Accelerated Bridge Construction (ABC) and the Utah Experience

Similar documents
James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition

California Department of Transportation

ABC and Innovative Bridge Construction for Minnesota Local Roads

Deep Creek Canyon US Highway 12

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

Value Engineering Design Build MODULAR INFRASTRUCTURE

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations

PCI Update on Transportation Activities and elearning Modules for AASHTO Technical Committee T-4 AASHTO SCOBS --- Spokane Washington

BRIDGE TYPE CONCEPT EVALUATION

Precast Concrete Pavement

Programmatic Implementation of ABC: Module 6 Project Highlights Contractor Perspective

THE TRANSPORTATION ISSUE

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

In Denver, a recently completed flyover

INDEX. Initial SOL Approval. 1. Evergreen Retaining Wall System (Deleted) 3. Sound Barrier Walls (Deleted) Standard Details

Segmental Bridge Construction. Segmental Bridges It s a Construction Technique with Design Implications. Plans Review Group

OpenBridge Modeler: What is it and how can I use it today?

Dauphin Island Bridge

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute

Quality Control and Quality Assurance Guide

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Phase 2 Silver Line Update

Use of Self-Propelled Modular Transporters (SPMTs) to Remove & Install Bridges

Jointed Precast Concrete Pavement

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

Cooke Precast Concrete

adopted in Hong Kong

Minutes. 4. Informational: Opportunities & Status for Economic Stimulus; Current Situation for each DOT

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Maintenance of Traffic sequence of operations including any phasing and detour maps;

TABLE OF CONTENTS 1200 PLAN PREPARATION

RAPID CONSTRUCTION-INOVATIVE APPROCH OF PREFABRICATED CONSTRUCTION

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

Legolizing infrastructure

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

The $13.2 billion Central Artery/Tunnel Project (CA/

CONVEYANCE PIPELINE AND PUMP STATION

HIGH TENSION CABLE BARRIER (HTCB)

AASHTO TIG Promoting the use of Precast Concrete Pavement Systems. Highways for Life PCPS Showcase NJDOT, Mt. Arlington NJ Timothy J.

OpenBridge Designer Interoperability

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

THE PROMOTION AND DEVELOPMENT OF CONSTRUCTION AUTOMATION TECHNOLOGY IN TAIWAN

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA

Double Storey HC Precast System Drawing - 3D

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Unit 8 Precast Concrete

SECTION G ESTIMATE OF QUANTITIES

FDOT PRECAST BENT CAP DEVELOPMENT AND IMPLEMENTATION

Welcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR

How to Estimate the Cost of a. Precast Concrete Parking Structure

A. Extent of structural precast concrete work is shown on drawings and in schedules.

MANuFACturers industry QuALity statement.

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

Cooke Precast Concrete

SUBSTATION SECURITY WALL INSTALLATION MANUAL

WEB-BASED QUALITY CONTROL OF PRECAST CONCRETE

Bridge Design and Drafting Manual Oregon Department of Transportation

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

Union Station Tunnel Overall DBE Goal Calculation

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

1.1 RELATED DOCUMENTS

Cooke Precast Concrete

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

LETTING : CALL : 029 COUNTIES : GOODHUE

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services

ABC-UTC Progress Report

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

Nasri Group Hollowcore factory

SUPPLEMENT 1127 PAY FACTORS DETERMINATION FOR PAVEMENT AND STRUCTURE CONCRETE

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Working Drawing Manual

AASHTO/NSBA Steel Bridge Collaboration G Design Drawing Presentation Guidelines. AASHTO/NSBA Steel Bridge Collaboration

THE ONTARIO CONCRETE PIPE ASSOCIATION

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

Pacific West LLC! " Working Journal CMT Practicum

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Amajor transportation infrastructure undertaking, billed

Stellenbosch University South Africa CONSTRUCTION ENGINEERING & MANAGEMENT CHAIR. Jan Wium

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

Cooke Precast Concrete

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Structural Design And Drawing Reinforced Concrete And

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

Connected Vehicles and Maintenance Operations

Proven precast solutions for every application

2. The AB symbol shall be placed beside each As-Built correction on the sheets.

Projector Test Screen. Slides Ready

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

Transcription:

