SENTINEL SERIES 110 SINGLE HUNG WINDOWS

Similar documents
TARGA 7100 SINGLE HUNG INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation.

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

CGI Series 560 SGD Installation Instructions

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Heavy Wall Applied Stop Tube Frame and Door Installation

All Window Installation Instruction

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

Flashing Materials. Rough Opening Preparation

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

Installation Instructions

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

Sun Windows General Information New Construction Hinged Door Installation Instructions

Tools required by installer: Materials required by installer:

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Recommendations for Finless Frame Doors

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Sliding Glass Door Assembly and Installation Guide

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

How To Install Windows: Nail-Fin Application

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Pocket Door Installation Instructions

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Series 7650 Installation Instructions Sliding Glass Door

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

Providing 3 Layers of Protection

INOVO 2-LITE SLIDING PATIO DOOR

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Vinyl Windows and Doors Manufactured by Pella Corporation

Curtain Wall Installation Guide

Vinyl Windows and Doors

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

Installation Instructions for Vinyl Windows without Nailing Fin (JII011)

Storefront Installation Guide

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guide for Andersen Architectural Clad Awning Windows

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Kinro Metal, Vinyl, Flush mounted and Recessed Fin Windows (HUD) OEM INSTALLATION MANUAL

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

for Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

WINDOW INSTALLATION GUIDE

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

Series Exterior glazed curtain wall. Installation Instructions

window installation Guide wood FRaMinG New Construction

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

Vinyl Windows and Doors

Series Advanced and alternate. Installation Instructions

Installation Guide for Architectural Wood Hinged Windows

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

Eagle clad double-hung window installation instructions

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS - INSTRUCCIONES PARA LA INSTALACIÓN CLAD WINDOWS WITH FLUSH FLANGE

YES 600 Thermal Clip Storefront System Installation Manual

Vinyl Sliding Glass Door Assembly Instructions

YSG 40/50/50T Window Wall System Installation Manual

Dear Contractor, I am glad that you are interested in our window rebate program.

Series Sloped glazed Curtain wall. Installation Instructions

Definitions and Design Considerations... W-CR-2

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

4-lite Patio Door. Installation Instructions

Integrity Polygon and Round Top Installation and Finishing Instructions

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

Installation Guide for Andersen Architectural Clad Hinged Windows

Installation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows

Transcription:

Installation Instructions SENTINEL SERIES 110 SINGLE HUNG WINDOWS Page 2: Opening Preparation, Wood Buck Installation and Figure 1 Page 3-6: Installation Instructions and Figure 2 Page 7: Figure 3: Installation type A Page 8: Figure 4: Installation type B Page 9: Figure 5: Installation type C Page 10: Figure 6: Installation type D Page 11: Figure 7: Mullion Details NOTE: Read instructions completely before attempting any installation. These instructions are provided as a general guide in the installation of our Sentinel Series 110 Single Hung windows. Applicable approval documents (such as but not limited to Miami-Dade County NOA Product Approvals, State of Florida Approvals, TDI Approvals, etc.) should be used in conjunction with these instructions. Only experienced installers familiar with these or similar products should attempt to install these units. Incorrect installations could void the warranty. Technical support is available by contacting CGI at 305-593-6590 (Miami) or 1-800-442-9042 www.cgiwindows.com 07/22/10

2 WOOD BUCK INSTALLATION into MASONRY OPENINGS for Flange Windows 1. Make sure that masonry opening (or rough opening on stud construction) is made to within tolerance, level and plumb. Verify by measuring at each end and every 24 (vertically and horizontally). Make any corrections required to openings. Bucks must be set on a smooth and flat surface. Remove or chip away any concrete, which protrudes from the face of the opening prior to setting bucks. Make sure ends of masonry opening are square and not rounded at corners. Chip concrete if necessary. 2. Select the size of Pressure Treated wood buck to be used (see figure 1 or refer to approval documents for approved bucks) and decide how far from the face of the wall the bucks are going to be set. Most contractors like to set the wood bucks in about 1 to 2 from the exterior face of the 8 concrete walls when installing windows. 3. Set wood bucks in a continuous heavy bed of professional grade sealant. Make sure sealant is applied at ends were bucks touch one another. Run a continuous bead of sealant on exterior side of bucks between concrete and wood, after installing bucks. 4. Make sure wood bucks are installed continuous and on all four sides of the opening. Wood bucks must touch one another at ends. 5. Install wood bucks level and plumb in all directions. Verify that opening is square. Do not follow the walls, as many times they tend to be leaning in or out. 6. Wood bucks must be secured to the structure, independently of the window. Figure 1: Wood Buck types. INSTALLATION INSTRUCTIONS

