John Bednar, Chairman

Similar documents
b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Winter Committee Meeting Houston, TX Wednesday, January 13, 2016

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2015 Winter Committee Meeting Houston, Texas (BP Westlake Location) January 20, 2015

Draft MINUTES, Revision 1 API SC 17 Subsea Production Equipment 2012 Winter Meeting Houston, Texas January 19, 2012

19th Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Atlanta Hilton Hotel API Summer Standards Conference Atlanta, GA

21st Joint Meeting of ISO/TC67/SC4/WG6 and API SC17 Technip Building Old Katy Road Houston, TX. February 7, 2007 Joint Meeting - 8:30 am

1. John Bednar, API SC 17 Chairman, welcomed the group to the meeting at 8:00 AM and outlined various safety and housekeeping issues.

API 17G Update. API SC17 Summer Meeting 12 Jun API 17G Monthly Leadership Update 1

2015 Exploration & Production Winter Standards Meeting Subcommittee 10. January 27-29, 2015 Intercontinental Hotel New Orleans, LA

Recommended Practice for Flexible Pipe

SC20 MEETING MINUTES January 29, E&P Winter Standards Meeting InterContinental New Orleans New Orleans, Louisiana

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS API 17H REMOTELY OPERATED TOOLS AND INTERFACES TASK GROUP STATUS

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

Formation of a standing Subsea committee in IOGP and the prioritized work areas for the committee. Roald Sirevaag IOGP Subsea committee chair

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

ISO/TC 67/SC 4 N 267 ISO/TC 67 N

2014 Exploration & Production Standards Conference Subcommittee 10. January InterContinental Dallas Addison, Texas

Training: Industry Overview

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

API COPM CPMA Chapter 20.X

Specification for Subsea Umbilicals

Overview and Update of API Standards

ISO INTERNATIONAL STANDARD

Building Subsea Capability

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

API 17G Update. API SC17 Winter Meeting 07 Feb API 17G Update SC17 Winter Meeting 1

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS. API RP 17G2 Subsea Pumping Well Intervention Systems TASK GROUP STATUS

Minutes of Meeting. Meeting attendees introduced themselves. Record of Meeting Attendance is included in the minutes.

Safe Marine Transfer LLC Meeting Minutes Final Project Presentation to RPSEA WPG; July 14, :30 AM 2:30 PM

API Standards Overview

Gulfstar One FPS. Nathan Davidson. February 26, 2015

FREQUENTLY ASKED QUESTIONS to the SOME:

API C2 / SC 17 SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Module B contains eleven modules. This is Module B8. International Standards Development

Subsea Structural Engineering Services. Capability & Experience

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President

OBSERVATORY SERVICING AND MAINTENANCE

Dennis Marlow has begun work on the first two topics. The others will be addressed in new business.

IOGP JIP33 Standardisation of Equipment Specifications for Procurement Completion of the Pilot and the Next Phase

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Marine Well Containment Company Response Overview New Orleans Area Committee

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

IEEE Session #14 Opening Plenary Presentation

Stoa Administrative Calendar

Matrix Composites & Engineering Ltd

Minutes Board of Trustees Teleconference Meeting University of Central Florida August 21, 2018

Siemens Subsea. Aravinda Perera, Edson Federighi 2nd May 2017

Send your directly to

QUARTERLY UPDATE Q2 FY13

HESI Sustainable Alternatives Subcommittee

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

Spokane in 2015 Worldcon Bid Filing Overview 2

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer

QUARTERLY UPDATE. Summary

4 Briefing. Responsible investor

Industry Response - Post Macondo

Minutes Followspot Position Working Group Meeting Thursday, 21 January 2010 Dallas/Ft. Worth Marriott Solana Westlake, TX

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

Missing the Potential Value of Subsea Processing Technology

Veterans and Offshore Drilling

Subsea Chokes and Flow Modules

Mobility Choice Initiative Agenda Wednesday, October 25, 2017

SWiG Subsea Wireless Group - Presentation to API

ISO/TR TECHNICAL REPORT

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals

Minutes Technical Standards Council Tuesday, 23 August 2016 WebEx

SAFER, SMARTER, GREENER

7 Briefing. Responsible investor

Cost Reduction in Frontier Deepwater Riser Systems

IEEE Working Group on Broadband Wireless Access (BWA)

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

AADE Houston Chapter. Group. 26 January 2011

Pipeline Design & Installation Systems

Issues associated with Selection and Use of Gas-lift in Deep water, High Pressure and High Temperature Applications

AWHEM NORTH SEA COMMITTEE 3 rd QUARTERLY MEETING MINUTES SYNOPSIS FOR THE MEETING HELD ON THE 25 TH OF AUGUST 1999.

