-PILOT & Industry development -Decommissioning. Audrey Banner Head of Offshore Decommissioning Unit, DECC

Similar documents
Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

Offshore Decommissioning Conference Fairmont Hotel, St Andrews 8 th October 2014

Taking the Temperature of Scottish oil & gas industry Gerry Love

MER UK Forum Meeting 30 th August 2017

Delivering Competitive Wells

The petroleum industry, internationalisation, 11 and technology development. Industry development and internationalisation

CONNECTING CAPABILITY WITH OPPORTUNITY. Supply Chain Capacity and Capability

NCS Prospects Conference

Executive Summary and Table of Contents

Nigel Lees Regional Director Strategy and Growth Wood Group PSN

Re-use & Decommissioning in The Netherlands: A Joint Effort

Decommissioning. Offshore Europe Seminar

Driving down the costs of decommissioning through technology. Malcolm Banks & Susi Wiseman Offshore Decommissioning Conference, November 2017

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

NSRI Mastermining Wave & Tidal Workshop 16/05/18. Opening Address. David Rennie Head of Oil and Gas Scottish Enterprise.

Murchison and Beyond. John Allan Development and Decommissioning Projects Manager CNR International. Late Life and Decommissioning

Delivering the Well Cost Reduction challenge

OPRED. Wendy Kennedy EUOAG. Vision and Objectives

DECOMMISSIONING INSIGHT Contents

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016

Perenco UK Ltd. SNS Decommissioning

MER UK Forum Steering Group and Task Forces

Marine Scotland Science: Oil and gas survey work. Peter Hayes Offshore Energy Environmental Advice Group

UK EXPLORATION WHERE NEXT? OIL & GAS UK BREAKFAST 8 DECEMBER 2015

Decommissioning - The Cost Challenge

Click to edit Master title style

OFFSHORE OIL AND GAS DECOMMISSIONING POLICY

A Perspective on Digitalisation in the Oil and Gas Industry

Morgan Stanley Houston Energy Summit

DNB s oil and offshore conference. Idar Eikrem, CFO

For personal use only

Unlocking marginal fields UKCS opportunity

ENGINEERING SERVICES CONSULTANCY

A Rebirth in the North Sea or simply a False Dawn

While you wait. write down one question we ll collect them in a moment and address some of them later. Repsol Sinopec Resources UK

Greta Lydecker opened the meeting, welcomed everyone and thanked them for their attendance.

For personal use only

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets

Decommissioning of Offshore Production Systems Eduardo Hebert Zacaron Gomes

NSRI/ORE Subsea Technological Challenges in Offshore Wind

Gas Technology Review. Reach over 30,000 gas professionals worldwide

Esso offshore projects

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

These questions have exercised DECC and the industry and have come together into

Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher

Standalone Facilities Back to the future SeaCaptaur Unlocking small pools and extending old pools

Access to Infrastructure: A new approach for the North Sea

A A Well Engineer s s Perspective

Taking a broader view

THE FISHSAFE INFORMATION PROJECT -

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

Technology Delivery Programme

SUPPLY CHAIN CAPACITY REPORT

What made Norway a deepwater hub

OIL & GAS UPSTREAM SECTOR PRESENTATION NAMIBIA PETROLEUM OPERATOR ASSOCIATION. Mr Dennis Zekveld Vice Chair NAMPOA 25 April 2018

North East England: Offshore wind market opportunities

UK OIL & GAS SHARE FAIR 2015

Operating Cost Optimisation: Importance & Approach

Thank you for downloading this document. This September (2018) we will be running our biennial membership focus group exercise to discuss:

CAPETANO OIL LIMITED (+233) (+233)

Review of the UK oilfield services industry. January 2016

Changing in a time of change

Maximising Economic Recovery. Katy Heidenreich Operations Optimisation Manager

The P&J Platform. For further information regarding our advertising packages contact the P&J Energy Team on:

2Q 2016 Results. Mermaid Maritime Plc. August 2016

ATP Oil & Gas Corporation. Advanced Asset Acquisition and Divestiture in Oil & Gas. April 26-27, Gerald W. Schlief, Senior Vice President

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Water, Energy and Environment in the scope of the Circular Economy

Offshore Renewable Energy Catapult

Blue growth. Stijn Billiet. DG Maritime Affairs and Fisheries

DIGITALISATION OFFSHORE

INTERNATIONAL. June 2017 Volume 13. A Buoyant Future. Reducing Cost and Risk in Floating Offshore Wind

Intervention/Decommissioning

Oil & Gas Offshore. Industry challenges in deepwater discover

Subsea Engineering: Our Action Plan

New realities re-inventing our industry

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION

Bay du Nord Framework Agreement

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

The potential for windpower in the Baltic Sea

ACTEON FLS - DECOMMISSIONING

Offshore Wind Risks - Issues and Mitigations

New to the Danish area?

Oil and Gas Decommissioning: law, policy and comparative practice

Subsea UK - Underwater Vehicles Conference

CDN College EXPO Work Based Learning Policy into Practice.

