A. Rough carpentry includes but is not limited to the following:

2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc.

SECTION ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK:

SECTION ROUGH CARPENTRY

DIVISION 6 WOOD AND PLASTICS

FT DIX ELEMENTARY SCHOOL PHASE VII, CLASSROOM ADDITION PEMBERTON TOWNSHIP REGAN YOUNG ENGLAND BUTERA, PC PROJECT #5349A

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

Multi-Institutional Academic Health Science & Research Center Evansville, IN

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION ROUGH CARPENTRY

DIVISION 6 WOODS AND PLASTICS SECTION ROUGH CARPENTRY

SECTION CARPENTRY

FASTENERS BUILDING DEPARTMENT

A. Product Data: For each type of process and factory-fabricated product indicated.

Ash Brook Golf Course Scotch Plains, New Jersey

B. Related Sections: The following Sections contain requirements that relate to this Section:

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

RAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION 2012

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

A. Boards or Strips: Lumber of less than 2 inches nominal size in least dimension.

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

DIVISION 6 WOOD, PLASTICS AND COMPOSITES

1.03 QUALITY ASSURANCE A. Inspection Agencies: 1. SPIB: Southern Pine Inspection Bureau; for all structural framing of roof joists and headers.

Load Tables, Technical Data and Installation Instructions

THE ENGINEERED WOOD ASSOCIATION

Sections & Details VOCABULARY

ROOF-CEILING CONSTRUCTION

3.1 General Provisions

Exterior Wall Fastener Schedule

Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016

Carpentry Level 1, 2014

Typical Deck Details Based on the City of Nixa Residential Deck Ordinance

Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor Systems Overview Revised 9/2/2016

APA Performance Rated Rim Boards

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

SECTION ROUGH CARPENTRY

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

Section Rough Carpentry

2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

SECTION ARCHITECTURAL WOOD CASEWORK

SECTION FINISH CARPENTRY

Typical Deck Details

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Typical Deck Details

GlasRoc Sheathing Type X

Slate Shingle Specifications

DIVISION 6 WOODS AND PLASTICS SECTION FINISH CARPENTRY

City of Virginia Beach, Virginia Typical Deck Details

Trusted ICC ES PASLODE, Evaluation. report, or as to any. ICC-ES Evaluation

Strands & Standards CARPENTRY 2

Sections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013.

Core Curriculum Carpentry 1 Carpentry 2 Carpentry 3

eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233

3 for handling, storing, installing, and finishing treated materials: 5 unless otherwise specified. 34. Air-infiltration barriers.

Prescriptive Residential Wood Deck Construction Guide Based on the 2006 International Residential Code

Material List for Log Complete Packages

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

Nails, Fasteners, Connectors, and Framing

SECTION ROUGH CARPENTRY

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

ROOF-CEILING CONSTRUCTION

ROOF-CEILING CONSTRUCTION

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

Deck Design Guide. One and Two Family Residential Dwellings

8 x 10 Timber-frame Garden Shed

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

ROOF-CEILING CONSTRUCTION

B. Related Requirements: 1. Section "Interior Painting" for priming and backpriming of interior finish carpentry.

eco-shake INSTALLATION INSTRUCTION

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

4. Metal roof jacks at penetrations and attachments

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.

HOW TO BUILD A 12X8 SHED

ICC-ES Evaluation Report

SECTION INTERIOR FINISH CARPENTRY. A. Lumber grading agencies, and the abbreviations used to reference them, include the following:

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

WALL TO FABRICATED FLOOR

Description. Lesson Outcomes. Assumptions. Build a Floor. Carpenter

Best Barns USA Assembly Book

SECTION METAL FABRICATIONS

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

SECTION TRAFFIC SIGNAGE

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

GLOSSARY OF TERMS SECTION 8

Dura-Lock Roof System

ROOF-CEILING CONSTRUCTION

Pulaski County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code

Maryland Building Officials Association Typical Deck Details

Unit 9. Wall and Ceiling Framing

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION SHEET METAL FLASHING AND TRIM

