SEAM Pressure Prediction and Hazard Avoidance

Similar documents
Innovative Solutions Across the E&P Lifecycle. ACCESS EXPLORATION APPRAISAL DEVELOPMENT PRODUCTION

Company profile... 4 Our Teams... 4 E&P Software Solutions Software Technical and Software Support Training...

Smarter oil and gas exploration with IBM

1. Purpose of the survey

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

OILFIELD DATA ANALYTICS

Unlocking future growth for deepwater in the Gulf of Mexico

Canadian Discovery Ltd.

Overview of the C-NLOPB and the Can-NL Offshore Oil and Gas Industry. Sean Kelly MA, APR, FCPRS May 15, 2017

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

OIL INDIA (USA) INC. Three Allen Center, 333 Clay Street, Suite 3300, Houston, Texas, Ref: OILUA/GC/597/2017 Date: 20 th January, 2017

We ll Get You There. Petroxin Petroleum Solutions 2016

The Continuous Improvement Fund (CIF)

BP plans for significant growth in deepwater Gulf of Mexico

Spectrum. The Pareto Oil & Offshore Conference. Jan Schoolmeesters, COO. 4 th September 2013

Gas Storage and Oil & Gas Exploration in County Antrim

Marine Imaging Systems (Streamer & Seabed)

Six steps to measurable design. Matt Bernius Lead Experience Planner. Kristin Youngling Sr. Director, Data Strategy

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

WG/STAIR. Knut Blind, STAIR Chairman

Seabed Geosolutions Company Profile. Visit us. seabed-geo.com

INTERNATIONAL OIL AND GAS CONFERENCE IN CHINA OPENING PLENARY SESSION OPPORTUNITIES AND CHALLENGES IN A VOLATILE ENVIRONMENT, BEIJING, JUNE 2010

Using machine learning to identify remaining hydrocarbon potential

Husky s Focus on East Coast Exploration and Production

Advancing Global Deepwater Capabilities

Imaging Deep into the Gulf of

4 Briefing. Responsible investor

Identifying Ways to Reduce Drilling Budgets in the Low Oil Price Environment

Reservoir Management

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

Is Yesterday s Unconventional Tomorrow s Norm?

ATP Oil & Gas Corporation. Advanced Asset Acquisition and Divestiture in Oil & Gas. April 26-27, Gerald W. Schlief, Senior Vice President

Course Specifications

Digital Oil Recovery TM Questions and answers

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

Tomorrow's Energy Designed Today TECHNOVA

Laws of Attraction The use of electromagnetics in exploration is revolutionizing the way operators view their reservoirs.

Deep Water Technology A Focus on Drilling US-China Oil & Gas Industry Forum

Instrumentation and Control

Strategic Plan Approved by Council 7 June 2010

Technical Data Standards Development & Implementation

ECU Research Commercialisation

Investigation into the use of Autonomous Vehicles for Subsea Seismic Acquisition

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Executive Summary and Table of Contents

Hugoton Asset Management Project

Repeatability Measure for Broadband 4D Seismic

Tu SRS3 07 Ultra-low Frequency Phase Assessment for Broadband Data

Survey and Geosciences. Capability & Experience

Seabed Geosolutions Company Profile. Visit us. seabed-geo.com

NAME YOUR SEISMIC CHALLENGE.

RESERVOIR CHARACTERIZATION

Leader in Pharmaceutical Films

25823 Mind the Gap Broadband Seismic Helps To Fill the Low Frequency Deficiency

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES

AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015

Joint Industry Programme on E&P Sound and Marine Life - Phase III

Why not narrowband? Philip Fontana* and Mikhail Makhorin, Polarcus; Thomas Cheriyan and Lee Saxton, GX Technology

It all starts here. Format fermé : 9" x 12" Format ouvert : 18 x 12 Marges : 0,125" Couleurs : CMYK

Offshore Trends Deep Pockets, Deepwater. Presented by: Mark Peters Group Publisher

The Institute for Communication Technology Management CTM. A Center of Excellence Marshall School of Business University of Southern California

Raw Materials: Study on Innovative Technologies and Possible Pilot Plants

M&A Technical Assessments

DRAFT. Cardiac Safety Research Consortium CSRC. Membership Committee Charter. 12September2018. Table of Contents

Multipole Sonic-While-Drilling Technology Delivers Quality Data Regardless of Mud Slowness

SAUDI ARABIA FUGRO-SUHAIMI LTD. UNDERSTANDING your operational objectives. TACKLING your complex challenges. DELIVERING your global success stories

E X TREME DRILLING LABORATORY Project Summary (May 2009)

NXT Energy Solutions The new class of gravity-based geophysical survey technology

7 Briefing. Responsible investor

Robotics: from FP7 to Horizon Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission

Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority

ENGINEERING SERVICES CONSULTANCY

A Strategy for Advancing Critical Zone Science - February 2016

Boreal Forest Alberta, Canada

Statement of Corporate Intent

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016

AT A GLANCE. US$16.9 billion. US$52 billion. 41 million 5,299

2015 Trinidad Update. Trinidad & Tobago Energy Conference

Scotian Basin Exploration Drilling Project: Timeline

NASA s Strategy for Enabling the Discovery, Access, and Use of Earth Science Data

The Center for Emerging and Innovative Sciences University of Rochester September 5, 2013

UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines.

