Designed for flexibility... Engineered to last. CYCLE-SAFE / TWO-TIERED INSTALLATION

Similar documents
PROPARK OUTDOOR BICYCLE LOCKER SYSTEM INSTALLATION & ASSEMBLY INSTRUCTIONS UPPER-TIER LOCKER MOUNTING

Oxford Stalls Installation Instructions

Assembly Instructions 10 X 10 Aluminum Frame Building

Franklin Mills Stackable Movable Lateral Instructions

Assembly Instructions 10 X 10 Aluminum Roof Support

Qwik-Fence Installation Instructions

Installation Instructions - Model V4JSD 1

INSTALLATION GUIDE Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum )

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Installation Manual for Metal Emperor Lockers

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Sliding Door Kit

Ford Pick Up Rear leaf Spring Kit Installation Instructions

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

INSTRUCTION BOOKLET #C20

Enclosed Partition Installation Instructions

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC KK-K9-F7-K

32 Gallon Perforated Square Receptacle

Locker Pedestal Installation Instructions

INSTALLATION INSTRUCTIONS KK-K9-C12-K CHEVY IMPALA

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS

Side DuraRac Installation Instructions

NISSAN NV200 CHEVY CITY EXPRESS WALL LINER KIT INSTALLATION INSTRUCTIONS

Side DuraRac Installation Instructions

Installation Instructions

4832A Installation Sheet Part List

Trak-Slider Instructions

METAL BLINDS. Deluxe GETTING STARTED OPTIONAL HARDWARE. A few simple tools are required: STANDARD HARDWARE

11 6 Round Building Assembly Instructions

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

BASEBALL FOUL POLES SURFACE MOUNTED

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE FTX FLOOR Ford Transit ( 148" Extended Wheelbase )

K.D. LOCKER ASSEMBLY INSTRUCTIONS

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

Installation Guide 40670

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Cabinet Mount Lifter Instructions

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

PROFILE Flat Panel Console System Installation Manual

Installation Instructions

PROMASTER 136 WB LOW ROOF WALL LINERS INSTALLATION INSTRUCTIONS

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Introduction. Depending on your kennel project, you may have some or all of the following hardware: Part # Description Part # Description 1468

Baby Grande with Crank, Housing, and Side Rails Installation Instructions

MobileTrak5 Installation Instructions

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL

BOX-115 Club Car Precedent Utility Box Mounting Kit Installation Instructions

Sliding Door Kit

RangerWare Fiberglass Door System Installation Instructions P/N

INSTALLATION INSTRUCTIONS

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

INSTALLATION INSTRUCTIONS

WPS crew Doors Installation instructions

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

40670 Transit Connect/NV200/City Express/ProMaster City Partition

Hover. Installation Instructions. Raised Panel. Version

RBP-1215B-RX DODGE RAM QUAD CAB RX3

PLEATED SHADE ARCH INSIDE MOUNT GETTING STARTED. A few simple tools are required: STANDARD HARDWARE

TRANSIT 148 HIGH ROOF WALL LINERS INSTALLATION INSTRUCTIONS

V nyl Gazebo truct c it Assembly Instr ons

PH03 Comfort XL Front Assembly Replacement Instructions

MODULAR BUMPER INSTALLATION MANUAL

55000/55010 Installation Instructions

WG-4 Wall Guard Installation Instructions

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

Custom Wood Frame Overlay for Glass Doors Installation Instructions

Shetland Stalls Installation Instructions

Track Rack. * Track Racks are not lockable

Super Tube Spiral Slide Instructions

Assembly Instructions

DuraRac Shelving System

INSTALLATION INSTRUCTIONS

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE. C20-FTL STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel )

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

Installation Instruction

BioPrism Solid Surface

INSTALLATION INSTRUCTIONS

Installation for Full Size Polaris Ranger Crew Doors

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

This Folding Shelf Kit will work in conjunction with our Swing Away Carrier Kit allowing you add additional exterior storage space to your Vanagon.

