Settlements & Revenue Metering SLD Requirements INTERCONNECTIONS AT VOLTAGES 50KV

Similar documents
Connection Impact Assessment Application Form

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

Embedded Generation Connection Application Form

Connection Impact Assessment Application

Embedded Generation Connection Application Form

Table of Contents. Introduction... 1

Embedded Generation Connection Application Form

Form B. Connection Impact Assessment Application Form Distribution System

E N G I N E E R I N G M A N U A L

Impact Assessment Generator Form

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

PROCEDURE. Part 3.5: Site-Specific Loss Adjustments PUBLIC. Market Manual 3: Metering. Issue 8.0 MDP_PRO_0011

Southern Company Interconnection Requirements for Inverter-Based Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

TRANSMISSION ASSETS. Filed: September 12, 2006 EB Exhibit D1 Tab 1 Schedule 2 Page 1 of INTRODUCTION

Transmission Interconnection Requirements for Inverter-Based Generation

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

The Connecticut Light and Power Company

Bulk Electric System Definition Reference Document

GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

GUIDE FOR GENERATOR INTERCONNECTION THE WIRES OWNER DISTRIBUTION SYSTEM

Information and Technical Requirements For the Interconnection of Distributed Energy Resources (DER)

DRAFT. City of Lethbridge Electric ENGINEERING STANDARDS GUIDELINE FOR GENERATOR INTERCONNECTION THE CITY OF LETHBRIDGE ELECTRIC DISTRIBUTION SYSTEM

Functional Specification Revision History

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

Bulk Electric System Definition Reference Document

BED INTERCONNECTION TECHNICAL REQUIREMENTS

SECTION TRANSFORMERS

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Distributed Generation Application Form (Generation of Greater than 20 kw to 15 MW)

A1000 ALPHA and A1200 ALPHA Meter Installation Instructions. General. Installation. For A1000 ALPHA Type R, A1000 ALPHA Type C, and A1200 ALPHA Meters

Definition of Bulk Electric System Phase 2

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

Wind Power Facility Technical Requirements CHANGE HISTORY

Generation Interconnection Requirements at Voltages 34.5 kv and Below

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

Bulk Electric System Definition Reference Document

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management

TABLE OF CONTENT

Reference Number PDS 07 (RIC Standard: EP SP)

Short Circuit Current Calculations

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

State of North Dakota Engineering data submittal Page 1 For interconnection of distributed generation to Otter Tail Power Company

APPENDIX B: Generation Interconnection Application Form

Generation and Load Interconnection Standard

Babak Enayati National Grid Thursday, April 17

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

TECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM

Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

South African Distribution Code

The BioBrick Public Agreement. DRAFT Version 1a. January For public distribution and comment

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

ReliabilityFirst Regional Criteria 1. Disturbance Monitoring and Reporting Criteria

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES

Informative (*Customer to review then remove this page from submitted witness test procedure)

DISTRIBUTION ENGINEERING PRACTICES

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

HPS Universal BUCK-BOOST TRANSFORMERS

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW

Functional Specification Revision History

Biogas Monitoring Project (Biogas Association)

3Ø Short-Circuit Calculations

MV network design & devices selection EXERCISE BOOK

GRID CODE Interconnection Requirements At Voltages 24.9 kv and below

3.1 Overview of ATCO Electric s URD System Design

INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

Component Requirement Specification for SGI 500XT Isolation Transformer

FACILITY RATINGS METHOD TABLE OF CONTENTS

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

GRID INTERCONNECTION OF EMBEDDED GENERATION. Part 2: Small-scale embedded generation

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

PART 1 OWNER/APPLICANT INFORMATION

Final ballot January BOT adoption February 2015

INTERNATIONAL TRANSFORMERS. Acme Electric s broad selection of CSA energy efficient transformers

Customer Standard. Standard for Embedded Generation (5MW and above)

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

I n s t a l l a t i o n M a n u a l. T E D P r o L i t e A B C. f o r. Shop for The Energy Detective products online at: Rev 3.