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

Transcription:

SECTION 06100 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide Rough Carpentry as shown and detailed on the Drawings and specified herein. 1.02 QUALITY ASSURANCE A. References: 1.03 SUBMITTALS 1. American Forest and Paper Association (AFPA): National Design Specification for Wood Construction. 2. American Lumber Standards Committee (ALSC): Grading Standards. 3. American National Standards Institute (ANSI): a. Mat-Formed Wood Particleboard: ANSI A208.1. b. Basic Hardboard: ANSI/AHA A135.4. 4. American Plywood Association (APA): Standard Grading Rules. 5. American Wood Preservers Association (AWPA): Preservative and fire retardant treatment. 6. Redwood Inspection Service (RIS): Standard Specifications for Grades of California Redwood Lumber. 7. West Coast Lumber Inspection Bureau (WCLIB): Standard Grading Rules No. 16. 8. Western Wood Products Association (WWPA): Western Lumber Grading Rules. A. Product Data: Submit manufacturer's specifications, data and installation instructions for review. B. Certificates: 1. Pressure Treatment: Submit mill certificate verifying compliance as specified, for each shipment received, in addition to a stamp on each piece of lumber, from an approved independent inspecting agency operating under the overview of the ALSC. 2. Lumber Grades: Where lumber and plywood is exposed to view and clear finished, provide Certificates in lieu of grade stamping and trade marks. 06100-1

1.04 SITE CONDITIONS A. Protection: PART II - PRODUCTS 2.01 MATERIALS 1. Temporary Supports: Provide adequate centering, bracing, and shoring for protection of structure during construction. A. Grading: 1. General: NBS PS-20 and applicable Lumberman's Association rules, under which each lumber species is produced. 2. Grade Marking: B. Lumber: a. Lumber: UBC Standard 23-1; each piece of lumber, factory marked with official grade mark of grading agency. b. Plywood: UBC Standard 23-2 and PS 1-83; each panel legibly identified for type, grade and species by APA grade. 1. General: Sizes dressed as shown, surfaced four (4) sides; 19% maximum moisture content; air or kiln dried. Boxed heart will not be permitted in lumber 3x or thicker. 2. Lumber Grades: a. General: Douglas fir-larch; to 4 thickness - No. 1; 6 thickness and larger - Select Structural. b. Sills: 1) General: Pressure treated douglas fir-larch No. 2 or better; AWPB marked or branded. 2) Non-bearing Stud Walls: Redwood, where specifically shown. c. Posts, Beams and Stringers: Douglas fir-larch - Select Structural. d. Miscellaneous Framing: 1) Douglas Fir-Larch: Blocking, nailers, furring, bridging and stripping; Construction or No. 2 grade. 2) Redwood: Where specifically shown; Foundation Grade, unless otherwise noted. C. Plywood: APA Structural I, with exterior glue; [tongue and groove at unblocked floor sheathing only]; sizes as shown. 06100-2

D. Wood Treatment: 1. Western Wood Treating; factory applied treatment, unless otherwise noted, J. H. Baxter Co., or equal. 2. Fire Retardant: AWPA Treatment C20, Exterior Type, chemically treated and pressure impregnated; capable of providing a maximum flame spread rating of 25. 3. Wood Preservative E. Sheathing: a. Pressure Treatment: AWPA Treatment C1 using water borne preservative. b. Surface Application: Clear type. 1. Insulation Sheathing: ASTM D2277, nail base type, tongue and groove; thermal conductivity as shown. 2. Gypsum Sheathing: ASTM C79, size as shown. F. Rough Hardware: 1. Hangers, Clamps, Straps and Anchors: a. Simpson Strong Tie Co., Inc.; types as shown. b. Comparable products with current ICBO approval and equal or greater rated load capacity, TECO/LUMBERLOCK, TECO Products, or equal. c. Special Fabrications: Per Division 5 STRUCTURAL STEEL. 2. Fasteners: a. Nails: FS FF-N-105, common wire; hot-dipped galvanized for pressure preservative treated and exterior work; electro galvanized for other work. Box and sinker nails not permitted. b. Bolts and Nuts: 1) General: ASTM A307, Grade A, including Supplementary Requirement 51. 2) Expansion Bolts: a) Metal anchored to concrete: products with current ICBO approval and equal or greater rated load capacity, Hilti, Inc., or equal. b) Press treated wood anchored to concrete: stainless steel with current ICBO approval and equal or greater rated load capacity, Hilti, Inc., or equal. 06100-3