Sentinel Electronic Safe Installation Guide

LANAUGHURK. Installation Instructions. Auger Extensions for High Unload Rate John Deere Combines. 270 West Park Avenue Huron, SD

How To Measure Your Finished Opening


Assembly Instructions

BOX-118 E-Z-Go TXT Utility Box Mounting Kit Installation Instructions

INSTALLATION INSTRUCTIONS

Installation Instructions Ascend Ceiling Systems - Stainless Pan Ceilings

43107 Rhino Jerry Can Holder Rhino Jerry Can Holder - Horizontal

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.


Transcription:

CYCLE-SAFE / TWO-TIERED INSTALLATION Designed for flexibility... Engineered to last. Two-Tiered Locker Installation Supplement to ProPark Owners Manual

CYCLE-SAFE / TWO-TIERED INSTALLATION TWO-TIERED LOCKER LAYOUT FIG. 1 Cycle-Safe s modular design allows expandability so you can start small and expand the system easily as your budget allows. The Cycle-Safe two-tiered bicycle storage system doubles parking availability without taking up more property. The photos and drawing here show one row of twelve units doubletiered, which results in 24 individual lockers in just three parking spaces! CONTENTS: Overview................................... 2 Parts List................................... 3 Assembly Sequence.......................... 4 General Notes............................... 4 System Assembly B. Install Center Support Blocks.............. 5 C. Install Horizontal Frame Filler............. 5 D. Install Second-Tier Leveling Plates......... 5 E. Install Second-Tier Frame Assemblies....... 6 F. Install Left & Right Corner Support Blocks.... 6 G. Install Second-Tier End Panels............ 6 H. Install Second-Tier Top Panels............ 7 I. Install Diagonal Partitions................. 7 J. Install Second-Tier Doors................. 7 K. Install Door Sill Plates................... 7 L. Final Squaring and Adjusting.............. 7 M. Install Door Check Kits................ 8, 9 Special Notices and Contact Information...... 10 FIG. 2 All contents of this manual 2007, Cycle-Safe Corporation.

CYCLE-SAFE / TWO-TIERED INSTALLATION PARTS LIST NOTE: Key Numbers shown below along with the list from the ProPark Installation Manual are referenced throughout this document. KEY No. Description Part No. 50 Door assembly, second tier modified lock/latch 11701 54 Horizontal frame filler 11030 55 Center Support Block 11050 56 End Panel Support Block - Left 11055 57 End Panel Support Block - Right 11056 58 Door Sill Plate 11013 62 Door Check Hold Back Kit (contents of kit also listed on page 8) 10635 61 Door check spring assembly 10632 63 Long L angle flange 2 1/4 x 1 5/8 x 15 pre drilled 11016 64 Short L angle flange 2 1/2 x 1 5/8 x 3 1/2 pre drilled 11018 65 (2) 1/4 x 3 SS carriage bolts 10637 66 (2) 1/4 x 3 1/2 SS carriage bolts 10634 67 (4) 1/4 I.D. washers 10636 68 (4) 1/4 Nylock nuts 10638 69 (2) 2 3/8 Nylon sleeves use with short flange 10633 70 (2) 2 Nylon tube sleeve spacers use with long flange 10639 80 Hardware Kit D (one kit needed for each starter unit) 11100 D1 (4) 3/8 x 3 SS hex head cap screws 11101 D2 (16) 3/8 SS flat washers 11102 D4 (4) 3/8 x 4 SS hex head cap screws 11104 D5 (8) 3/8 Nylock nuts 11105 D6 (4) 5/16 x 2 SS hex head cap screws 11106 D7 (4) 5/16 SS flat washers 11107 D8 (4) 5/16 SAE-type Nylock nuts 11108 D9 (8) 5/16 x 1-1/4 hex head sheet metal screws 11109 85 Hardware Kit E (one kit needed for each adder unit) 11200 E1 (2) 3/8 x 4 SS hex head cap screws 11201 E2 (4) 3/8 SS flat washers 11102 E3 (2) 3/8 SAE Nylock nuts 11105 E6 (4) 5/16 x 2 SS hex head cap screws 11106 E7 (4) 5/16 SS washers 11107 E8 (4) 5/16 SAE-type Nylock nuts 11108 #65, 66 #68, D5, D8, E3, E8 #D1, D4, D6, E1, E4, E6 #D9 #67, D2, D7, E2, E7 TOOLS REQUIRED...are the same as those noted for the First Tier Assembly in the ProPark Owners Guide, plus one (1) 7/16 Drill Bit, a Phillips-head screwdriver, and a bar of soap.

