GEM Detector Assembly, Implementation, Data Analysis

Similar documents
Recommissioning the Qweak Drift Chambers Using a Cosmic-Ray Telescope

Testing the Electronics for the MicroBooNE Light Collection System

Uva GEM R&D Update. Nilanga Liyanage

Cosmic Rays in MoNA. Eric Johnson 8/08/03

Goal of the project. TPC operation. Raw data. Calibration

A Large Low-mass GEM Detector with Zigzag Readout for Forward Tracking at EIC

Scintillators as an external trigger for cathode strip chambers

Trigger Rate Dependence and Gas Mixture of MRPC for the LEPS2 Experiment at SPring-8

Multi-Wire Drift Chambers (MWDC)

HF Upgrade Studies: Characterization of Photo-Multiplier Tubes

Status of UVa

Introduction to TOTEM T2 DCS

TPC Readout with GEMs & Pixels

A New GEM Module for the LPTPC. By Stefano Caiazza

INITIAL PERFORMANCE STUDIES OF THE FORWARD GEM TRACKER A THESIS SUBMITTED TO THE GRADUATE SCHOOL IN PARTIAL FULFILLMENT OF THE REQUIREMENTS

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem

Study of the ALICE Time of Flight Readout System - AFRO

Large Size GEM Detectors for 12 GeV Program in Hall A at JLab

The on-line detectors of the beam delivery system for the Centro Nazionale di Adroterapia Oncologica(CNAO)

Discharge Investigation in GEM Detectors in the CMS Experiment

GEM chambers for SoLID Nilanga Liyanage. University of Virginia

arxiv: v1 [physics.ins-det] 25 Oct 2012

Traditional analog QDC chain and Digital Pulse Processing [1]

PMT Calibration in the XENON 1T Demonstrator. Abstract

1.1 The Muon Veto Detector (MUV)

OPERATING CHARACTERISTICS OF THE GEIGER COUNTER

The CMS Outer HCAL SiPM Upgrade.

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Pulse Shape Analysis for a New Pixel Readout Chip

arxiv:physics/ v1 [physics.ins-det] 19 Oct 2001

Physics Laboratory Scattering of Photons from Electrons: Compton Scattering

Full characterization tests of Micromegas with elongated pillars

Seminar. BELLE II Particle Identification Detector and readout system. Andrej Seljak advisor: Prof. Samo Korpar October 2010

The Multigap RPC: The Time-of-Flight Detector for the ALICE experiment

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Milestone Report

Triple GEM detector as beam monitor Monitors for Crystal experiment at SPS A compact Time Projection chamber with GEM

1 Detector simulation

Data Acquisition System for the Angra Project

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Charge-Sensing Particle Detector PN 2-CB-CDB-PCB

Studies of a Bulk Micromegas using the Cornell/Purdue TPC

Development and tests of a large area CsI-TGEM-based RICH prototype

KLauS4: A Multi-Channel SiPM Charge Readout ASIC in 0.18 µm UMC CMOS Technology

Performance Characterization Of A Simultaneous Positive and Negative Ion Detector For Mass Spectrometry Applications

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

arxiv: v2 [physics.ins-det] 17 Oct 2015

Development of large readout area, high time resolution RPCs for LEPS2 at SPring-8

Average energy lost per unit distance traveled by a fast moving charged particle is given by the Bethe-Bloch function

Resistive Micromegas for sampling calorimetry

Characterization of GEM Chambers Using 13bit KPiX Readout System

GEM beam test for the BESIII experiment

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures

Gas Electron Multiplier Detectors

Gas Electron Multiplier 2. Detectors Gas Electron Multiplier (GEM) is a thin insulating foil which have thin electrodes on both sides and many

Tracking properties of the two-stage GEM/Micro-groove detector

Fast Drift CRID with GEM*

arxiv:hep-ex/ v1 19 Apr 2002

Chromatic X-Ray imaging with a fine pitch CdTe sensor coupled to a large area photon counting pixel ASIC

