The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

Similar documents
SECTION MANHOLES

Standard Specifications

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

SECTION MANHOLES

Section COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.

Construction Specification for Watermain and Water Service Tracer Wire

SECTION PRECAST CONCRETE STRUCTURES

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.

SECTION 39 - MANHOLES TABLE OF CONTENTS

REQUEST FOR BIDS WELL #4 ABANDONMENT

STRUCTURES FOR SANITARY AND STORM SEWERS

Section Heavy Duty Slide Gates Tender No. [ ] Page 1

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION METAL FABRICATIONS

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Appendix C Construction Details

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

DISTRIBUTION VAULT 8' x 14' x 9'-4" DEEP TRAFFIC FLAT WALL WITH 5' x 8' OPENING

This specification describes the minimum requirements for piping systems for the following service:

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

PART MATERIALS. Section Fencing Materials. Description

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE:

Ford Water Meter Couplings & Accessories

GENERAL ELEVATION SECTION A-A

FIELD LOK 350 Gasket 4" 24"

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Section 914. JOINT AND WATERPROOFING MATERIALS

FOR SERVICE BOXES IN CONCRETE DRIVEWAYS, SEE NOTE Min. COVER UNDER DITCHES. 600 Min. COVER

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

SPECIFICATION: ALUMINUM SLIDE GATES

Figure 11 Flange Adapter and Back-Up Ring

AF-4 Grooved Flange Adapter

SECTION TRAFFIC SIGNAGE

Rodney Hunt. A GA Industries Company Glydaseal Gates

GENERAL ISOMETRIC LAYOUT

This specification describes the minimum requirements for piping systems for the following service:

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

General Information...SA1-SA4

General Information. Ball Curb Valve

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove

Item 550 Chain Link Fence

STANDARD SPECIFICATIONS SECTION PRECAST CONCRETE 1.2 REQUIREMENTS FOR MANUFACTURERS AND SUPPLIERS BEFORE DELIVERY

Evaluation of In-Pavement Light Fixture Designs and Performance

Fluid Sealing Association

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Series 6000 Vinyl Single Hung

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS


StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS

5.1 MUELLER CORPORATION VALVES. MUELLER 300 Ball Type Corporation Valves

CS3 represents manufacturers of products for use in the municipal waterworks industry.

STEEL PIPE GUIDERAIL 01/01/

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

Thru Wall Floor Seals For New Installation

Design and Construction Standards SECTION ATHLETIC LOCKERS

Series 9000 Vinyl Fixed Window

3400 Tectura Designs Precast Concrete

SECTION TRACER WIRE FOR NONMETALLIC PIPE

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.

TECHNICAL SPECIFICATION FOR STEEL DRY CARGO CONTAINER 6'x1960mmx1920mm TYPE

SECTION THERAPEUTIC POOL ACCESSORIES

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

This specification describes the minimum requirements for piping systems for the following service:

PENSTOCK VALVES. Performance through Excellence

ABOUT INLAND. Tannis Karklin, E.I.T Technical Sales and Marketing

SECTION METAL CASTINGS AND FABRICATIONS

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg

Transcription:

September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers and/or combination chambers as shown on the Plans including: the supply and installation of a precast reinforced concrete structure or special manhole; the supply and installation of piping, valves, fittings, meters and related appurtenances; the supply and installation of miscellaneous metal; the sanding, priming and painting of all uncoated non-galvanized iron and steel products; the connection of the chamber to the pipeline or forcemain external to the chamber, and the testing of the completed works. 1.2 CLASSIFICATION OF WORK.1 AIR RELEASE - shall be classified on the basis of the nominal inside diameter of the pipe passing through the chamber..2 FLUSHOUT - shall be classified on the basis of the nominal inside diameter of the pipe passing through the chamber..3 VALVE - shall be classified on the basis of the nominal inside diameter of the valve installed in the chamber..4 METER - shall be classified on the basis of the nominal inside diameter of the pipe passing through the chamber..5 COMBINATION - shall be classified on the basis of the nominal inside diameter of the pipe passing through the chamber, and on the basis of the combination of air releases, flushouts, valves and meters as may be required to be installed. 1.3 STANDARDS The following organizations publish Standards which have been referred to in this Section:.1 CSA International 178 Rexdale Boulevard Toronto, ON M9W 1R3