4 CYCLE-SAFE / TWO-TIERED INSTALLATION ASSEMBLY SEQUENCE A. Build first-tier locker row. Plumb and true assembly according to the Installation Guide and Owners Manual ProPark Series. (Attachment and operation of second-tier lockers will go better if first-tier lockers are installed level and plumb.) B. Install center support blocks C. Install horizontal frame filler D. Install 2nd-tier leveling plates E. Install 2nd-tier frame assemblies F. Install left & right corner support blocks G. Install 2nd-tier end panels H. Install 2nd-tier top panels Read all instructions prior to assembly! NOTE: Custom doors are furnished for the second tier. (Door boxes should be properly identified.) Locking mechanism for the custom doors is located in the lower right corner of the door assembly. (See figure 3 below.) NOTE: PRIOR TO INSTALLATION run each bolt through a bar of soap. This will allow the nylock nut to connect with the fastener easier, minimizing the amount of force applied to the bold and preventing any of the bolts from breaking. I. Install diagonal partitions J. Install 2nd-tier doors K. Install door sill plates L. Final squaring and adjusting E H M. Install door check kits G J B, C & D K F Letters in figure 3 at right correspond with areas of installation where tasks above are described. FIG. 3

CYCLE-SAFE / TWO-TIERED INSTALLATION 5 B. Install center support blocks ep C. Install horizontal frame filler(s) eo D. Install second-tier leveling plates 9 Materials: Center Support Blocks Leveling plate ep 3/8 x 4 SS hex 9 head cap screw E 3/8 SS flat washers E 1 3/8 Nylock nuts E 2 Horizontal Frame fillers 3 eo See soap note on page 2 before proceeding. STEP 1: Drill a hole in the first-tier horizontal frame using a 7/16 drill bit. The hole should be 1-5/8 inches from the front edge of the frame. (The pre-drilled holes in the center support block ep should be precisely 1-5/8 inches from the edge of the frame. Use the support block as a template if necessary.) NOTE: There is one specific position for each Support Block (Left, Right, and Center). The blocks are uniquely molded to fit flush with the ridges of the end panels and frame assemblies. The top of the block will be flush with the edge of the top panel. The blocks are embossed with an L, R, or C. STEP 3: Line up the second-tier leveling plate 9 over the pre-drilled hole in the center support block ep. Using a 3/8 x 4 SS hex head cap screw E 1, 3/8 SS flat washers E 2 and 3/8 SAE Nylock nut E 3, secure the second-tier leveling plate and center support block ep to the first-tier horizontal frame. One washer is positioned next to the head of the bolt and one washer is positioned next to the nylock nut. Repeat for each center support block. STEP 4: Position the horizontal frame filler eo over the first-tier horizontal frame. It will nest between the two center support blocks and fit flush with the top panels (see figure 5). No hardware is needed to hold the filler in place, as the second-tier frame assembly (once installed) will secure the filler. FIG. 4 Center Support Block properly aligned. STEP 2: Line up a center support block ep on the edge of the first-tier frame assembly where the vertical and horizontal frame meet. The block will nest securely between the top panels and fit flush with the front of the top panel. (See figure 4) The pre-drilled hole should line up with the hole drilled in Step 1. Repeat on the opposite side. (Do not secure with hardware yet.) NOTE: Be sure the center block is pushed back so that it does not hang below the bottom edge of the top panel - otherwise it will interfere with opening of the first tier door. FIG. 5 horizontal frame filler Position of horizontal frame filler.

