Special Provision No. 999S29 May 2010

Similar documents
Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

Special Provision No. 904S14 October OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows:

580 - NOISE BARRIERS OPSS 580 INDEX

Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

A. Extent of structural precast concrete work is shown on drawings and in schedules.

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

SECTION METAL FABRICATIONS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Section 914. JOINT AND WATERPROOFING MATERIALS

SECTION COUNTERTOPS ecox PART 1 GENERAL

For crossing under a railroad, contact the specific railroad company's engineering department.

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

² TL Beton-StB 07 = German technical conditions for construction materials for concrete road pavements

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017]

CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS

Dowel Bar Alignment and Location for Placement by Mechanical Dowel Bar Insertion

JVI Vector Connector

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

ALUMINUM PIPE GUIDERAIL 01/01/

STEEL PIPE GUIDERAIL 01/01/

Procedure for Testing Direct Tension Indicators (DTI) Assemblies

Product Guide Specification

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

Moment-Resisting Connections In Laminated Veneer Lumber (LVL) Frames

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016)

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

Corrosion-Resistant Coated Dowel Bars

DIVISION PAVEMENT MARKINGS AND MARKERS

SECTION CHAIN LINK FENCING

American Institute of Timber Construction 7012 South Revere Parkway Suite 140 Centennial, CO Phone: 303/ Fax: 303/

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

PALM SQUARE SHOPPING CENTER TENANT SIGN CRITERIA

Section 808. FENCING

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

MILITARY SPECIFICATION

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

MILITARY STANDARD PATCHING OF WOOD STOCKS

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

1.1 RELATED DOCUMENTS

Merrick Pet Care New Distribution Center Hereford, Texas

SECTION EQUIPMENT WIRING

MIL-STD-883E METHOD BOND STRENGTH (DESTRUCTIVE BOND PULL TEST)

Page 1 of 18. SunRail System Installation Instructions

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION MASONRY ANCHORAGE AND REINFORCEMENT. Display hidden notes to specifier. (Don't know how? Click Here)

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

MATERIAL SPECIFICATION FOR PACKAGED SILICA FUME DRY GROUT MIXTURE FOR POST TENSIONING

SECTION CONCRETE ANCHORING. Display hidden notes to specifier. (Don't know how? Click Here)

Rodney Hunt. A GA Industries Company Glydaseal Gates

**************************************************************************************************

SECTION CABLE TRAYS

SECTION HELICAL PILES AND HELICAL ANCHORS

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

GUIDELINE SPECIFICATIONS

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures.

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting

APPENDIX FENCE GENERAL NOTES

English FULL MOTION FLAT PANEL TV MOUNT. User Manual L102 TV Mount. 56 lb (25 kg) VESA. Supporting your digital lifestyle (

Joint with Bent Dowels. David Cronin, P.E. City Engineer. Jason Hoskinson, P.E., PTOE BG Consultants, Inc. DATE: January 23, 2014

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

HSD-LD-US 06/13 Page 1/5. Components

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

PERFORM WITH PRECISION WELDED DOWEL ASSEMBLY LOAD TRANSFER PRODUCTS CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Instruction Manual for installing

Installation of Desert Aire FreshAire Evacuator Bench System

Powers Trak-It XH and HD nails for gas actuated tools C4 and C5

This Special Provision covers the requirements for the installation and testing of fibre optic modems (FOM).

SECTION ROOF ACCESSORIES. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION PRE-MANUFACTURED CABINETS

Session 8: Load Transfer Restoration. (Dowel Bar Retrofit, Cross-Stitching, and Slot Stitching)

A Solution to Cracking and Stresses Caused by Dowels and Tie Bars

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

Section Meetings Section Material and Equipment. None Required

U1500E Gas Fireplace

PRECAST CONCRETE STRUCTURES

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

3" [76.0mm] HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

1. Land survey Work. 2. Civil and Structural engineering services.

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

Storefront Installation Guide

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

EKSPAN. Standard F Series Bearings. Description. Bearing types F series bearings are available in three forms - Typical 21F details.

