Tools & Materials Needed

Similar documents
GATE INSTALLATION. Tools & Materials Needed. peakproducts.com. Self-drilling screw. Lag bolt

Tools & Materials Needed

Tools & Materials Needed

Continuous Handrail Kit Installation Instructions

A LUMINIUM. Modular Handrail Installation Guide. Tools and Materials Required. Hardware Included. See WARNING on inside panel

Tools & materials required for each application. Hammer drill Shovel. Masonry bits: Concrete mixing. 7/32", 5/16" equipment

Report of: RailBlazers Aluminum Railing System Post Anchorage with GRK Screws

2015 International Building Code Report WARNING

2014 Florida Building Code Residential Report

ATLANTIS RAIL Contact Information

RadianceRail Installation Guide

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

Installing AZEK Evolutions Rail

The following instructions will guide you through the installation of your new vinyl railing stair kit.

TREX TRANSCEND RAILING

Evolutions Rail Contemporary Style Installation Guide

738 SERIES PIVOT SHOWER DOOR

Installation Instructions for. Before You Begin TOOLS REQUIRED

Curved Baluster Railing Systems

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

Installing AZEK Evolutions Rail

Harmony 1/4 Glass Railing Installation Instructions - Deck Application

VersaRail Gate Kit. freedomproduct.com. To register your product, please visit: INSTALLATION INSTRUCTIONS

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

Aluminum Railing Gate Kit

Vinyl Privacy & Picket Gates

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

340 & 350 SERIES BATH ENCLOSURES

1. TOOLS + MATERIALS REQUIRED

PVC Composite Railing & Stair Kit

340 & 350 SERIES DELUXE FRAMELESS BYPASS

TREX SELECT RAILING Installation Instructions

POST INSTALL INSTRUCTIONS

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

INSTALLATION MANUAL VERANDA ENCLAVE RAILING. Model # SEC17 EW R15 PRE W/H SEC17 EW R15 KD W/HW SEC17 EWS R13 KD W/H

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

The following instructions will guide you through the installation of your new vinyl railing.

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

Installation Instructions for. Handrail Component System

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

42" Hybrid Composite Railing Installation Guide. v

ESSENCE. Shower / Tub Door Installaion Instructions

RAILING R A IL ING 51

OPERATORS MANUAL WEEKENDER STEEL LADDER RACK

Stair Parts Installation. Tricks

T r e x Art i s a n Se r i e s Railing

ALUMINUM FENCE. Additional freight charges may apply depending on order size. Please call for quote at

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Installation Instructions

Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV

TREX SELECT RAILING. Installation Instructions PARTS

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

EASY-IN POOL STEP SYSTEM NE132

Installation Instruction

Gazebo GZ3584 Aluminum Composite Roof Panels

INSTALLATION MANUAL VERANDA REGENCY RAILING WITH METAL BALUSTERS. Model # SEC17 RW U8 W/MTL KD SEC17 RWS U8 W/MT KD

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

INSTALLATION INSTRUCTIONS Small Flat Panel Height-Adjustable, Extended Pitch Swing Arm Wall Mount Model KWE-110

INSTALLATION MANUAL WEEKENDER STEEL LADDER RACK

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

IMPORTANT: Read all sections before you start

Chapter 17 - Porch Trim

INSTALLATION INSTRUCTIONS GUIDE

INSTALLATION SUGGESTIONS LEVEL APPLICATION LIMITED WARRANTY

FIXED PANEL SLIDER QCI5241

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

Installing the Nantucket (100 Series), Manhattan (200 Series), and Charleston (300 Series) Code-Approved Rail Systems

HEAVY GLASS HINGE INSTALLATION INSTRUCTIONS HINGE PARTS LIST. Tel: G D K I

Create cable assemblies to fit your style

2017 UPDATED INSTALLATION INSTRUCTIONS

Frameless Inline Door With Return QCI5263

EASY POOL STEP (NE113)

PRODUCT: BALDUR + ODEN

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

Flat Panel Stand FPZ-655. for 32" to 55" Flat Panel Screens FEATURES. Reinforced universal adapter plate for a strong hold

36" Hybrid Composite Railing Installation Guide. v

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

340D & 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

Safety Glasses Work Gloves Chop Saw with Cutting Disk. Half Round File Pencil Marker

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Owner s Manual. Easy Close Gate

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

TREX PERGOLA INSTALLATION INSTRUCTIONS

Fortress Al Posts must always be secured to the deck framing. Fortress Al Posts should never be attached to only the deck boards.

