Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

Similar documents
PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

Business reform Action Plan Rec # 299 to 303 Certification of Electrical Installation by Electrical inspectorate

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

ACCESS TO HIGH VOLTAGE APPARATUS

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

2 Grounding of power supply system neutral

Substation Preventive Maintenance

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

Module Title: Electrical Installation II Laboratory Sheet:

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS

INTERPLANT STANDARD - STEEL INDUSTRY

EI HIGH VOLTAGE INSULATION TESTING POLICY

7. INSPECTION AND TEST PROCEDURES

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING

COURSE PLANNER. Subject: TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS ( ) B.E. Fourth Year (8 th Sem) Branch Electrical Engineering

LIGHTNING ARRESTOR. September 2017 WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED

Licensed Electricians Practical Assessment (LEP)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

Wisconsin Contractors Institute Continuing Education

POTENTIAL TRANSFORMER

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A

Transformer Protection

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

Preface...x Chapter 1 Electrical Fundamentals

VI 3 - i TABLE OF CONTENTS

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS

Specialists in HV and MV test and diagnostics. Testing in Substations

TECHNICAL SPECIFICATION

REPORT ON INVESTIGATION OF FAILURE OF 100 MVA, 220/66-33/11 KV POWER TRANSFORMER AT 220KV GEETA COLONY SUBSTATION OF DELHI TRANSCO LTD.

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

CONTENTS. 1. Introduction Generating Stations 9 40

IMPORTANCE OF INSULATION RESISTANCE

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

Occupational Safety, Health and Welfare (Woodworking Machines) Regulations 1989

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division

Instruction Manual for Digital Grounding Resistance Meter

Testing Manual for Electrical Equipment

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011


MANUFACTURING GUIDELINES FOR PLC (LEVEL-1 AUTOMATION)

EASQ ELECTRICAL APPLIANCE SERVICEPERSON (QUALIFIED) MARKING SCHEDULE. SECTION 1 Marks Reference Marking notes Qu 1 A 10 MΩ (2 marks)

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

Licensed Electricians Practical Assessment (LEP)

Back to the Basics Current Transformer (CT) Testing

Basic Principles and Operation of Transformer

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Single Line Diagram of Substations

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI

FAQ ON EARTHING STANDARDS 16/08/2018

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED (SOUTHCO UTILITY)

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

Welcome to the Session on. HT Distribution Network

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

EASUN REYROLLE LIMITED

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

ARC FLASH HAZARD ANALYSIS AND MITIGATION

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations

Instruction Manual for Digital Grounding Resistance Meter. Table of Contents

American Electrical Institute

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

S&C Series 2000 Circuit-Switchers Outdoor Transmission (69 kv through 230 kv)

PCTS Series. Power Capacitor Test System. Applications: Testing Applications: Benefit and Advantage: and IEC

Single Earthed Neutral and Multi Earthed Neutral. Single Earthed Neutral and Multi Earthed Neutral: Multi Grounded Neutral System (MEN):

Reference Number PDS 04 (RIC Standard: EP SP)

Company Replaces previous document Document ID Issue E.ON Energidistribution AB Ny engelsk utgåva D

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

Onsite Mobile AC High Voltage Test System

Earthing Guidance Notes

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SECTION TRANSFORMERS

2014 NEC Changes Part 1

Grounding for Power Quality

Frequently Asked Question on Isolated Power Supply(IPS)

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus

Transcription:

Form-IV Form of Inspection/Test Report (Under Regulation 43) 1. Name and address of the Chartered Electrical Safety Engineer 2. Name and address of the consumer (or) Owner(or) supplier: Contact No: E-Mail: 3. Address of installation: i. Office/Head Office (or) both: Contact No: E-Mail: Factory/works: Contact No: E-Mail: 4. Details of the Installation: a. Production activities b. level c. Transformer Capacity d. Generator Capacity e. Other details 5. Grade A Licensed Contractor Name & Address: Lic No.: Permit No: Valid from to 6. Date of approval of Drawings from concerned electrical Inspector: 7. Short circuit fault level of the installation 8. Date of test of installation: 9. Results of tests conducted: S.No Equipment Test Conducted 1. Isolators DP structure provided at point of commencement with RS joist Poles 185X75 mm as per standards 11 KV-3.05 mtrs (i) Mechanical operation (ii) Measurement of contact resistance (iii) IR Values

