SAPURA 3000 VESSEL TRACK RECORD

Similar documents
Subsea Capability Profile

Local Contribution to the Aasta Hansteen development

A WORLD-LEADING SEABED-TO-SURFACE PARTNER

BRENT BYPASS & FRAM Subsea Projects

Subsea Structural Engineering Services. Capability & Experience

Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development

Offshore Construction Management Services. Capability & Experience

Gulfstar One FPS. Nathan Davidson. February 26, 2015

Floating Systems. Capability & Experience

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund

Riser Installation in Deep & Ultra Deep Water

FLNG in Harsh Environment - Disconnectable and Relocatable Riser System

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Evolution of Deepwater Subsea / Offshore Market

Technip Floating Production: A Comprehensive Portfolio

A marginal field (re-)development using several alternative methodologies 1

OUR BACKGROUND. Section 1: Company Overview

Apache Subsea Projects NORTH SEA REGION. Richard Stark Paul Williams

Offshore Pipelines. Capability & Experience

Implementing a Deepwater- Pipeline-Management System

Engineering and Procurement We are designing and purchasing everything we can firmly identify

Offshore Trends Deep Pockets, Deepwater. Presented by: Mark Peters Group Publisher

IHC Handling Systems. High quality offshore. Head Office The Netherlands Sliedrecht

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

Oil&Gas Subsea Subsea Technology and Equipments

Swiber Holdings Limited 1Q FY08 Results Briefing

Learn more at

OFFSHORE SERVICES PIPELINE CONSTRUCTION

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

FLNG Opportunities for WA A Contractor s Perspective. Sam ALLEN Managing Director, Technip in Australia Perth, 12 March 2015

Capability Presentation

Marine Risers. Capability & Experience

LIFE OF FIELD SOLUTIONS - ONSHORE AND OFFSHORE

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations

Learn more at

Flow Assurance. Capability & Experience

The World Floating Production Report

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

For personal use only

Click to edit Master title style

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Safety and Environment considerations override all other items and should be considered in all design aspects.

Deepwater Precommissioning Services

OFFSHORE EQUIPMENT. Pipelay Umbilical lay flex lay cable lay. Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR INSTALLATION & CONSTRUCTION PLATFORM

We Deliver We Care.

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011

Getting to Grips with Deepwater Handling Operations

Subsea Positioning In deep water

Opportunities and Challenges in Deepwater West Africa Projects

Product overview SIP I SIP II SIP III SIP IV

Offshore Australasia Oil & Gas Market Report to 2017

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

Pressurised Subsea Pipeline Repair Recent Case Studies

Capital Marked Presentation. Dof Subsea Atlantic Region

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation

subsea partner of choice

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

Dry trees for cost effective solution with the Wellhead Barge: WHB

Summary of Experience and Qualifications

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges

Active Heating Potential Benefits to Field Development

Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Floating LNG facilities

BROWSE BASIN NORTH-WEST AUSTRALIA

CURRICULUM VITAE. Diploma - Ocean Engineering BEng (Hons) - Civil Engineering Fellow of the Institute of Marine Engineering Science and Technology

Matrix Composites & Engineering Ltd

RELIANCE INDUSTRIES LIMITED

Pipeline Design & Installation Systems

Passion at work. Oil & Gas

Q: Are there any dividend or profit sharing policy for investors? Does the company have plans on quarterly, bi-annual or annual dividends pay-outs?

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation

Brian Roberts Jim O Sullivan

Cameron MOSAIC. Systems for the Malampaya Project

Curlew B&D and Curlew C Decommissioning Programmes

Research for Ultra-Deepwater Production

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Specific requirements for offshore structures Part 6: Marine operations

The use of an integrated contract model (iepci) for Subsea developments

A New Lifting System for Installation of Risers in Deeper Water

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed.

NEXUS Capabilities and Experience

NEXUS Capabilities and Experience

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France

Next generation WTG foundation and WTG installation. WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director

REPLACING FULL MOORING SYSTEM FOR COOEC IN THE SOUTH CHINA SEA

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

Low Cost Field Development using Hybrid Risers. Learn more at

Offshore Energy Solutions. Technologies and products

KREUZ SUBSEA INTRODUCING KREUZ SUBSEA

Transcription:

SAPURA 3000 VESSEL TRACK RECORD Date Client Country Work Descrip on September 2007 Singapore Load test at Sembawang: 3000MT October 2007 March 2008 Singapore / Yard commissioning /yard punch list closing / barge prepara on for projects April June 2008 Kikeh Gas Export Pipeline Murphy Oil Sabah Deep Sea Pipelay: 12 x 138km up to 1350m water depth June July 2008 J4DP A Installa on J4 jacket and pla orm installa on Jacket 900MT Topsides 980MT July August 2008 August Mid October 2008 Mid October End November 2008 Kikeh Gas Export Pipeline PC 4 Installa on ANDP D Installa on Murphy Oil Sabah Deep Sea Installa ons: In 1350m water depth 80MT PLET Jumper installa on Precommissioning support Jacket 1564MT Topside 1686MT Tripod 500MT Bridge 85MT Flare Boom 130MT Install launched jacket of 2200MT Topside 1775MT