The HPD DETECTOR. Michele Giunta. VLVnT Workshop "Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean Sea"

Understanding the Properties of Gallium Implanted LGAD Timing Detectors

Parallel Ionization Multiplier(PIM) : a new concept of gaseous detector for radiation detection improvement

Today s Outline - January 25, C. Segre (IIT) PHYS Spring 2018 January 25, / 26

Recent Developments in Gaseous Tracking Detectors

The High-Voltage Monolithic Active Pixel Sensor for the Mu3e Experiment

A monolithic pixel sensor with fine space-time resolution based on silicon-on-insulator technology for the ILC vertex detector

Status of the PRad Experiment (E )

Assessment of Hall A Vertical Drift Chamber Analysis Software Performance Through. Monte Carlo Simulation. Amy Orsborn

Assembly 30 cm x 30 cm Gem detectors Amilkar Quintero Florida Institute of Technology July 2009

MuLan Experiment Progress Report

Digital trigger system for the RED-100 detector based on the unit in VME standard

Scintillation Counters

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

Development of High Granulated Straw Chambers of Large Sizes

Pixel hybrid photon detectors

Micromegas for muography, the Annecy station and detectors

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades

Contents. Why waveform? Waveform digitizer : Domino Ring Sampler CEX Beam test autumn 04. Summary

High granularity scintillating fiber trackers based on Silicon Photomultiplier

A Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker

Performance of 8-stage Multianode Photomultipliers

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

EUDET Pixel Telescope Copies

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

Small-pad Resistive Micromegas for Operation at Very High Rates. M. Alviggi, M.T. Camerlingo, V. Canale, M. Della Pietra, C. Di Donato, C.

Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Deliverable Report. CERN pixel beam telescope for the PS

Backgrounds in DMTPC. Thomas Caldwell. Massachusetts Institute of Technology DMTPC Collaboration

Novel MPGD based Detectors of Single Photons for COMPASS RICH-1 Upgrade

P ILC A. Calcaterra (Resp.), L. Daniello (Tecn.), R. de Sangro, G. Finocchiaro, P. Patteri, M. Piccolo, M. Rama

Total Absorption Dual Readout Calorimetry R&D

Wrinkleless Mylar Shell and GEM Foil Prototypes for The BONuS Detector at Jefferson Lab

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH A 1024 PAD SILICON DETECTOR TO SOLVE TRACKING AMBIGUITIES IN HIGH MULTIPLICITY EVENTS

GAMMA-GAMMA CORRELATION Latest Revision: August 21, 2007

Noise Characteristics Of The KPiX ASIC Readout Chip

Multianode Photo Multiplier Tubes as Photo Detectors for Ring Imaging Cherenkov Detectors

Stato del progetto RICH di LHCb. CSN1 Lecce, 24 settembre 2003

Generation of Sub-nanosecond Pulses

INFN Milano Bicocca. Andrea Giachero Claudio Gotti Matteo Maino Gianluigi Pessina. Alessandro Baù Andrea Passerini (partial support)

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

arxiv: v1 [physics.ins-det] 26 Nov 2015

Transcription:

1 GEM Detector Assembly, Implementation, Data Analysis William C. Colvin & Anthony R. Losada Christopher Newport University PCSE 498W Advisors: Dr. Fatiha Benmokhtar (Spring 2012) Dr. Edward Brash (Fall 2012)

2 ABSTRACT In particle physics experiments, one of the crucial techniques for determining the energy and momentum of the scattered particles produced in collisions is to use position-sensitive detectors. These detectors, when used in combination, provide a "track" of the particle as it travels outward from the collision point. The Gas Electron Multiplier (GEM), a type of positionsensitive detector, shows great promise for future use at particle accelerators. In our project, two prototype GEM detectors were assembled and tested in an experiment at the Italian National Institute of Nuclear Physics (INFN) in Frascati, Italy. The GEM detectors were used to measure the position/trajectory of the incoming electron beam which was used in conjunction with another detector, known as a Ring Imaging Cherenkov Detector (RICH). In addition to building the GEM detectors themselves, we were responsible for assembling a system of electronics that could be used to signal an event, or when a charged particle passes through the detector. Furthermore we calibrated the response of the GEMS, and aided in the subsequent data analysis. We will report on all aspects of this process from construction to data analysis.

