UltraDeck. Decking & Railing Installation Guide.

Similar documents
UltraDeck. Decking & Railing Installation Guide.

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

CONTRACTOR CERTIFICATION COURSE

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

Installation Guide (888)

INSTALLATION INSTRUCTIONS

Installation Guide (888)

Installation Instructions for. Before You Begin TOOLS REQUIRED

DECKING INSTALLATION GUIDE

The following instructions will guide you through the installation of your new vinyl railing.

Indura Plank Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing stair kit.

installation care & maintenance instructions moistureshield.com limited lifetime warranty

LOOKS AND FEELS LIKE TIMBER

COMPOSITE RAILING INSTALLATION

AZEK Porch Install Guide

INSTALLATION MANUAL VERANDA ENCLAVE RAILING. Model # SEC17 EW R15 PRE W/H SEC17 EW R15 KD W/HW SEC17 EWS R13 KD W/H

T r e x Art i s a n Se r i e s Railing

ATLANTIS RAIL Contact Information

TREX SELECT RAILING. Installation Instructions PARTS

Balustrade Systems / Installation Instructions

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

INSTALLATION MANUAL VERANDA REGENCY RAILING WITH METAL BALUSTERS. Model # SEC17 RW U8 W/MTL KD SEC17 RWS U8 W/MT KD

TREX TRANSCEND RAILING

TREX SELECT RAILING Installation Instructions

DuraLife Porch Collection Installation Instructions

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

2.0. Select Rail & Stair Kit Assembly and Installation Instructions BOM V2 5/13. Owner's Manual. Version

340 & 350 SERIES BATH ENCLOSURES

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Balustrade System Installation - Cambridge & Huntington

FENCE INSTALLATION GUIDE 8 HIGH WALLS

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

PREPARATION & TOOL CHECK LIST

Installing AZEK Evolutions Rail

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Chapter 17 - Porch Trim

Need a little help installing your railing?

Horizontal Cable Systems

340 & 350 SERIES DELUXE FRAMELESS BYPASS

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

INSTALLATION MANUAL POST SLEEVE SURFACE MOUNT WITH WOOD INSERT. Model # BKT SLV MT W/WD KT V HOMEDEPOT.COM/VERANDA

INS TA L L AT I O N IN S T R U C T I O N S F O R BEF O R E YO U BE G I N TOOLS REQUIRED

Installation Instructions for. Handrail Component System

Install Instructions. SCR-48N Crash Rail. Please read these instructions thoroughly prior to beginning the SCR-48N Crash Rail installation!

Customer Service: Installation, Care and Maintenance

Balishutters. INSTALLATION guide FOR L-FRAME MOUNT INSTALL OPTIONS B OR C

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

PREPARATION & TOOL CHECKLIST

DECKING INSTALLATION INSTRUCTIONS PARAMOUNT, SYMMETRY, HORIZON, SANCTUARY, PROTECT ADVANTAGE, AND GOOD LIFE

INSTALLATION INSTRUCTIONS TOOLS YOU WILL NEED GETTING STARTED

Dura-Lock Roof System

Sonoma Outdoor Kitchen Pergola. Assembly Instructions

Decking Installation Instructions IMPORTANT EVERGRAIN AND EVERGRAIN ENVISION PRODUCT INFORMATION CUTTING & DRILLING LUMBER SIZES & DIMENSIONS

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

TimberTech Composite Decking Installation & Maintenance

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

Installation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.

AquaGuard - Water Resistant Flooring Installation guidelines

Veranda Decorative Lattice & Deck Skirting Special Order Catalog

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

Lodge II Pergola. Manual and Installation Instructions. Please read these instructions before removing parts from crate

Horizontal Cable Systems

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

Step 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each

Tools & Materials Needed

Sea Doo Spark Engine Access Kit

Basic Spring Motor Roller Shades

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

Dundalk LeisureCraft Cedar Pod Sauna Assembly Instructions

FENCE INSTALLATION GUIDE 6 HIGH FENCE

42" Hybrid Composite Railing Installation Guide. v

Installa on Guide: Fence Distributors. YourNextFence.com

Octagon Vinyl Gazebo Assembly Instructions

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

RAILING SYSTEM INSTALLATION INSTRUCTIONS

Installation Operation Care

NewTech - CleverDeck Composite Decking Installation Guidelines

RAILING R A IL ING 51

Ventilation System. Installation Manual. Hog Slat Inc. Newton Grove, NC USA March