2. 3. 4. 5. 6. 7. LAs HV Cable Size- Length- Circuit Breaker Sl.No. ------ Make: Type Circuit Breaker Control Circuits Transformer Sl.No. ------ Make: DG Set Sl.No. ------ Make: For 1. Alternator: 2. Engine : (iv) Open condition Ph-Ph, Ph-E (v) Closed condition Rupturing Capacity IR Values 1) IR Values 2) Open condition 3) Close condition 4) Contact Resistance : 5) Mechanical operation: 6) Remote operation: 1) Alarm and Trip for 2) OTI/WTI/Buchholz/PRV 3) Earth Fault Relay : 4) Over current Relay: 5) Under Relay: 6) SF6 pressure alarm and trip operation test (A) Insulation Resistance Values: 1. HT to LT : 2. HT to Earth: 3. LT to Earth: (B) Break down Test Oil Sample I(Top) Oil Sample II (Bottom) (C) Vector Group Test: (D) Polarity Tests: (E) Magnetizing Balance: (F) Tan Delta Test ( as per capacity) (G) Oil level in conservator Tank: (H) Oil level in breather cup: (I) OTI/WTI settings : (J) OTI/WTI alarm and trip operation (K) Operation of Buchholz relay : (L) Operation of PRV (M) Oil leakage (N) Interlock of door switch for dry transformer (O) Clearances for Side clearance : Between two Transformers: (P) Body earth resistance Neutral earth resistance (A) Interlocking with other Supply Sources: (B) Body earth resistance Neutral earth resistance (A) Insulation Resistance Values: 1. Ph - Ph : Cables 8. 2. Ph Earth : Size: Sq. mm 3. Ph Earth + other Ph : (B) Bending Radius: 9. Earthing : (A). Metal and Size of Earth Strips:

10. Potential Transformer 11. Current Transformer 12. Transmission line 13. General Observations : (B). Type of Earthings: (1) Plate Earthing: (2) Pipe Earthing: (C). Values of Earth resistances of earth electrodes for (1) Reactor Neutral: (2) LAs : (3) Structure: (4) Transformer (5) Generator (6) Busduct (7) PCC (8) MCCB (9) MLDBs (10) Motor with Capacity (11) VVF/VDF Drives (12) Cables (13) Capacitors: (14) Cable Trays : (i) Ratio test (ii) Polarity test (iii) BDV of oil (iv) IR test (i) Ratio test (ii) Polarity test (iii) BDV of oil (iv) IR test (i) Physical condition of conductor/tower (ii) Check of tower accessories (iii) Tower footing resistance (iv) Conductor continuity test (v) Check of ground clearance (i) Check of required phase to phase, phase to ground and sectional clearance. (ii) Check of equipment lay out and over all installation details. (iii) Test of resistance of earth mat or earth electrodes as applicable. (iv) Check of consumer s pre-commissioning test Reports of individual equipment. (v) Check of manufacturer s routine/type test reports of individual equipment. (vi) Whether Inspector s approval if applicable is obtained? (vii) Whether owner s self-certification about compliance with the Regulations is obtained? (viii) General observation and views (specific deviation from the requirements of the Regulations shall be clearly brought out). 10. The following observations: Sl. No Regulation Nos Requirements Report 1. Regulation-3 Is the register of the designated persons properly made and kept up to date duly attested?