Date Client Country Work Descrip on End November Mid December Muda Living Quarters Jacket 1100MT Topside 1860MT Mid December End December 2008 Muda Process Install launched jacket of 4600MT Mid February Early May 2009 Mumbai High South Re Phase II Larsen & Toubro ONGC India RS 15 Jacket: 1800MT RS 16 Jacket: 1760MT RS 17 Jacket: 1820MT RS 15 Topside: 1344MT RS 16 Topside: 1258MT RS 17 Topside: 1970MT 17 19 May 2009 Muda Process Installa on of CSS (crossing steel support) at MDB MDPP pipeline crossings Installa on of Free Span Support at MDPP FSO pipeline free span loca on 20 21 May 2009 Muda Process Laying of 8 x 3km pipeline from MDPP FSO 23 27 May 2009 Muda Process Laying of 18 x 8km pipeline from MDPP MDB 30 May 15 June 2009 Muda Process Laying of 24 x 33km pipeline from MDPP JKA 19 22 June 2009 Muda Process Laying of 18 x 3km pipeline from MDPP MDC 22 June 2009 Muda Process Installa on of 18 riser for MDC MDPP pipeline 23 28 June 2009 Muda Process 8 Riser for FSO MDPP pipeline 18 Riser for MDB MDPP pipeline 24 Riser at JKA MDPP pipeline MDLQ deck 1220MT

Date Client Country Work Descrip on 29 30 June 2009 Muda Process Installa on of 24 Riser at JKA 9 20 July 2009 Kumang Cluster Offshore F9JT A Jacket Installa on and Piling 1749MT 25 July 14 August 2009 23 August 8 September 2009 9 12 September 2009 12 September 8 October 2009 11 31 October 2009 Kinabalu Offshore Kumang Field, Bintulu, Sarawak Kumang Cluster Offshore Kumang Cluster Offshore LHDP A Lahor Field, Terengganu KNJT C Jacket Installa on Tripod 895MT Combined li and upend jacket with main and auxiliary hoist KNJT A Jacket Installa on and piling 1720MT F9JT A Topside Installa on 1826MT KAKG A Jacket Installa on (960MT) and Piling LHDP A Jacket Installa on 1122MT 25 February 2010 15 March 2010 Newfield West Belumut TLO/NFX WBWP Jacket Installa on approximately 710MT and piling 16 March 18 April 2010 MLDP A/Melor Field TLO/Petronas Carigali Sdn Bhd MLDP A Jacket Installa on approximately 1170MT and piling 15 April 20 July 2010 Iwaki Decommissioning Nippon Steel Engineering Co Ltd Offshore Iwaki Petroleum Co Ltd Japan Heavy Li, Decommissioning: Topsides, Jacket and Associated Sec on of 12 Gas Export Pipeline 20 July 20 November 2010 (Season 1 Campaign) Pipelay Installa on Recover and laying 18 x 140km, (various diameters)