The Festival Assembly Instructions

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

IMPORTANT: Read all sections before you start

Assembly Instructions

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

RAILING. Installation Guide

Tools & Materials Needed

Installation Instructions and Details

Tools & Materials Needed

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

Transcription:

UltraDeck Decking & Railing Installation Guide www.midwestmanufacturing.com

Table of Contents: General Guidelines for Deck Installation 4 Plank Board Installation 6 QuickCap Installation 8 Cladding & Endcap Installation 9 General Guidelines for Rail Installation 0 Railing Installation: Method Railing Installation: Method 4 Railing Installation: Fusion 6 Cleaning and Warranty UltraDeck Fading Information All UltraDeck products are created from a wood and plastic polymer composition which lets you create a low-maintenance outdoor space without having to worry about cracking, splintering, rot, or insects. The Fusion Decking and Railing products are produced with an added cap layer that provides the most fade resistance. Fading will occur at different rates depending on sun exposure of the products. Vertical applications such as spindles will fade at a slightly different rate than decking, as the sun exposure is different in these two areas. Over time, all Natural, Rustic, and QuickCap decking and Rustic railing will fade to a similar shade. See the UltraDeck Decking and Railing book for color charts and fading information. General Guidelines for Deck Installation Your installation guide for UltraDeck decking Fastening Systems: T-CLIP & ULTRACLIP Designed for use with UltraDeck Rustic, Natural, & Fusion T-Clip UltraClip Hidden Fastening System Naturally gaps the planks 3/6" apart, saving you measuring time. Deck Framing Requirements: Once you decide which way the deck boards will run, determine the span between the joists. Always adjust the joist span to accommodate the deck pattern and stairs. Be sure the foundation is sound, level, and use a minimum of two fasteners for attachment of deck boards to each joist. Be sure to check local codes for additional requirements and information. Additional framing will be required for all butt joints. See nailer board information in Plank & End Gapping. DEKMOUNT Designed for use with UltraDeck Rustic, Natural, & Fusion ; Recommended for radius edge boards Hidden Fastening System Available in 8' long stainless steel or brown powder coated finish. 3/4" premium screws are recommended for bracket to joist and plank to bracket connections. 45 Deck Pattern " o.c. maximum SURFACE SCREWING Designed for use with UltraDeck Rustic & Natural Radius Board Color-matched composite deck screws. Perpendicular Stair Pattern 8" o.c. maximum QUICKCAP Designed only for use with UltraDeck QuickCap Designed to be applied over existing decking Naturally gaps the planks 7/3" to 3/8". Perpendicular Deck Pattern 6" o.c. maximum

! Plank & End Gapping: When installing UltraDeck decking, gapping guidelines must be followed to ensure that gaps between decking and end gaps allow for proper expansion/contraction, drainage, and the shrinking of treated wood joists that can happen over time. Rustic, Natural, & Fusion For every 6' of plank, allow a /6" gap for every 0 F temperature difference between the time of board installation and the maximum expected temperature (refer to the end gapping chart, Figure ). With all fastening methods, make sure to use two fasteners for attachment of deck boards to each joist. Nailer Boards An additional nailer board will need to be added to the framing material at any butt joint connection to properly end gap UltraDeck planks. Additional nailer boards must be installed at all end gaps no matter what installation method used. See Figure. T-Clips Install two UltraDeck T-Clips to each board at every end gap. The additional nailer boards must be used to aid in supporting the deck planks and proper T-Clip placement. See Figure. DekMount Install DekMount onto each joist by screwing a 3/4" premium screw through side hole in DekMount. Install deck planks one at a time, from the end of the deck, working back towards the house or walled structure. Install two pieces of DekMount on either board at butt joints. Surface Screwing When using screws through the top side of decking, at each end of the plank, pre-drill and sink screws at least 3/4" away from the edge of the plank to prevent splitting. Do not over tighten the fasteners. See Figure 3. Installing Posts to Deck Substructure: Fig. Fig. /3" to /4" Gap Per Gapping Chart Additional Nailer Board End Gapping Solutions *For deck designs including railing Step : Determine the location and install the 4x4 treated posts to the substructure. The maximum post spacing is 6' between posts. Do not notch 4x4 railing posts. Step : Use blocking that is the same size and dimension as the joist members to reinforce the side of the 4x4 post opposite the rim joist. Step 3: Use three 3" quality deck screws for attaching each end of blocking to joist. Step 4: Secure 4x4 treated post to the rim joist and reinforcement blocking using two 6" lag screws (with a minimum spacing of 5-/4" apart.) Countersink the lag screws if using UltraDeck Cladding. A deck board installed as a joining board at the seams will minimize the look of end to end contraction by separating the visual gap. Reinforcement Blocking 3/4" Surface Screwing Joist Members Reinforcement Blocking () /" x 6" Lag Screws 5-/4" Apart /3" to /4" Gap Per Gapping Chart Note: UltraDeck Post Sleeves are designed to fit over dimensional 4x4 posts. If the 4x4 posts you are using are outside of standard, trimming or shimming of the 4x4 edges may be required. Check fit of the 4x4 post into the Post Sleeve prior to attaching it to your deck structure and make any changes to the 4x4 if needed. Fig. *For QuickCap end gapping, see page 8 T-Clip / DekMount UltraDeck T-Clips Joist Members (3) 3" Screws Fig. 3 4x4 Post Rim Joist Additional Nailer Boards 4x4 Post Rim Joist 3