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

2. Recommended items need for installation: cordless or power drill with Phillips head screwdriver, saw, pencil and measuring tape.

Template. Blue 242. May 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

THE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

Chalk Line. #4 Phillips Driver Bit. Cable Cutters

Frameless Bypass Slider

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

Transcription:

Installation Guide U.S. Version Tools & Materials Needed Hacksaw or metal cutting saw Drill Drill bits: 1/8", 5/32", 3/16", 7/32", 1/4" 3/8" socket or wrench Phillips screwdriver Measuring tape Non-corrosive exterior silicone caulking All fasteners are included with each component. Self-drilling screw Phillips screw Lag bolt Universal Connector (UC) bolt See WARNING on inside panel peakproducts.com

Dear Customer, We d like to take a moment to say thank you and congratulations for choosing our products. At Peak your satisfaction is very important to us. That is why we work very hard to provide you with products of exceptional quality, value, and beauty. And that is also why we want to hear from you. Please contact us with your comments or suggestions at: quality@peakproducts.com Or if you prefer, write to us at: Customer Care The Peak Group of Companies P.O. Box 96060 Richmond, B.C. Canada V7A 5J4 Finally, we d like to remind you to always work safely. Then, take pride, relax with your family and experience years of enjoyment with Peak products. The Peak Group of Companies WARNING No representation or warranty is given that your particular application of these products complies with relevant building codes or that the fasteners provided or used are appropriate for your application. Therefore consult with professionals and local building officials before beginning work: (i) to ensure compliance with relevant building codes for your application and for your proposed use of fasteners; (ii) to ensure the integrity of the structural components in connection with which these products are to be used; (iii) to identify appropriate safety gear that is to be used during installation such as a safety harness when working above ground; (iv) to ensure that the work area is free from utilities, services and hazards; and, (v) to clarify any instructions or warnings that may not be clear. Work in a safe manner wearing protective gear such as gloves, eyewear, headwear, footwear and clothing. When using tools always comply with operation manuals and instructions. Metal and glass may have sharp edges and could fragment or splinter during or as a result of handling or cutting. Do not use these products in connection with any substance that is or may be harmful or corrosive to the products. Inspect and maintain these products and the structural components that they are used in connection with on a regular basis using professionals when appropriate. These instructions have been prepared for certain standard residential applications. Obtain professional advice for any non-standard or non-residential application. IMPORTANT INFORMATION Maximum post spacing of 6 for Residential use. - Applies to guards serving one-and-two family dwellings. For Commercial use - please call Peak Customer Service at 1-877-883-PEAK (7325) or email: cservice@peakproducts.com. To prevent wood splitting and rot, drill 5/32" pilot holes and coat lag bolt threads with non-corrosive exterior silicone caulking. Ensure that the posts are plumb. Ensure that the spacing between each of the following is less than 4 : pickets glass panels pickets and post glass panel and post pickets and wall glass panel and wall Wall Mount Brackets Railings can be attached to a wall using wall mount brackets. 2 3/8" 42 1/8 " Universal Connectors Stair Connectors Used for horizontal angle Used for applications Stair applications* No member of The Peak Group of Companies (as defined at www.peakproducts.com) shall be liable for any loss or damage resulting from the improper installation or use of this product. In the unlikely event that any member of The Peak Group of Companies becomes liable for any loss or damage, the aggregate liability shall be limited to the retail purchase price of the product. Peak products and the materials associated therewith are protected by patents, designs, copyrights and/or trademarks. The Peak and RailBlazers trademarks and related intellectual property are used under licence from Peak Innovations Inc. 2014 & Peak Innovations Inc. Patents pending. * Glass panels cannot be used on stair applications. Stair pickets must be used on stair applications. 2 3