ClearSpan PolyMax Windbreak Wall

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE

Transcription:

DOWELS INTO CONCRETE - Item No. Special Provision No. 999S29 May 2010 1.0 SCOPE This special provision covers the requirements for the installation and acceptance of metallic dowels in concrete. 2.0 REFERENCES This Special Provision refers to the following specifications, standards or publications: Ontario Ministry of Transportation Publications Pull Test Guide for Testing of Metallic Dowels, of Uncoated, Coated or Stainless Steel Designated Sources for Materials 3.0 DEFINITIONS Dowel Adhesive means an adhesive used to secure the dowel in concrete. Dowel means deformed reinforcing steel bar, either uncoated, coated or stainless, placed into a hole of specified dimensions drilled into a concrete structure and bonded to the concrete by dowel adhesive. Dowel Type means a dowel differentiated by bar size, orientation of embedment (horizontal, vertical or other), and embedment length. Pull Test means a test consisting of the application of a specified tensile axial load for a specified time period to installed dowels selected for testing. Proof of Process Installation means the procedure by which the Contractor demonstrates to the Contract Administrator that the dowel installation materials and methods will produce a product that meets the pull test requirements of the Contract Documents. 4.0 SUBMISSION REQUIREMENTS N/A 5.0 MATERIALS 5.1 Dowels Dowels shall be as specified elsewhere in the Contract Documents. Dowels shall be new, clean, and free of deleterious material. 5.2 Dowel Adhesive May 2010 Page 1 of 5 SP 999S29

Dowel adhesive shall be an approved material listed on the Designated Source for Materials list, Dowel Adhesives, Acrylic and Epoxy Resins, Index number 9.30.25 6.0 EQUIPMENT N/A 7.0 CONSTRUCTION 7.1 Dowels in Concrete The Contractor shall drill dowel holes to the required dimensions and depth as specified elsewhere in the Contract Documents. Core drilling of the dowel holes shall not be permitted. Holes that are started but not completed shall be cleaned and filled with a proprietary patching material from the Owner s pre-qualified products list. The Contractor s installation and removal operations shall not cause spalling, cracking, or other damage to the surrounding concrete. Any damage caused by the Contractor s operation shall be repaired in a manner acceptable to the Contract Administrator. Steel reinforcement and other existing embedments shall not be cut or damaged by the drilling process. Prior to drilling holes, the Contractor shall locate existing steel reinforcement, utility ducts, post tensioning hardware, and any unsound concrete in the vicinity of the dowel locations. If any of the above is encountered during drilling operations, the Contract Administrator shall be notified immediately The Contractor shall prepare, clean, and place dowel adhesive in the drill holes as per the adhesive manufacturer s recommendations. The Contractor shall properly position dowels as specified in the Contract Documents. The dowel adhesive shall completely fill the drill hole once the dowel is installed. All excess adhesive shall be struck-off flush with the concrete surface and removed from the surrounding concrete surface area. The Contractor shall maintain dowels in the proper position during the setting of the dowel adhesive and shall prevent the loss of dowel adhesive from the holes. The Contractor shall notify the Contract Administrator in writing when a Lot, as defined in the Lot Size clause, or Proof of Process Installation, is ready for testing. The Contractor shall allow 5 Business Days for the Contract Administrator to carry out the testing. The Contractor shall provide access to the dowels for testing and shall not install formwork or attach anything to the dowels (such as steel reinforcement or utility ducts) until the pull tests have been completed and the dowel lots are accepted into the work. 8.0 QUALITY ASSURANCE 8.1 General Installed dowels shall be accepted based on conformance to the Visual Acceptance Criteria and Pull Testing Criteria. Dowels tested in-situ will be accepted on a lot basis. April 2010 Page 2 of 5 Special Provision 999S29

All dowels, with the exception of dowels installed in the following applications, shall be subjected to insitu pull testing for acceptance purposes: concrete box culvert extensions;, re-facing of all structural elements (e.g. abutments, columns, wing walls) less than 2m in height; widening of footings; concrete patches; concrete pavement repairs; slip-formed barrier walls; Proof of Process Installation shall be used in lieu of in-situ testing when the Contract Administrator determines that in-situ testing is not possible (such as but not limited to confined spaces, restricted clearance for the test device, dowels too short to fit the testing device grips). 8.2 Visual Acceptance Criteria Completed dowel installations shall be properly positioned as specified elsewhere in the Contract Documents and free of damage to the dowel or dowel coating. Excess dowel adhesive shall have been struck off flush with the concrete surface and removed from the surrounding area. 8.3 Pull Testing Criteria 8.3.1 General Pull testing shall be carried out by the Contract Administrator according to the Pull Test Guide for Testing of Metallic Dowels, of Uncoated, Coated or Stainless Steel available from Materials Engineering and Research Office, Concrete Section. The Contractor may be present during the testing procedure. When requested by the Contractor, the Contract Administrator shall provide documentation of equipment calibration. An installed dowel that can hold the load specified in Table 1 without any change in the load for the required time of no less than 15 seconds shall be considered a pass. An installed dowel that cannot sustain the load specified in Table 1 for the required time of no less than 15 seconds shall be considered a failure. An individual dowel shall not be subjected to more than one pull test. Any spalling, cracking, or other damage to the surrounding concrete caused by Contractor s installation or removal of dowels shall be repaired at the Contractor s expense and in a manner acceptable to the Contract Administrator. 8.3.2 Lot Size - In-Situ Testing Only A lot shall consist of no more than 200 dowels of the same type in a single stage. Where a single stage is less than 200 dowels of the same type the lot shall be the single stage. 8.3.3 In-Situ Pull Test Requirements May 2010 Page 3 of 5 SP 999S29