for Flange or Equal Leg (Flush) Frame Windows (Refer to Figures 3, 4, & 5) 3 1. Check window opening for correct size. If the opening is incorrect, have it fixed. Never attempt to force a window into a small opening or install a window into an oversized opening. 2. If wood bucks are being used, make sure they are of the correct size and type for the installation method being used (see figures 3 and 4 - Installations Types A and B). The bucks must be properly bed in sealant and securely attached to structure. Wood bucks should not be separated at corners. Verify that wood bucks are plumb, level and square. Note that Installation Type C (Equal/Flush Leg) does not require a wood buck. 3. If installing flange windows, clean window flange and apply a generous amount of professional grade sealant / caulking material to flange at full perimeter. Make sure the sealant is compatible and will adhere to aluminum and wood. If installing equal leg frames (figure5), the perimeter sealant is applied after window is installed. 4. Stand window upright and open sash. Make sure the window is standing upright, as if it were installed. If the window is lying flat, upside down or on its side, the balance will not have enough counterweight from the sash and the sash will open very quickly. This may cause injury or damage to the window. Once the window is properly opened, install window from the outside on to the opening. If flange frame is being used, the backbed sealant should seep out as it gets compressed. 5. Temporarily secure window frame using installation screws as selected from the approval documents for your specific application (see figures 3 5). To simplify the pre-installation process, you may want to use a smaller temporary screw such as a #12 Sheet Metal Screw and only penetrate the wood. Shim every installation screw snugly (shim space should not exceed ¼ ). Temporarily secure the window with one screw at each end of jamb member (top & bottom). Make sure window operates correctly and is plumb, level and square. Caution: Any window, which is forced into an opening and racked or twisted, can eventually cause glass breakage. 6. Once the window is correctly set, finish installing with the proper installation screws. If temporary #12 screws were used, replace those with the correct screws. Every hole must have a screw and every screw must have a shim. In order to access the installation holes on the head, the screw cover will need to be removed. To do this, gently remove the vinyl screw cover starting from one side and pull down out of the head. These covers have a slight snap engagement with the head that allows them to be easily removed. Install the installation screws at this area, and replace the screw covers. 7. If installing mullion tubes between S/H windows, make sure tubes are properly aligned on the window (see Figure 7). The standard Sentinel Series 110 SH

Window Mullions do not require end clips. The proper mullion length is the same size as the interior window dimension. 8. If the mullion being installed is long or the windows being mulled are large or the opening is located in a high windload area, additional installation holes may be required on each side of mullion, at the window member. Remember that these mullions do not have independent clips, so their anchorage is transferred to the window frames. The CGI Standard Hole Pattern includes one installation hole at each corner of the window. Certain installations will require two or three screws on each side of the mullion. Refer to the approval documents to see if additional screws are required. These additional screw holes must be field drilled. 9. On flange windows, make sure there is no daylight between wood buck and window flange. If any exist or as a precautionary step, apply additional sealant from the outside at this joint. If installing equal leg (flush) frames, initial perimeter sealant can be applied at this point. 10. Check window for leakage, especially on the frame joints. Although not normal, it may be necessary to reseal frame corners after installing. The factory applied sealant may get damaged during transport or installation of the window due to racking. 11. Perform a last check of the window operation. If the window is not opening properly, make sure the heads of the jamb installation screws are tight against the aluminum and not sticking out. Also, make sure there is no debris along the jambs where the sash slides on or in the sill. Lastly, make sure the frame sill is not bowed/twisted and preventing the sash from closing. 4 INSTALLATION HINT: If the window does not close properly and evenly, then recheck plumbness, level and squareness. Also make sure that the head and sill are not bowed at the center and the frame members are not twisted. INSTALLATION INSTRUCTIONS for Fin Frame Windows (Refer to Figure 6) 1. Check window opening for correct size. If the opening is incorrect, have it fixed. Never attempt to force a window into a small opening or install a window into an oversized opening. 2. Verify that opening is correctly prepared. Using a self adhering flexible flashing as part of the opening preparation is recommended. For more specific details on fin frame opening preparation, reference FMA/AAMA 100-07 3. Attach the fin frame adaptors to window. To install fin adaptor, snap adaptor as shown in figure 2. Install the adaptor on the head and sill first, then the jambs. The end of the fin will line up with the end of the frame. The jamb adaptors will be notched and the fin will run through. Once fin adaptors are installed, do not

