INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Similar documents
INSTALLATION LOW HEADROOM EXTENSION. 1 Cutting Vertical Track. 2 Quick Install Jamb Brackets

Low Headroom Rear Mount TorqueMaster

Model Series T o r s i o n

T o r s i o n. Table Of Contents IMPORTANT NOTICES!

Models 9100 / 9405 / 9600

Standard Lift IMPORTANT NOTICES!

Models 8300 / T o r s i o n. Windload

Models 8000 / 8100 / 8200

Model 7100 Series. T o r s i o n, R e a r M o u n t L o w H e a d r o o m

TorqueMaster Replacement Spring

Model ThermoMark 530. T o r s i o n

7100 Series. Standard Lift IMPORTANT NOTICES!

Model 44, Double Flush

Aluminum Full View Models 464, 451, 452

Model T o r s i o n, S t a n d a r d L i f t

Model 7100 Series. T o r s i o n, R e a r M o u n t L o w H e a d r o o m

Double Flush, Model 44

Models ThermoMark 5150 / 5155 / 5200 / 5255

Models 42 and 45. T o r s i o n, R e a r M o u n t L o w H e a d r o o m

Models 42 and 45, Flush

Converting. T o r q u e M a s t e r O n e

Flush, Models: 42, 45 and 48

T o r q u e M a s t e r P l u s

Models 42 and 45. T o r s i o n, F r o n t M o u n t L o w H e a d r o o m, O u t s i d e H o o k - U p

Models ThermoMark 5150 / 5155 / 5200 / 5255

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

8000/8100/8200. T o r q u e M a s t e r P l u s

Models 105, 110, 106, 116, 310, 311, 314 and 316

Models 5120 / T o r q u e M a s t e r P l u s. Manual

Model 44, Double Flush

Windload Post 9100/9600/9900 Installation Instructions

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

9100 / 9405 / E x t e n s i o n

Models 9100 / 9405 / 9605

Models 9700 and T o r q u e M a s t e r P l u s. Manual

Models Thermospan, , 200, 150, 125

GARAGE DOOR WITH TORSION SPRING

HD installation guide

installation guide

RESIDENTIAL GARAGE DOOR INSTALLATION INSTRUCTIONS UNITED

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

ALDoor DOUBLE DOOR INSTALLATION

SECTIONAL DOORS INSTALLATION GUIDE. (incl. Inspiration Doors) THIS GUIDE IS FOR USE BY EXPERIENCED INSTALLERS OF GARAGE DOORS

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

6100 Light Commercial Door

Oxford Stalls Installation Instructions

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

InstallatIon manual. 8500, 25 th Avenue, St-Georges, Qc, Canada G6A 1K5 Tel.: Dealer : Telephone number :

TABLE OF CONTENTS REQUIRED TOOLS

Spring Loaded All Season Roll-Up Doors

Ultimate Products, Inc.? 2319 Laurelbrook Street? Raleigh, NC 27604? USA Toll-Free: (800) ? Fax: (919)

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

WIND BRACE SECTIONAL DOOR INSTALLATION GUIDE. (incl. C2/C3 Inspiration Doors)

Gared Pro-S Portable Backstop

Rolling Curtain door Manual

Assembly Instructions for Model: VMPL3

STANDARD GRAVITY BOX TARP INSTALLATION

MODEL 83 Pail Handler

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

MPA-9000 Universal Ceiling Projector Mount Kit

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

How To Measure Your Finished Opening

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

INSTALLATION INSTRUCTIONS

3,500/4,500lb. Vertical Cable Feighner Lift

GIRTS ON BACK OF BUILDING

INSTALLATION MANUAL. 8500, 25 th Avenue, St-Georges, QC Canada G6A 1K5 Tel.: Dealer: Telephone number:

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

Privacy Wall Glass Selections - Polished Edge Slider Door

Residential 2000, 700, 600 Series

installation guide

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

Installing flat panels on the MPL15 wall mount

Dublin Stalls Installation Instructions

Lange Crank Hoist-a-top Assembly Instructions

INSTALLATION INSTRUCTIONS for the JOMY RETRACTABLE LADDER. If there are any questions, please call (800)

INSTALLATION INSTRUCTIONS Flat Panel Static Wall Mount Model: GSM-111

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

VSD-6500 Frame Exploded View LIFT P/N

CMA-455 Suspended Ceiling-Tile Reinforcing Kit

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

PH03 Comfort XL Front Assembly Replacement Instructions

TMA812 Tilt Mount Adapter for NEAR A8 and A12 Loudspeakers Installation Instruction Manual