Notes 1: Introduction to Distribution Systems

MANITOBA HYDRO TRANSMISSION SYSTEM INTERCONNECTION REQUIREMENTS. April 2009 Version 2

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana

Transcription:

HYDRO ONE NETWORKS INC. ISTRIBUTED ENERATION Settlements & Revenue Metering SLD Requirements INTERCONNECTIONS AT VOLTAGES 50KV AND BELOW COPYRIGHT 2016 HYDRO ONE NETWORKS INC. ALL RIGHTS RESERVED

This Page is intentionally left blank

HYDRO ONE NETWORKS INC. LIMITATION OF LIABILITY AND DISCLAIMER Hydro One Networks Inc. s ( Hydro One ) Distributed Generation Settlements & Revenue Metering SLD Requirements: Interconnections at Voltages 50kV and Below (the DG S&RM SLD Requirements ) identifies typical Settlements & Revenue Metering SLD requirements for generation projects connecting to Hydro One s distribution system. Additional requirements may need to be met by the owner of the generation project to ensure that the final connection design meets all local and national standards and codes and is safe for the application intended. The DG S&RM SLD Requirements are based on a number of assumptions, only some of which have been identified. Changing system conditions, standards and equipment may make those assumptions invalid. Use of this document and the information it contains is at the user s sole risk. Hydro One, nor any person employed on its behalf, makes no warranties or representations of any kind with respect to the DG S&RM SLD Requirements, including, without limitation, its quality, accuracy, completeness or fitness for any particular purpose, and Hydro One will not be liable for any loss or damage arising from the use of this document, any conclusions a user derives from the information in this document or any reliance by the user on the information it contains. Hydro One reserves the right to amend any of the requirements at any time. Any person wishing to make a decision based on the content of this document should consult with Hydro One prior to making any such decision. CONTACT/PUBLISHER Please forward questions/comments regarding this Document to the following email address: Email: TDSGENERATOR@HydroOne.com Telephone: 1-877-447-4412

HYDRO ONE NETWORKS INC. REVISION HISTORY Date Version Comments Oct 14, 2010 Rev 0 New Document Aug 3, 2011 Rev 1.1 Updates as a result of changed Site Specific Loss Allowance (SSLA) requirements. The length of line between PCC and transformer, and between the transformer and metering is required. Previous note 8 removed. Information is now included on diagrams. Renumbered remaining notes. Updated note 3 to include reference to SSLA. New requirement for the size and number of inverters for solar projects to be included. Added SSLA to acronyms. Replaced EPC with PCC, to align with the usage in Condition of Service. Removed reference to separate metering for ARFA contracts in diagrams on pages 4, 5, 6 & 7. Revision to text describing load side disconnect switch on page 4 and 5. Minor revisions to text describing the identification of loads in note 9. Added PCC location determination diagrams, and notes on pages 12 and 13. Aug 29, 2011 Jan 17, 2012 Aug 28, 2012 Oct 5. 2016 Rev 1.2 Removed text describing station service requirement on diagrams on pages 4-7. Updated notes on Station Service and Loads on page 9. Added PME bypass switch to diagrams on pages 4 7. Added reference to CIA and TIR in general requirements on page 10. Rev 1.3 Modified text explaining applicable losses in PCC diagram #1 on page 12. Added requirement to identify ownership of primary line, and removed reference to RESOP exception in metering diagrams and notes. Rev 1.4 Rev 1.5 Modified diagrams to include an indication of the ownership of lines. Updated Note 3 to include POC. Added POC to the list of acronyms. Modified diagrams and note 4 to require both TS and DS station and feeder names. Added number of phases as a requirement in note 5. Updated note12 to require information on the SLD is legible. Updated the example SLD with to reflect changes for this version. Updated note 9 to include all other loads below the PCC. Changed the email address for SLD and SSLA submissions to TDS.Generator@hydroone.com on page 10 and 13. Modified station service loads definition for Item No. 9 in Notes for Diagram Callouts section.

