ACS 1000 Transformer Failure Investigation. Nathan Schachter, Peng

Similar documents
How Harmonics have led to 6 Power Factor Misconceptions

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

TABLE OF CONTENT

NJWA - Harmonics and Drives Proper System Design

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

(2) New Standard IEEE P (3) Core : (4) Windings :

Harmonic Mitigation for Variable Frequency Drives. HWEA Conference February 15, Kelvin J. Hurdle Rockwell Bus. Dev. Mgr.

Harmonic Filters for Power Conversion Equipment (Drives, rectifiers, etc) Effects of Harmonics IEEE Solutions

Low Pass Harmonic Filters

Tab 2 Voltage Stresses Switching Transients

P2 Power Solutions Pvt. Ltd. P2 Power Magnetics. Quality Power within your Reach. An ISO 9001:2008 Company

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

Do Capacitor Switching Transients Still Cause Problems?

2 Grounding of power supply system neutral

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

7/15/2002 PP.AFD.08 1 of 28

TECHNICAL BULLETIN 004a Ferroresonance

HARMONICS THE BASICS H A R M O N I C M I T I G A T I O N A N D D I S P L A C E M E N T P O W E R F A C T O R C O R R E C T I O N

Economical Solutions to Meet Harmonic Distortion Limits[4]

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

HIGH VOLTAGE ENGINEERING(FEEE6402) LECTURER-24

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

thepower to protect the power to protect i-gard LITERATURE Low and medium voltage

Connection Impact Assessment Application

Medium Voltage Drives in Industrial Applications. By: Navid Zargari & Steven Rizzo Rockwell Automation Cambridge, ON

Power Factor. Power Factor Correction.

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY --

Electric Power Quality: Voltage Sags Momentary Interruptions

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages

Embedded Generation Connection Application Form

Effective Harmonic Mitigation with Active Filters

SHARDA Make Harmonics Filter

Phoenix DX Clean Power (18 Pulse) AC Drive

Harmonic control devices

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Wind Power Facility Technical Requirements CHANGE HISTORY

Embedded Generation Connection Application Form

Preface...x Chapter 1 Electrical Fundamentals

Welcome to the rd. Annual Northern Ohio. 3 rd Energy Management Conference September 30, 2008

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

Connection Impact Assessment Application Form

RESONANT TRANSFORMER

Conventional Paper-II-2011 Part-1A

Industrial Electrician Level 3

HIGH VOLTAGE CIRCUIT BREAKERS

Power Factor & Harmonics

THE COMPREHENSIVE APPROACH TO FACILITY POWER QUALITY

Ferroresonance in MV Voltage Transformers: Pragmatic experimental approach towards investigation of risk and mitigating strategy

OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES

Impact Assessment Generator Form

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Distribution System Development & Preliminary Studies

Effects of Harmonic Distortion I

How adjustable speed drives affect power distribution

Understanding Input Harmonics and Techniques to Mitigate Them

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

APPLICATION GUIDE. Harmonics in HVAC applications

FERRORESONANCE SIMULATION STUDIES USING EMTP

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I

2.10. Adjustable Frequency Drives. Clean Power Drives. Clean Power Drives

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS

Evaluating the Response of Surge Arresters

PQ01. Harmonic Solutions for VFD s. Review of Power Control Harmonics, Power Factor, Distortion & Displacement

Voltage Sag Mitigation by Neutral Grounding Resistance Application in Distribution System of Provincial Electricity Authority

Part Five. High-Power ac Drives

Application Note. Applicable Product: AC Drives

Relay Protection of EHV Shunt Reactors Based on the Traveling Wave Principle

Cetronic Power Products Ltd. REGUVOLT CONSTANT VOLTAGE TRANSFORMERS. Technical Information

System Protection and Control Subcommittee

Harmonics and Their Impact on Power Quality. Wayne Walcott Application Engineering Manager June, 2017