! Plank Board Installation: Side-to-Side Gapping: Your installation guide for Rustic, Natural, & Fusion decking When installing decking with a T-Clip, the fasteners will automatically set the side-to-side gapping of the decking. If installing decking using DekMount or surface screwing options (see Fastening Systems on page ) a minimum of 3/6" gap will need to be left between planks. If the temperature is below 40 F at the time of installation, a 3/8" gap is recommended. T-Clip Installation: Side-to-Side Gapping 3/6" to 3/8" Gap Follow the deck framing tips, the plank gapping, and end gapping pages to begin your plank installation. These steps are key to ensure your decking is properly installed to last for many years. Before installing Fusion decking, be sure to look over all your boards and note color differences in order to distribute the boards in a pleasing, natural looking manner. Note: T-Clips have arrows on them to show which way of installation. Always have arrows pointing towards last completed deck board. Make sure all arrows are facing the same direction. A Parallel START START Perpendicular Installing Planks that Run Parallel to a House A Pre-drill the first UltraDeck plank along the outer lip every 8". Fasten it to the rim joist with -5/8" premium deck screws. Do not use UltraDeck T-Clips to secure the outside edge of the first board. A Install a row of UltraDeck T-Clips at every joist along the deck frame (A). Then, slide the next UltraDeck plank into place (B). Attach the next row of UltraDeck T-Clips, sliding the next plank into place (C). Continue this process until the deck surface is covered. 3A Finish by securing the final board with UltraDeck T-Clips to the ledger along the house at every joist. If necessary, cut the final board down to fit, pre-drill every 8", and fasten it to the ledger with premium deck screws. Installing Planks that Run Perpendicular to a House B Begin by pre-drilling the first plank along the outer lip every 8". Fasten the plank to the rim joist with -5/8" premium deck screws. UltraDeck T-Clips are not used on the outside edge of the first board. B Install a row of UltraDeck T-Clips at every joist along the deck frame (A). Then, slide the next UltraDeck plank into place (B). Attach the next row of UltraDeck T-Clips, sliding the next plank into place (C). Continue this process until the deck surface is covered. 3B Pre-drill the last UltraDeck plank along the outer lip every 8". Fasten it to the rim joist with -5/8" premium deck screws. Do not use UltraDeck T-Clips to secure A,B 3B A B C the outside edge of the last board. 8" Apart 4 B