AGENDA PORT OF VANCOUVER USA BOARD OF COMMISSIONERS REGULAR MEETING AGENDA 3103 Lower River Road, Vancouver, WA Tuesday, February 26, 2019

AGENDA AND GENERAL INFORMATION IEEE P802.3CK GB/S, 200 GB/S, AND 400 GB/S ELECTRICAL INTERFACES TASK FORCE

Subsea Boosting. November 2015 John Friedemann

ISO/TC67/SC4 Work Group 4 Annual Report

Status: ISO : FDIS submitted for voting to ISO-Secretariat on ISO : FDIS End of 2009 (planning)

RESULT OF SYSTEMATIC REVIEW OF ISO STANDARD

Reliability of Deepwater Technologies

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Oil&Gas Subsea Production

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

Learn more at

Opportunities and Challenges in Deepwater West Africa Projects

Greta Lydecker opened the meeting, welcomed everyone and thanked them for their attendance.

Investor Relations Presentation April 30, 2013

Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc.

QUARTERLY UPDATE. Summary

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT

Transcription:

MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Summer Committee Meeting Grand Hyatt Hotel, Washington DC Wednesday, June 29 th 2016 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman Ross Frazer, (Co) Vice-Chairman Bruce Witwer, Liaison Materials Man Pham, Secretary Terry Cook, (Co) Vice-Chairman Jens-Henrik Neuenkirchen and Liaison Industry Standardization Liaison International Standards 1. Meeting Opening/Safety Issues SC17 Chairman welcomed the Subcommittee members and attendees to the meeting at 8:00 AM with opening remarks and safety/housekeeping overview. Review and comment on API Winter 2016 Minutes of Meeting 2. Attendance and Rosters - Roll call of attendees/rosters. 3. Review of SC17 Membership details list (address, phone number) 4. A roll call was completed and confirmed that there was a quorum of 27 present for this meeting (a minimum of 15 is required). 5. API Summer 2016 Agenda review: Motion was made to approve. Seconded. Motion passed 6. Antitrust reminder was provided by API staff. All present acknowledged their understanding of the antitrust rules. 7. The updated SC17 Voting Representation Listing presented (Attachment 01), the API Work Group Leads Contact List was presented (Attachment 02) 8. The Subcommittee 17 Standards Status Matrix (Attachment 03) was presented by John Bednar. 9. Minutes from API Winter 2016 [Houston]: Motion was made to approve. Seconded. Motion passed. 10. International Standardization Update provided by Terry Cook New standards being worked: Forging Material JIP (DnV), Phase 2 Subsea Tree Standardization (JIP WEF 33 IOGP) Consideration as supplement to API 17D SC17 generally supports the intent of these other initiatives. The applicable task groups are encouraged to review the final work products for consideration of incorporation into API documents (e.g. 17D) and no duplications of efforts between various standards development organizations. 11. SC21 and Materials Update Bruce Witwer (Attachment 04) Recap of Roundtable Discussion

12. Update on SC18, Subcommittee on Quality, Task Group Liaison: Mohsen Shavandi (Attachment 05) Summary of ongoing activity and open action items from the subcommittee provided as per the attached report. 13. International Involvement: Jens-Henrik Neuenkirchen Goal to maximize international participation in API standardization work. 14. Task Group / Project Lead Reports a) API 17A: Subsea Production Systems The Task Group report was given by Ed Knerr (Attachments 06) Document is currently out for ballot. Motion was made for 2-year extension in case current ballot process extends beyond December 2016 (required action date for this edition of the document). Seconded. Motion passed (with no dissent) b) The Task Group report was given by John Bednar (Attachment 07) API 17L1: Specification for flexible pipe ancillary equipment API 17L2: Recommended practice for flexible pipe ancillary equipment API 17J: Recommended practice for flexible pipe API 17B: Specification for unboned flexible Pipe API 17K: Specification for Bonded Flexible Pipe SRRR submitted for approval to develop the next edition of the document. c) API 17D: Subsea Production System The Task Group report was given by Ross Frazer (Attachments 08) Motion was made for 2-year extension. Seconded. Motion passed (with no dissent) Waiting on IOGP JIP 33 publication for review and incorporation as appropriate. Action: Task group is to consider referencing API 20E and API 20F. d) API 17E: Subsea Umbilical The Task Group report was given by Ed Baniak (Attachment 09) The document is out for re-ballot to validate changes required from the 1 st ballot. Previous ballot negatives have been withdrawn in conjunction with comment resolution. e) API 17TR9: Subsea Umbilical Termination (SUT) Selection and Sizing Recommendations The Task Group update was given by Ed Baniak Re-ballot is open for review and comment. Previous ballot negatives have been withdrawn in conjunction with comment resolution. f) API 17Y: Chemical Injections The Task Group report was given by Farah Saidi (Attachments 10 and 10a) Estimated completion and go to ballot at the end of 2017.