3 Table of Contents Title Page 1 Abstract..2 Table of Contents 3 Introduction.4 Theory.5 Experiment..6 Construction 7 Implementation 8 Efficiency 9 Data Analysis..11 Future Work 13 Appendix.14

4 Introduction For our PHYS 498 capstone project, we worked on the Ring Imaging Cherenkov (RICH) detector upgrade being constructed for Experimentation Hall B at Thomas Jefferson National Accelerator Facility (TJNAF). This project was an international collaboration with the Italian National Institute of Nuclear Physics (INFN) in Frascati, Italy. The RICH detector consists of two main parts. The first is two Gas Electron Multiplier (GEM) detectors that are used to plot trajectory of a charged particle. The two GEM detectors are not part of the actual RICH but rather will be used for the prototype only. The second part if the RICH detector itself consists of an aerogel block, used as a Cherenkov radiator combined with an array of Photomultiplier Tubes (PMTs), used to detect the Cherenkov cone. When first offered to join this collaboration we were given two separate tasks; William would set the electronics for the GEMs and operate them. Anthony would write macros to read and display the data collected by 28 PMTs. However, it was crucial that we both know the specifics of each other's work. This is because, in Italy we were both expected to be able to answer any question asked about either project as both of were not always present. Once problems arose with the arrival of the GEMs, Anthony was reassigned to the GEM portion of the RICH upgrade, joining William s work. At this point, the goals were set as follows: 1. Assemble the two GEMs. 2. Calibrate and test them at TJNAF. 3. Operate them on the beam line at INFN. 4. Collect successful run data to be analyzed upon return to the TJNAF. 5. Calculate the position of the beam line with respect to the GEM detectors.

5 Theory Gas Electron Multipliers (GEMs) are a type of micro pattern detectors created by CERN in 1997. The key element to the GEMs is the four pieces of very thin double-sided copper-clad kapton foil (See Figure 4). The foil is perforated with a high density of holes, and each hole has a diameter of about 70 µm and spaced 140 µm apart (center-to-center). A gas mixture of 70% argon and 30% carbon dioxide is left to flow through the chamber at a very low pressure so that the kapton foil is not damaged. A high voltage, no greater than 4.1kV, was applied to the drift chamber of the GEMs. This voltage created a potential difference between the stacked layers of kapton foil and the signal strips. In order to trigger the data acquisition software to record the voltages on the signal strips, a trigger must be set up. The most common trigger setup is a pair of scintillators, one in front and one behind the GEM chamber. A charged particle travels through the front scintillator and the outer layer of the GEM and then, temporarily neglecting diffusion, the particle follows the electric field lines created when a potential difference is introduced to the front and back electrodes. These lines are then pushed into the holes of the kapton foil, in what is called the drift region (See Figure 11). The high electric fields in these holes excite the particle and thus it causes a coulomb interaction with the gas and the medium is ionized releasing an electron-ion pair. As a result of the high electric field, the field lines multiply causing the primary electrons to further ionize the gas, thus creating secondary electrons. This then causes an avalanche effect where each new electron is interacting with the medium, resulting in an exponential increase in electron quantity (See Figure 7). These charges can then be picked up by sensors with 256 channels for both x and y positions located on the board at the base of the GEM (See Figure 3). Depending on the equipment set-up and the Data Acquisition (DAQ) System, GEMs can be used to analyze different scenarios. A common use of GEM detectors is to