!! DekMount Installation: Follow the deck framing tips, the plank gapping, and end gapping pages to begin your plank installation. These steps are key to ensure your decking is properly installed to last for many years. Before installing Fusion decking, be sure to look over all your boards and note color differences in order to distribute the boards in a pleasing, natural looking manner. Install DekMount onto each joist by screwing a 3/4" premium screw through side hole in DekMount. DekMount should be flush on top of the joist and flat against the side of the joist. DekMount is easily cut with snips to fit in any required length. Stagger DekMount butt joints so they don't land in the same location on each joist. " is recommended for staggering of butt joints. Install deck planks one at a time, from the end of the deck, working back towards the house or walled structure. This allows you to reach the last plank attached from beneath the deck. The deck planks should be located and spaced using side to side and end gapping charts before screwing. Screw from the bottom; for best results, do not screw at the edge. By kneeling on top of the plank and reaching underneath, the screws are driven upwards through the DekMount and into the plank. DekMount is designed to provide for a minimum of holes for each plank. If the deck is elevated and is easier to fasten from below the deck, another person should be on top of the deck, not only to ensure proper spacing, but to provide weight; allowing the screws to securely anchor deck board. Note: Use of clamp to secure board in place prior to fastening will aid in installation. i Surface Screwing Installation: *For all Rustic boards & Natural radius boards only Follow the deck framing tips, the plank gapping, and end gapping pages to begin your plank installation. These steps are key to ensure your decking is properly installed to last for many years. Note: When using this method, use composite deck screws, or -/" conventional deck screws. Composite deck screws are recommended for this application, as they pull shavings into the screw hole, eliminating the "mushrooming effect". When using conventional deck screws, you must pre-drill and countersink for each screw to avoid the "mushrooming effect". Begin screwing, keeping screws at least 3/4" away from the edge or end of the plank to prevent splitting. It is necessary to pre-drill and countersink at each end of an UltraDeck board. Always add additional nailer boards at butt seams (see page 3). Do not over tighten fasteners. When fastening Natural Radius planks, screws must be passed through the interior channel to avoid compression of the planks ( screws must be placed on each board at every joist). 3/4" Screws DekMount Hidden Fastening System Rustic boards Natural radius edge boards Joist DekMount Hidden Fastening System Note: For radius board installation, follow DekMount or surface screwing installation instructions. If installing decking planks with T-Clips, follow Step 3 of T-Clip installation on final grooved deck (at perpendicular joists only). For deck framing perimeter applications, additional bridging joists every 6" may be required to support radius edge boards installed in perimeter applications. 5

QuickCap Installation: Your installation guide for QuickCap decking 6! QuickCap Site Preparation: Check the condition of your current deck to make sure it is sound. If any part of the substructure or the surface is showing decay, make repairs prior to installing the QuickCap boards. Any raised or twisted boards should be fastened down with quality 3" premium deck screws, tightened until the deck surface is level, Figure. If there are any areas where two deck boards come together end to end on top of a joist, the joist should be inspected for structural stability (an additional joist should be added if needed). If using additional screws and joists is not successful in smoothing out the deck surface, sand down any raised edges using an abrasive sanding disk attached to an angle grinder, Figure. Existing decking must be properly side gapped to provide proper drainage. QuickCap End Gapping: If two QuickCap boards are spliced, a joining board installed at the seams will minimize the! amount of visual end-to-end gap, Figure 3. This is done by separating the end-to-end gapping. If splices are needed and the joining board method is not used, it is recommended to stagger splices by two feet or more and use QuickCap Fasteners 3/4" to " at each side of the splice, Figure 4. QuickCap boards expand and contract with temperature changes. Follow the End Gapping Chart if any splices are needed to cover the surface of your old deck, Figure 5. Old deck QuickCap deck (diagonal installation) Fig. 5 Fig. Fig. 3 Fig. Fig. 4 UltraDeck QuickCap Fasteners on both ends of the splice

QuickCap Installation: Snap a chalk line, parallel to the existing surface, at -/" in from the edge of the deck to act as a reference. Add an additional chalk line every 6" to mark the placement of each QuickCap fastener. If the chalk line falls in the gap between the existing deck boards, move the line back until the line is at least 3/4" in from the edge of the existing deck boards. This will decrease the space between this line and the previous line making sure the chalk lines do not exceed the recommended 6" spacing. The 6" spacing for additional lines will continue from this adjusted line. Color-matched cladding screws may be used to attach the first section of the QuickCap boards along the outside edge of the deck. Pre-drill and countersink each screw. These screws should be placed every 6" and go through the first leg that is at least -/4" in from the outside edge. Install a row of QuickCap fasteners on the chalk lines, one every 6". Then slide the QuickCap plank into place. Continue this process until the deck surface is covered. Do not over tighten the fasteners; this will not allow the clip head to line up with the groove in the plank. QuickCap boards can be ripped down when less than a full width is needed. Fasten the unaltered edge of the board to the existing deck with a QuickCap Fastener. Then fasten the altered edge by pre-drilling and fastening with color matched cladding screws to the cut side of the board. Color-matched cladding screws may be used to attach the last section of the QuickCap boards along the outside edge of the deck. Pre-drill and countersink each screw. These screws should be placed every 6" and go through the first leg that is at least -/4" in from the outside edge. 6'' Chalk Lines Perpendicular installation 3 4 5 7/3" to 3/8" Gap 6'' -/4'' 3 QuickCap Fastener 5 Color-matched cladding screw 4 Cut end of QuickCap Support Leg Support Leg Support Leg Support Leg Pre-Drill Outside deck edge 7

