic Control Zone (TCZ-1): o Replace two existing Lions Gate Bridge sector lights with new channel centre-line sector light o Air gap sensors on Lions Gate Bridge o Current profiler (HDCP) installation on Lions Gate Bridge south pillar o TCZ boundary marker buoys (2) o Chart updates (i.e. TCZ boundaries, fishing area, oneway channel versus sectors, LGB vertical clearance)

Vancouver Fraser Port Authority (con t) 2. 2 nd Narrows o Eastbound / Westbound sector lights at Berry Point o Visibility and fog sensor o TCZ boundary marker buoy (1) o Chart updates (i.e. TCZ boundaries) 3. Vancouver Harbour Chart Updates: o Seaplane landing area (area alpha) / orange buoy o Coal Harbour / VCC West / Canada Place Anchorage boundaries

Vancouver Fraser Port Authority (con t) 4. Other items: o Quality assurance/maintenance of various gauges and AtoN s o Chart updates in VFPA jurisdiction o Anchorage O

Port of Prince Rupert o Assets from former projects including Acoustic Doppler Current Profiler (ADCP) Watchmate ODAS Buoy Two x TRIAXYS Directional Wave Buoys o Ridley Island/RoRo Ramp sensor (tide, current, weather) station o Repairing sensors at Fairview container terminal

Pilots Canadian Marine Pilots Change in Western representative Change in national Technical Committee Chair National coordination and engagement with CCG/CHS/EC BC Coast Pilots o Working with CCG to test AIS network o Testing new PPU software and tablets o Working with CHS on berthing scale charts o Working with ports to obtain real time information

Pilots (con t) Fraser River Pilots o Testing AIS ATON network, and alternative PPU software o Implementing real time tide and weather AIS support to assist as ship size increases in the limited navigation channel o Working with CCG to standardize our MIO (Marine Information Overlay)

BC Ferries o Challenges with seeing AIS ASM on bridge equipment o Almost completed bridge updates to standardize the fleet o Identified 2 highest risk areas in organization - ship-to-shore interface and navigating o Current priority is navigation to ensure good navigation processes and good practice.

Oceans Network Canada o Surface current and multi level current for Casey Point (Prince Rupert) and Inside Passage (4 areas) o Acoustic monitoring for real time cetacean detection

Questions?