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network

Protection of Electrical Networks. Christophe Prévé

Insulation Co-ordination For HVDC Station

Dynamic Harmonic Mitigation and Power Factor Correction

PowerFlex Medium Voltage Drives with Direct-to-Drive Technology Eliminating the Isolation Transformer

Distribution Transformer Random Transient Suppression using Diode Bridge T-type LC Reactor

Analysis of Temporary Over-Voltages from Self-Excited Large Induction Motors in the Presence of Resonance - Case Studies

AGN 026 Harmonic Voltage Distortion

p. 1 p. 6 p. 22 p. 46 p. 58

How to maximize reliability using an alternative distribution system for critical loads

Bruce L. Graves /01/$ IEEE. IEEE Industry Applications Magazine PhotoDisc, Inc.

Calhoon MEBA Engineering School. Study Guide for Proficiency Testing Industrial Electronics

Emicon Engineering Consultants L.L.C.

3/29/2012 MAIN TOPICS DISCUSSED ELECTRICAL SYSTEMS AND ELECTRIC ENERGY MANAGEMENT SECTION K ELECTRIC RATES POWER COMPUTATION FORMULAS.

VIRGINIA TRANSFORMER CORP. Drive & Rectifier. Transformersrs

Welcome. Power Survey International

Floating Output DC-DC Converter Using Single Winding Reactor and Its Applications

Power Conditioning Equipment for Improvement of Power Quality in Distribution Systems M. Weinhold R. Zurowski T. Mangold L. Voss

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

Utility System Lightning Protection

Optimizing HV Capacitor-Bank Design Protection & Testing

Table of Contents. Introduction... 1

ECE 528 Understanding Power Quality. Paul Ortmann (voice) Lecture 6

Harmonic control devices. ECE 528 Understanding Power Quality

Transcription:

Investigation Nathan Schachter, Peng

Objectives Learn what happened Explain why it happened Discuss solutions Suggest remedies so it does not happen again Prevention is the key to success 2

ACS 1000 VFD TRANSFORMER FAILURE What happened? The plant experienced several transformer and VFD failures with the medium voltage drives supplied for Line 2 installation between November 1999 and January 2001. 3

ACS 1000 VFD transformer failures The equipment involved includes the following: -1000kVA - kiln bypass fan -3000kVA - pre-heater ID fan -4500kVA - raw mill ID fan -2250kVA - filter bag-house fan, which sustain damage to the electronic components - some of the smaller drives lost fuses and diodes (ACS600) 4

ACS 1000 VDF tranformer failures 5

ACS 1000 VFD transformer failures 6

7

8

9

Possible causes Physical design of the transformer for the application of non-linear load characteristics Impedance specification to limit the secondary current. (Commutating reactance) Electromagnetic forces withstand capability for core and windings Shape of the coils- rectangular or round Cooling and oil circulation between the coils 10

What actually happened? Indications are that the windings did not fail turn to turn at first, which would be an indication of insulation failure due to an external surge The rectification process of the AC waveform itself subjects the windings to near short-circuit conditions every half cycle. All failures occurred on the Y winding connection of the secondary - ungrounded 11

The secondary windings deformed first as a result of the electromagnetic force which is proportional to I². The deformation of the windings also changes the mutual inductance of the windings, which in turn reduces the reactance component - a cascading effect to increase secondary current. Secondary of the transformer is not fused, the drive is a fuse-less design. It relies on the primary protection and the electronic protection supplied with the drive. 12

Other possible causes for failure It has been suggested that switching transients from the capacitor banks were the root cause of the failure. - not likely although repeated switching of shunt capacitors can give rise to over-voltages under certain conditions. A high secondary current is also likely a result of a diode failure because of forward current handling. Surge protection of the diode bridge and high DC bus voltage remain a potential weak link. 13

Re-energizing the transformer with a faulted winding Power system transients due to the breaker dropping out under load is to be expected in an industrial power system Switching transients of 1.8 to 2.0 per unit voltage are not desirable but are expected in an industrial power system. 14

Electrostatic shields provide adequate isolation between the primary and secondary steep waveforms such as a surge voltage Independent analysis of the mode of failure arrived to similar conclusions: - Sunbelt report, Van-Koy and BBX s reports,etc. 15