Cladding & Endcap Installation: Your installation guide for UltraDeck Cladding 8 UltraDeck Cladding: Cladding Dimensions: UltraDeck Natural and UltraDeck Fusion : 3/8" x 4" x ' UltraDeck Rustic : 7/6" x 0-/" x ' Cladding will provide a professional finished look to your deck. UltraDeck cladding can be used as skirting to cover joist members, elevated support posts, outside edges of board profiles, stair stringers, and other exposed lumber products. When attaching cladding to the deck frame, use color-matched cladding screws. In order to be sure there is enough room for proper expansion and contraction of the UltraDeck planks, leave a /6" gap between cladding and deck boards. When installing cladding be sure to pre-drill and countersink two screws, starting -/" from the top and bottom edge of the cladding every ". Screws should be snug but it is important not to over tighten the screws. For long distances requiring multiple pieces of UltraDeck cladding, use opposing miter cuts at the seam to reduce visible joints, leaving a /8" gap between the cuts to allow for expansion, Figure. UltraDeck Cladding UltraDeck Cladding Fig. 45 Miter Cut on Cladding Deck Board Outside Joist Joist Deck Board Joist /8" Gap /6" Gap UltraDeck Plank Endcaps: *For Natural boards only Endcaps are a great way to protect your UltraDeck with hollow profiles by helping create a barrier against moisture, dirt, and insect infestation. They can provide a clean, professional look to end cuts made at a 90 angle. Endcaps are not necessary for any butt joints in the deck. If desired, a silicone adhesive caulk may be used to further secure endcaps to the planks.

General Guidelines for Rail Installation: Your installation guide for UltraDeck Railing 3 Installing UltraDeck Post Sleeves: Cut the UltraDeck post sleeve to the proper length. Slide the cut UltraDeck post sleeve over the 4x4 treated post. With the UltraDeck Rustic or UltraDeck Fusion post sleeves, be sure to slide the ring base to the bottom before installing the railing. Post sleeves are secured to the 4x4 post as the first spindle is fastened to the post sleeve. Install the Post Cap by aligning it with the top of the post sleeve and sliding it into position. A silicone adhesive caulk can be used to secure the post cap to the post sleeve, if desired. 4x4 Trim 4x4 Note: UltraDeck Post Sleeves are designed to fit over dimensional 4x4 posts. If the 4x4 posts you are using are outside of standard, trimming or shimming of the 4x4 edges may be required. Check fit of the 4x4 post into the Post Sleeve prior to attaching it to your deck structure and make any changes to the 4x4 if needed. Post sleeves are available in both 48" and 96" lengths. Since decking and railing components are extruded products and post cap and ring base components are injection molded, each will fade at a different rate. 3 i Note: & Preparation for Stair Rails: Inserts, railings, and top caps can be marked for cutting by laying the components on the stairs and marking the angle and length using the installed post as a reference. On the lines that you marked, trim all pieces to the same angle. This angle will also be used to cut the spindles. Once railing and spindles are cut to necessary angle and length, follow the appropriate railing instructions (listed below). It is very important to verify spindles are all the same length. Measure and cut accordingly. Types of Railing Installation: *All UltraDeck Railing methods are recommended for spans of 6' or less Method : For UltraDeck Rustic (see page 0) Method : For UltraDeck Rustic (see page ) Fusion: For UltraDeck Fusion (see page 4) 9