This Page is intentionally left blank

Information Required for Distribution Connected Generators INDEX Index (This Page) Page 1 Acronyms & Definitions. Page 2 Legend.. Page 3 Revenue Metering Single Line Diagram (SLD) for Secondary-Metered Generator. Page 4 Revenue Metering Single Line Diagram (SLD) for Secondary-Metered Generator & Customer Load. Page 5 Revenue Metering Single Line Diagram (SLD) for Primary-Metered Generator. Page 6 Revenue Metering Single Line Diagram (SLD) for Primary-Metered Generator & Customer Load. Page 7 Notes for Diagram Callouts... Page 8, 9 & 10 Example of a Single Line Diagram (SLD) for illustrative purposes only. Page 11 Examples of PCC location determination. Page 12 Version Date: October 5, 2016 Version 1.5.1 Page 1

Information Required for Distribution Connected Generators ACRONYMS & DEFINITIONS ACRONYMS ANSI: American National Standards Institute ARFA: Advanced RESOP FIT Agreement BIL / LIL: Basic Impulse Level / Lightning Impulse Level CSA: Canadian Standards Association CT: Current Transformer DG: Distributed Generation ECP: Embedded Connection Point ESA: Electrical Safety Authority FIT: Feed in Tariff HONI: Hydro One Networks Inc. LDC: Local Distribution Company NGR: Neutral Grounding Resistor IESO: Independent Electricity System Operator PCC: Point of Common Coupling POC: Point of Connection RESOP: Renewable Energy Standard Offer Program SLD: Single Line Diagram SSLA: Site Specific Loss Adjustment S&RM: Settlements & Revenue Metering VT: Voltage Transformer DEFINITIONS Red Diagram Callouts: The red diagram callouts give the item number of Settlement & Revenue Metering Information Required on Pages 8, 9, & 10 of the document. Black Diagram Callouts: The Black diagram callouts give specific information for a device or item shown on the diagram. Blondel s Theorem: Blondel s Theorem states that in a polyphase system of N electrical conductors, N-1 electrical energy or wattmeter elements, properly connected, will measure the power or energy taken. The connection must be such that all potential coils have a common tie to the conductor in which there is no current coil. Version Date: October 5, 2016 Version 1.5.1 Page 2

Information Required for Distribution Connected Generators LEGEND of SYMBOLS Power Transformer VT (N) Voltage Transformer (N = Number of VT s = 2 or 3) CT (N) Marked Polarity Current Transformer (N = Number of CT s = 2 or 3) M Revenue Meter M G Generator Revenue Meter Disconnect Switch Fused Switch (Ganged, Load Break) Disconnect Switch (Ganged, Load Break) Circuit Breaker G Generator Ground NGR Neutral Grounding Resistor Version Date: October 5, 2016 Version 1.5.1 Page 3

Information Required for Distribution Connected Generators Revenue Metering Single Line Diagram (SLD) for Secondary-Metered Generator Name of Owner See Item No. 1 of the Name of Generator and Facility Address/Location/ Hydro One Project ID See Item No. 2 of the To HONI Station State applicable HONI Station Name(s), Feeder Name & Supply Voltage. Include DS and TS HONI upstream switch closest to the PCC PCC See Item No. 3 of the Limit of responsibility of HONI Limit of responsibility of the Generator Boundary Line Customer-owned downstream switch closest to the PCC. Required based on criteria set out in the Technical Interface Requirements document. See Item No. 5 of the Disconnect switch to be accessible and lockable by HONI T1 Provide length(s), ownership, and size(s) of line(s) from the PCC to the power transformer, and from the transformer to the meter. This data is used for SSLA determination. Note: The metering point is at the location of the CT s and not the physical meter. VT (N) See Item No. 6 & 11 of the Distance in meters Distance in meters CT (N) M G Bypass switch HONI required lockable disconnect switch in close proximity to metering See Item No. 8 of the Station Service See Item No 7 of the attached notes ESA required lockable disconnect switch G1 Gn Version Date: October 5, 2016 Version 1.5.1 Page 4