Seismic interference noise attenuation based on sparse inversion Zhigang Zhang* and Ping Wang (CGG)

CURRENT STATE OF E&P PROJECTS IN PEMEX. September 22 nd, 2015

Mexico s Energy Reform: A Game Changer in the Nation s History (An Upstream Perspective)

Nova Scotia s Energy Matrix: Connecting the Dots. Stephen Dempsey Executive Director

Mexico Energy Reform Update -- New Timelines for Fast-Approaching Upstream Oil and Gas Bid Processes

Integrating Technology & Operational Excellence Improves Efficiency, Lowers F&D Costs

BUILDING VALUE THROUGH WORLD CLASS ASIAN ASSETS AGM, 5 SEPTEMBER 2018

Climate Change Innovation and Technology Framework 2017

Company Presentation May.2016

Science Integration Fellowship: California Ocean Science Trust & Humboldt State University

Software-Intensive Systems Producibility

Mining and Petroleum Services Centre of Excellence

Cannabis Practice Group

Seabed Geosolutions Company Profile. Visit us. seabed-geo.com

Visual Analytics in the New Normal: Past, Present & Future. geologic Technology Showcase Adapting to the New Normal, Nov 16 th, 2017

Design of an Optimal High Pass Filter in Frequency Wave Number (F-K) Space for Suppressing Dispersive Ground Roll Noise from Onshore Seismic Data

Th N Robust and Fast Data-Driven MT processing

Transcription:

Announcing SEAM Pressure Prediction and Hazard Avoidance 2014 2017 Pore Pressure Gradient (ppg) Image courtesy of The Leading Edge Image courtesy of Landmark Software and Services May 2014

One of the major benefits of the SEAM Phase I project is the diverse expertise supplied by each company. These experts have collaborated in developing and validating the complex models, but their work is largely volunteer. What has made the collaboration a success is regular meetings for the technical committees and coordination by the Project Manager. Michael Deal, ExxonMobil Upstream Research Another Phase I benefit was the interaction with the representatives of other SEAM member representatives. These relationships have proven beneficial in the conduct of join imaging projects. Given the need to manage risk on costly deepwater exploration efforts, multi-company imaging projects have become the norm in the subsalt Gulf of Mexico and the personal contacts developed during the SEAM Project are of continuing value. David Walraven, Anadarko 2

PROSPECTUS SEAM Pressure Prediction and Hazard Avoidance May 2014 The SEG Advanced Modeling Corporation (SEAM) announces SEAM Pressure Prediction and Hazard Avoidance. Current methods to predict pore pressure can and must be improved. Integrated pressure predictions from many data sources, and inclusion of avoidance and mitigation procedures in the drilling plan is still ambiguous and not risk-free with current technologies. One of the most important technologies for pressure prediction in the early well planning stage, that is pre-drill, is 3D seismic. A significant barrier to improving the methodology has been the lack of accurate and precise data of the subsurface calibrated back to either well logs that are used in prediction or 3D seismic. Research Partnership to Secure Energy for America (RPSEA) August 14, 2013 The SEAM Pressure Prediction and Hazard Avoidance research project will evaluate and advance current methodologies for pre-drill pressure and hazard prediction. The research consortium will provide a collaborative forum where industry experts prioritize current challenges in the use of seismic velocity (and other seismic attributes) to construct pre-drill pressure forecasts for well planning. These challenges will be used to design a comprehensive earth model and to acquire, through advanced computer simulation, benchmark data sets to be used by industry for quantifying risk and uncertainty associated with velocity models derived from current and future state-of-the-art in seismic acquisition, processing and imaging. A methodology will be developed for assessing risk and uncertainty in pressure prediction from seismic. Though the focus will be Gulf of Mexico Deepwater, the resultant advances in pressure prediction technology and methodology will be more broadly relevant. Terms of Participation: Three year project commencing October 1, 2014 Membership fee $30,000 per year ($90,000 total) Minimum of 10 Participants ($900,000+) RPSEA co-funding of $1.9 million Project budget $3.0 million (+/-) 3