Assembly Instructions for Model: VMDD26

Installation And Care Instructions. Vertical Honeycomb Shades

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

OPERATOR'S MANUAL 46" SNOW BLADE. Model Numbers OEM IMPORTANT: READ SAFETY RULES AND INSTRUCTIONS CAREFULLY

3DLQWLQJ \RXU 'RRU 6QDS,Q 'HFRUDWLYH,QVHUW 5HPRYDO $QG &ORSD\ 3UR 6HULHV /LPLWHG :DUUDQW\

Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Transcription:

TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH., 44660 Supplemental insert Copyright 2015 Wayne Dalton, a division of Part No. 333895 REV5 05/03/2015 INSTALLATION Overhead Door Corporation This supplemental installation instruction is to be used as a supplement to the main Installation Instruction and Owner s Manual provided with the door. The instructions included in this document are ONLY those which deviate from the standard installation. All WARNINGS and CAUTIONS listed in the main manual are applicable to this supplemental instruction as well. www.wayne-dalton.com 1 Cutting Vertical Track 1/2 5/8 Vertical track must be cut to the proper length prior to installation. IMPORTANT: DOORS THAT ARE 7-0 OR 8-0 IN HEIGHT DO NOT REQUIRE CUTTING THE VERTICAL TRACK. Determine the radius of your horizontal track. Using this measurement, refer to the vertical track cutting chart to determine the length of the vertical track. Cut the track off at the TOP. Two holes must be drilled into the top of the cut vertical track. Refer to the illustration shown for hole locations. Use a 5/16 drill bit, as shown in FIG. 1.1. Vertical Track Cutting Chart Horizontal Track Vertical Track Cut Length Radius 0 Rad Door Height Minus 17 3-1/2 LHR Door Height Minus 15 6-1/2 LHR Door Height Minus 12 Repeat for other vertical track. 14 Cut vertical track here Vertical track cut length FIG. 1.1 5/8 (2) 5/16 Dia. Holes 2 Fully Adjustable Jamb Brackets The bottom jamb is always the shortest included with your door. To attach the bottom jamb, locate the first set of quick install features of the vertical track. Align the slot in the jamb with the slot above the quick install features in the vertical track. The long side of the is placed against the track and with the tabs away from the track. Fasten the jamb finger tight, using (1) 1/4-20 x 5/8 track bolt and (1) 1/4-20 flange hex nut. To attach the top jamb, locate the third set of quick install features of the vertical track. Align the slot in the jamb with the slot above the quick install features in the vertical track. The long side of the is placed against the track. Fasten the jamb finger tight, using (1) 1/4-20 x 5/8 track bolt and (1) 1/4-20 flange hex nut, as shown in FIG. 2.1. Repeat for other vertical track. NOTE: The jamb fasteners are to be tightened when the vertical track is secured to the jamb. Jamb Fully Adjustable Jamb Bracket (1) 1/4-20 X 5/8 Track bolt 3rd Set 1st Set (1) 1/4-20 Flange hex nut Quick install feature Vertical track FIG. 2.1

3 Bottom Bracket Installation Counter balance cable (2) 1/4-20 x 11/16 Self drilling screw Identify the low-headroom bottom s provided with your door (A, B or C). Place them, left and right onto the bottom corners of the section. Seat the bottom s against the edge of the section, as shown in FIG. 3.1 and 3.2. FOR LOW HEADROOM BOTTOM BRACKET (A): Secure the low headroom bottom to the section with four 1/4-20 x 11/16 self drilling screws, as shown in FIG. 3.1. Cotter 5/16 Flat washer Clevis 1/4-14 x 5/8 Tamper resistant screw Place roller into holes of each bottom, as shown in FIG. 3.1. NOTE: (For dealer use only) Install one additional 1/4-14 x 5/8 tamper resistant screw, as shown in FIG. 3.1. Low headroom bottom (A) (2) 1/4-20 x 11/16 FOR LOW HEADROOM BOTTOM BRACKET (B): Secure the low headroom bottom to the section with four 1/4-20 x 2 1/2 carriage bolts and four 1/4-20 flange hex nuts, as shown in FIG. 3.2. Place roller into holes of each bottom, as shown in FIG. 3.2. Counter balance cable FIG. 3.1 (4) 1/4-20 x 2 1/2 Carriage bolts (4) 1/4-20 Flange hex nuts NOTE: (For dealer use only) Install one additional 1/4-14 x 5/8 tamper resistant screw, as shown in FIG. 3.2. Clevis FOR LOW HEADROOM BOTTOM BRACKET (C): Secure the low headroom bottom to the section with four 1/4-20 x 11/16 self drilling screws, as shown in FIG. 3.3. NOTE: (For dealer use only) Install one additional 1/4-14 x 5/8 tamper resistant screw, as shown in FIG. 3.3. Cotter 5/16 Flat washer 1/4-14 x 5/8 Tamper resistant screw Attach the counter balance cable to the low-headroom bottom s using clevis s. Secure the clevis s to bottom s using a 5/16 flat washer and cotter, as shown in FIG. 3.4. Low headroom bottom (B) FIG. 3.2 NOTE: Place roller into the factory attached bottom s, as shown in FIG. 3.5. Counterbalance cable Clevis Cotter (2) 1/4-20 x 11/16 1/4-14 x 5/8 Tamper-resistant screw 5/16 Flat washer Low headroom bottom (C) FIG. 3.3 (2) 1/4-20 x 11/16 Counter balance cable NOTE: The low headroom bottom (C) is not shown for clarity purposes. Low headroom bottom 5/16 Flat washer FIG. 3.4 Clevis Cotter Typical factory attached bottom FIG. 3.5 2