PICKET INSTALLATION Pickets & Spacers (including Stair Pickets & Spacers) are designed for Residential 1 use only. Wide Pickets & Spacers (including Wide Stair Pickets & Spacers) are designed for Residential 1 or Commercial 2 use. 1 Guards within dwelling units and exterior guards serving not more than two dwelling units. 2 Please call Peak Customer Service at 1-877-883-PEAK (7325) or email: cservice@peakproducts.com. Remove the temporary post to install the last few pickets and spacers. Cut the last spacers flush with the ends of the rails. NOTE: to ensure equal picket spacing at each post, cut the first and the last spacers in the hand and base rails to equal lengths. Measure and mark the position of all posts and space equally. Fasten the end post in place - ensure that the post is plumb. Temporarily position the second post - do NOT secure it yet. Cut the hand and base rails to fit between the posts. Install the base rail support(s) into the bottom channel of the base rail and install all but the last four spacers into each rail. support Spacers Insert the rails into the second post. Position and fasten the second post in place - ensure that the post is plumb. Secure the rails to the second post with self-drilling screws. Repeat Steps 1-4 for each remaining section. Insert the rails into the first post and secure these rails to this post with self-drilling screws. Use the second post as temporary support - do NOT secure the rails to the second post yet. Slide the first spacer in each rail against the first post. Insert a picket into the base rail and swing the top of the picket into the handrail as shown below. Repeat to complete the section. IMPORTANT To ensure that the pickets remain engaged in the rails, you must install one or more base rail support(s) for each railing section. To install the base rail support, insert it into the bottom channel of the base rail (as shown in Step 1), slide it to the centre position and secure it to deck surface using fasteners. 4 5

GLASS PANEL (18 wide or greater) INSTALLATION Always use two people to handle glass panels. Always lift a glass panel by its sides. Tempered glass is extremely fragile do not bump the edges. Always use protective gear including eyewear and gloves when handling glass panels. Cut the glass gaskets the same length as the rails and drill 1/8" holes into the base rail glass gasket for water drainage. Press the glass gaskets into the rails and install the base rail support into the bottom channel of the base rail. IMPORTANT: The smaller of the two glass gaskets goes into the. Glass gasket Measure and mark the position of all posts and space equally. Fasten the end post in place - ensure the post is plumb. Temporarily position the second post - do NOT secure it yet. Cut the hand and base rails to fit between the posts. Base rail support Hand rail Insert the rails into the posts. Position and fasten the second post in place - ensure that the post is plumb. Secure the rails to the posts with self-drilling screws. (Refer to Step 4 on Page 5.) IMPORTANT: Ensure that the glass gaskets and the top and bottom edges of the glass panel are well lubricated with liquid soap before installing the glass panel. Install the glass panel by inserting it into the handrail gasket then lowering it into the base rail gasket. IMPORTANT: Ensure that the glass is fully seated in the gaskets. Wash away excess soap with clean water. Repeat Steps 1-4 for each remaining section. Remove the plastic picket gaskets from both rails. 3 15 /16 max. Picket gasket IMPORTANT To ensure that the glass panel remains engaged in the rails, you must install one base rail support for each railing section. To install the base rail support, insert it into the bottom channel of the base rail (as shown in step 3), slide it to the centre position and secure it to deck surface using fasteners. 6 7