Objectives: 1. Collaboration: Establish an industry collaborative forum involving geological, petrophysical and geophysical experts from leading oil and service companies. This forum will identify specific pressure and drilling hazard challenges to include in the earth model. This forum will direct the research. 2. Earth Model: Provide a highly realistic earth model built from current industry understanding of Gulf of Mexico deepwater stratigraphy, structure, rock physics and pressure. This model will be designed to include a number of abnormal pressure regimes, drilling hazards and seismic imaging challenges. The model will include several wells to be used as calibration points for testing pressure prediction methodologies. This large model (35km x 40km x 15km) will become the standard for future research in pre-drill pressure prediction from seismic. 3. Pressure Prediction: Provide a full azimuth and long offset oversampled elastic anisotropic data set acquired over the earth model. This benchmark data set will be unique compared to actual industry data sets in that the underlying geology, velocity, and pressure regimes will be accurately known. It will serve as the standard for both industry and academic research institutes to test current and evolving technologies for extracting velocity information and other relevant attributes from seismic data. The impact of current and yet-to-be-developed acquisition geometries will be testable through decimation of the oversampled acquisition. 4. State-of-the-Art: Provide a state-of the art report document summarizing the current state and future directions in pre-drill velocity and pressure prediction, with recommendations for ongoing research. 5. Methodology: Collaboratively process a selected subset of the simulated seismic data to assess current technologies for extracting information relevant for pressure prediction. Develop a new (industry standard?) methodology for estimating and quantifying risk and uncertainty in the pre-drill transformation of seismic data to pore pressure and effective stress. Provide a post-project workshop where industry and academia can share results from testing new approaches on the benchmark data sets. 4

The SEAM Phase I earth model includes a highly realistic salt structure based on actual GOM deepwater case. Model dimensions are 35km x 40km x 15km. The model is parameterized on a 20m x 20m x 10m grid. Why Collaborate Now? Accurate pre-drill predictions of abnormal pressures (and related uncertainty) are essential for design of safe well plans that will meet drilling objectives most costeffectively. Abnormal pressures at reservoir depth are of great importance to understanding exploration prospectivity, particularly maximum potential hydrocarbon columns. Pre-drill pressure prediction is a grand challenge that would benefit from industry collaboration, from sharing of ideas and information between companies. No one company has all the data and all the answers. Seismic acquisition, processing, and imaging technologies continue to advance at a rapid rate, enabling new and improved approaches for extracting rock physics properties relevant to pressure and drilling hazards prediction. Commercially available geophysical modeling technology has advanced to the point where large scale industrial strength elastic anisotropic seismic simulations are possible. Modeling is a proven approach for evaluating geophysical technologies. Government authorities must have confidence that all industry operators are following best practice standards in well design. Project Plan SEAM - Pressure Prediction and Hazard Avoidance will build on the successes of SEAM Phase I, notably the elastic earth model and the simulation QC methodology. The project will commence no later than September 30, 2014. Geological, petrophysical and geophysical experts from a minimum of 10 companies active in the deepwater will discuss current perspectives on mechanisms that generate abnormal pressures in the deepwater GOM, related rock physics, and pressure-geophysical property transforms (p velocity, s velocity, and density). Specific examples and case histories provided by 5

Participants, with log and laboratory data, will be reviewed. Required modifications to the structure, stratigraphy, rock properties and geophysical transforms in the SEAM Phase I model will be determined. Stress modeling, and possibly basin modeling, effects will be considered. Well locations will be defined for use in testing velocity prediction methodologies. A vendor will be contracted to make these modifications. This activity is anticipated to last twelve months (months 1-12). The SEAM Phase I earth model starts with rock properties: from geology and petrophysics to geophysics. A 3D seismic simulation will be conducted to develop industry benchmark data sets. Acquisition parameters for the simulation will be designed to include known imaging challenges (e.g. subsalt illumination) in highly oversampled data sets. Both streamer and sea floor node (4- component) data sets will be acquired. The simulation vendor will be selected through competitive bidding, with simulation fidelity confirmed through comparison with benchmark codes from industry and/or national labs. The simulation will be anisotropic elastic. QC of simulation results will be conducted by both the simulation vendor and an independent QC North-south crosssection through SEAM Phase I earth model. Miocene subsalt reservoirs are red bands within lower velocity (green) shale. SEAM is an effective vehicle for any company to use to discuss ideas with partners, clients and academia, as it provides a common platform for such discussions. Milos Cvetkovic, ION 6