The Contract Administrator shall randomly select 10 dowels in each lot for testing. Any damage to the dowel coating shall be repaired in a manner acceptable to the Contract Administrator. If 2 or more dowels fail, the Contract Administrator shall conduct additional pull testing on 20 dowels in the lot. If 2 or more dowels fail, the lot shall be deemed unacceptable and the lot shall be removed and replaced at the Contractor s expense. Replacement dowels shall be accepted by pull testing, proof of process installation, or other means, as directed by the Contract Administrator. Additional pull testing shall be at the Contractor s expense as detailed elsewhere in this special provision. All testing shall be completed before concrete is placed. 8.3.3.1 Replacement of Failed Dowels Any installed dowels that fail the pull test shall be removed and replaced by the Contractor at no additional cost to the Owner. In lieu of removal, dowels can be cut off flush with the concrete surface. The Contractor shall install the new dowel in a location approved by the Contract Administrator. 8.3.4 Proof of Process Installation The Contract Administrator shall select the location(s) for proof of process installations in area(s) where the concrete and element are the same. Dowels shall not be installed into the work until the Contract Administrator has accepted the proof of process installation procedure. An approved proof of process installation procedure for dowel types shall be valid for the contract for 120 days from the date of acceptance. After 120 days, proof of process installation shall be repeated using the same labour, materials, dowel type, and process to re-qualify the proof of process installation procedure. The Contract Administrator may at any time require re-qualification of the proof of process installation procedure. When re-qualification process is required and it has been deemed acceptable by the Contract Administrator, it shall be valid for 120 days from the date of re-qualification. The number of dowels required for each proof of process installation shall be 5 dowels for each dowel type to be installed in the work. Straight bars may be installed for proof of process installation. If any dowel fails, the proof of process installation shall be considered unacceptable. The Contractor shall not be permitted to install any of the dowel types in the work until a successful proof of process installation procedure for the dowel type has been completed and accepted by the Contract Administrator. Any installed dowels used for proof of process installation that fail the pull test shall be removed by the Contractor at no additional cost to the Owner. If directed by the Contract Administrator, remaining dowels shall be removed by the Contractor at no additional cost to the Owner. Cutting off dowels flush with the concrete surface is permitted. April 2010 Page 4 of 5 Special Provision 999S29

Upon the successful completion of a proof of process installation procedure, the Contractor shall be permitted to install dowel types at locations specified elsewhere in the Contract Documents using the accepted installation procedure. If the Contractor changes the accepted procedure for any dowel type from that used for the proof of process installation, the Contractor shall repeat the proof of process installation according to the changed procedures prior to incorporating any dowel types into the work. 9.0 MEASUREMENT FOR PAYMENT For measurement purposes, a count shall be made of the number of dowels installed. 10.0 BASIS OF PAYMENT 10.1 Dowels Into Concrete - Item Payment at the Contract price for the tender items shall be full compensation for all labour, equipment, and material to do the work, except that payment for the reinforcing steel bars or coated reinforcing steel bars or stainless steel reinforcing bars used as the dowels shall be according to OPSS 905. No payment shall be made for dowels that fail the pull test. The cost of additional pull testing shall be at the Contractor s expense and shall be a lump sum of $1,000 per mobilization to the contract with an additional cost of $50 per dowel. Dowel Size TABLE 1 Pull Test Loads Embedment Depth Less Than or Equal to 200mm Test Loads kn Embedment Depth Greater Than 200mm 10M 20 35 15M 40 70 20M 60 110 25M 100 180 30M 140 250 35M 190 340 May 2010 Page 5 of 5 SP 999S29