6 calculate a beam track. This is done by placing a minimum of two chambers in parallel one in front of the other, collecting the x and y position of where the beam passed through each chamber, and then calculating the slope. This slope calculation was crucial for the success of the RICH detector prototype. In order to find the most accurate beam trajectory through the RICH, the GEMs would need to sandwich the aerogel and PMT array. Experiment Our preparation for the experiment began in early 2012. The first task was to acquire two Panasonic adapting connectors for each chamber. These are needed because the readout chips used at CERN are not the same as APV-25 readout chips used in Frascati. Each connector has 128 channels, so two connectors are needed for the x and y positions respectively. A picture of these connectors and the APV-25 cards can be seen in Figure 1 in the Appendix. This connector had to be specially fabricated and purchased by TJNAF. The next task was to build two voltage dividers, making one for each chamber. A voltage divider is a series of resistors used to split up a high input voltage. The output voltage is a fraction of the initial voltage and the ratio is dependent on the resistors used. Voltage dividers are essential to the GEM detectors because without them a discharge voltage between the layers of kapton would likely destroy the chamber. With a voltage divider applied, the discharge would cause a drop in one of the voltages which would cause the overall voltage to decrease and prevent damaging high electric fields in the drift region. A diagram of the voltage dividers can be seen in Figure 2. Upon arrival of the GEMs, we encountered our first large setback. Our expectation was that the GEMs would arrive ready to be run; only lacking the APV-25 electronics setup and voltage dividers. However, what we received was a parts kit, for two unassembled GEM

7 detectors. This meant our focus had to switch from calibration of the GEMs, to construction. Construction While we understood the basic concepts of GEMs, we needed the help of an expert in order to avoid damaging them. So we emailed UVA asking for help and one of their grad students, Kiad, walked William through the assembly at TJNAF. To begin, the chamber wall had to have the gas inputs attached and sealed (See Figure 5). This was done with a twenty-four hour epoxy. Using the same epoxy, the translucent plastic window was sealed to the cover of the GEM (See top of Figure 4). Then four plastic rods were glued onto the board to support the Kapton frames. These rods were glued with a five minute epoxy. The layers were then placed onto the board and supported with the plastic rods. ½ mm plastic spacers were used to create a gap between the layers. With the frames that protect the foils having a ½ mm thickness on the top and bottom, two spacers were used to create a 2mm gap between the layers. The gap between the board and the bottom foil requires 3 spacers because there is no frame to provide the extra ½ mm on the board. The distance between the third layer and the drift foil is larger, using four spacers to make a 3mm gap between the layers. Both the top and bottom sides of the foil strip must be soldered to the board via the copper strips. While there is no specific strip designated for each layer, it is vital that each side of each layer is on its own strip. It is also necessary to know where each layer is attached when implementing the voltage divider. Once the chamber wall had finished drying, two rubber tubes were used as O-rings for the top and bottom of the wall respectively. The wall was then placed onto the board encasing the foils and the top cover was then bolted on and tightened to ensure a thorough seal. During this process nitrogen gas running through a filter was used to clean off every part of the detectors throughout the construction. It

8 was absolutely necessary to perform the entirety of this construction within a clean-room to prevent dust from getting into the sealed chamber. See Figure 6 for the completed GEM rig. Once the GEMs themselves were constructed the voltage dividers were installed. This was a quick task of soldering the voltage dividers in place. To ensure everything was connected properly, we used a multi-meter to check for short circuits. After confirming there were none, we ran 4.1 kv through it and tested the current output to verify we were creating the proper electric field. At this point the GEMs were ready to be tested using TJNAF s facilities, which would be done one at a time due to resource constraints. Implementation In order to test the GEMs we had to set up the coincidence trigger. To do this we placed a GEM between two scintillators. Using a coincidence module the trigger logic was set to only accept a hit if it occurred on both scintillators simultaneously. A discriminator was used and set to accept any trigger greater than or equal to 30 mv. When a coincidence was accepted and the signal was above 30 mv a veto was set to prevent further signals from being read. While the veto was active a read-out module read the data from the APV-25 cards and sent it to the Data Acquisition System (DAQ). When the DAQ finished processing the hit, it sent a reset command back to the veto module which turned the veto off. The cycle then repeated from there once a new hit was registered (See Figure 8). With the two GEM detectors were constructed and all external electronics had been set up, we began the process of testing. To act as a source we placed a small amount of Strontium-90 above the top scintillator. As the Strontium-90 underwent radioactive decay, it would release a beta particle. This beta particle would pass through the top scintillator, the GEM chamber, and then the bottom scintillator, triggering a coincidence event and creating an electron avalanche in