Information Required for Distribution Connected Generators Revenue Metering Single Line Diagram (SLD) for Secondary-Metered Generator & Customer Load Name of Owner Name of Generator and Facility Address/Location/ Hydro One Project ID To HONI Station See Item No. 1 of the See Item No. 2 of the State HONI Station Name, Feeder Name & Supply Voltage HONI upstream switch closest to the PCC PCC See Item No. 3 of the Limit of responsibility of HONI Limit of responsibility of the Generator Boundary Line Customer-owned downstream switch closest to the PCC. Required based on criteria set out in the Technical Interface Requirements document. See Item No. 5 of the Disconnect switch or circuit breaker to be accessible and lockable by HONI Separate Revenue metering is required for any loads, excluding station service if the Generator is on an IESO Contract See Item No. 9 of the Customer load (New or existing connection) T1 Bypass switch Metering to be specified, provided and installed by HONI Station Service Provide length(s), ownership, and size(s) of line(s) from the PCC to the power transformer, and from the transformer to the meter. This data is used for SSLA determination. Note: The metering point is at the location of the CT s and not the physical meter. Circuit breaker or fused main disconnect switch CT (N) VT(N) Disconnect switch or circuit breaker to be accessible and lockable by HONI M G See Item No. 6 & 11 of the HONI required lockable disconnect switch in close proximity to metering ESA required lockable disconnect switch Distance in meters Distance in meters See Item No. 8 of the G1 See Item No 7 of the attached notes Gn Version Date: October 5, 2016 Version 1.5.1 Page 5

Information Required for Distribution Connected Generators Revenue Metering Single Line Diagram (SLD) for Primary-Metered Embedded Generator Name of Owner Name of Generator and Facility Address/Location/ Hydro One Project ID To HONI Station See Item No. 1 of the See Item No. 2 of the State HONI Station Name, Feeder Name & Supply Voltage See Item No. 3 of the HONI upstream switch closest to the PCC PCC Limit of responsibility of HONI Limit of responsibility of the Generator Boundary Line Identify customer or HONI ownership Customer-owned downstream switch closest to the PCC. Required based on criteria set out in the Technical Interface Requirements document. Bypass switch CT (N) VT(N) M G See Item No. 6 & 11 of the Distance in meters CTs are considered to be located at the PCC if their distance to the PCC is <=100m T1 HONI required lockable & accessible disconnect switch Provide length(s), ownership, and size(s) of line(s) from the PCC to the meter. This data is used for SSLA determination. Note: The metering point is at the location of the CT s and not the physical meter. See Item No. 5 of the Station Service See Item No. 8 of the ESA Required lockable disconnect switch G1 See Item No 7 of the Gn Version Date: October 5, 2016 Version 1.5.1 Page 6

Information Required for Distribution Connected Generators Revenue Metering Single Line Diagram (SLD) for Primary-Metered Embedded Generator & Customer Load Name of Owner Name of Generator and Facility Address/Location/ Hydro One Project ID See Item No. 1 of the See Item No. 2 of the To HONI Station State HONI Station Name, Feeder Name & Supply Voltage See Item No. 3 of the HONI upstream switch closest to the PCC PCC Identify customer or HONI ownership Hydro One Distribution System Limit of responsibility of HONI Limit of responsibility of the Generator Customer-owned downstream switch closest to the PCC. Required based on criteria set out in the Technical Interface Requirements document. Hydro One New Connection Application is required Bypass switch Boundary Line VT(N) Distance in meters See Item No. 6 & 11 of the M L CTs are considered to be located at the PCC if their distance to the PCC is <=100m CT (N) M G HONI required lockable & accessible disconnect switch Whether Primary or Secondary metered to be determined in accordance with HONI Condition of Service T1 Provide length(s, ownership, and size(s) of line(s) from the PCC to the meter. This data is used for SSLA determination. Note: The metering point is at the location of the CT s and not the physical meter. Customer Load (New or existing connection) See Item No. 9 of the Station Service See Item No. 5 of the Separate Revenue metering is required for any loads excluding station service if the Generator is on an IESO Contract See Item No. 8 of the G1 ESA Required lockable disconnect switch See Item No 7 of the Gn Version Date: October 5, 2016 Version 1.5.1 Page 7

