SAGIREV Installation Manual

Similar documents
SAGIREV INSTALLATION GUIDELINES

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

How to install soffit VENTILATION. How to begin

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Tools needed. Supplies Needed

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

Installation Guide (888)

DECKING INSTALLATION GUIDE

Panel Installation Instructions

INSTALLATION INSTRUCTIONS

AZEK Trim & Moulding Install Guide

Installation Instructions Lineals around Windows & Doors

INSTALLATION INSTRUCTIONS

Panel Installation Instructions

WoodWORKS Channeled Plank

Installation Guide (888)

Installation Guide. 203 Chesterra Drive, Dahlonega, GA Toll-Free ~ Fax ~

Installation Instructions for easy to install Texture Plus faux wall panels

COMPOSITE SIDING INSTALLATION GUIDE

Exterior Moulding & Trim Special Order Items. royalbuildingproducts.com Royal Building Products

How to Mitre Mouldings

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Agricultural Mechanics and Technology Power Tool Safety Rules

Panel Grille Suspended Ceiling Installation Guide

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Installation Manual 0318

How-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

EASY INSTALLATION GUIDE WPC DECKING.

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

Indura Plank Installation Instructions

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #:

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Shapes Siding. Perfection Shingles. Chalk Line

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

Installation Manual SOLID CORE SIDING

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Vinyl Gazebo Instructions

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

METALWORKS TARTAN PANELS General Installation Instructions

PATIO INSTALLATION MANUAL

Installation Instructions for Siding

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Installation Instructions

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

Metro Series Sauna. installation instructions

8 x 10 Timber-frame Garden Shed

4 1/2" [114.3mm] HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

METALWORKS Concealed. Installation Instructions

modular/panel-built sauna kit

Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation!

Linear Open Style Suspended Ceiling Installation Guide

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

Installation Instructions

LuxCore Installation Instructions

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Fig. 1. Fig. 2. Fig. 3. Fig. 4. Fig. 5. Fig. 6

Fitting Guide. Measuring your walls

INSTRUCTIONS Crown Molding and Trim Protractor Used to cut trim lying flat

3555 Scarlet Oak Blvd. St. Louis, MO FAX:

Canadian Product Spec Guide

Gambrel Barn with Overhang Manual

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit

Customer Service: Installation, Care and Maintenance

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Install Windsor Corners

Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

Building An Outdoor Playhouse

DuraLife Porch Collection Installation Instructions

Installation Instructions

Installation Guide. When purchasing Aboeda flooring, add 5%-15% to actual square footage needed for cutting allowance.

AZEK Porch Install Guide

CRASH RAIL INSTALLATION HEIGHT

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

Assembly Book. the Fairview. Building Size 12'x12' Revised July 25, 2012

Mach Wall Installation Instructions

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017

INSTALLATION PROCEDURE

Classic Mitered Jewelry Box

WOODWORKS Walls. Installation Instructions WALL

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

Make every component count.

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

ECOUSTIC VENEER INSTALLATION + CARE

IMPORTANT: Read all sections before you start

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

Assembly Book. the Brandon. Building Size 12'x12' or 12'x16' Revised September 13, 2017

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Engineered Hardwood Flooring Installation Instructions

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

3" [76.0mm] HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

CRASH RAIL INSTALLATION HEIGHT

Standard Practice for Installation of Rigid Poly(Vinyl Chloride) (PVC) Siding and Soffit 1

RAILING SYSTEM INSTALLATION INSTRUCTIONS

Transcription:

SAGIPER North America Inc 13179 156 Street Edmonton, AB Canada T5V 1V2 T: (780) 482-3445 F: 1 (888) 870-7069 www.sagipernorthamerica.com SAGIREV Installation Manual NOTE: This guide has been prepared and intended for individuals with moderate to extensive knowledge of basic building practices. Appropriate protective eye wear should always be used when cutting. Warranty may be voided if proper application and installation practices are not followed. SAGIREV is produced from virgin PVC and is coated with a high quality PVC film, especially designed for outdoor use (Exterior colors and/or Exterior Metallic colors) enabling you to embellish your interiors ceilings and walls, or exterior soffits, with a wide variety of finishes. Although relatively simple to install, SAGIREV requires compliance with some fundamental building practices for standard ceiling/wall and soffit installations, described in this manual. SAGIREV panels can be applied in the following applications: 1. Ceilings: - Fastening directly onto existing - Fastening onto face of t-bar suspension system 2. Interior Walls 3. Exterior Soffits SAGIPER offers accessory profiles that enable you to complete your projects in the best way:

In addition to the 27 colors there are also three panel profiles with different widths and groove finishes to choose from: Panel100 mm (4 ) Panel 150 mm (6 ) Panel 200 mm (8 ) 2

Interior Ceiling: Screw wood strapping 16 or 24 apart, perpendicularly to the direction of the panels. Screw / staple the trim profiles all around the perimeter. In the case of the clip crown molding, apply only the male clip itself first. Fit the first panel end into the perimeter j-mold and screw / staple through the tab on the groove end. Fit the second panel into the perimeter j-molds, slide into previous panels groove, and once again, screw / staple through the tab on the groove end. Repeat the same procedure for the remaining pieces. In the case of the clip crown molding, snap the crown female piece onto the male end fastened to the perimeter, after all panels are fastened into place. 3

Interior ceiling with t-bar suspension system: Apply metal structure identical to that of a t-bar suspended ceiling. Screw the trim profiles to the perimeter L channel or wall molding that it is bordering the t-bar suspension system. In the case of the clip crown molding, apply only the male clip itself first. Fit the first panels ends into the perimeter j-mold and screw / staple through the tab on the groove end and through the face of the t-bars. Fit the second panel hiding the previous groove and screw in the groove. Repeat the same procedure for the remaining pieces. In the case of the clip crown molding, snap the crown female piece onto the male end fastened to the perimeter, after all panels are fastened into place. 4

Exterior Soffits (Perpendicular to Home/Building): Screw the SAGIREV J-mold every 16, through its longest end and into appropriate framing substrate. The application of additional framing or strapping substrate may be required in eave spans greater than 16 for added support. Cut your panels to the appropriate length, allowing ¼ for expansion on each end. Use a compound miter saw with a fine tooth blade (no less than 72 teeth) to complete all cuts. Fit the first panel into the perimeter J-mold, then onto the channel at the fascia board and then screw the panel through the tab on the groove end into the appropriate framing substrate. 5

Continue to fit and screw the panels until you reach a corner. When you reach a corner, install a H-mold from the J-mold on the corner wall to the outer fascia channel, fastening through the longer base tabs into framing substrate. Once the H-mold is in place, proceed to miter cut the SAGIREV soffit panels, fit and fasten between perimeter wall J-mold and outer fascia channel. 6

Exterior Soffits (Parallel to Home/Building): Framing substrate must be present to allow for 16 or 24 fastening. Ensure butt joints are NOT used when installing the panels parallel. It is recommended to start with installing one continuous H-mold from the perimeter J-mold to the outer fascia, at the centre of any exterior wall, and work out from there to ensure even cut panels at each corner. Continue to install the soffit panels at constant lengths, in a tongue and groove manner, fastening at every joist, and install a continuous H-mold along the terminating ends. 7

Tips: The use of 1 ¼ #8 stainless steel wafer head screws is recommended for all fastening. When cutting for lights, use an appropriately sized hole saw attachment (ensure your drill runs in reverse), a router or jig saw. For standard straight and miter cuts, ensure to use a compound miter saw with a finishing blade (no less than 72 teeth). It is recommended to mix the use of panels from different bundles of wood grain finishes, in order to maximize grain variation. Installing the last piece of SAGIREV in an enclosed ceiling or soffit application, with perimeter J- molds, can always be tricky. Often the piece will need to be ripped to accommodate the appropriate measurement. This can be done with either a table saw or circular saw with appropriate blades. If the J-mold is already fastened into place, the final SAGIREV panel can be shimmied into place by using a very thin metal spatula to pry the J-mold open enough to receive the panel. Alternatively, the last panel could be put into place with the J-mold already attached to the panel. In this instance, you would place a bead of PL Premium to the back of the panel, to ensure it stays in place, and fire a finishing nail at each corner of the panel, into the wood frame substrate, for maximum obscurity. The use of any pneumatic fasteners is strongly discouraged as the pressure will often shatter the fastening tab. If staples are the desired fastener for interior ceiling/wall application, a heavyduty construction hand powered stapler is recommended. 8