9 the GEM. However, beginning with our first run we experienced an extraordinarily large amount of background noise. This noise created inefficiency and reducing it became the focus of our calibration efforts. Efficiency We were told by Evaristo Cisbani that the GEM detectors should ideally be over 99% efficient with a common background noise of around 10-30 ADC units. An ADC unit is proportional to the voltage detected on the strips; this proportion is caused by the process of analog-to-digital conversion, thus the name ADC. Efficiency is defined as the number of good, or usable, hits divided by the total number of samples. Over the course of the experiment, the average background noise we registered was around 500 ADC units, 50 times greater than expected. While the background noise was capable of blocking the analysis programs from detecting hits, we should have been able to see them by eye on the display modules. However, when we check we saw only a few over the course of several samples, meaning not only was there background noise, but some other causes of inefficiency as well. With the aid of Mark Jones at TJNAF, and Evaristo Cisbani at INFN, we identified and attempted to correct several causes of inefficiency. The first inefficiency cause we tackled was the large amount of background noise. As stated above, the GEM should have a background noise of 10-30 ADC units and we were experiencing 500 ADC units. To solve this problem we tried four main solutions. First we added layers of insulation between the electronics (such as the ADC cards) and the metal rack the GEMs were in. This resulted in no noticeable change. Second, we placed the GEMs in a faraday cage in an attempt to reduce interference from electric fields. This gave us a visible change, dropping the average background radiation by 50-100 ADC units. The third solution attempt was

10 to add extra grounding. The key in doing this was to avoid creating loops that could feed ground signals from one APV card into another. The added grounding also produced positive results, lowering the background by another 100 ADC units. At this point our background noise was averaging at 300-350 ADC units, which was still too high. Our final solution was to simply increase the distance between the GEMs and other sources of electronic interference. We moved the GEMs two meters from everything else and our background noise dropped to less than 50 ADC units. The reason this was so effective is due to the fact that electromagnetic interactions decrease by 1/R 2. With the background noise problems solved, we expected to begin seeing a high efficiency, but it was still far below 50%. There were a few possible causes for this. The next potential problem we decided to solve was what is known as clocking errors. Due to the speed in which the charged particles are moving, sampling has to be correct within 50ns. The time it takes for the electric signals to move across wires creates a latency effect that can cause our sampling to be late. To account for this, clock settings are added to programs to go back through older data for sampling. A clocking error occurs when this window is offset from the good data. To solve it we simply set the phase clocks to zero and took data runs, incrementing the clock in steps of 25ns as we went. Eventually we started seeing consistent hits, verifying our clock settings (in our case this occurred at around a 450 ns delay). With the clocks fixed our efficiency rose, but was still around 30%. The final issue that caused problems during the experiment was improper gas flow. In our case, the gas flow was so low that the GEMs efficiency was cut by over half. Once discovered, this issue was easily fixed by quadrupling the gas flow. The reason this occurred was due to the

11 electronic flow-meter not having any form of units for its flow rate. This solution brought our final efficiency to just below 80%. Data Analysis In order to begin the process of analyzing data, we first had to take what is known as a pedestal run. This is a data collection run taken using a false trigger, at a point when no charged particles were being sent through the GEMs. The purpose of this run is to find the average levels of background noise on each channel. As long as that noise is within an acceptable level, the pedestal run will be a baseline. A background noise of less than 100 ADC units is usable, but less than 50 is desirable. The pedestal run will be subtracted from all future data runs taken under the same conditions. Once a pedestal has been set, the runs with data may be analyzed. We used two methods of data analysis. The first method is what we will refer to as live analysis. For a live analysis, we would begin looking at data while the acquisition program was still running. Once it had 50+ hits we would load the data into a root tree and plot the immediate voltage on the strips at a 25ns time step for the 150ns following the trigger. The purpose of doing this was to simply check for good hits by eye. We would expect to see a voltage spike up to 1000 ADC units then a slow decay over the course of the 150ns. The main purpose of doing this was to ensure that the GEMs were operating properly. Therefore, this was our main method of analysis throughout the experiment both at TJNAF and INFN. This was the method used to calibrate the GEMs, by making small changes to a single setup variable, such as the phase clock. We could take several different runs within a small time frame and check to see which parameters produced the best results.