BRENT E-NEWS SHELL BRENT FIELD DECOMMISSIONING PROJECT

OIL AND GAS AUTHORITY RESPONSE TO ECONOMY, ENERGY AND TOURISM COMMITTEE REPORT ON FUTURE PROSPECTS FOR OIL AND GAS IN SCOTLAND

"North Sea Decommissioning : Market Forecast"

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

AlaskaNor: Opportunities for Blue Growth in Alaska & North Norway. High North Center for Business and Governance, Nord University

Petroleum Safety Levy Methodology. Decision Paper

A Step Change in Activity

NEW GROWTH OPPORTUNITIES IN THE NORWEGIAN OIL AND GAS SECTOR

Strategic Innovation Acceleration - UK marine energy industry: pathway to commercialisation Simon Robertson

UK offshore wind industry progress to cost reduction

ADVANCE A Plan for Growth in the Newfoundland and Labrador Oil and Gas Industry

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

An Introduction to KIS-ORCA

Transcription:

-PILOT & Industry development -Decommissioning Audrey Banner Head of Offshore Decommissioning Unit, DECC

PILOT Joint Industry/Government Strategic Forum Membership includes; 8 members of the board of Oil & Gas UK, and around 5 independent members all industry leaders at a managing director / chief executive level. Forum is Chaired by Secretary of State and Vice Chaired by Energy Minister Secure full economic recovery of our hydrocarbon reserves 2

Achievements of PILOT Successes: Changes to Licensing Fallow Access to Infrastructure Stewardship Technology Jobs Exports Investment 3

PILOT current Refocused in 2011 and moved from targets to tackling Big Ticket issues Key Working Areas: Infrastructure Area Rejuvenation (Infrastructure) EOR Exploration Production Efficiency Technology Supply Chain 4

Promoting the Supply Chain Working with BIS, Scotland office and Scottish Government. Work with OGUK Supply Chain team Support Supply Chain and Supply Chain Code of Practice PILOT Share Fairs Information Sharing PILOT Forward Work Plan Website Project Pathfinder Participate on board of Trade Associations Energy North, Decom North Sea, NOF Energy, EEEGR and Subsea UK OGUK Supply Chain Forum and sub group members Trade Association Group Direct engagement with Major Purchasers Promote UK content Fabrication Group 5

Current focus on Supply chain promotion Encourage UK Content Provide accessible Information Special focus on promotion of fabrication sector Oil and Gas industrial strategy DECC, BIS and Industry Sustain and promote growth of UK Supply Chain Renewed focus on UK content Oil and Gas Industry Council 40 action points Available via single Government website online: https://www.gov.uk/government/publications/uk-oil-and-gas-industrial-strategybusiness-and-government-action-plan 6

Competitiveness Project Pathfinder Promoting a capable and competent supply chain: Project Pathfinder: https://www.gov.uk/oil-and-gas-projectpathfinder 7

Competitiveness Forward Workplan Promoting a capable and competent supply chain: Forward Workplan Database: http://www.achilles.com/en/find-yourachilles-community?id=409 8

Technology Development Understand the technology priorities of the industry Liaise with Industry Technology Facilitator Supporting small innovative companies Technology demand-chain annual event Innovate UK (formerly TSB): UK's innovation agency Investments between 2007 and 2012 in oil and gas was 6M Technology Liaison Board: Key focus of identifying technology areas and closely aligned with the aims and visions of the Wood Review. Single industry voice giving strategic technology clarity, direction and priorities. 9

Buoyant Basin/UKCS Size of opportunity for UK Supply Chain 2012 Total CAPEX 8.1 billion Average UK content 73% Value to UK Supply Chain 6 billion 2013 28 projects with value up to 14 billion 27 th licensing round 167 licences awarded covering 330 blocks largest number ever OGUK activity report suggests 100 billion of new projects in the pipeline Over 100 undeveloped discoveries New companies arriving in basin bringing new money 10

New developments Mariner Bressay MAR Montrose/Arbroath Clair Phase 3 11

2013 saw record investment in the UKCS The UKCS is one of the most mature offshore basins, but still offers new opportunities for example frontier regions such as West of Shetland Over 14bn was invested in 2013 a UKCS record The 27 th licencing round was the most successful to date

growing competition for investment UKCS one of the most expensive offshore basins in the world development costs per barrel have risen five fold over the last decade Huge competition for investment and resources from the international market Government and Industry under pressure to keep the UKCS commercially attractive 200000 150000 $bn 100000 50000 0 OFFSHORE CAPEX EXPECTED 2013-16 BY MARKET Source: INTSOK market report 2012 - Rystad Energy Markets represent capital expenditure of U$1,25 trillion dollar in 2013-16 Growing from $250 billion in 2012 to $350 billion in 2016 13 Wood Review

.. a mature basin Some operating assets are more than 30 years old at or beyond the end of their intended design life DECC & Industry face challenges of needing to maintain ageing infrastructure, encourage new infrastructure investment, and ensure full infrastructure utilisation through better industry collaboration INSERT GRAPHIC SHOWING WHICH INFRASTRUCTURE ASSETS ARE DUE TO BE COMMISSIONED OVER THE NEXT X YEARS 2003 2010 2020