Railing Installation: Your installation guide for Rustic Railing 0! Method Railing System: Make sure the post sleeve and ring base have been installed. Make sure post is plumb and level. Properly size the top and lower rail, and metal insert by measuring the distance between the two post sleeves, and cut to desired length. Make sure the spindles are all the same length, measure and cut accordingly. i Note: It is very important to verify spindles are all the same length. Measure and cut accordingly. Method uses spacer blocks between the spindles, and does not require pre-drilling of the metal insert. To apply this method as a stair rail assembly, please see preparation instructions, page 9. Metal Insert Long Post Cap () Top Rail () Short Post s () 3" Composite Deck Screws (6) s Traditional 6' section : ~5 Check with local building code Lower Rail () Ring Base () Note: Though spindles may appear to be square, one side is slightly longer than the other. When installing, make sure to align the narrower end of the spindle into the metal insert to ensure proper fit. Metal Insert () Spacer Blocks Number according to spindles Post Sleeve () Spacer Blocks Number according to spindles Support Block Check with local building code Rail Section: Metal insert Spacer block Support block Top Cap Post Sleeve Upper Spacer block Lower Base Ring

Method Installation: 3 4 5 6 7 8 9 Starting with the post spindle set even with the end of the insert, continue down the top rail, evenly spacing spindles, making sure to meet local building code for spacing. Keep in mind an additional post spindle is placed even with the opposite end of the insert. Measure the distance between spindles and cut spindle spacer blocks from UltraDeck spindles for the upper and lower railing. The two post spindles will need to be pre-drilled to attach the completed rail to the post sleeves. Using a /8" drill bit, drill three holes at a 60 angle in the spindle, spacing them 3-/" from the top and bottom, and one on center. All rail spans over 3' require a spindle support block centered under the lower rail assembly. Check with local building codes and cut the support block to the required height from UltraDeck spindles. Starting with one of the post spindles, begin sliding the spacer blocks and spindles into the profile of the metal insert. Make sure the post spindles are flush on the ends of the assembly. Slide the upper handrail over the metal insert. This is intended to be a tight fit; please use soap as a lubricant if needed. Pre-drill and fasten the spacer blocks and spindles to the top rail using " corrosion resistant screws. To install the support block, attach the block to the bottom side of the lower rail by fastening a screw through the lower rail into the support block. Slide the spindles and spacer blocks into the profile of the lower railing. Pre-drill and fasten the spacer blocks using " corrosion resistant screws. Position the rail assembly between the post sleeves, following local building code height requirements. Secure the post spindles to the post sleeves using six 3" composite deck screws through the pre-drilled holes. Align the post caps with the top of the post sleeve and slide into place. A silicone adhesive may be used to secure the cap. Metal Insert 4 Upper 6 7 spacer block " corrosion resistant screws Metal Insert 8 Post Support Block Lower 4x4 Post Pre-drill spindles at a 60 angle

Railing Installation: Your installation guide for Rustic Railing Method Railing System:! Make sure the post sleeve and ring base have been installed. Make sure post is plumb and level. Properly size the top and lower rail, and metal insert by measuring the distance between the two post sleeves, and cut to desired length. Makes sure the spindles are all the same length, measure and cut accordingly. Cut a 6" piece of metal insert for the support block assembly. i Note: It is very important to verify spindles are all the same length. Measure and cut accordingly. Method does not require spacer blocks between spindles, requires pre-drilling of the metal insert, and the top and lower rail profiles are identical. To apply this method as a stair rail assembly, please see preparation instructions, page 9. Metal Insert Long Short Note: Though spindles may appear to be square, one side is slightly longer than the other. When installing, make sure to align the narrower end of the spindle into the metal insert to ensure proper fit. Rail Section: Top Cap Post Sleeve Post Cap () Top Rail () 3" Composite Deck Screws (6) Metal Insert () 3-/" Premium Deck Screws Metal insert Upper Post s () s Traditional 6' section : ~ 5 Check with local building code Lower Rail () Ring Base () Post Sleeve () 6" Metal Insert Support Block Check with local building code Support block Lower (See detail 5) Base Ring

