B17. Sewer Site Plans BULLETIN

Similar documents
Grease Interceptor Design Checklist

Oil-Water Separator Design Checklist

Sewer Line Extension Permit Design Checklist

Plan Submittal and Review Checklist

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

CITY OF MUSKEGO DRAFTING STANDARDS

1.1 GENERAL RECORD DRAWING REQUIREMENTS

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

City of Massillon Site Plan Checklist

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

List of Figures. List of Forms

Porter County Plan Commission

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Application for Site Plan Review

PLANNING AND DEVELOPMENT

Town of Westlake Construction Plans Review Checklist

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

What Plans Do I Need for a Building Permit?

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

Subdivision Application Checklist

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

MAJOR GRADING PLAN CHECKLIST

B-PERMIT PLAN CHECK MANUAL

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

CHAPTER 11. Plan Standards

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

STATE UNIVERSITY CONSTRUCTION FUND

Guide to the Single Family Site Development Process

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Phone Number: Address:

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

DECK PERMIT APPLICATION PACKET

Commercial Building Permit Process

Residential Room Addition / Remodel Submittal Requirement Checklist

City of Starkville Development Review Committee Infrastructure Drawings Submittal Checklist for Site Plan Applications

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

DEVELOPMENT PLAN CHECKLIST

Checklist for Tentative Subdivision Map

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Applying for a Site Development Review

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

Washington County Road Engineering Plan Submittal/Review Checklist

Engineering Plan Submittal Requirements. Revised: October 2, Page 1 of 13

HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS

TOWN of LAKESHORE SITE PLAN CHECKLIST

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

CONCEPT REVIEW GUIDELINES

Thurston County Permitting System Policies &Procedures Page: 1 of 3

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Charlotte County Utilities DESCRIPTION

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

Public Works Standards

Construction Documents (CDs) Checklist

Lincoln County Public Works Water and Sewer Submittal Application

On-Site Sewage Disposal Application Packet

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

Public Works City of Lebanon, Tennessee; Department of Public Works

Clarifications in italics added July 2018

3. DESIGN SPECIFICATIONS

Chapter 13 Plan Submittals

SECTION III SUBMITTALS AND APPROVALS

Legal Description & Site Plan Requirements and Layouts

WATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS

Site Plan/Building Permit Review

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

Babcock Ranch Water Utilities as operated by Town & Country Utilities and Babcock Ranch Irrigation

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

CITY OF VISTA STANDARD DRAWINGS

PRECISE GRADING PLAN CHECKLIST

Transcription:

BULLETIN B17 Revised 5/2/2016 Sewer Site Plans Public Works This bulletin is designed to assist you in submitting the required documentation for sewer site plans to the Pierce County Sewer Division in support of a Residential or Commercial Sewer Service Permit application. It contains information on the requirements and resources available to you through your application process. This document is a guide only and is not a replacement or revision of the Pierce County Code and associated sanitary sewer design and construction standards. Graph paper and example Site Plans follow the bulletin for your use. All documents must be uploaded in PDF format. Sewer Division Standard Plans and Forms can be downloaded at: www.piercecountywa.org/sewerformsandplan. If you have questions, contact our office at (253) 798-7210. Why do I need to submit a sewer site plan? Generally speaking, sewer site plans are required in order to answer the following questions: 1. Can the proposed work on the building sewer be accomplished in accordance with the Pierce County Code and associated sanitary sewer design and construction standards? 2. Is a right-of-way permit needed to accomplish the proposed sewer work? 3. Are there any public or private easements or agreements needed to accomplish the proposed sewer work? 4. Are there any other buildings on the property that need to be connected to the public sewer system? What regulations should I follow when laying out my building sewer? Sanitary sewer construction in the Pierce County Sewer Service Area is regulated by the Pierce County Code Chapter 13, Standard Plans, Sanitary Sewer Standard Specifications, and the Sanitary Sewer Standard Details Manual. However, you can use the County s Building Sewer Installation Guidelines for a more concise version of those regulations as they relate to building sewer installation. I already have to submit a Site Plan for my building permit application. Do I have to draw a different site plan for my sewer service permit application? Not necessarily. As long as your site plan includes the required information listed below, you can submit a copy of the same site plan you used for your building permit application. I want to connect my house to the sewer system. What do I need to show on my residential sewer site plan? The following is a list of minimum requirements for residential (single-family residences and duplexes) sewer site plans: 1. North Arrow and scale indicator. Sewer site plans must be drawn to some measurable scale (e.g., 1 =20 ). 2. Property information: Parcel number(s), Site Address(es), property lines (include dimensions), existing and proposed easements with dimensions (include Auditor s File Number, or AFN if already recorded). 3. Street(s) adjacent to the property (include road name, edge of pavement, and existing and proposed right-ofway line). If any sewer work will be done in the existing public right-of-way (including excavation), also show the right-of-way centerline and width. 4. Show and label the existing side sewer stub bubble data (include the length, diameter, pipe type, and depth). You can find the existing stub (or bubble ) information by researching the sewer main as-built plan drawings at http://matterhorn3.co.pierce.wa.us/publicgis/, or by contacting a Sewer Division Engineering Technician at (253) 798-2737 or Sewer Division Engineer at (253) 798-4050. 5. If a side sewer stub does not exist, show the proposed tap, its distance from the upstream and downstream sewer manhole, the pipe length, diameter, type, and depth of the side sewer stub, and the invert elevation of the proposed connection point to the existing sewer main. Show the existing sewer main (include the length, Sewer Site Plan Bulletin 1 of 7