Settlement and Revenue Metering Information Required Item No. Description 1 Comments 1 Owner s Name 2 - State the full legal entity name of the Generator s Owner. 2 Generator s Facility Name and Location - State the facility name of the physical generator. - State the precise civic address/geographic location, and / or GPS coordinates. 3 Point of Common Coupling (PCC) - Clearly identify and indicate the PCC to the Distributor (LDC). - This is normally shown as a boundary line depicting the limits of responsibility between the embedded generator and the LDC. - See pages 12 and 13 for diagrams and notes for determining the location of the PCC. - A Site Specific Loss Adjustment is applied for any customer owned lines greater than 100 meters. - The PCC and the POC are often at the same location. Sometimes they are not, please see the Form B diagrams to determine the POC for the project. 4 Connectivity Distribution and Transmission Facility (Station) Name, Type, Feeder & Switches - State HONI s distribution and transmission facility (station) name(s). - State the name of the HONI station feeder to which the generator is connected. - State the nominal distribution supply voltage (e.g. 44 kv). - State the information for the upstream and downstream switches closest to the PCC (nomenclature, type etc.). - HONI to assign nomenclature for up-stream switch. 5 Power Transformer(s) - Used to step-up the generator voltage to the distribution service voltage and / or step down the distribution voltage for customer loads. - State ownership (i.e. Hydro One vs Customer) of transformer and primary line. - Show the number of phases and the power transformer(s) primary and secondary winding configurations (Wye, Delta, and Ground). - Indicate size (kva or MVA), primary and secondary voltages (V or kv) and include details of any GFR / NGR if applicable. - State operating nomenclature (e.g. T1, T2 etc.) - Specify use and location of Neutral Ground Resistor (NGR) on SLD. 6 Retail Revenue Metering - Wholesale-registered metering must conform to the IESO market rules. - Retail-settled metering must conform to HONI s Condition of Service. - Metering installation shall conform to the latest Hydro One Retail Metering Standard. - Instrument Transformers (CTs & VTs) shall be dry-type (not oil filled), individual units, if primary metered and conform to manufacturers approved by HONI. - The insulation class, and Basic Impulse Level / Lightning Impulse Level (BIL / LIL) shall conform to HONI s standards. - Show the CTs, VTs or PME and meter(s). State the Manufacturer and Model # information. - State the number of CTs and VTs being used. - State the CT and VT ratios including both ratios if they are dual ratio. - State the in-use CT and VT ratios if dual ratio. - State the ANSI/CSA CT & VT accuracy class information. - State whether or not the metering is Blondel compliant. - State Measurement Canada s Notice of Approval for the Instrument Transformers. 1. The terms used are the same as those used in the IESO rules and HONI s TIR document 2. It is the Owner s / Generator s obligation to ensure full compliance with current IESO rules Version Date: October 5, 2016 Version 1.5.1 Page 8

Settlement and Revenue Metering Information Required Item No. Description 1 Comments 7 Generator(s) 8 Station Service 2 9 Loads at Generation Facility 2 - Show the generator(s) connection(s) to the power transformer(s). - Show the operating nomenclature of the generator(s) (e.g. G1, G2, etc.). - State the nameplate capacity of the generator or individual generators, where there is more than one, in kva / MVA. or kw / MW. - For solar, state the size(s) and number of inverter(s) - State the operating power factor (PF). - State connection type (Wye, Delta, etc.) and indicate grounding. - State whether the generator is induction or synchronous type. - Refer to the IESO contracts or standard definitions for a definition of station service. - The connectivity and size of the station service must be clearly depicted and comply with current IESO rules. - If operating under an IESO contract, station service load must be captured by the revenue metering for the generator so that the measured generator output is net of station service. - At the sole discretion of Hydro One, may be separately supplied and revenue metered. - Metering of station service shall be at the same voltage as the secondary voltage of the main power transformer. Secondary metering of any station service transformer is not acceptable. - The connectivity and size of all loads at the generating facility must be clearly depicted and comply with the current IESO rules, and any other relevant rules or regulations in the province of Ontario. - Include a depiction of all loads and meters below the PCC, including those not related to the generation facility. - For IESO Contract projects customer loads excluding station service must be metered independently of the generation metering. - Behind-the-load or In-Series generator metering is not permitted. 1. The terms used are the same as those used in the IESO rules and HONI s TIR document 2. It is the Owner s / Generator s obligation to ensure full compliance with current IESO rules Version Date: October 5, 2016 Version 1.5.1 Page 9

