Institute for Energy. ENIQ 2020 Roadmap. ENIQ report No 43

Similar documents
Training workshop "Safety of food contact materials: exposure assessment of chemicals in foods and the use of FACET for exposure assessment"

New societal challenges for the European Union New challenges for social sciences and the humanities

Implementing the International Safety Framework for Space Nuclear Power Sources at ESA Options and Open Questions

ETSON: Role and activities for harmonizing safety assessment practices. Benoit De Boeck ETSON President. N2017 ETSON - Pitesti (May 2017) 1

The ETV pilot programme: State of play, standardisation issues

Mobilisation and Mutual Learning (MML) Action Plans on Societal Challenges

Institute for Health and Consumer Protection 2007

nuclear science and technology

NSNI Priorities related to Advanced Nuclear Designs

English - Or. English NUCLEAR ENERGY AGENCY COMMITTEE ON THE SAFETY OF NUCLEAR INSTALLATIONS FINAL REPORT AND ANSWERS TO QUESTIONNAIRE

Education and Training in Nuclear Decommissioning

ASD EUROSPACE RESEARCH AND TECHNOLOGY COMMITTEE (SRTC)

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Proposal for a COUNCIL DECISION

Development of the Strategic Research Agenda of the Implementing Geological Disposal of Radioactive Waste Technology Platform

European Nuclear Education Network Association

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange

ISO INTERNATIONAL STANDARD. Non-destructive testing Qualification of radiographic film digitisation systems Part 2: Minimum requirements

The Research Infrastructures in FP7

A New Platform for escience and data research into the European Ecosystem.

Common Features and National Differences - preliminary findings -

Consultation on Long Term sustainability of Research Infrastructures

European Technology Platforms

An Initiative towards Risk-Informing Nuclear Safety Regulation in Hungary

An overview of the activities of the CNRA* Working Group on Public Communication of Nuclear Regulatory Organisations (WGPC)

Agreements in R&D and Technology Transfer: Best Practices and Model Agreements

Energiforsk Nuclear power concrete structures R&D program

Engaging Stakeholders

Enpr EMA. Enpr-EMA. European Network of Paediatric Research at the European Medicines Agency

Convergence and Differentiation within the Framework of European Scientific and Technical Cooperation on HTA

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

This document is a preview generated by EVS

Mutual Learning Programme

CDP-EIF ITAtech Equity Platform

CAPACITIES. 7FRDP Specific Programme ECTRI INPUT. 14 June REPORT ECTRI number

Twinning cases selected Deliverable D3.2 INNO-Partnering Forum

A/AC.105/C.1/2006/NPS/CRP.7 16 February 2006

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

Research DG. European Commission. Sharing Visions. Towards a European Area for Foresight

PROJECT FINAL REPORT Publishable Summary

MINERVA: IMPROVING THE PRODUCTION OF DIGITAL CULTURAL HERITAGE IN EUROPE. Rossella Caffo - Ministero per i Beni e le Attività Culturali, Italia

Radiological Protection: Old Questions Needing New Answers

European Charter for Access to Research Infrastructures - DRAFT

Marine Strategy Framework Directive (MSFD) Common Implementation Strategy (CIS)

EUROPEAN MANUFACTURING SURVEY EMS

Realising the FNH-RI: Roadmap. Karin Zimmermann (Wageningen Economic Research [WUR], NL)

The UK Generic Design Assessment

A tool on Privacy Enhancing Technologies (PETs) knowledge management and maturity assessment

TECHNOLOGY WITH A HUMAN TOUCH

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES

Terms of Reference. Call for Experts in the field of Foresight and ICT

Office for Nuclear Regulation

Mutual Learning Programme Database of National Labour Market Practices. Step-by-Step Guide

Report OIE Animal Welfare Global Forum Supporting implementation of OIE Standards Paris, France, March 2018

DoReMi-MELODI Training and Education Forum Introduction and background

An ecosystem to accelerate the uptake of innovation in materials technology

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

Heads of European Radiological

Co-operative Programme on Decommissioning Projects CPD. Jean-Guy Nokhamzon CEA/DEN/DPA

Environmental Technology Verification pilot programme. Version 1.3 This document replaces GVP Version 1.2 as of 1st April 2018.