September 2013 Page 2 of 8.2 ASTM American Society for Testing and Material 100 Barr Harbor Drive West Conshohocken, PA 19428-2959 USA.3 CGSB Canadian General Standards Board Lac Du Portage 111, 6B1 11 Laurier Street Gatineau, QC K1A 1G6.4 AWWA American Water Works Association 666W. Quincy Avenue Denver, Colorado 8235 U.S.A. 1.4 QUALITY ASSURANCE.1 CONCRETE - The Engineer shall carry out tests on concrete as he considers necessary in accordance with the current CSA Standard A23.2, Method of Test for Concrete. Such tests shall be at the expense of the Owner except that the Contractor shall provide any and all test samples free of charge..2 LEAKAGE The Contractor, under the Supervision of the Engineer, shall undertake infiltration and exfilteration testing of the completed chamber to ensure the manhole is watertight..3 TESTING AND OPERATION The Contractor and if required the suppliers of major components shall test the operation of the chamber under the direct supervision of the Engineer..4 WELDED JOINTS - The Engineer shall test joints by x-raying or other means. Such tests shall be at the expense of the Owner, except that the Contractor shall supply any and all test samples free of charge. Welders shall hold a valid Welder s Licence in the Province of Manitoba and be certified by Manitoba Labour and Immigration..5 PRESSURE TEST - The Contractor shall pressure test the piping in the chamber under the direct supervision of the Engineer. 1.5 STORAGE AND HANDLING.1 Products and materials associated with the construction of the chamber shall be stored and handled in accordance with the recommendations of the manufacturer and in a manner approved by the Engineer.

September 2013 Page 3 of 8 1.6 INSPECTION.1 Inspection of the work described in this Section shall be performed by the Engineer. Part 2 Products 2.1 APPROVED PRODUCTS.1 Products shall be supplied in accordance with the Listing of Approved Products in the attached Appendix, or shown on the Plans or Specified in Section 01001, Special Provisions. 2.2 PRECAST CONCRETE MANHOLE CHAMBER.1 OVER 1200 mm IN DIAMETER - Chamber structures shall be precast reinforced concrete manholes conforming to ASTM C478 Standard for Pre-cast Manhole Section complete with: precast reinforced base and top slab, each designed for 700 kg live load, with galvanized steel, painted steel or aluminium access hatch frame and cover unit, complete with hasp and padlock, cast-in-place with the top slab; tongue-in-groove manhole section joints with deformable bituminous gaskets ("Ram-nek" or approved equal); cast-in-place openings as required; and cast-in-place galvanized or aluminium manhole rungs. The exterior of the pre-cast manhole section shall be wrapped with 16 mil polyethylene plastic..2 1200 mm IN DIAMETER Chamber structures shall be precast reinforced concrete manholes conforming to ASTM Standard C478, Standard for Pre-cast Manhole Section. The base section shall be 1200 mm in diameter, 1.2 metres high, with a precast floor and cast-in-place openings as required. The flat top reducer shall be 1200 mm x 750 mm x 1.05 metres high. The riser shall consist of 750 mm diameter sections. Base, reducer and riser sections shall have tongue-in-groove joints with deformable bituminous gaskets ("Ram-nek" or approved equal) and cast-in-place galvanized or aluminium manhole rungs. A galvanized steel, painted steel or aluminium access hatch frame and cover unit, complete with hasp and padlock, cast in place with the top section shall be provided for access..3 PRECAST CONCRETE - Precast concrete chamber structures other than manholes shall be supplied and installed by the Contractor to the dimensions shown on the Plans, The Standard Drawing on Page 8 of 8 of this Section or as specified in Section 01001, Special Provisions. A galvanized,

September 2013 Page 4 of 8 painted steel or aluminium access frame and cover, complete with lockable mechanism and gasket, shall be provided as shown on the Plans. An external 225 mm wide manhole chimney seal assembly shall be provided to seal the joint between the access manhole and the chamber (Note: chimney seal should be installed under polywrap). 2.3 CONCRETE GROUT.1 Concrete grout shall be non shrink type in accordance with Clause 2.7.6 of Section 03300, cast in place concrete, or as specified in Section 01001, Special Provisions. 2.4 PIPE AND FITTINGS.1 Pipe and fittings shall be supplied in accordance with the Listing of Approved Products and Section 150500, Basic Materials and Methods, and as indicated on the Plans or specified in Section 01001, Special Provisions. 2.5 VALVES, METERS APPURTENANCES.1 Valves, meters and appurtenances shall be supplied in accordance the Listing of Approved products and Section 150500, Basic Materials and Methods, and as indicated on the Plans or Specified in Section 01001, Special Provisions. 2.6 CONNECTIONS TO LINE.1 The internal flanged steel, iron or PVC piping shall be connected to the water pipeline (or forcemain) by means of suitable adaptors or couplings approved by the Engineer. If the pipeline (or forcemain) is polyethylene, the connection shall be made by means of a polyethylene flange assembly (polyethylene stub end of the same size as the pipeline, with ductile iron epoxy coated backup ring, full faced red rubber gasket and all stainless steel nuts, bolts and washers). If the pipeline (or forcemain) is PVC, the connection shall be made by means of a PVC flange, full faced red rubber gasket, and all stainless steel nuts, bolts and washers. The pipeline passing through the precast chamber flat wall shall utilize a link seal assembly. 2.7 INSULATION.1 Insulation shall be 50 mm thick rigid polystyrene in conformance with the current CGSB-51-GP-20M or CAN/ULC S701 type 4 or approved equal and shall be fastened in accordance with the manufacturer s recommendations or as shown on the Plans or Specified in Section 01001, Special Provisions. Miscellaneous metal