4 Low Headroom Top Bracket Identify the low-headroom top s provided with your door (A, B, C or D). Push the top section of door out against the jamb until the section is parallel with the other sections of the door. Starting with the left hand side, align the edge of top with the edge of section. Top Section 1/4-20 x 11/16 Top (A) assembly (B) assembly (C) NOTE: When installing the top s, the top section must be vertically aligned with the rest of the sections from the side view. If needed reposition top (s) to achieve vertical alignment. FOR LOW HEADROOM TOP BRACKET (A): Secure the low headroom top to the section by placing one 1/4-20 x 11/16 self drilling screw through the lower slot of. Adjust the low headroom top if necessary and secure two more 1/4-20 x 11/16 self drilling screws through the top holes, as shown in FIG. 4.1. Repeat the same process for the other side. Lower slot FIG. 4.1 3. (2) #12 x 1/2 Phillips head screws Male part of top section FIG. 4.2 1. (1) 1/4-14 x 5/8 Self-tapg screw 3. (2) #12 x 1/2 Phillips head screws FOR LOW HEADROOM TOP BRACKET (B) OR (C): NOTE: The LHR top comes pre-assembled, as shown in FIG. 4.3 or FIG. 4.4. Locate the edge of the top section and seat the top on male part of the top section, as shown in FIG. 4.2. Attach the top to the top section (B): 1. Attach one 1/4-20 x 11/16 self-drilling screw to the top assembly. 2. Attach two 1/4-20 x 11/16 self-drilling screws to the top assembly. 3. Attach two #12 x 1/2 phillips head screws on the opposite side of top assembly. Insert a roller into the top slide, as shown in FIG. 4.3. Repeat the same process for the other side. Attach the top to the top section (C): 1. Attach one 1/4-14 x 5/8 self-tapg screw to the top assembly. 2. Attach two 1/4-20 x 11/16 self-drilling screws to the top assembly. 3. Attach two #12 x 1/2 phillips head screws on the opposite side of top assembly. Insert a roller into the top slide, as shown in FIG. 4.4. Repeat the same process for the other side. REVERSING THE TOP SLIDE (B) OR (C), IF NEEDED: NOTE: Depending on your application, you may need to reverse the top slide for more adjustment, if needed, prior to securing it to the top base. Remove the top slide by removing the two 1/4-20 x 5/8 carriage bolts, two retention washers and two 1/4-20 flanged hex nuts. Flip the top slide in the opposite direction. Loosely fasten the top slide to the using two 1/4-20 x 5/8 carriage bolts, two retention washers and two 1/4-20 flanged hex nuts, as shown in FIG. 4.5 or FIG. 4.6. NOTE: The retention washers must be fully seated against the top base to ensure the anti-twist feature on the top slide engages in the slotted hole in the top base. FOR LOW HEADROOM HORIZONTAL TRACK (D): NOTE: This is a traditional low headroom windload top. Vertically align the flat portion of roller slide with the endcap and u-bar at the top of top section. Fasten roller slide using (2) 1/4-14 x 7/8 self drilling screws, as shown in FIG. 4.7. Repeat the same process for the other side. WARNING DO NOT RAISE DOOR UNTIL HORIZONTAL TRACKS ARE SECURED AT REAR, AS OUTLINED IN REAR SUPPORT INSTALLATION, OR DOOR COULD FALL FROM OVERHEAD POSITION CAUSING SEVERE OR FATAL INJURY. slide (B) 2. (2) 1/4-20 x 11/16 Self-drilling screws Slot 1. (1) 1/4-20 x 11/16 Self-drilling screw FIG. 4.3 Reverse top slide Two retention washers (2) 1/4-20 x 5/8 Carriage bolts Endcap FIG. 4.5 U-bar (2) 1/4-14 x 7/8 FIG. 4.7 Anti-twist feature Top section (2) 1/4-20 Flanged hex nuts base assembly (B) Flat portion of roller slide Top (D) Top Section (C) 2. (2) 1/4-20 x 11/16 Self-drilling screws Top section FIG. 4.4 Reverse top slide Two retention washers Slot (2) 1/4-20 x 5/8 Carriage bolts FIG. 4.6 (2) 1/4-20 Flanged hex nuts Anti-twist feature base assembly (C) 3