ERAC-SFIC 1353/15 AFG/nj 1 DG G 3 C

Culture for a new creative generation. Creativity in schools in Europe A survey of teachers

ENUMERATE: Measuring the progress of digital heritage in Europe

Public Consultation: Science 2.0 : science in transition

The TTO circle workshop on "Technology Transfer in Nanotechnology"

Getting the evidence: Using research in policy making

Goals, progress and difficulties with regard to the development of German nuclear standards on the example of KTA 2000

Use of the Graded Approach in Regulation

WG/STAIR. Knut Blind, STAIR Chairman

This document is a preview generated by EVS

NERIS Platform An attempt to enhance European response to and recovery from radiological emergencies

Using Foresight and Scenarios for Anticipation of Skill Needs

COUNCIL OF THE EUROPEAN UNION. Brussels, 9 December 2008 (16.12) (OR. fr) 16767/08 RECH 410 COMPET 550

I. Introduction. Cover note. A. Mandate. B. Scope of the note. Technology Executive Committee. Fifteenth meeting. Bonn, Germany, September 2017

General Questionnaire

ECC ALL ABOUT OUR ORGANISATION The Electronic Communications Committee

MERIL MAPPING OF THE EUROPEAN RESEARCH INFRASTRUCTURE LANDSCAPE

Technology Needs Assessments under GEF Enabling Activities Top Ups

COST FP9 Position Paper

ITU-D activities on EMF

NUGENIA position paper. Ageing of Low Voltage Cable in Nuclear Environment. 12 February 2015

Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report

Lessons learned from QUALICHeCK Lund workshop on ventilation and airtightness. François Rémi Carrié ICEE

Research and Innovation Strategy for the Smart Specialisation of Catalonia. Brussels March 20th, 2014

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes.

The International Decommissioning Network

Item 4.2 of the Draft Provisional Agenda COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE

Supporting European expertise in nuclear decommissioning roundtable

Invitation to take part in the MEP-Scientist Pairing Scheme 2015

2. At its meeting on 3 November 2008, the Working Party reached agreement on the attached draft conclusions.

Foundations for Knowledge Management Practices for the Nuclear Fusion Sector

IAEA Training in level 1 PSA and PSA applications. PSA Project. IAEA Guidelines for PSA

OSRA Overarching Strategic Research Agenda and CapTech SRAs Harmonisation. Connecting R&T and Capability Development

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes.

Stakeholder Involvement. Nuclear Issues. INSAG and IAEA perspective BASIS FOR KNOWN PUBLIC CONCERN. INSAG-20 Stakeholder Involvement in

ISO INTERNATIONAL STANDARD

Trade Barriers EU-Russia based in technical regulations

Research Infrastructures in FP7

Science-Driven Scenario for Space Exploration

Transcription:

Institute for Energy ENIQ 2020 Roadmap ENIQ report No 43 EUR 24803 2011

The mission of the JRC-IE is to provide support to Community policies related to both nuclear and non-nuclear energy in order to ensure sustainable, secure and efficient energy production, distribution and use. European Commission Joint Research Centre Institute for Energy Contact information Address: Westerduinweg 3, NL-1755 LE Petten E-mail: luca.gandossi@jrc.nl Tel.: +31.224.565250 Fax: +31.224.565641 http://ie.jrc.ec.europa.eu/ http://www.jrc.ec.europa.eu/ Legal Notice Neither the European Commission nor any person acting on behalf of the Commission is responsible for the use which might be made of this publication. Europe Direct is a service to help you find answers to your questions about the European Union Freephone number (*): 00 800 6 7 8 9 10 11 (*) Certain mobile telephone operators do not allow access to 00 800 numbers or these calls may be billed. A great deal of additional information on the European Union is available on the Internet. It can be accessed through the Europa server http://europa.eu/ JRC63643 EUR 24803 EN ISBN: 978-92-79-20072-4 (pdf) ISBN: 978-92-79-20071-7 (print) ISSN: 1831-9424 (online) ISSN: 1018-5593 (print) doi:10.2790/31433 (pdf) Luxembourg: Publications Office of the European Union European Union, 2011 Reproduction is authorised provided the source is acknowledged Printed in The Netherlands.

European Commission Directorate General Joint Research Centre Institute for Energy Petten, The Netherlands ENIQ POSITION DOCUMENT ENIQ 2020 Roadmap May 2011 ENIQ Report nr. 43 EUR 24803 Endorsed by the ENIQ Steering Committee

ENIQ, the European Network for Inspection and Qualification, publishes three types of documents: Type 1 Consensus documents Consensus documents contain harmonised principles, methods, approaches and procedures and emphasize the degree of harmonisation between ENIQ members. Type 2 Position/Discussion documents Position/discussion documents contain compilations of ideas, express opinions, review practices, draw conclusions and make recommendations for technical projects. Type 3 Technical reports Technical reports contain results of investigations, compilations of data, reviews and procedures without expressing any specific opinion or evaluation on behalf of ENIQ. This ENIQ Position Document: ENIQ Roadmap 2020 (ENIQ Report No 43) is a type 2 document.