stand the window on the fin edge as this may cause the adaptor to get damaged. If this window uses a mullion, the adaptor at the mullion side may need to be detached or ripped. For mullion information, refer to Figure 7. 4. If mullions are used, the ends of the mullions must be plugged and sealed watertight when fin frame installation is used. If the mullions are not sealed, go ahead and seal them now. The easiest way to seal them is using an expanding foam sealant. Once the foam hardens, you can trim the excess from the ends. 5. After fin adaptor is attached, drill two ¼ diameter drain holes (approx. 4 from each end) at the bottom fin adaptor on each window (refer to figure 6). This will allow any water that may get trapped behind the fin adaptors and the window to drain out. Note: These holes can also be drilled prior to attaching the adaptor. 6. With window in upright position, open sash. Make sure the window is standing upright, as if it were installed. If the window is lying flat, upside down or on its side, the balance will not have enough counterweight from the sash and the sash will open very quickly. This may cause injury or damage to the window. Once the window is properly opened, add a generous amount of backbed sealant (minimum 3/8 bead) to the backside of the fin adaptor as shown in figure 2. This seal is CRITICAL, especially at the sill area. This seals between the adaptor & the frame and between the window & the opening. Add this sealant to the head, sill and jambs. Install window from the outside into wood opening. 5 Figure 2: Fin Frame Adaptor Installation 7. The fin adaptor has pre-punched slotted hole for installation screws (slotted holes allows for expansion and contraction of house structure). Note that there are more screw holes than necessary on the adaptors, so refer to approval documents to see where installation screws will be required. 8. Secure window using installation screws as selected from the approval documents for your specific application (see figure 6). Shim window to main structure at every installation screw location (shim space should not exceed ¼ ). You can

secure the window with a few screws at first to make sure window operates correctly and is plumb, level and square. Caution: Any window, which is forced into an opening and racked or twisted, can eventually cause glass breakage. Important Note: Since the pre-punched fin adaptor holes are slotted, make sure that the screws at the SILL are installed at the top of the slot. This will prevent the window from sliding down due to its weight once installed. All other screws should be placed at the center of the slot. 9. Once the window is correctly set, finish installing with the rest of the installation screws. If in doubt, use more screws rather than less. 10. After completely setting window, a self adhering flashing (SAF) which is a flexible water proofing film/membrane must be applied to the window fins. Begin by placing the film across the sill fin always extending the film on to the house wall. Next, place film on the jamb fins, overlapping the sill film at the bottom. Finally, place film across the head fin, overlapping the jamb film on each side. This technique/sequence of working from the sill up is critical in weather sealing the window. If mullions are used, make sure to run the film at the top all the way across the mullion area and on to the adjacent window. 11. Check window for leakage, especially on the frame joints. Although not normal, it may be necessary to reseal frame corners after installing. The factory applied sealant may get damaged during transport or installation of the window due to racking. 12. Perform a last check of the window operation. Make sure there is no debris along the jambs (where the sash slides on) or inside the sill. Lastly, make sure the frame sill is not bowed/twisted and preventing sash from closing. 6 INSTALLATION HINT: If the window does not close properly and evenly, then recheck plumbness, level and squareness. Also make sure that the head and sill is not bowed at the center and the frame members are not twisted. RECOMMENDED INSTALLATION SCREWS (refer to approval documents) : Window attachment to structure Window to mullion screws Based on installation type used. Refer to figures 3 through 6 in these instructions for the minimum screw size recommended in installations type A, B, C, or D. Also, refer to approval documents. #14 x 1 Flat Head SMS (standard point) or #14 x 1 Self Drilling Flat Head Teks or #14 x 3/4" Flat Head B Point SMS

Figure 3: Installation type A using 1 x bucks 7

Figure 4: Installation type B using 2 x bucks 8

Figure 5: Installation type C using Equal Leg (Flush) frame directly to structure 9

Figure 6: Installation type D using Fin Frame 10

Figure 7: Mullion Installation Details 11