PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

DESIGN CHECKLIST INTRODUCTION

POWER SERVICE DETAILS

American Electrical Institute

CONTINUING EDUC ATION

SECTION 5 TRANSFORMERS

Page Electric Utility Service Specifications

Single-Family Dwelling Submittal Requirements

Article 250 Grounding & Bonding

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

SECTION PANELBOARDS

Wisconsin Contractors Institute Continuing Education

Electrical IP Red Seal Practice Exam

Customer Connection Guide Updates Effective May 2017

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

B. Manufacturers: Square-D, G.E. or Westinghosue.

BUILDING PLAN REVIEW REQUIREMENTS

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Short Circuit Current Calculations

MERALCO Standards: Electrical Design. Engr. Eduard Mercado Electrical Design Team

3Ø Short-Circuit Calculations

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

Residential Construction Checklist Single and Two Family Construction

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement

Electrical Wiring: Commercial, Seventh Canadian Edition

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

City of Thousand Oaks

INTELLIMETER REGISTER

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Chapter 25. Lighting Plans

Article 225: Outside Branch Circuits And Feeders

FTTH ENGINEERING AND INSTALLATION INTRODUCTION

SECTION DISTRIBUTION SWITCHBOARDS

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Journeyman's Practice Exam

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION TRANSFORMERS

Bid No. B14-02 Building 100 HVAC Improvements

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Customer Requirements RF Antenna Installations

A/E REVIEW CHECKLIST HVAC

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

SECTION DISTRIBUTION SWITCHBOARDS

TABLE OF CONTENT

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

PLAN SUBMITTAL REQUIREMENTS

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Continued from Part 1 Rules 1 25.

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY

Non-Residential and Multi-Family Plan Check Submittal Requirements

Planning Guidelines. Lightcloud. Best Practices for Installing Lightcloud

FDM Medium Voltage Controller

The Variable Threshold Neutral Isolator (VTNI)

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

3 Basic Code Enforcement, Part 3

Electrical Standards Division 16

Design Deliverables. Summary. A. Expectations for Design Deliverables:

BGE STRATEGIC CUSTOMER ENGINEERING

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

Grounding Recommendations for On Site Power Systems

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

SECTION EQUIPMENT WIRING

FAQ ON EARTHING STANDARDS 16/08/2018

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

VILLAGE OF ALGONQUIN COMMUNITY DEVELOPMENT 2200 Harnish Drive Algonquin, IL Phone (847) Fax (847)

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

Electrical Calc Elite

Datawave Magnetic Synthesizer

Residential Room Addition / Remodel Submittal Requirement Checklist

2018 Consultant s Handbook Division 26 Electrical ARC Flash Hazard Analysis

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

METER - INSTALLATION Pad Mount Transformer

2014 NEC Changes Part 1

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

ADDENDUM NO. 3. Ellis County Elections Building

Transcription:

Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not part of architectural set b) Next drawing (s) riser, service details c) Next drawing (s) feeder information d) Next drawing (s) lighting plan e) Next drawing (s) power plan f) Last drawing is Specs if stand alone 2) Information from other disciplines a) Civil i) Pond Pumps ii) Rain Water Pumps b) Mechanical i) HVAC ii) Fans iii) Compressors iv) Ventilation (75 CFM/Fixture) v) Ventilation Control vi) Plumbing vii) Irrigation viii)control c) Sanitary i) Control ii) Sump iii) Control d) Architectural 3) Check symbol legend for accuracy, verify there is only one symbol legend 4) Fire Alarm a) Note location of in-duct Smoke Detectors b) Note location of Flow Sensor switches and location of alarm annunciator point Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 1 of 7

5) Telephone a) Type of Landing device b) In Conduit or Rings c) Network Communication d) Client Supplied e) In Conduit or Rings f) Type of Connection 6) Network Communication a) Client Supplied b) In Conduit or Rings c) Type of connection d) How is network service getting to new devices e) Delineation of responsibility 7) Single Line Diagram a) Panel sizes b) Spaces c) Al/Cu busses d) Interrupt Rating e) Bolt in/clip in/rack in breakers f) 100%/200% Neutral g) Frame Sizes h) Trip Sizes i) 10% Spares 8) Ground Triangle a) 10 ft from outdoor XFMR. b) Single Gnd/Neut Connection indoor XFMR c) Two Electrodes to triangle d) Electrodes To Water lines e) Bond on Bldg. Side of Cathodic Protection Barrier 9) Ground Notes a) Isolated Ground b) Hi Z Ground c) GFI d) Cathodic Protection 10) Site Lighting 11) Site Power Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 2 of 7

12) Emergency Lights connected to light circuit ahead of switching devices or attached to Night Light circuit 13) Emergency Lights connected to light circuit ahead of switching devices or to NL Ckts 14) Exit Ways Only Lit 15) Remote head over each outside door 16) Quartz restrike/nightlight Circuits in areas W/ HID Lighting 17) Fault Value Shown on Single Line a) Notes specifying equipment AIC that exceeds available fault b) Show current limiting fusing to reduce below 10ka where applicable 18) Lighting Budget Shown on Drawing 19) Existing Electric devices Involved in Demolition 20) Existing Electric devices that remain require power 21) Lights along sidewalks 22) Owner approval of lighting fixtures. a) Direct/Indirect b) Troffer i) Parabolic ii) Lensed c) Surface i) Parabolic ii) Lensed d) Industrial i) MH/HPS e) Restroom Lighting f) Exit (Battery issues) g) Emergency (Battery issues) 23) Protective Devices Coordinated 24) Drawings Properly Numbered. a) Details Properly numbered 25) Conduit + Wire Schedule a) Use for Busway system where loads are known Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 3 of 7