FOREWORD The present work is the outcome of the activities of the ENIQ Steering Committee. ENIQ, the European Network for Inspection and Qualification, is driven by the nuclear utilities in the European Union and Switzerland and managed by the European Commission s Joint Research Centre (JRC). It is active in the field of in-service inspection (ISI) of nuclear power plants by non-destructive testing (NDT), and works mainly in the areas of qualification of NDT systems and risk-informed in-service inspection (RI-ISI). This technical work is performed in two task groups: TG Qualification and TG Risk. In the recent past both ENIQ task groups have been very active. In 2005, TGR published the "European Framework Document on RI-ISI", and has since been working at producing more detailed Recommended Practices (RPs) and discussion documents on several RI-ISI related issues. Amongst which are RPs on the verification and validation of structural reliability models and guidance on the use of expert panels together with discussion documents on the application of RI ISI to the inspection of the reactor pressure vessel and updating of RI-ISI programmes. TGQ, after publishing the third issue of the European Qualification Methodology Document in 2007, has recently issued a RP on personnel qualification and a document giving an overview of inspection qualification for the non-specialist. In 2010, the ENIQ Steering Committee recognised that the European nuclear industry was entering a period of significant change and thus initiated an internal discussion to determine its vision and objectives regarding ENIQ's future role and activities. This exercise resulted in the issuing of this strategy document, entitled the "ENIQ 2020 Roadmap" (January 2011). This ENIQ type-2 document was approved for publication by the ENIQ Steering Committee. The voting members of the ENIQ Steering Committee are: T Dawood P Dombret K Hukkanen P Kopcil E Martin B Neundorf J Neupauer S Pérez U Sandberg R Schwammberger D Szabó EDF Energy, United Kingdom Tractebel, Belgium Teollisuuden Voima OY, Finland Dukovany NPP, Czech Republic EDF, France (chairman) Vattenfall Europe Nuclear Energy, Germany Slovenské Elektrárne, Slovakia Iberdrola, Spain Forsmark NPP, Sweden Kernkraftwerk Leibstadt, Switzerland Paks NPP, Hungary The European Commission representatives in ENIQ are O Martin and L Gandossi. 3

TABLE OF CONTENTS 1 VISION... 5 2 GENERAL OBJECTIVES... 5 3 SPECIFIC OBJECTIVES... 5 3.1 TECHNICAL AREAS FOR FUTURE WORK... 5 3.2 ACHIEVING AND MAINTAINING NETWORK EXCELLENCE... 6 3.3 MAINTAIN, UPDATE AND EXPAND EXISTING METHODOLOGY DOCUMENTS AND RECOMMENDED PRACTICES... 6 4 TOOLS... 7 4.1 INCREASED VISIBILITY... 7 4.2 IMPROVED WORKING MECHANISMS... 8 5 SHORT-TERM WORK PROGRAM... 8 4

1 VISION ENIQ will continue to be recognised as a highly respected and efficient network supporting the long term safe reliable operation of European nuclear facilities through the effective application of NDE techniques, including qualification and risk-informed ISI. ENIQ will continue to foster and maintain collaboration with the global nuclear industry in advancing and harmonising best practices. 2 GENERAL OBJECTIVES By co-ordinating expertise and resources, the ENIQ network aims at supporting licensees and stakeholders by: Addressing issues where the practice and implementation of Non Destructive Evaluation (NDE) will ensure the safe and reliable operation of NPP through inspection qualification, the application of risk-informed approaches, and other processes. Providing recommendations and guidance to optimise and harmonise processes. Continually improving the processes for inspection qualification and risk informed ISI for increased effectiveness and efficiency. Responding to the new challenges of the world-wide nuclear renaissance including plant life extension (PLEX) and new build. Promoting ENIQ approaches outside Europe and in non nuclear industries. 3 SPECIFIC OBJECTIVES 3.1 Technical areas for future work Ultimately, the success of ENIQ will be achieved by contributing successfully to the technical challenges that are arising within its domain, both in view of ageing nuclear power plants and new build. ENIQ will achieve these by considering the following list of technical areas. Ensure a robust link between inspection and inspection qualification and the input processes such as code requirements, safety cases. Provide guidance on inspection qualification issues to address concerns and queries raised by members. Ensure that inspection results are used effectively to inform the safety assessments made by others. 5