Date Client Country Work Descrip on 04 December 2010 21 March 2011 Devil Creek Apache Energy Heavy Li, Pipeline Installa on and Subsea Tie in: 91km x 16 Pipeline Pipeline Stabilisa on (45 x pairs Rock Bolts) Wellhead (1700Te drilled/ grouted piled jacket + 450Te Topside) SSIV Structure c/w Protec on Frame Tie In Spools Tie in Spool Stabilisa on (Gravity Anchors) Umbilical and Umbilical Stabilisa on (ma resses) Umbilical Protec on Frame Pre commissioning 01 June 2011 12 September 2011 (Season 2 Campaign) Deep Sea Installa on: Semi submersible Floa ng Produc on System (FPS) Mooring Line Hook Up Installa on Pipeline Riser Installa on (J Lay) Pipeline / Riser Pre Commissioning Flowline Risers Installa on (J Lay), including Gas Li In Line Sleds Flowline / Risers Pre Commissioning September 2011 January 2012 Montara Field PTTEP Australasia (Ashmore Car er) Pty Ltd Decommissioning, Transport & Installa on: Removal of exis ng wellhead pla orm Installa on of: 14, 10, 6 & 4" pipelines > 2 no 1.4km 14 > 1 no 1.4km 6 > 1 no 17.8km 14 / 4 piggyback > 1 no 5.2km 10 / 4 piggyback > 1 no 2.4km 6 / 4 piggyback) Piled moorings, chain and STP Buoy Subsea manifold and riser base structure Flexible risers & sta c / dynamic umbilicals Rigid spools Pipeline and umbilical stabilisa on Removal of exis ng wellhead pla orm Installa on of pipeline and umbilical stabiliza on 20 March 2012 15 April 2012 Liu Hua 4 1 Pipeline COOEC, China Offshore Oil Engineering China Pipelay Installa on: Installa on engineering Fabrica on of installa on aids (inclusive of A&R Heads and Pig Launcher/Receiver using ver cal connector Welding qualifica on Installa on of 10.4.km of 18 /22 pipe in pipe Installa on of 2x30 ton PLETs via S Lay mode and associated mudmat Pre commissioning of pipeline and associated PLETS 18 May 2012 27 July 2012 Block 0.6 Phase III Lan Do Com BP Explora on Opera ng pany Ltd Vietnam Subsea Installa on: Installa on of main and infield umbilical including hydraulic and electrical flying lead connec ons to wellhead 1101, 1102 and SSIV Pipelay and umbilical trenching Laying of a 12 gas pipeline (CRA) including an ILS Installa on of Rock support and protec on Installa on of a PLET and e in to the new pipeline Installa on of SSIV and e in into the exis ng pla orm and new pipeline Installa on of subsea jumpers between well 1101 and PLET, well 1102 and ILS Pre commissioning of the pipeline system and umbilical Fabrica on SOW 18 August 2012 29 January 2013 Installa on (Charter Party contract basis) Pemex Exploración Y Producción Mexico (Gulf of Mexico) Installa on: Installa on of Two (2) Jackets (XUX A and XUX B) and Three (3) Topsides (XUX A, XUX B and ONEL A)at water depth of 14.9m to 75.5m ONEL A (Deck: 2400MT); XUX A (Jacket:1400MT & Deck:2200MT); XUX B (Jacket:1400MT & Deck:2200MT) March 2013 September 2013 (Season 3 Campaign) Export Pipeline, FPS, Flowlines, Spools Installa on: Towing and installa on of FPS (12 moorings). Linepipe transporta on J Laying of flowlines and SCR for 6 x 8inch, 1 x 10inch, 2 x 12inch and 1 x 18inch in water depth of 1200m. 6 x 8inch flowlines wet parked before the arrival of FPS at Gumusut field. Installa on of e in 10 x e in spools and 4 x 65m sea water caisons at FPS Install 6 x jumpers and wet store 2 x jumpers Pre commissioning (pigging, gauging and hydrotes ng) of ALL 10 lines ( 6 x 8inch, 2 x 12inch, 1 x 10 and 1 x 18inch) Intelligent pigging of all Flowlines ( 6 x 8inch)

Date Client Country Work Descrip on 16 September 2013 18 September 2013 Siakap North Petai (SNP) Murphy Installa on of expansion modules (weight: 127MT and 1000MT) on an exis ng FPSO 24 October 2013 24 September 2014 Gorgon (Heavy Li and Tie ins) Subsea 7 Chevron Installa on of Subsea Structures and Spools: 20 subsea structures and founda ons 15 heavy spools 48 e in spools 39 electrical and 18 hydraulic flying leads 5 infield umbilicals & 2 assoc distribu on units 6 off corrosion monitoring spools 24 October 2014 3 November 2014 Wheatstone Buoyancy Tank Heerema Marine Contractors Chevron Buoyancy Tanks and Disposal (2 x 600T) 12 August 2014 16 December 2014 Yolla Mid Life Enhancement (MLE) Origin Energy Installa on of 2 modules: (a compressor and a condensate pump) onto exis ng Yolla pla orm) 05 May 2015 17 June 2015 Cakerawala Booster Compression (BCP) Hyundai Heavy Industries Carigali Hess Opera ng Co. Installa on of : Jacket (6,614MT) Piles (4,033 MT) 23 June 2015 25 October 2015 Maharaja Lela South (MLS) Total E&P Borneo B.V Brunei Heavy Li, Pipeline Installa on & Decommissioning: Transport & Install New MLJ3 WHP (Jacket: 1040MT & Topside: 1410MT) EPCI Modifica on of MLJ1 & MLJ2 Decommissioning of 5km x Ø18in CS Pipeline from MLJ1 EPCI 10.4km x Ø18in CRA clad Pipeline Pre commissioning & Commissioning Assistance 1 February 2016 10 May 2016 Badamyar Phase 1 Total E&P Myanmar Myanmar Heavy Li & EPCI of 8.2km of 16inch subsea carbon steel pipeline between WP4 and LCP EPCI of 8.2km of subsea electrical / fibre op c cable between WP4 and LCP EPCI of subsea carbon steel spool between pipeline and connec ng pla orms WP4 and LCP Transporta on and Installa on of: IBS Tripod (727MT) WP4 Jacket (1390MT) WP4 Topside (1067MT) LCP Jacket (1864MT) Pre commissioning of Pipeline and Cable 11 May 2016 15 June 2016 Malikai (TLP Piles) Hereema Marine Contractors Installa on of : TLP Driven Piles (Ø96in x 130m long, 433MT) 11 December 2016 19 January 2017 Badamyar Phase 2 Total E&P Myanmar Myanmar Transporta on and Installa on of : IBS Deck (111MT) LCP Topsides MSF (696MT), M1 (1705MT) and M2 (1840MT) Modules LCP MCP Bridge (707MT)