i) Show bus plug size, conduit, wire, fuse size (current limiting? What to?), motor / load size. b) Properly references runs c) Shows Wire Sizes d) Shows Proper number of wires e) Shows Conduit Size f) From /To Information 26) Riser Diagram a) XFMR/ Ownership b) Meter Box c) Meter section DP&L d) Mounting height e) Who Supplies f) Conduit to CT's g) Size/type h) Verify that conduit sizes are consistent on drawing 27) Service entrance a) Ground fault protection where required (>250V; >800 Amps) b) No more than six grouped disconnects c) Working space provided around gear (show on riser drawing and layout view) d) Service drop adequate height and clearance e) Underground detail for UG services f) Concrete around High Voltage lines g) Divided vault on Customer owned padmount h) Has neutral in service entrance and in gear on 4 wire transformer i) No neutral on 3 wire transformer j) Account for Utility Metering Meter box mounting, conduit for CT/PT k) CT/PT Box where applicable. Note who provides/installs 28) Load Calculations shown on Single Line a) 125% of existing load from utility readings b) 125% lighting c) 100% of fixed equipment d) Diversified receptacles 29) Sched 40 PVC /no ground a) Depth of Conduit b) Sweeps c) THHW d) XFMR Pad e) Housekeeping Pad - 3½" f) Rebar 6" Centers on 2" chairs-bonded to Copper Gnd Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 4 of 7

30) Site Grounding a) Rod every 150' around perimeter b) Ground Ring c) Exothermic welded d) 5/8" x 8' Ground rods-copper weld 31) Symbol Legend a) All fixtures shown b) Approved Cat. Number c) "Or Approved Equal" 32) Lighting Drawing a) All Circuited b) 1.25 Multiplier to all load c) Light on roof HVAC d) Egress ways lit e) Exit lights on all rooms with 2 or more exits f) Emergency lights on exits 33) Receptacle Plan a) All Circuited - Pnl/Ckt b) Mounting height c) GFI within 6' of Sink d) GFI Exterior e) 180 VA /receptacle f) Split Wired receptacles off 2 Pole Breaker g) No Shared Neutrals h) Owner Selection of Style i) Owner Selection of Color j) Within 6' of all pts. Along Baseboard k) Within 6' of HVAC 34) Feeder Layout a) Supports Every 10 ft b) Rigid Conduit c) 360 Maximum Bend Radius d) 36" Flex @ Motors 100 Hp. & Greater e) 24" Flex @ Motors 25 >n>100 f) 12" Flex @ Motors < 25 Hp. 35) Motors a) Starters Supplied b) Disconnects at Motors c) Heaters Specified d) Feeders sized at 125% of largest plus 100% of remainder Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 5 of 7

36) Control Wiring a) Garage Doors - Operators b) Heating - Thermostats 37) Title block a) Properly depicts what is on Dwg. b) Design Firm Noted 38) ''Contractor to verify present conditions" on dwgs. 39) "Contractor to verify that specified parts and part numbers work together as intended." 40) Note: "All wiring & wiring devices shall be UL listed & installed per NEC; all wiring, devices and equipment installation to be completed in accordance with OBC. Conformance of installation of electric conductors and equipment to NFPA 70 listed in Chapter 35 of 2002 OBC shall be prima facie evidence that such installations are reasonably safe for use per Article 2701.1 2002 OBC." 41) Disconnection means for all motors in excess of ¼ horsepower (can be motor rated snap switch up to 1 hp) 42) Ground electrode sizes noted on all separately derived systems. 43) All areas with more than one exit have exit signs. 44) Note: "metal siding to be firmly attached to steel substructure, which is firmly grounded, or shall be attached to ground rod every 150 feed of building perimeter" 45) Transformers a) Provided transformer class rating over 112 kva (NEC 450-1 b) Transformers over 112.5 kva in 1 hr fire rated room or have insulation class of 155 (80 degree C rise) (NEC 450-21) c) Oil Containment for Liquid filled indoor transformers (containment out of doors?) d) Primary and secondary protection adequate e) Ventilation requirements f) Grounding details present 46) Note: "Water line attached to ground electrode within 5 feet of building entrance" 47) Provide mounting detail for "Special" fixtures. Includes high and low bay HID's. Show safety chain and hook on purlain. Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 6 of 7

48) All restroom outlets GFI 49) IDC Engineering, Inc., address, and phone is on each sheet 50) Notation Drawing is property of IDC Engineering, Inc., Unauthorized use or copying is prohibited 51) Notation of Preliminary or Final 52) Note: "Contractor to assure that sufficient work space access remains around electric equipment as required by NEC Article 110-26" 53) Conduits that terminate in weatherheads shall be 25% larger than required by NEC. 54) Note QC check by and date on drawing. File Closeout 1) Design Cut Sheets 2) Approved Cut Sheets 3) Contract 4) Lighting Design Sheets 5) Correspondence 6) Meeting notes 7) Time Sheets 8) Outside Services Invoices 9) Panel Schedules 10) Load calculations 11) Design Assumptions 12) Photos Property of IDC Engineering, Inc.; No portion may be Reproduced or Page 7 of 7