September 2013 Page 5 of 8 shall be supplied in accordance with Section 059000 Miscellaneous Metal, and as indicated on the Plans and in Section 01001, Special Provisions. 2.8 MISCELLANEOUS METAL.1 PIPE SUPPORT STRAPS Shall be all stainless steel with all stainless steel nuts, bolts, and washers..2 VENTILATION PIPING shall be seamless black steel thin wall pipe with light gauge welded fittings..3 ACCESS HATCH shall be a galvanized steel, painted steel or light aluminum hinged frame with a continuous gasket and lockable cover unit. Part 3 Execution 3.1 EXCAVATION BEDDING AND BACKFILLING.1 This portion of the work shall be undertaken in accordance with Section 022190, Structural Excavation, Backfilling and Compaction, and with Section 022180, Pipe Excavation, Bedding and Backfilling. 3.2 ALIGNMENT AND GRADE.1 The chamber shall be constructed to the alignment and grade shown on the Plans or as staked on the ground by the Engineer. 3.3 JOINING SECTIONS.1 When the chamber requires assembly of precast concrete sections then all precast concrete slabs and sections shall be sealed with a deformable bituminous gasket Ram-nek or approved equal. The sections and top slab shall be joined such that the ladder rungs line up vertically and align properly with the access hatch frame and cover unit. All joints shall be grouted in the interior and exterior of the chamber with approved non shrink concrete grout. 3.4 GROUTING.1 All holes, joints, and pipe passing through the chamber walls shall be grouted with non shrink grout.

September 2013 Page 6 of 8 3.5 CUTTING PIPE.1 Pipe shall be saw-cut to the correct lengths and the edges bevelled (or squared as in the case of polyethylene and steel pipe) for joining purposes. 3.6 WELDING.1 Welding of pipe and fittings shall conform with the current AWWA C206, Standard for Field Welding of Steel Water Pipe. 3.7 JOINING PIPE AND FITTINGS.1 All flanged pipe, valves, and fittings shall be bolted together with a rubber gasket between the flange faces. Nuts, bolts and washers joining pipe shall be all stainless steel. 3.8 PIPELINE CONNECTIONS.1 The water pipeline (or forcemain) shall be connected to flanged piping and fittings by a method approved by the Engineer. Where pressure pipelines pass through walls of the chamber, the Contractor shall ensure that no ground water infiltration occurs. The Contractor shall utilize a sleeve cast into the wall of the chamber with sleeve inside diameter conforming to the correct approved link seal for the diameter of pipe being installed. 3.9 INSULATION.1 Insulation shall be fastened in accordance with the manufacturer s recommendations and as shown on the Plans and described in Section 01001, Special Provisions. 3.10 RURAL PIPELINE METER CHAMBER.1 A typical Detail of a Rural Pipeline meter chamber is shown on page 8 of 8. The Contractor shall install the precast chamber with the holes/sleeves cast into the chamber to provide for the installation of a link seal. The vertical riser on the top of the chamber shall be installed with deformable bituminous gasket Ram-nek or approved equal, grouting, and mechanical external manhole chimney seal to prohibit ground water from entering the chamber. The exterior of the meter chamber shall be damp-proofed with asphaltic compound meeting the requirements of CGSB 37-GP-2B Emulsified Asphalt Compounds or CGSB 37- GP-6C Asphalt Cut-Back.

September 2013 Page 7 of 8 3.11 TESTING.1 The piping in the completed chamber shall be pressure tested in accordance with Section 027060, Pressure Pipelines. The chamber shall be tested for infiltration. The chamber shall be completely dry at the beginning of the test. Any infiltration which occurs over a 7 day period shall be noted by the Engineer, and remedial action shall be taken by the Contractor. The tests shall be repeated until all defects are eliminated to the satisfaction of the Engineer. Any defects shall be corrected by the Contractor at his own expense. Chambers consisting of a single piece precast unit shall have no leakage into the chamber or through sleeved connections for pipeline, watermain, or forcemains.