New Opportunities Carbon Capture and Storage Shale Gas and Oil (Credit Image DNV)

Decommissioning

Background to decommissioning 1995 - UK Government approved disposal of the Brent Spar in a deep sea trench in the Atlantic Shell reversed its plans following Greenpeace campaign and the Spar was recycled as foundations for a quay in Norway Oslo/Paris Convention for the Protection of the Marine Environment of the N E Atlantic Installation decommissioning - OSPAR rules apply OSPAR 98/3 agreed by the 15 member countries 17

Unit is responsible for: Accounting for UK s international obligations and maintaining statutory liabilities on operators covering all of the infrastructure on the UKCS; Maintaining and developing Offshore Decommissioning policy, and industry guidelines; Supporting operators as they develop their decommissioning programmes; Approving decommissioning programmes and monitoring programme execution; 40 Billion liability - Protecting the Government and Taxpayer from incurring decommissioning liabilities; Maintaining statutory liabilities on operators / field partners covering all of the infrastructure on the UKCS; Supporting operators as they develop their decommissioning programmes and monitor post decommissioning activities. 18

UK - DECC decommissioning policy DECC ensures companies involved in decommissioning can afford the work 325 groups of companies sharing ownership or interests in UK installations and pipelines There is joint and several liability for all companies concerned Liability maintained throughout field life; new owners get liability notices; notices may be withdrawn from sellers, but if there is a default they will be brought back in DECC can insist on financial security if concerned about ability to pay for decommissioning, e.g. if costs = > half net worth Several 4 default cases (in 1996, 2002, 2005, 2008) - Their parents, co-venturers and rig lessors paid No dumping or leaving in place of installations in the marine environment it must be brought ashore for re-use, recycling or final disposal Possible exceptions for large concrete substructures, footings of jackets >10,000 tonnes, concrete anchor bases and damaged structures Petroleum Act requires programme for installation or pipeline This must cover removal and disposal proposals, waste inventory, EIA, wells, cuttings, costs, schedule, site clearance, surveys 19

What s already been Decommissioned 3 installations with large concrete substructures* 1 with large steel jacket (> 10,000 tonnes)*ospar derogation cases 15 other steel jackets 7 floating production systems 2 subsea production systems 10 other facilities (loading buoys, flares etc) 16 pipeline programmes 10% of installations decommissioned to date 20

Infrastructure still in place Estimated expenditure between 30 bn and 35 bn 8 installations with large concrete substructures 32 with large steel jackets (> 10,000 tonnes) 244 other steel jackets 311 subsea production systems 30 floating production systems 3,300 pipelines around 25,000 kms <5,000 wells <200 cuttings piles Last Estimates of Cost about to start new survey 253 offshore installations 15bn to 16 bn 278 subsea production systems 7 bn 3300 pipelines 2bn to 7 bn Total between 30 bn and 35 bn 21

Increasing level of decommissioning 44 draft decommissioning programmes under consideration Approximately 7-8 Billion estimated decommissioning costs over next 3-5 years Further 63 programmes on the horizon Volume of work is increasing in 2013 we were looking at 21 DPs 22

Cessation of production dates 45 Programmes 40 35 30 25 20 15 Programmes 10 5 0 23

Brent decommissioning Largest decommissioning project to date Complex decisions being made on methods of decommissioning How to treat cell contents Where and how to cut the concrete legs. Some large contracts already awarded 24

UKCS 35 Billion Decommissioning Market There are around 470 installations 10% floating 30% subsea 50% small steel 10% large steel or concrete potential derogations >35,000km pipelines 233 suspended wells 25

Current issues for regulators Areas where companies are actively looking for technology development Pipelines leave in place or remove? Pipeline bundles? cutting techniques Mattresses leave in place or remove location and diver-less retrieval Drill Cuttings Piles - cover, remove, leave to degrade naturally? Wells standards for plug and abandonment, cost efficiency Radioactive scale in pipes and vessels Low carbon decommissioning Energy Efficiency 26

Projects and issues for the future Re-use of oil and gas facilities Gas storage, CO2 sequestration, wind farms Re-use/ recycling of parts and machinery from installations. Cost reduction Lessons learned from previous decommissioning programmes topic based areas Publishing all studies quoted in programmes 27

Working to provide more market intelligence to the Supply chain Project pathfinder on the DECC website shows information on decommissioning projects hope to expand to provide contacts awarded information. Forward Workplan also available via a link on DECC website shows ongoing decommissioning contracts. Plans to do more to provide more detailed information to the supply chain vital to ensuring companies are able to decommission during periods of high activity working with Decom North Sea 28

Wood review A 25% cost reduction in decommissioning would save the Exchequer 5bn Delaying UKCS decommissioning by five years could allow an extra 1bn boe to be recovered Set up a single decommissioning forum through Oil and Gas authority to deliver significant cost reductions, look at cost efficiency. Promote innovation and technology development Require greater collaboration and cooperation between companies 29

Thank you for listening My contact details are : Audrey.banner@decc.gsi.gov.uk Or 01224 254104