Method Installation: Starting with the post spindle, set even with the end of the insert, continue down the top rail, evenly spacing spindles, making sure to meet local building code for spacing. Keep in mind an additional post spindle is placed even with the opposite end of the insert. Pre-drill holes on the metal insert with a /4" drill bit, aligning the center of the spindles to the center of the metal handrail insert. On each end of the spindles, pre-drill the center, using a /8" drill bit to avoid splitting. The two post spindles will need to be pre-drilled to attach the completed rail to the post sleeves. Using a /8" drill bit, drill three holes at a 60 angle in the spindle, spacing them 3-/" from the top and bottom, and one on center. 3 All rail spans over 3' require a spindle support block centered under the lower rail assembly. Check with local building codes and cut the support block to the required height from UltraDeck spindles. 4 Taking the metal insert, begin to slide the spindles into place, aligning the pre-drilled holes. Starting with the center spindle, attach metal insert and spindles using 3-/" premium deck screws. Attach post spindles flush on the two ends of the assembly. Remember spindles must be centered to ensure ease of assembly when attaching the top rail. Do not use composite deck screws. 5 Position the lower rail so the spindles will rest on the top side of the rail. Secure the spindles to the rail from the underside using quality 3-/" premium deck screws. Do not use composite deck screws. Screws should be snug; do not over tighten. 6 7 Slide the top rail onto the metal insert with attached spindles. This is intended to be a tight fit; please use soap as a lubricant if needed. To install the support block, take the 6" piece of metal insert, slide the support block into the profile of the insert, and secure with a premium deck screw. Slide the insert to the center of the lower rail. 8 Position the rail assembly between the post sleeves, following local building code height requirements. Secure the post spindles to the post sleeves using six 3" composite deck screws through the pre-drilled holes. 9 Align the post caps with the top of the post sleeve and slide into place. A silicone adhesive may be used to secure the cap. inote: Make sure screw is centered. If screw head falls out of groove, sliding rail may be difficult. 4,6 Metal Insert 5 7 Deck Screws Upper i Lower 6" Metal Insert Lower 8 4x4 Post Support Block Pre-drill spindles at a 60 angle 3

Railing Installation: Your installation guide for Fusion Railing 4! Make i Note: Fusion Railing System: sure the post sleeve and ring base have been installed. Make sure the post is plumb and level. Properly size the upper and lower rail and the top cap by measuring the distance between the two post sleeves, and cut to desired length. Make sure the spindles are all the same length, measure and cut accordingly. It is very important to verify spindles are all the same length. Measure and cut accordingly. To apply this method as a stair rail assembly, please see preparation instructions, page 9. Fusion railing is installed with a composite insert; stair railing assembly will use lower rail for both top and bottom rail. Top Rail () Post Cap () 3-/" Premium Deck Screws Rail Section: Top Cap Post () Insert () 3" Composite s Deck Screws (6) Traditional 6 section: ~ 5 Check with local building code insert Upper handrail Post Sleeve Lower Railing () Ring Base () 6" Insert () Post Sleeve () Support Block() Check with local building code Lower handrail Support block

Fusion Installation: 3 4 5 6 7 8 9 Starting with the post spindle set even with the end of the insert, continue down the top rail, evenly spacing spindles, making sure to meet local building code for spacing. Keep in mind an additional post spindle is placed even with the opposite end of the insert. On each end of the spindles, pre-drill the center, using a /8" drill bit to avoid splitting. The two post spindles will need to be pre-drilled to attach the completed rail to the post sleeves. Using a /8" drill bit, drill three holes at a 60 angle in the spindle, spacing them 3-/" from the top and bottom, and one on center. All rail spans over 3' require a spindle support block centered under the lower rail assembly. Check with local building codes and cut the support block to the required height from UltraDeck spindles. Taking the handrail insert, begin to slide the spindles into place, aligning the pre-drilled holes. Starting with the center spindle, attach handrail insert and spindles using 3-/" premium deck screws. Attach post spindles flush on the two ends of the assembly. Remember spindles must be centered to ensure ease of assembly when attaching the top rail. Do not use composite deck screws. Position the lower rail so the spindles will rest on the top side of the rail. Secure the spindles to the rail from the underside using quality 3-/" premium deck screws. (Do not use composite deck screws) Slide the top rail onto the handrail insert with attached spindles. From the underside of the handrail insert, attach the top rail using eight 3/4" screws, equally spacing them along the handrail, using four on each side of center. To install the support block, cut a 6" piece of handrail insert and slide the support block into the insert and secure with a premium deck screw. Center handrail insert into the profile of the lower handrail. Position the rail assembly between the post sleeves, following local building code height requirements. Secure the post spindles to the post sleeves using six 3" composite deck screws through the pre-drilled holes. Align the post caps with the top of the post sleeve and slide into place. A silicone adhesive may be used to secure the cap. 6 Upper 7 Deck Screw Lower rail Deck Screw 8 4x4 Post Insert Support Block 6" Insert (For over support block only) Pre-drill spindles at a 60 angle 5