What has been done to date Interim transformers have been secured through ABB and installed temporarily until the new drive transformers arrive at the plant. These units remain in service at this time. Damaged drive parts have been replaced with spare parts. These were purchased by the plant. Three new transformers have been delivered to the plant: 2250kVA, 3000kVA and 4500kVA. 16

The 1000kVA powering the bypass fan was the first to fail. At the advise of ABB an available transformer was purchased by the plant from Monarch Cement. All the new transformers have been supplied also with surge arresters on the HV side. The original transformers did not have. 17

The priorities until now was to secure adequately designed replacement transformers. The next steps require fine tuning of the power distribution system. We require every ones participation. 18

Outstanding issues with the drives Replace temporary transformers with new units. There were discrepancies with the impedance specifications and winding temperature class for all of the new transformers. These were only recently partially clarified. - Short circuit type test verification for the prototype coil design (VT /ABB to confirm) - Insulation class of the windings. ABB to confirm 19

A proposal from ABB to enhance the surge protection across the diode rectifier section of each drive remains on the table. ABB to confirm requirements 20

The plant is concerned that the 1000kVA transformer was designed with aluminum windings and want it replaced. Also it was designed for a higher temperature rise (65C) than the other units (55C). Also it has larger impedance than the other units - 8.84 vs 7.34. Supplied with 6kV arrester vs 3kV arresters for the new units. Spare parts for the ACS1000 drives. The plant depleted their resources. 21

Coordination of primary protection devices need to be revised for the electrical characteristics of the new transformers. Review of the drive control scheme and interface to the DCS. The drive must trip the contactor under normal operation.( ABB 80-100ms) 22

Concern remains with the smaller drives ACS600 and the design of the isolation transformers. These were were built by the same manufacturer as for the larger units.(pti Industries) These units are fused and have slightly higher impedance values that that of the medium voltage drive transformers. 23

The secondary fuses have blown during the power system disturbance in December 2000. This is perhaps the reasons they have not failed. Also denotes a lack of selectivity in coordination with the primary protective devices. This has to be reviewed in detail. 24

Other observations There was lack of information on the original transformers and actual test data. Transformer damage curves. Commissioning reports for the drives, protection device settings (preliminary and final settings), etc. 25

Line 2 capacitor banks Requirement for having and also for switching the 800 and 1200kVAr capacitor whenever the 8000hp S-I motor is off line? If these are required the capacitor banks must be upgraded to include reactor de-tuned for 4.7th. This is the minimum requirement to mitigate harmonic effects from the utility. (IEEE) 26

Utility contract What are the contractual power factor requirements at the 138kV for Line 1 and Line 2? - above 90, 92 or 95 - firm demand or interruptible power contract? - what load factor? - coincidental billing? 27

Preventative measures Power system analysis -short circuit duties at equipment -Load flow analysis -power factor - (displacement and actual) - selective co-ordination and protection. The incident on December 2000 indicates that a complete review is required. In particular with the SI motor 28

Harmonic studies Modeling of harmonic sources Harmonic sensitivities and amplification factors Actual field measurements with the equipment operating - partial and full load. (measurements and spectrum analysis done at 138kV by the plant after Line 2 came on stream) First sign of harmonic amplification are blown fuses and capacitors. 29

Switching transients EMTP -electromagnetic transient program and modeling can give an indication if there are dynamic over-voltages in excess. If these were a problem other equipment would have been also affected. Switching capacitor banks and virtual current chopping is more of a problem when a capacitor bank is de-energized. - 30

Protection of fuse-less drives Special attention is required with the primary interrupting devices and power electronic devices. ABB has to provide damage curves for the diodes, protection IGCTs. Selection and coordination of primary fuse to protect the transformer winding, the diode and the electronic protection IGCT. 31

Similar attention is required for the ACS600 drives. 32

Questions? For additional clarifications/requirements please contact the presenter at 1-(905)-336-2786, Ext 21 33