2. Regulation-12 (xi) Whether all required type and routine tests at factory done for equipment. Deficiencies and Discrepancies in above test report and results, if any, shall be reported? (xii) Are there deficiencies in construction with reference to Indian Standard requirements? Please specify. 3. Regulation-13 Give report on condition of service lines, Cables, wires, apparatus and such other fittings placed by the supplier or owner of premises. If not satisfactory give details. 4. Regulation-14 Whether suitable cut-outs provided by the supplier at the consumer s premises are within enclosed fire proof receptacle? 5. Regulation-15 (i) Whether switches are provided on live conductors? (ii) Whether indication of a permanent nature is provided as per Regulation so as to distinguish neutral conductor from the live conductor? 6. Regulation-16 General visible condition of the earthing arrangement 7. Regulation-17 i) Are bare conductors in building inaccessible? (ii) Whether readily accessible switches have been provided for rendering them dead? 8. Regulation-18 Whether Danger Notice in Hindi and the local language of the district and of a design as per relevant Indian Standard is affixed permanently in conspicuous position? 9. Regulation-19 i. Whether insulating floor or mats conforming to IS-15652:2006 have been provided? Whether identification of panel has been provided on the front and the rear of the panel? 10. Regulation-21 Whether flexible cables used for portable or transportable equipment covered under the Regulation, are heavily insulated and adequately protected from mechanical injury? 11. Regulation-24 Whether the circuits or apparatus intended for Operating at different voltage(s) are distinguishable by means of indication(s) of permanent nature? 12. Regulation-26 Whether all circuits and apparatus are so arranged that there is no danger of any part(s) becoming accidentally charged to any voltage beyond the limits of voltage for which it/they is/are intended? 13. Regulation-27 i. In the case of generating stations and enclosed sub stations, whether fire-

buckets filled with clean dry sand have Been conspicuously marked and kept in convenient situations in addition to fireextinguishers suitable for dealing with electric fires? Whether First Aid Boxes or cupboards conspicuously marked and properly equipped are provided and maintained? Is adequate staff trained in First Aid Treatment and fire fighting? 14. Regulation-28 i. Whether instructions in English or Hindi and the local language of the district and where Hindi is the local language, in English and Hindi, for the resuscitation of persons suffering from electric shock have been affixed in a conspicuous place?. Are the designated persons able to apply instructions for resuscitation of persons suffering from electric shock? 15. Regulation-34 Leakage on premises: State insulation resistance between conductors and earth in Mega Ohms. 16. Regulation-35 i. Whether a suitable linked switch, or circuit breaker, or emergency tripping device is placed near the point of commencement of supply so as to be readily accessible and capable of being easily operated to completely isolate the supply? i Whether suitable linked switch or a circuit breaker to carry and break the full load current on the secondary side of a transformer? Whether every distinct circuit is protected against excess electricity by means of a suitable circuit breaker or cut-out? iv. Whether linked switch or circuit breaker or emergency tripping device is provided near the motor or other apparatus at voltage exceeding 650V but not exceeding 33kV for controlling supply to the motor or apparatus? v. Whether adequate precautions are taken to ensure that no live parts are so exposed as to cause danger? 17. Regulation-44 (i) Whether all conductors and apparatus Including live parts thereof are inaccessible? (ii) Whether all windings of motors or other apparatus are suitably protected? (iii) State in case of transformers or reactors or switches or static condensers

involving the use of more than 2,000 litres of oil in one chamber, if suitable oil soak pits are provided? iv) Whether trenches inside sub-station Containing cables are filled with noninflammable material or completely covered with non- inflammable slabs? 18. Regulation-45 Whether protections and interlocks have been provided? If not, give details 19. Regulation-48 i) Have the frames of every generator, stationary motor, and so far as practicable portable motor and metallic parts not intended as conductors of all transformers and any other apparatus used for regulating or controlling electricity and all electricity consuming apparatus at voltage exceeding 650V but not exceeding 33kV been earthed by two separate and distinct connections with earth? (ii) Is the earth wire free from any mechanical damage? (iii) Has the neutral point at the transformer and generator been earthed by two separate and distinct connections with earth? (iv) Whether earthing has been properly executed and has been tested. If yes, give value of earth resistance 20. Regulation-49 Is the outdoor (except pole type) substation efficiently protected by fencing not less than 1.8 metres in height?