Cleaning UltraDeck : UltraDeck should be periodically cleaned, at least twice a year, with soap and water or any product made for washing composite decking. Check out the how-to-video for cleaning any UltraDeck decking and railing products on the Midwest Manufacturing website. For cleaning of more stubborn dirt and debris, follow these guidelines: PROBLEM Dirt and Debris Chalk Lines Water Spots, Leaf Staining and Wood Tannins Scuffs and Abrasions Rust Stains, Ground-In Dirt and Grime and Pigment Staining Mold and Mildew Oil, Grease and Food Using a Pressure Washer Sanding Disposal SOLUTION Clean deck to remove dirt and debris. Soap and water is all that is needed. Most colored chalks are permanent. Use baby powder or Irwin Dust-Off Marking Chalk (SKU 44-34), available at your local Menards. Tannin leaching occurs naturally in UltraDeck and all wood-based products. Allow for at least weeks of normal weathering for spots to disappear. Scuffs and abrasions can fade or disappear naturally after -6 weeks of weathering. Use soap and water to clean your deck. If further cleaning is needed, use Wolman DeckBrite (SKU 553-993), available at your local Menards. Semi-annual (spring and fall) cleaning of your deck is important to prevent buildup of pollen and other debris that can support mold growth. If mold colonies appear, clean the deck with soap and water. If further cleaning is needed, use Wolman DeckBrite (SKU 553-993), available at your local Menards. If the deck has not been cleaned regularly, it may require several washes to completely remove all mold colonies. Rinse the stain with hot water as soon as possible. To remove stains, use Oil Grabber (SKU 56-605), available at your local Menards. A pressure washer may be used on your UltraDeck deck. Use no more than 500psi with a fan tip kept at least " away from the deck. Sanding is not recommended. Sanding will change the appearance of the surface of UltraDeck material and will void the warranty with respect to any condition caused by the sanding. UltraDeck decking products should be disposed with normal construction debris or household waste. DO NOT burn UltraDeck products. Limited 0 Year Warranty: MIDWEST MANUFACTURING warrants to the original purchaser of any UltraDeck decking product, who purchased and installed the product for residential purposes, that such product will not split, rot, warp, or suffer structural damage from fungal decay for a period of ten (0) years, beginning on the date that the product was purchased and continuing until this period of time has elapsed, or until the property on which the UltraDeck decking product was originally installed has transferred ownership. The warranty only applies to the original purchaser, who must present an original purchase invoice or receipt, and is non-transferable. LIMITATIONS. The warranty does not cover defects that occur through normal wear and tear and weathering of the UltraDeck decking product ( The Product ), misuse of the product or negligence in the use of the product, improper storage and handling of the product prior to installation, or lack of maintenance of the product in a manner inconsistent with or contrary to the point of sale material provided. Minor surface irregularities and color differences are a natural characteristic of polyethylene and may be slightly visible on the woodgrain surface and will be visible on the underside of the decking. Any such irregularities do not constitute a product defect. MIDWEST MANUFACTUR- ING will replace, at its own opinion, any UltraDeck decking product used for residential purposes that is deemed defective within the ten (0) year period for which this warranty applies. The original purchaser must supply MIDWEST MANUFACTURING with the original purchase invoice indicating the date of purchase and showing sufficient UltraDeck product was purchased to cover the amount claimed to be defective. If the product must be replaced due to splitting, rotting, warping, or structural damage from fungal decay, according to the sole discretion and judgment of MIDWEST MANUFACTURING, MIDWEST MANUFACTURING will send the replacement product to the store where the product was originally purchased. The original retail purchaser(s) to whom this warranty applies must then, at their own expense, pick up the replacement product. The original purchaser(s) must pay all costs of the removal of defective product or installation of the replacement, including labor. No monetary compensation will be paid by MIDWEST MANUFACTURING. MIDWEST MANUFACTURING SHALL NOT BE LIABLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING, BUT NOT LIMITED TO, LOSS OR DAMAGE TO PERSONAL OR REAL PROPERTY, INCONVENIENCE, OR LOSS OF INCOME. This warranty provides you with specific legal rights, and you may have other rights under state law. Some states do not allow for the limitation or exclusion of incidental or consequential damages or limits on the length of an implied warranty, so some of the above limitations or exclusions may not apply to you. www.midwestmanufacturing.com 06 edition 903-068