vendor. Subsets of the simulation ( classic data sets ) will be extracted for ease of use in investigating specific velocity estimation and pressure prediction challenges. The full datasets will be available for investigation of the impact of improved acquisition approaches on velocity estimation. Simulation will commence upon completion of the model revisions and is expected to last 9 months (months 12-21). Data sets will be provided to Participants for proprietary research. Recognizing the critical importance of improved industry performance in pre-drill pressure prediction and well planning (one bad well can have major implications for all), data sets will also be made available to wider industry and academia for testing improved technologies and methodologies. These late users will suffer from not having influenced the model and acquisition design, but may be able to offer new predictive insights. A subset of the pressure prediction data set will be processed during the second half of the project (months 22-33) to evaluate current industry approaches for estimating velocity and other attributes relevant to pressure prediction. This evaluation will be used to develop a methodology for assessing risk and uncertainty in pre-drill pressure predictions from seismic. It will take into account geophysical variables such as acquisition parameters, illumination and image quality, and geological variables such as well control, lab calibration, stratigraphy, structure and centroid effects. Proposed Project Plan 2014-2018 Year 1 Year 2 Year 3 Year 4 Model Redesign Pressure Simulation State-of-Art Report Processing Trials Methodology Report Industry Workshop Three Year Commitment The success of the SEAM Phase I project is due to a significant degree to the dedication and technical leadership provided by Project Manager Michael Fehler and to the equally strong project management skills and administrative support provided by SEG staff. This support and attention to the myriad details of the project were essential to its success, leveraging the technical contributions made by the various member companies. David Walraven, Anadarko 7

SEAM will produce an interim report, at the end of year two, summarizing current state-of the art in pre-drill pressure prediction and requirements for improving velocity estimation from seismic, including a draft methodology and recommendations for future research. A final report will be produced at the end of year three summarizing results from the processing trials and proposing a refined methodology for evaluating risk and uncertainty in pre-drill pressure prediction from seismic. It is anticipated that the methodology may gain wide industry acceptance. SEAM will organize an industry/academic workshop in year four, after project completion, where pressure prediction investigators can compare results from tests on the data sets and establish future research directions. SEAM Track Record of Success The SEG Advanced Modeling Corporation (SEAM) was established by the Society of Exploration Geophysicists (SEG) in 2007 as a wholly owned not-for-profit research subsidiary. The corporation identifies geophysical grand challenges that would benefit from collaborative industry research and provides the infrastructure for the fiduciary, policy, and management oversight of the SEAM projects. The Corporation s mission is: to advance the science and technology of applied geophysics by, among other things, acting as a leading member of industry consortia and engaging in: (1) designing and generating synthetic model 3D and 2D geophysical data that represent challenges to the geophysical community; (2) providing a forum to discuss geophysical problems of interest; (3) advancing the art of modeling and computation by testing and comparing modeling code for accuracy and efficiency; (4) providing data sets for industry benchmarks and educational purposes; and (5) furthering the science of seismology for the public benefit. The SEAM Phase I model is not just another benchmark model to test data-processing algorithms. The SEAM I model is a valuable resource for doing research that links geophysical measurements to the business need of finding and producing more volumes of hydrocarbons. Michael Deal, ExxonMobil Upstream Research 8

SEAM has since demonstrated that a collaboration of multiple oil and service companies working with a common purpose can achieve significant advances. Participants have been able to pool resources and intellectual property of mutual interest whilst maintaining competitive proprietary and confidential information. SEAM Phase I - Deepwater Subsalt Imaging first developed the technical and management approaches. Enthusiastic engagement in SEAM Phase II - Land Seismic Challenges has since confirmed that SEAM s approach is value-added for participating companies. Thirty-three corporations have participated in SEAM projects to date. SEAM Phase I Deepwater Subsalt Imaging 24 participating companies 2007 2013 $5.4 million budget $2.7 million research grant from RPSEA Deepwater sub-salt earth model : 60 OCS blocks Acoustic, TTI, elastic, gravity, CSEM and MT simulations SEAM Phase II Land Seismic Challenges 22 participating companies 2011 2014 $5.2 million budget Unconventional reservoir elastic simulation Arid near surface elastic simulation Foothills/thrust elastic simulation 9

SEAM has evolved a successful approach for encouraging industry collaboration while maintaining project focus and progress. These success factors include: o Industry consensus on the importance of advancing the relevant state-of-the-art o A high level initial plan provided by SEAM on how to proceed o Strong project management provided by a dedicated Project Manager o Early Participant agreement on must haves o Technical decision-making through small committees composed of experts o Project oversight and fund allocation through majority vote of Participants o Rigorous qualification of simulation vendors o Competitive bidding for all vendor contacts o Industry standard storage and access to simulated data and classic subsets o Flexibility to respond to both opportunities and limitations in simulation technology The most important principle is that the paying Participants determine the direction of the project. Additional Information on SEAM activities is available at www.seg.org/seam Contact SEAM at seam@seg.org 10