Settlement and Revenue Metering Information Required Item No. Description 1 Comments 10 Blondel Compliance & Grounding 11 Sizing of Current Transformers (CT) for Generator Metering 12 General SLD Requirements - Generally, compliance with Blondel s theorem (rule) is required. - Must determine if current can flow in the ground and by-pass the metering point (where the CT s are located). - When the connections on both sides of the metering point are grounded current can flow in the ground and by-pass the metering point (where the CT s are located) and possibly cause the metering to be Blondel incompliant. - Blondel incompliant metering can also occur where a neutral grounding resistor (NGR) is used with 2 element secondary metering. - In these situations HONI may require primary metering to achieve Blondel compliance. - Current Transformers must be sized based on the nameplate capacity rating of the generator and conform to the most current version of the following standards and requirements: - The Canadian Standards Association (CSA) standards for Instrument Transformers. - Note: The current version at the time of publication of this document (Oct 2010) is CAN/CSA-C60044-1:7, 1 st Edition Instrument Transformers Part 1: Current Transformers (Adopted CEI/IEC 60044-1:1996, edition 1.2, including Amendment 1:2000 and Amendment 2:2002, with Canadian deviations). This standard replaces those portions of CSA CAN3-C13-M83, Instrument Transformers that deal with current transformers. - The requirements of Measurement Canada for the use of instrument transformers in revenue metering applications. - The requirements of the Electrical Safety Authority (ESA). - SLD must be stamped and signed by a Registered Professional Engineer in the Province of Ontario. - All information on the SLD must be legible, and of a reasonably sized font for ease of reading. - Must state the HONI project no. in the SLD s title block. - The Connection Impact Assessment provides details regarding the type and configuration of isolation devices required. - The DG facility must comply with all applicable interconnection requirements specified in the Hydro One Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below (TIR). - Returned complete, stamped SLDs to the Hydro One Transmission and Distribution Settlements Generator mailbox address at TDS.Generator@HydroOne.com 1. The terms used are the same as those used in the IESO rules and HONI s TIR document 2. It is the Owner s / Generator s obligation to ensure full compliance with current IESO rules Version Date: October 5, 2016 Version 1.5.1 Page 10

Illustrative Example Only New Wind Enery Incorporated New Wind GS 100 Wind Trail, Windy Town, ON Project #12,345 Small Point DS, F2/ 8.32 kv Hydro One TS, M1 Feeder, 44kV NW-100 PCC Limit of responsibility of HONI Limit of responsibility of the Generator Boundary Line NW-101 Radial Line Data Metering Installation Data 1. IT RATIOS: CT ratio (3) Bar Type Available ratios - 600:5 in use 600:5 or 120:1, CCRF=1.5@30 C VT ratio (3) Available ratios - 2400:120V in use 2400:120 or 20 : 1 2. ANSI class: CT class in use 0.3B2.0 MC Approval Number: SD.EA.17 VT class in use: 0.3WXY MC Approval Number: AE-0372 3. Manufacturer & Model No: CT: Canadian General Electric JKM-3 VT: Canadian General Electric JVM-3 200 m Primary Line Ownership: Customer/Generator 44kV 4160/2400V 5 MVA 3Ø T1 Transformation Ownership: Customer/Generator T1-1 T1-CL1 Accesible & lockable by HONI Metering to be specified, provided and installed by HONI Length: 0.5 km Conductor Size: 4/0 MCM Conductor Type: ACSR Penguin GMD: 1.728 CT (3) T1-G1 Accesible & lockable by HONI VT(3) M G ION 8600A A DS-1 Accesible & lockable by HONI Metering to be specified, provided and installed by the Generator 500 m 30 m 4. Distance between CT's & PT's: 0 m 5. Distance from metering to New Wind Energy Inc. limits of Responsibility is 0.5 km To Customer Load 200 kva (New Connection) To Station Service 75 kva 2 MVA @ 0.9 PF (1.8 MW). 4.16/2.4 kv 3Ø 60HZ DS-2 Accesible & lockable ESA requirement 2 MVA @ 0.9 PF (1.8 MW). 4.16/2.4 kv 3Ø 60HZ Synchronus G1 Synchronus G2 DS-3 Accesible & lockable ESA requirement MSP ENGINEERING CONSULTANTS Title New Wind Energy Incorporated Drawing No: Address New Wind GS Example-1 Drawn By JAG HONI Project No: Date: NWEI-123456 Approved By RFL Jul 30, 2010 Rev Description Version Date: October 5, 2016 Version 1.5.1 Page 11