g) API 17F: Subsea Production Control Systems The Task Group report was given by Christopher Curran (Attachment 11) Estimated first draft of the next edition is proposed for the end of 2016. h) API 17G: Completion Workover Riser The Task Group report was given by Brian Skeels (Attachment 12) Task group draft has been split into two documents: 17G addresses product manufacturing and the new 17G1 addresses operations and maintenance. 17G is to be out for ballot in July 15 th 2016 with 8-week review cycle. 17G1 will be out for ballot on August 15 th 2016 with 8-week review cycle. Motion was made for 2-year extension of current 17G reaffirmation. Seconded. Motion passed (with no dissent) Baby G s reports were provided as follows: 1) 17G2 - Subsea Pumping Well Intervention Systems (a) Draft of 17G2 completed - being formatted for ballot by API, should be ready for industry comment ballot in July 2016 2) 17G3 Subsea Well Intervention Systems using Non-Ferrous Alloys (a) Draft of titanium materials completed - out for industry comment ballot, closing July 29, 2016 (b) Draft of aluminum materials completed - out for industry comment ballot, closing July 29, 2016 (c) Motion was made for swapping of G3 designation. Seconded. Motion passed (with no dissent). SRRR submitted to approve this re-designation by API. 3) 17G4: Riserless Subsea Well Intervention Systems (Attachment 13) Document is out for comment ballot, closing August 4th. i) API 17H: ROV Intervention The Task Group report was given by Terry Cook (Attachments 14 and 14a) Task group has developed 17TR15 and document has passed API ballot. Comment resolution is in process. Contents of 17TR15 will eventually be incorporated into the next edition of API 17H AUV is to be incorporated into the next edition of API 17H No new action. j) API 17Q: Subsea Qualification The Task Group report was given by Man Pham (Attachments 15 and 15a) Coordinating with 17N Co-Chairs, API and SC17 Leadership on the approach to ensure a smooth transition of contents (Annex B, D, F) from 17N to 17Q. (This agreement to be covered under 17N report) Task group goal is for comment ballot in 3Q16 k) API 17N: Subsea Reliability The Task Group report was given by John Bednar (Attachments 16 and 16a) Ballot passed and document under comment resolution. l) API 17P: Subsea Structures and Manifolds The Task Group report was given by Terry Cook (Attachments 17 and 17a) Working on Material section

Draft should be completed by end of 2016 2nd Edition should be completed in 2017 and ready for ballot No outstanding action m) API 17R: Flowline Connections The Task Group update was given by John Bednar (Attachment 18) 17D will confirm alignment with 17R. No outstanding action n) API 17W: Capping Stack The Task Group update was given by John Bednar (Attachment 19) API 17W 1st Edition was published in 2014 o) API 17X: Recommended Practice on Subsea Pumping Systems The Task Group report was given by Dan Friedemann (Attachment 20) Consider if compression is applied to gas resevoirs and boosting is applied to oil reservoirs. p) API 17TR8: HPHT Design Guidelines The Task Group report was given by Brian Skeels (Attachment 21) Intent to have 2 nd Edition draft ready by 3Q16 for comment ballot. q) API 17TR7: Verification and Validation of Subsea Connectors The Task Group report was given by Jim Kaculi (Attachment 22) Intent to have 1 st Edition draft ready for ballot soon after standards conference. r) API 17Z: Bonded Composite Pipe The Task Group report was given by John Bednar API provided guidance on the need to better separate the content of DNV document material (currently published) that is being used as the basis for 17Z. Task Group is to review these recommendations. Action: Task group to decide by next meeting (Winter 2017) the final direction of 17Z relative to DNV RP F119. s) API 17O: HIPPS The Task Group report was given by Christopher Curran (Attachment 23) API 17O published in 2014 No current or planned activities t) API 17U: Wet and Dry Thermal Insulation The Task Group report was given by John Bednar (Attachment 24) API 17U published in February 2015 u) API 17V: Subsea Safety The Task Group report was given by Christopher Curran (Attachment 25) API 17V published in March 2015

15. New business: a) John Bednar announced the new SC17 Chairman Terry Cook (Shell) b) John Bednar s vision for path forward for SC17: Quality of documents Universality of standards Enthusiasm by committee/task group members Simplicity of documents Timing of standards/documents development 16. Upcoming Meeting: 2017 API Exploration and Production Standards Conference on Oilfield Equipment and Materials, Summer Meeting, Calgary, AB Canada, June 2017. 2018 Winter Meeting Houston, TX, January 2018 17. The meeting adjourned at 11:30 am