c. Screws: Wood and lag screws per NFPA National Design Specification for Wood Construction; galvanized for exterior work. d. Washers: Malleable iron or standard cut steel. e. Powder Actuated Fasteners: 1) Hilti, Inc.; type as shown, comparable products with current ICBO approval and equal or greater rated load capacity, Ramset, or equal. G. Adhesive: Per APA-AFG-01 for Plywood Floor Sheathing. H. Building Paper: ASTM D226, 15 lb. asphalt saturated felt. I. Caulking: Provided under Division 7 CALKING AND SEALANTS. PART III - EXECUTION 3.01 PREPARATION A. Temporary Bracing: Provide bracing adequate to keep structure stable, plumb and in line; keep in place until permanent framing is completed. Provide bracing capable of supporting loads imposed by stockpiled material, erection equipment and other loads, during construction. 3.02 ERECTION A. General: 1. Coordination: Coordinate placement of anchors, inserts, etc., in concrete and masonry. Establish locations, lines, levels and provide cutting, patching and fitting as required to accommodate built-in Work specified in other Sections. 2. Lumber: Use new lumber; re-use not permitted unless authorized in writing by the University's Representative. Select lumber in a manner that allowable knots and obvious minor defects do not interfere with placement of bolts, nailing or structural connections. 3. Layout: As shown; set plates, nailing blocks, anchors, grounds, etc., as required. 4. Site Applied Wood Treatment: Brush apply two (2) coats of preservative treatment on wood in contact with cementitious materials and roofing and related metal flashings. Treat site-sawn cuts. Allow preservative to dry prior to erecting members. 5. Fasteners: a. Nails: Per CBC Table 23-11-B-1, unless otherwise noted. Space groups of nails no closer together than ½ nail length and not closer than ¼ nail length from cut ends of lumber. Prevent splitting due to nailing; drill holes for nails where required to prevent splitting. Where nails of normal length may penetrate through exposed work, use nail of specified diameter and shorter length. Use of nailing gun is subject to written approval of the University's Representative. 06100-4

B. Installation: PROJECT NO. ####### b. Bolts and Nuts: Use steel pieces as templates for location of holes; drill holes 1 / 16 larger than diameter of bolts; tighten nuts or rods and bolts at time of installation. Re-tighten before covering up and just before final acceptance of the work; at exposed work, cut protruding bolt ends off to within ⅛ of bolt head and file off all burrs. c. Washers: Install at bolts, nuts or lag screws bearing on wood; not required under heads of carriage bolts. d. Screws: 1) General: Hammering or driving in place not permitted. Use soap to lubricate screw threads, if required. 2) Lag Screws: Drill holes of same diameter and depth as shank; drill holes for threaded portion of screw no larger than ¾ shank diameter. 3) Wood Screws: Drill lead holes for shank and threaded portions ⅞ shank or thread root diameter. e. Powder Actuated Fasteners: 1. General: 1) General: Install where shown or required; DO NOT install in structural connections required to carry computed stresses. a. Structural Members: 1) General: Set level and plumb, in correct position; place horizontal members flat, with crown side up. 2) Glue Laminated Beams: Provided under Division 6 GLUE- LAMINATED BEAMS; do not erect until fabrication inspector's certificates have been reviewed by the University's Representative. Cutting is not permitted, except as shown on Drawings, or with written approval of the University's Representative. b. Framing Members: Construct full length without splices. c. Blocking: 1) General: Provide as shown and where necessary to obtain required lines and levels in finished surface and to provide solid nailing. Secure blocking plumb and rigid; use wood shims wherever necessary to form true and even plane for finish materials. 2) Firestopping: Provide per CBC at interior and exterior walls at intersection with floor, ceiling and roof, and at all hollow 06100-5