5 Universal Horizontal Track Place the horizontal track overtop of the previously installed vertical track. Align the bottom of the horizontal track with the top of the vertical track. (1) 3/8-16 Hex nut (1) 3/8-16 - 3/4 Hex head bolt Secure the horizontal track to the corresponding flagangle with (2) 1/4-20 x 9/16 track bolts and nuts. Level the horizontal track and secure the upper curve to the flagangle using (1) 3/8-16 x 3/4 hex head bolt and (1) 3/8-16 hex nut, as shown in FIG. 5.1. Repeat for other side. Flagangle (2) 1/4-20 X 9/16 track bolts (2) 1/4-20 Flange hex nut FIG. 5.1 6 End Bearing Bracket Front Mount Springs Place the left and right end bearing fixtures above the flagangles. Attach the fixtures to the jamb using (3) 5/16 x 1-5/8 lag bolts, as shown in FIG. 6.1. End bearing fixture (3) 5/16 X 1-5/8 Lag bolt Flagangle FIG. 6.1 4

7 Center Bearing Bracket Front Mount Springs Locate the center of the door and mark a vertical pencil line on the mounting surface. Then measure the distance from the top of the door to the center of the bearing on the end bearing fixture. Mark a horizontal line on the mounting surface, the measured distance up from the top of the door. Offset the center bearing 1-1/2 off center on the spring mounting surface and center the bearing hole in the over the horizontal line so that the torsion shaft will lay level through the s when installed. Attach the to the mounting surface using (2) 5/16 x 2 lag bolts and (1) 5/16 x 2 RED HEAD lag screw, as shown in FIG. 7.1. IMPORTANT: THE 5/16 X 2 RED HEAD LAG SCREW MUST BE ATTACHED THROUGH THE BOTTOM HOLE OF THE CENTER BRACKET(S). Mounting surface Center Line of door 1-1/2 Offset Center bearing 5/16 x 2 Lag bolts Distance from door to bearing 5/16 x 2 RED HEAD lag screw FIG. 7.1 8 Torsion Shaft Assembly Front Mount Springs Place the torsion shaft on the floor in front of the door. Facing the door, slide the nylon center bearing over the end of the tube until it is centered on the shaft. Slide the spring with the black winding cone over the left hand end of the tube. Slide the spring with the red winding cone (if applicable) over the right hand end of the shaft. If applicable, slide the set collar over both ends of the torsion shaft, as shown in FIG. 8.1. NOTE: Front mount torsion shaft assembly for LHR doors are opposite from standard lift doors. Red Winding Cone Set Collar (If Applicable) NOTE: Set collars are only included when outside pull bottom fixtures and a 2 piece solid shaft are supplied. Left Hand End Nylon Center Bearing Torsion Shaft(s) Right Hand End Black Winding Cone Set Collar (If Applicable) FIG. 8.1 5