6 CYCLE-SAFE / TWO-TIERED INSTALLATION E. Install second-tier frame assemblies 2 & 3 F. Install Left & Right Corner Support Blocks eq & er G. Install second-tier end panels 8 Materials: Left support blocks Right support blocks eq 3/8 x 3 SS hex head er cap screw D 3/8 SS flat washer D 1 3/8 x 4 SS hex head 2 cap screw D 3/8 Nylock nut D 4 5/6 x 1-1/4 sheet 5 metal screw D 9 See soap note on page 2 before proceeding. STEP 1: Install second-tier frame assemblies 2 & 3 onto leveling plates. Refer to frame assembly instructions on page 17 and 18 of the ProPark owners manual. STEP 2: Line up the two left eq and two right er corner support blocks on the outside corners of the first-tier end panels. The blocks will rest flush with the top panel and ridges of the end panel. Using a 7/16 drill bit, drill a hole through the end panel using the second hole position as a template. (See figure 6.) Drill out only the second hole position at this time. Secure each block to the end panel using a 3/8 x 3 SS carriage bolt D 1, two 3/8 flat washers D 2 and a 3/8 Nylock nut D 5. Position one washer next to the head of the bolt and a second washer next to the nylock nut. Repeat for each corner. STEP 3: Drill a hole in the end panel using the first predrilled hole of the support block as a guide. Use a 7/16 drill bit. Repeat for each corner block. STEP 4: Line up second-tier end panels 8 (leveling plates pre-installed) with the holes drilled in Step 3. Place a 3/8 x 4 SS hex head cap screw D 4 and 3/8 washer D 2 down through the hole in the leveling plate. Do not secure yet. STEP 5: Position a second leveling plate 9 inside the end panel (upside down) so the bolt from Step 4 goes through the hole of the leveling plate. (See figure 7) Use a second 3/8 washer D 2 and 3/8 Nylock nut D 5 to secure the end panel. Repeat on each corner. upside-down leveling plate position for the tek screws FIG. 6 L R second hole FIG. 7 STEP 6: Secure the upside-down leveling plate to the end panel using two 5/16 tek screws D 9. Position screws so they go through the frame into the leveling plate. (See figure 7.) Repeat for each leveling plate.

CYCLE-SAFE / TWO-TIERED INSTALLATION 7 H. Install second-tier top panels 1 I. Install diagonal partitions 6 J. Install second-tier doors eu K. Install door sill plates es L. Final adjustments and squaring NOTE: Be sure to use the custom doors for the top tier. The pop out t-handle is in the lower right corner of the door. Materials: Second-tier top panels 1 Diagonal partitions Second-tier doors 6 Door sill plate eu es 5/16 x 2 SS hex head cap screws D 6 or E 5/16 SS washers D 6 7 or E 5/16 Nylock nuts D 7 8 or E 8 See soap note on page 2 before proceeding. STEP 1: Install second tier top panels 1. Refer to page 18 of the ProPark Owners manual for proper assembly instructions. STEP 2: Install diagonal partitions 6 following assembly instructions on page 19 and 20 of the ProPark owners manual. STEP 3: Install the second-tier doors eu following the installation instructions on page 21 of the ProPark Owners manual STEP 4: Position the door sill plates es directly in front of the door between the ears of the vertical frames. (See figure 8) Close the locker door. This should adjust the sill plate to the correct position. Open the door and mark the top of the roof panel using the two predrilled holes in the sill plate as a template. Drill holes in the top panel using a 5/16 drill bit. Make sure you are not interfering with any ribbing beneath the top panel. Secure the sill plate to the top panel with a 5/16 x 2 Hex Head Cap Screw D 6 or E 6, 5/16 SS washers D 7 or E 7 and 5/16 SAEtype Nylock nut D 8 or E 8. Repeat for each sill plate. STEP 5: Make sure door closes properly and the sill plate fits securely when the door is closed. If there is interference. Remove the sill plate and enlarge the pre-drilled holes. Adjust the sill plate accordingly and secure the top panel. STEP 6: Final Squaring and adjusting of the second tier. Refer to pages 22 and 23 of the ProPark Owners manual. FIG. 8

Ada, Michigan 49301 P: 888-950-6531 or 616-954-9977 F: 616-954-4290 Assembly of materials and specifications herein are subject to change without notice. PLEASE FORWARD THIS INSTRUCTION BOOKLET TO THE LOCKER SYSTEM ADMINISTRATOR. E-mail: info@cyclesafe.com Website: www.cyclesafe.com E-mail: info@cyclesafe.com Website: www.cyclesafe.com