diameter, pipe type, and slope) and both the upstream and downstream sewer manholes (include rim elevations and invert elevations). If the sewer stub will cross other existing or proposed utilities, show and label them. 6. Show and label the existing and proposed building sewer pipe. Pipe must be labeled with the length, diameter, pipe type, and slope. Sewer pipes must be dimensioned from buildings, property lines, and water lines. Show sleeves, trench dams, and concrete encasement of sewer pipe, if any. See the Building Sewer Installation Guidelines (Drawing and Text) for more information. 7. Show and label the existing and proposed cleanouts. Cleanouts must be labeled with the cleanout type if other than wye-type cleanouts (i.e., double-sweep tee or straight tee). Label all double-sweep and straight tee cleanouts with rim (top) elevation and invert (bottom) elevation. 8. Show and label the plumbing outlets(s) from the building. 9. Show and label existing on-site septic system components (i.e., septic tank), if any. 10. Show and label the water service lines and meters as well as other utilities. 11. Show the existing and proposed building footprint(s), dimensions, finished floor elevation(s), distance(s) from property lines and other buildings. 12. Show limits of paving (driveway or parking lot). 13. If the building(s) cannot be served with a gravity building sewer, an engineered private pump system plan and additional plan review and inspection fees will be required. Please see the Residential Pump Standard Plan and Residential Pump Design Checklist for standards and further design requirements. I want to connect my business to the sewer system. What do I need to show on my commercial sewer site plan? The following is a list of minimum requirements for commercial (apartment buildings, strip malls, industrial facilities, etc.) sewer site plans: 1. Include items 1 through 12 of the minimum requirements for residential sewer site plan requirements listed above except, i. Label all cleanouts with rim (top) elevation and invert (bottom) elevation. 2. If the building(s) cannot be served with a gravity building sewer, an engineered private pump system plan and additional plan review and inspection fees will be required. Please see the Commercial Pump Standard Plan and Commercial Pump Design Checklist for standards and further design requirements. In addition, commercial sewer site plans must also include the following information: 1. Contour lines (2 foot intervals, maximum). 2. Show on-site storm drainage (include storm drain pipes, catch basins, retention and detention ponds, vaults, bio-swales, etc.) Catch basins must be labeled with rim and invert elevations. 3. Show any existing pretreatment devices. Installation of new pretreatment devices, such as grease interceptors and oil-water separators, requires submittal of engineered plans. See the standard plan and design checklist for the type of pretreatment device you are proposing to install. Where can I get the forms I need? Sewer Division Standard Plans and Forms can be downloaded in PDF format from the following webpage: www.piercecountywa.org/sewerformsandplan If you have any questions, please contact a Sewer Division Engineer at (253) 798-4050. Where do I submit my application? Completed applications must be submitted online at: https://palsonline.co.pierce.wa.us/palsonline/#/dashboard. The payment of permit fees and connection charges can also be made at the same website. If you can t pay online, you can pay in person at the Pierce County Development Center (Annex), 2401 South 35th Street, Room 150, Tacoma, WA 98409. If you have any questions, contact a Sewer Division Permit Technician at (253) 798-2737. Sewer Site Plan Bulletin 2 of 7

SEWER SITE PLAN Sewer Site Plan Bulletin 3 of 7

4 of 7

5 of 7

6 of 7

7 of 7