concealed spaces. Install minimum 2x material by width of enclosed spaces within partition in continuous row to prevent vertical and horizontal draft. Maximum concealed air space of 10'-0" in any direction. d. Recessed Fixtures: Frame openings for panel boxes and other equipment, as required for fixtures provided. 2. Floor Framing: a. Sills: Secure with anchor bolts, [or nails,] as shown. Join solid sill at corners and with halved joints where member is not continuous. b. Joist Framing: Support ends of each member with minimum of 1-½ bearing on structure below. Anchor joists and provide solid blocking for plywood joints, and as shown. c. Plywood Subflooring: Set in adhesive; secure with long dimension perpendicular to joists, with joints located over joists and end joints staggered; nailing as shown. 3. Wall Framing: a. General: Wood studs as shown; frame openings with multiple studs at sides and headers as shown. b. Plates: Provide continuous sole plates and double top plates. Lap top plate splices 4'-0" minimum; lap at wall corners and intersections. c. Studs: Continuous lengths without splices; provide solid blocking at plywood joints. d. Framing for Piping: Provide proper clearances; furr partitions as required. At pipe 1-½ diameter, or less, set pipe in center of plate using neat holes; no notching allowed. Holes in plates less than 5-½ in width, not allowed. e. Headers: Continuous members as shown. f. Corner Bracing: Continuous members as shown. g. Sheathing: 1) General: Secure with long dimension perpendicular to studs, with joints located over studs or solid blocking and end joints staggered; nailing as shown. 2) Plywood: Minimum 1 / 16 space at end joints and ⅛ at edge joints. Penetration of structurally required plywood to accommodate electrical or mechanical requirements must be approved in writing by the University's Representative. 3) Gypsum Sheathing: As shown. 06100-6

4) Insulating Sheathing: Apply tongue and groove sheathing with long dimension horizontal. 4. Posts and Columns: As shown, straight, plumb and level; brace as required. 5. Roof Framing: a. General: Provide minimum 4 bearing at both ends of each member and anchor as shown. Provide solid blocking at plywood joints. b. Beams and Girders: As shown; splices not permitted except where centered over columns. c. Joist Framing: As shown. d. Rafter Framing: Place rafters directly opposite each other at ridge; notch to fit exterior wall plates; bevel ends at ridge and hip. Provide double rafters at openings in roof. e. Sheathing: Secure with long dimension perpendicular to studs, with joints located over studs or solid blocking and end joints staggered; nailing as shown. Minimum 1 / 16 space at end joints and ⅛ at edge joints. 6. Miscellaneous Framing: a. General: Provide nailers, backing, and stripping as necessary to obtain required lines and levels in finished surface. Secure plumb and rigid; use wood shims where required. Provide backing required for wall or ceiling hung fixtures and equipment. b. Building Paper: Apply where shown, with 2 horizontal laps and 6 vertical laps at joints and corners. Use ⅜ head galvanized nails spaced adequately to hold paper in place, without buckling. Repair damaged paper before installation of finish material. c. Caulking: 1) General: Per Division 7 CALKING AND SEALANTS. 2) Energy Compliance: Apply during framing operations as required by CBC. 3) Sound-Rated Partitions: Install sole plates on double bead of acoustical sealant. 4) Thresholds: Set in full bed, where shown. d. Ventilating Holes: Provide in indicated sizes where shown. e. Mechanical and Electrical: Provide curbs, backing and blocking, as required for mechanical and electrical fixtures and equipment. 06100-7

C. Protection: Protect exposed roof sheathing and wood decking with protective waterproof covering until roofing has been installed. END OF SECTION 06100 06100-8