12 The other type of analysis is what is called reconstruction analysis. This analysis is what we spent the majority of the fall term learning how to do and trying to make functional. The process behind the reconstruction program is a fairly straightforward process in theory, but becomes complex in practice. In his Note on GEM reconstruction for CERN Test, Evaristo Cisbani explained the process in seven steps. 1. Find the strip with the maximum charge. Define as X 2. Define three windows surrounding X (See Figure 9) a. Peak region (X±n) b. Near region (X-2n, X-n) and (X+n, X+2n) c. Background region (0, X-2n) and (X+2n, 127) 3. Compute the integral of the peak region. Define as SP 4. Compute the mean of the near region. Define as MN 5. Compute the RMS of the background region. Define as RMSB 6. Check to see if the hit is a good hit. (Sp- 2n*MN)>(nsigma*RMSB) 7. If defined as a good hit, the peak region is fitted with a Gaussian. The center point of the Gaussian is defined to be XG. (See Figure 10) When performing these calculations with the 10cm by 10cm GEM detectors, n is always assumed to equal to five. The second unlabelled value, nsigma, is the noise threshold number of the RMS, which is always set as 4. These steps, 1 through 7, are performed for every sample of an event. For an event to be usable, the following two conditions must be met: 1. At least three of the samples are defined as good hits (step 6 returns true). 2. XG differs by no greater than 1 millimeter between all of the good hits.

13 If the event is usable, we average the XG of each sample, and that value becomes the coordinate position, either x or y depending on the plane, for that event. This process is repeated for the same event on each plane of both GEMs. If the event is usable on all four planes, then the (X,Y) coordinates for both GEMs are printed out to a file to be used for beam tracking. This entire process is repeated for every event to fill the file. With these coordinates, it is now possible to plot the trajectory of the slope. Future Work Given more time to work with the project, there are several things we would like to have done. Due to the focus of the collaboration being on the RICH detector, the programs we used were designed to pull necessary data from the GEMs, but not display it. The first thing that could be done is to write a program that displays the good hits in a two dimensional histogram representing the face of the GEM. This program would also plot or print the vector trajectory of the beam line using the distance between the two GEMs as the third dimension. Additional future research would focus on maximizing the efficiency of the GEMs. During the experiment we had constant struggles with noise, and tried several ways to reduce it. Eventually we were forced to place the GEM detectors about two meters away from the other electronics. The required distance from electronics may be effective, however, it is not an ideal setup. Given more time, we would like to experiment with the causes of background noise and find different methods of reduction. Ultimately, the goal would be to control noise in a way that allows the GEM detectors to be used in close proximity (<.5m) to other electronics.

14 Appendix Figure 1 - GEM APV-25 cards with connectors. Figure 2 - Voltage divider diagram.

15 Figure 3 - GEM board. Figure 4 - Kapton foils with frames and translucent window.

16 Figure 5 - Open GEM with chamber wall and gas inputs. Figure 6 - Completed GEM rig on the beam line.

17 Figure 7 - Diagram of an electron avalanche. Scintillators Veto Off Coincidence Pipeline sampled Veto on Figure 8 - Trigger logic diagram.

Figure 9 Picture of hit display with regions defined. 18

Figure 10 Hit display with Gaussian fit on the good hit. 19

Figure 11 An illustration of the electric field lines in a hole within the kapton foil. 20