Accelerated Bridge Construction (ABC) and the Utah Experience by Kris Peterson, P.E., UDOT Mary Lou Ralls, P.E., Ralls Newman, LLC AASHTO Subcommittee on Construction Annual Meeting Computers and Technology Section August 6, 2008

What is Accelerated Bridge Construction (ABC)? Building the bridge more quickly than your conventional practice, while maintaining quality What ABC means to you depends on where you are now ABC spans the entire process, from planning through construction

Examples of ABC - Planning Early owner meetings with contractors & suppliers to innovate Right-of-way acquisition & utility relocations before advertising project Early environmental clearance & permitting Innovative contracting strategies in contract documents (e.g., A+B bidding, lane rental, incentive/disincentive clauses)

Examples of ABC Planning, cont d. Electronic shop drawing submittal & approval process Procurement of materials before advertising project (e.g., prestressed concrete girders, structural steel girders)

Examples of ABC - Design Prefabrication of bridge components or entire bridge Geotechnical engineering enhancements (e.g., mechanically-stabilized earth walls instead of conventional cantilever retaining walls; reinforced or lightweight backfills)

Examples of ABC - Construction Allowing contractor options to innovate Use of innovative equipment (e.g., selfpropelled modular transporters SPMTs to move entire bridge; launching, pivoting, or skidding equipment) Concurrent onsite engineering operations (e.g., building abutments & interior supports simultaneously)

Accelerated Bridge Construction Replacement or new construction Uses innovative design & construction methods & high performance materials Reduces typical construction time Maintains or enhances quality Reduces traffic disruption Increases work-zone safety Produces cost-effective, long-lasting bridges with early openings

Prefabricated Bridges One ABC method Bridge elements or systems, or entire bridges, built at offsite locations Controlled offsite environment assures quality construction Transported to site & quickly installed, e.g., Girders & partial-depth deck panels Full-depth precast deck panels Superstructure systems Substructure systems Entire bridges of prefabricated elements

Benefits of ABC Minimized traffic disruption from months to days Improved work-zone safety improved worker safety & motorist safety Improved product quality controlled environment, cure times, easier access, etc.

The Utah Experience Making ABC Standard Practice

What does ABC as Standard Practice mean?

ABC as standard practice means considering ABC at the initial planning stage of each project Use FHWA Framework for Prefabricated Bridge Elements and Systems (PBES) Decision-Making http://www.fhwa.dot.gov/bridge/prefab or Develop your own decision-making tool Example: Utah DOT Decision Chart And having a business model in place to use ABC as appropriate

FHWA Decision- Making Framework 3 formats: Flowchart Matrix Questions (yes-no-maybe) Q&A Discussion

RAPID ONSITE CONSTRUCTION FACTORS Traffic Volume / Emergency / Commerce / User Delay???

OTHER FACTORS Worker Safety / Wetlands-Air Quality-Noise / Endangered Species / Multiple Similar Sections???

PBES CONSTRUCTION COSTS LESS???

FHWA Decision-Making Framework Decision-Making Matrix Example Questions Question Yes Maybe No High traffic volume? Emergency replacement?... Worker safety concerns?... High daily traffic control costs?...

FHWA Decision-Making Framework

Utah DOT Decision Chart

Utah s Transition to ABC as Standard Practice Developed decision-making chart Completed project-specific prefabricated ABC, e.g., Full-depth deck panels Precast bent caps Prefabricated superstructure installed with SPMTs Conducted domestic scanning tours Identified a program of ABC projects Requested demonstration project funding

Utah s Transition to ABC as Standard Practice, cont d. Involved nationally Developed first 2 sets of draft prefabricated ABC standards, specifications, design aids Full-depth precast deck panels Use of SPMTs to move superstructure spans Hosted workshop with national experts & local industry to receive recommendations First 2 draft products Transitioning to ABC as standard practice by 2010

Utah s Transition to ABC as Standard Practice, cont d. Revised first 2 sets of ABC standards Hosted local industry feedback meeting to further refine standards to meet local needs Updated standards & incorporated into upcoming projects Maintaining communication with industry Updating standards as needed