9 Torsion Shaft Front Mount Springs Lift the torsion shaft off the floor. Slide one end of the shaft through the end bearing fixture. Extend the shaft through the bearing until the opposite end of the shaft can be inserted into the other fixture. Equalize the amount that the shaft protruding on each side. Slide the nylon center bearing into the end of (1) spring and align the stationary spring cone(s) with the holes in the center bearing. Secure the spring(s) to the center bearing using (2) 3/8-16 x 1-1/2 bolts and nuts. Slide the red drum over the left end of the shaft as shown (inside looking out) and the black drum over the right end of the shaft, as shown in FIG. 9.1. IMPORTANT: THE SPRING WARNING TAG(S) SUPPLIED MUST BE SECURELY ATTACHED TO THE STATIONARY SPRING CONE IN PLAIN VIEW. SHOULD A REPLACEMENT SPRING WARN- ING TAG BE REQUIRED, CONTACT WAYNE-DALTON, A DIVISION OF OVERHEAD DOOR CORP. FOR FREE REPLACEMENTS. Red Drum Set Collar (If Applicable) Torsion Shaft (2) 3/8-16 x 1-1/2 Hex Head Bolt And Nut Center Bearing Bracket Stationary Cone Nylon Center Bearing Black Spring (Black Winding Cone) 10 Counterbalance Cable/Winding Instructions Front Mount Springs Release the vice grips from the ends of the cables and thread the counterbalance cables around the front side of the right cable drum and verify that there is no cable obstructions. Winding bars FIG. 9.1 Counter balance Cable Hook the cable into the drum. Slide the right hand cable drum against the right hand end bearing and tighten the set screws in the drum to 14-15 ft. lbs. of torque (Once set screws contact the tube, tighten screws one full turn), as shown in FIG. 10.1. Rotate the right hand drum and torsion tube until cable is taut. Attach vice grips to torsion tube and brace vice grips against jamb to keep cable taut. Slide the left hand cable drum against the left hand end bearing and rotate drum until cable is taut. Tighten set screws in left hand cable drum. Slide each of the set collars up against the inside surface of the end bearing s, with the set screw facing directly away from the header. Tighten the set screw in each of the set collars to the torsion shaft to 14-15 ft. lbs. of torque (once set screw contacts the shaft, tighten set screw one full turn). IMPORTANT: CHECK EACH CABLE, MAKING SURE BOTH ARE SEATED PROPERLY ON THE CABLE DRUMS AND HAVE EQUAL CABLE TENSION. NOTE: The torsion spring counterbalance system for front mount low headroom is wound in the opposite direction as standard lift. NOTE: Using approved winding bars, wind the springs downward to the required number of turns. NOTE: See provided installation instructions and owner s manual for information regarding proper spring tension adjustments. 11 Rear Mount Support Installation Rear Mount Springs Only Position horizontal track perpendicular to the opening, by measuring from the flagangle across the wall at 3 ft., then measuring 4 ft. down the horizontal track. The distance between the two points should be 5 ft. for perpendicularity. Level horizontals and drill (2) 3/8 dia. holes in the ends of the track as shown. Secure the horizontal track to the rear support drop angle using (2) 3/8 x 3/4 hex head bolts and nuts, as shown in FIG. 11.1. Red winding Cone FIG. 10.1 Black cable drum Right hand shown Rear support drop angle (supplied by others) (2) 3/8-16 X 3/4 Hex head bolts REAR SUPPORT MATERIAL SUPPLIED BY OTHERS (Note: lateral brace must always be used to prevent swaying of horizontal track.) LHR rear mount Bearing (2) 3/8-16 Nuts FIG. 11.1 6

12 Portland Track Bearing Bracket Installation Rear Mount Springs Only Level horizontal track and drill (2) 3/8 dia. holes in the ends of the track as shown. Secure bearing s to the rear support angle using (2 or 4) 3/8-16 x 3/4 truss head bolts and nuts, as shown in FIG. 12.1. NOTE: The orientation of the bearing s may be optimized for different low-headroom applications. See Figure for ceiling mount bearing s. Rear support drop angle (supplied by others) (2) 3/8-16 X 3/4 Truss head bolt and nut LHR rear mount bearing Rear support drop angle (supplied by others) (4) 3/8 X 3/4 Hex head bolt and nut 13 Cable Sheave And Torsion Shaft Assembly For Rear Mount Springs Only Cable Sheave: Using the appropriate hole in the sheave plate as a guide, drill a 13/32 dia. hole through the sheave plate and track. Place a 3/8-16 x 1-1/2 truss head bolt through the drilled hole and slide a steel sheave over the end of the bolt as shown. Secure the sheave using (1) 3/8 hex nut. Repeat for the other side, then loop the counterbalance cables over each sheave, as shown in FIG. 13.1. LHR rear mount bearing FIG. 12.1 3/8-16 X 1-1/2 Truss head bolt Torsion Shaft Assembly For Rear Mount Springs Only: Place the torsion shaft on the floor at the end of the horizontal track. Facing the door, slide the center bearing over the end of the tube until it is centered on the shaft. Slide the spring with the black winding cone over the left hand end of the tube. Slide the red spring (if applicable) over the right end of the shaft as shown in FIG. 13.2. 3/8 Hex nut Steel sheave Counterbalance cable FIG. 13.1 Black winding cone Center bearing Red winding cone Torsion shaft FIG. 13.2 7