6 wide GLASS PANEL KIT INSTALLATION IMPORTANT NOTICE: This kit was designed to fit into a 6 railing section. If your railing is shorter than 6 (1.8m), you will need to cut the spacers or remove the glass panel(s) accordingly. The opening between the individual glass panels must never exceed 4. The opening between a post and a glass panel must never exceed 4. Always lift a glass panel by its sides. Tempered glass is extremely fragile do not bump the edges. Always use protective gear including eyewear and gloves when handling glass panels. Insert the rails into the first post and secure these rails to this post with self-drilling screws. Use the second post as temporary support - do NOT secure the rails to the second post yet. Slide the spacer in each rail against the first post. Remove the temporary support post and slide a glass panel (with fittings attached) into the rails until touching the spacers. Slide the next pair of spacers into the hand and base rails. Repeat to complete the section. Measure and mark the position of all posts and space equally. Fasten the end post in place - ensure that the post is plumb. Temporarily position the second post - do NOT secure it yet. Cut the hand and base rails to fit between the posts. Install the base rail support into the bottom channel of the base rail. Insert a spacer into the handrail and another spacer into the base rail. Insert the rails into the second post. Position and fasten the second post in place - ensure that the post is plumb. Secure the rails to the second post with self-drilling screws. Repeat Steps 1-4 for each remaining section. support Spacers Attach the glass fittings to the top and bottom ends of each glass panel. IMPORTANT To ensure that the glass panels remain engaged in the rails, you must install one or more base rail support(s) for each railing section. To install the base rail support, insert it into the bottom channel of the base rail (as shown in Step 1), slide it to the centre position and secure it to deck surface using fasteners. 8 9

STAIR RAILING INSTALLATION Follow all applicable building codes for the stair post placement and heights of rails above nose of stair treads. NOTE: Stair pickets and spacers are different from regular pickets and spacers. For United States stair railing installations, regular hand and base rails are not International Code Council compliant for graspability. Always use stair hand and base rail set for stair applications. Use Stair Connectors (SCs) at each post. Drill 1/4" holes through the end caps and secure to the backing plates with SC bolts. Position the base rail at the required height above the nose of stair treads. Position posts to meet base rail less than 8" above base. Fasten the top post to the deck - ensure that the post is plumb. Position and mark the location of the bottom post on landing or on the last stair tread - do NOT secure yet. With the base rail still in position, place the SCs on the posts to align with the base rail. Remove the base rail and mark the locations of the SCs on the posts. Drill 7/32" pilot holes into the posts and use the flat head screws to attach bottom SCs to the posts. Measure and cut the base rail to fit between the end caps. Backing plate Stair Connectors Place a picket into both rails near the bottom post - ensure that the picket is plumb and 4" or less from the post. Starting from the bottom post, measure and cut the end spacers then remove the picket (Fig. 1). NOTE: At the bottom post, end spacer "a" will be shorter than end spacer "b". Temporarily move the bottom post and rails away from the top post (Fig. 2). Install the end spacers followed by pickets and stair spacers (step 2 of Picket Railing Installation). Cut and install the last spacers flush with the ends of rails. The last picket must also be 4" or less from the top post (Fig. 3). Fig.1 BOTTOM POST a 4" max. b Fig.2 4" Max. Fig.3 TOP POST End cap Drill 1/4" Max.8" PRO TIP: To ensure equal spacing at each post, cut the first and last spacers in the hand and base rails to a length that ensures equal spacing between the end pickets and the posts. Cut the handrail to the same length as the base rail and fit the SCs onto the handrail. Use two stair pickets to position the handrail. Mark the locations of the SCs on the posts. Remove the handrail from position and the SCs from the handrail. Drill 7/32" pilot holes into the posts and use the flat head screws to attach the SCs to the posts. Temporarily move the bottom post to place the hand and base rails into the SCs. Secure the SCs to the rails at the bottom post only. Place the bottom post back into position and ensure that the rails are fully inserted into the SCs at the top post. Secure the hand and base rails to the SCs at the top post as shown in step 2. Fasten the bottom post to the landing or last stair tread - ensure that the post is plumb. 10 11

GATE INSTALLATION Gate opening (W), must not exceed 46". Remove the latch side of the gate (Fig. 1). Cut the top and bottom gate rails 7 1/2" shorter than the gate opening (Fig. 2). Align the top rail of the gate with the handrails. Drill 3/16" pilot holes into the post and lag bolt the gate to the post. (Fig. 1) (Fig. 2) W ( 46" max) W minus 7 1/2" Use self-drilling screws for these steps: - Secure the retainer to the gate frame at marked position. - Insert the latch through the retainer and secure to the gate frame at marked position. - Secure the latch side of the gate frame to the top and bottom gate rails. - Secure the latch plate. Latch Retainer Latch plate Gate frame 12 II01US_V6A