Utah s Transition to ABC as Standard Practice, cont d. Initiated development on 2 nd round of prefabricated ABC standards, including precast Pretensioned girders Parapets Bent caps Columns Footings Approach slabs

Utah s Transition to ABC as Standard Practice, cont d. Assessing & implementing strategies to enhance performance of ABC by accelerating other areas, e.g., Project delivery (shortening time from funded concept to final constructed project) Decision making during design & construction Construction of critical path non-bridge parts of projects Continuing to consider workshop recommendations on transitioning to ABC

UDOT s Family of Innovative ABC Elements and Methods Innovative Accelerated Bridge Construction Precast Concrete Elements Modular Construction Structure Placement Methods Accelerated Geotech Work Fast Track Contracting

UDOT ABC History UDOT has 17 projects completed or under construction that utilized ABC Self-Propelled Modular Transports: 4 (14) Partial-Depth Precast Deck Panels: 2 Full-Depth Precast Deck Panels: 8 In conjunction with precast abutments: 1 In conjunction with precast bent caps: 1 Precast Voided Slabs: 1 Segmental Bridges: 1 Heavy Lift Cranes: 1

I-15 Design-Build 17-mile Corridor Completed in 4.5 years for 2002 Winter Olympics included partial-depth deck panels

I-215 East over 3760 South Precast Deck on Steel Girders Superstructure Replacement

Parrish Lane Bridge over I-15 Widened with Precast Bent Caps & Full-Depth Precast Deck Panels

4500 South Bridge over I-215E Prefabricated Superstructure driven into position with SPMTs I-215 closed over a weekend 4500 South closed only 10 days

I-80 State Street to 1300 East Multiple Structures, Salt Lake City June-July 2008 SPMT Bridge Moves in Program of Projects: I-80W over Highland Drive I-80W over 900 East Street I-80W over 700 East Street I-80W over 600 East Street I-80W over 500 East Street I-80W over 300 East Street I-80W 600 East Ramp Bridge

I-80 State Street to 1300 East Bridge Farm

I-80 State Street to 1300 East I-80W over Highland Drive

Upcoming SPMT Bridge Moves I-80 Lambs Canyon/Mt. Dell: I-80W at Lambs Canyon and at Mt. Dell August 9-10 (approximate) I-80E at Lambs Canyon and at Mt. Dell August 16-17 (approximate) I-215 East 3300 South: 3300 South Bridge over I-215E August 22-25 (approximate)

Upcoming SPMT Bridge Moves For details, see UDOT s Innovate 80 link: http://www.udot.utah.gov/innovate80 For exact move dates, contact: Susan K. Parker UDOT Project Development Office Phone: (801) 965-4826 Email: skparker@utah.gov

Utah s Transition to ABC as Standard Practice, cont d. Evaluating costs

Utah Precast Deck Panel Projects

4500 South over I-215 SPMT Bridge Move Construction Year: Total Construction Cost: ABC Construction Cost: Facility User Cost Per Day: Estimated Days Saved: User Savings: Cost Benefit Ratio: October 2007 $7,700,000 $900,000* $35,500 120 $4,260,000 5 * Project cost does not take into account traffic control cost savings from traditional to ABC

Utah s Transition to ABC as Standard Practice, cont d. Communicating with the public Stakeholders' OVERALL Satisfaction With Project Results (1=not satisfied, 7=very satisfied) 1, 0.00% 2, 0.00% 3, 1.40% 4, 1.40% 5, 2.80% 6, 18.30% 1 2 3 7, 76.10% 4 5 6 7 4500 South Bridge over I-215E Installed in One Weekend

Lessons Learned & Best Practices Get commitment from internal leadership Become educated nationally & internationally; consider domestic scans Develop business model, including decision-making tool & program of work Seek funding for demonstration projects Implement standardization Use innovative contracting strategies Educate and communicate internally, with industry, & with the public

Accelerated Bridge Construction helps transportation agencies achieve their Mission To efficiently & effectively move people, goods & services

Accelerated Bridge Construction and the Utah Experience Thank You