14 Torsion Shaft Installation Rear Mount Springs Only Lift the torsion shaft off the floor. Slide one end of the shaft through the end bearing. Extend the shaft through the bearing until the opposite end of the shaft can be inserted into the other. Equalize the amount that the shaft protrudes on each side. Slide the center bearing to the center of the torsion shaft. Secure the to the ceiling using perforated angle or wood blocking. Place the stationary cone(s) of the torsion springs in line with the slots in the end bearing s and secure using (2) 3/8-16 x 1-1/2 hex head bolts and nuts (each) as shown. Place the black drum over the left end of the torsion shaft (inside looking out) and the red drum over the right end. Apply locking pliers to the track above a roller before winding springs. Ensure that counterbalance cables are over the steel sheaves and wrap the counterbalance cables over the tops of the drums. Hook the cable stops behind the notches in the drums. Rotate the drums to add tension to the cables. Tighten the set screws for each drum. Clamp locking pliers onto the torsion shaft so that cables maintain tension. Cables should terminate at 6 O clock position minimum (as shown), and cable tension should be equal for both sides. Check the spring warning tag for number of turns required. Using approved winding bars, wind the springs upward to the required number of turns, as shown in FIG. 14.1 and FIG. 14.2. NOTE: See provided installation manual for information regarding adjusting spring tension. Counterbalance cable Red winding cone LHR rear mount end bearing Black cable drum Counterbalance cable FIG. 14.1 (2) 3/8-16 X 1-1/2 Hex head bolts and nuts FIG. 14.2 Black winding cone (2) 3/8-16 X 1-1/2 Hex head bolts and nuts Center bearing Stationary spring cone 1/2 Diameter x 18 long winding bar (2) Required Spring warning tag Red cable drum 15 Rear Support Installation Rear support Horizontal track Rear support drop angle (supplied by others) Raise the door until the top section and half of the next section are in a horizontal position. Do not raise door any further since rear of horizontal track is not yet supported. WARNING RAISING DOOR FURTHER CAN RESULT IN DOOR FALLING AND CAUSE SEVERE OR FATAL INJURY. Clamp a pair of vice clamps on the vertical tracks just above the second roller on one side, just below the second roller on the other side. This will prevent the door from raising or lowering while installing the rear support. Using perforated angle, 5/16 x 1-5/8 hex head lag screws and 5/16 bolts with nuts (may not be supplied), fabricate rear support for horizontal tracks. Attach horizontal tracks to the rear supports with 5/16-18 x 1-1/4 hex bolts and nuts (may not be supplied). s must be level and parallel to door within 3/4 maximum of door edge, as shown in FIG. 15.1 through FIG. 15.3. WARNING KEEP HORIZONTAL TRACK PARALLEL AND WITHIN 3/4 MAXIMUM OF DOOR EDGE, OTH- ERWISE DOOR COULD FALL, RESULTING IN SEVERE OR FATAL INJURY. IMPORTANT: DO NOT SUPPORT THE WEIGHT OF THE DOOR ON ANY PART OF THE HORI- ZONTAL TRACK HANGER THAT CANTILEVERS 4 OR MORE BEYOND A SOUND FRAMING MEMBER. NOTE: If rear supports are to be installed over drywall, use 5/16 x 2 hex head lag screws, and make sure lag screws engaged solid structural lumber. NOTE: 26 angle must be attached to sound framing members and nails should not be used. 5/16-18 x 1-1/4 Bolt Sound framing members Sound framing members 5/16-18 Nut 24 Max FIG. 15.1 FIG. 15.2 5/16-18 x 1-1/4 Hex head bolt & nut (Supplied by others) Perforated angle brace Perforated angle - bolted using (2) 5/16 x 1-5/8 Hex head lag screws to ceiling member and parallel to width of door. Space lag screws no further than 24 apart. Bolt must extend into the track to serve as a roller stop Horizontal track Angle brace 24 Max Perforated angle -bolted using (2) 5/16 x 1-5/8 hex head lag screws to ceiling members and parallel to width of door. Attach vertical perforated angle between the (2) 5/16 x 1-5/8 hex head lag screws, securing perforated angle to ceiling members. 8 FIG. 15.3