Settlement and Revenue Metering Information Required PCC Location Diagrams An SSLA is required if the length(s) of customer owned line(s) between either the PCC and the transformer, or between the transformer and the meter is >100 meters. Submit an SSLA for any span that is >100 meters. See notes on page 13. PCC PCC Property/switch boundary Property/switch boundary PCC Primary of transformer PCC Secondary of transformer VT(N) VT(N) VT(N) VT(N) CT (N) M G CT (N) M G CT (N) M G CT M G (N) G1 G1 G1 G1 Ownership: 1. Customer owned primary line, and transformer 2. Customer owned primary line. Hydro One owned transformer. 3. Hydro One owned primary line. Customer owned transformer. 4. Hydro One owned primary line, and transformer. SSLA 3 Required: Line loss and transformer loss. Generator may elect to accept standard Hydro One transformer loss. Line loss only. Standard Hydro One transformer loss applied Transformer loss only. Generator may elect to accept standard Hydro One transformer loss, in which case SSLA is not required. None. No losses applied. Customer Owned Hydro One Owned 1. The terms used are the same as those used in the IESO rules and HONI s TIR document 2. It is the Owner s / Generator s obligation to ensure full compliance with current IESO rules 3. SSLA provided by generation proponent, signed and stamped by a qualified engineer. Version Date: October 5, Version 1.5.1 Page 12

Settlement and Revenue Metering Information Required Item No. Description 1 Comments 1 Requirement for SSLA 2 Hydro One standard transformer losses 3 Switch or property boundary demarcation - An SSLA is required for secondary metered projects if the length(s) of customer owned line(s) between either o the PCC and the transformer, or o between the transformer and the meter is >100 meters. Submit an SSLA for any span that is >100 meters. Note: The metering point is at the location of the CT s, not the physical meter. - An SSLA is required for primary metered projects if the length(s) of customer owned line(s) between the metering and the PCC is > 100 meters - A radial line loss combining the distance between the meter and the PCC is not permitted. - See the IESO market manual 3.5 at the following address for information to support calculating the loss factors. http://www.ieso.ca/imoweb/pubs/metering/mtr_sitespeclosses.pdf. - Completed SSLA Register forms are to be returned to the Hydro One Transmission and Distribution Settlements Generator mailbox address at TDS.Generator@HydroOne.com. SSLA forms must be signed and stamped by a certified engineer containing the applicable loss information. Note that the loss calculation you provide may include transformer losses. If transformer losses are applicable, and are not included in your submission, Hydro One will apply a standard transformer loss. - The loss information you provide, and any other applicable losses, will be used to adjust settlement of the generator output at the facility. Failure to provide accurate SSLA data on time for a project may delay payments for the generator output. - Provide a separate and completed form for each facility. - Standard Hydro One transformer losses will be applied to secondary metered facilities as applicable when: o The power transformer is Hydro One owned and is located on a customer owned primary line o The power transformer is customer owned, and the customer has not submitted an SSLA containing transformation loss data - The standard Hydro One transformer losses are: o 1% loss applies to transformers >400kVA. o 1.5% loss applies to transformers <=400 kva. - The loss information you provide, and any other applicable losses, will be used to adjust settlement of the generator output at the facility. - When applicable, the PCC will be located at the customer owned switch connecting to the Hydro One system, or at the customer s property boundary, whichever closer to the power transformer. 1. The terms used are the same as those used in the IESO rules and HONI s TIR document Version Date: October 5, 2016 Version 1.5.1 Page 13