Improve the link between RI-ISI and Inspection Qualification (e.g. establish how risk reduction criteria could set ISI requirements, quantify the output of a qualified inspection, etc.). The role of Condition monitoring by NDE in order to improve maintenance of plants. The Role of RI-ISI in Defence-in Depth (pressure vessels, qualification approach, risk, etc.). RI-ISI for new build (including pre-service inspections). RI-ISI and qualification guidance for non-pressure boundary items. RI-ISI guidance to optimise ISI intervals. Develop more detailed guidance for the use of expert knowledge in RI-ISI and qualification. Guidance on the use of alternative methods (to ISI) for managing risk. Probabilistic safety assessment (PSA) (technical adequacy for RI-ISI, refinement for RI-ISI programmes). Guidance on Expert Judgement. Support extended application of computer modelling and simulations. Extended application of NDE qualification to other NDE methods. 3.2 Achieving and maintaining network excellence ENIQ will complement its methodology for Inspection Qualification and its Framework Document on Risk-Informed In-Service Inspection by fostering a common method of working. ENIQ will work towards establishing common procedures and practices. In particular, it will work towards easing the transport of qualifications between countries. ENIQ recognises the importance of engaging young engineers, and it will work towards capturing and transmitting knowledge of NDT qualification issues and the use of risk metrics to target in-service inspection. ENIQ will aim at further improving its technical output (in terms of peer reviewed publications). ENIQ will provide an international forum where interested parties from different countries can meet to discuss NDT issues. ENIQ will manage Pilot studies and Round-Robin tests to investigate areas of interests for the members. 3.3 Maintain, update and expand existing Methodology Documents and Recommended Practices Document maintenance is essential for the ENIQ network to maintain credibility. The ENIQ network will periodically review (and, if necessary, revise/update/expand) Methodology Documents and Recommended Practices to confirm that the current issues remain valid. 6

4 TOOLS To better achieve its objectives, the ENIQ network recognises that an increased visibility and improved working mechanisms are necessary. 4.1 Increased visibility ENIQ recognises the importance of increasing the visibility of its rationale and activities, at all levels (EU policy makers, regulators, users within utilities, etc.). An increased awareness of the importance of inspection qualification and risk-informed methods will ultimately benefit the safety of nuclear power plants globally. An increased awareness will promote continued support from the European Commission, which is considered essential for the success of the network. To achieve these objectives, ENIQ will: Extend its influence outside Europe. Increase interaction with the IAEA. Have more regular interactions with nuclear regulatory agencies. Present its work regularly at international conferences. More specific objectives are as follows: Investigate the possibility to register "ENIQ" as a trademark Produce a "position" paper. This report will explain what reasons led to the creation of ENIQ, what the network has achieved, what is the current situation in all countries that adopt the ENIQ methodologies and/or Recommended Practices (RPs). The report will also include a thorough list of all laws, regulations, codes, reports, etc. that mention ENIQ documents or RPs, both explicitly and implicitly. Produce "promotional" material, for instance a presentation of network activities that will be kept updated and that will assist the network members if they need to present ENIQ to internal or external stakeholders in their organisation or country. Produce a reference list of publications about ENIQ Regularly update the ENIQ website. Regularly publish an ENIQ newsletter. 7

4.2 Improved working mechanisms To achieve its objectives, ENIQ recognise that its working mechanisms can be improved. ENIQ will: Consider the development of an appropriate funding mechanism; Investigate the possibility of becoming an organisation such as EPRI or ASME: membership fee, own facilities, common databases (e.g. for test pieces), etc.; Broaden its expertise (including experts on structural integrity, materials, etc.) Investigate the possibility of creating other task groups (e.g. on structural integrity). 5 SHORT-TERM WORK PROGRAM The following Table summarises some activities for the short term period (1-2 years). 8

1 2 3 4 Activity Purpose Content Timescale Promote the importance of ENIQ to Background to the formation of ENIQ. Position Paper stakeholders. Network achievements. Provide a mechanism for engaging with all Publication by Dec 2011. The benefits. stakeholders. General areas for future work activities. Promoting regulatory understanding IQB Workshops Formal review of ENIQ Documents 5 Justification of Risk- Reduction through ISI 6 Decide and Develop Funding Scheme Obtain regulatory feedback on developments within ENIQ: The drive will need to come from licensees Mutual recognition of qualifications between supported technically by TGQ and TGR. countries. Possibility of regulator workshops, reestablishing the NRWG. Implementation of different RI-ISI approaches. Quantitative PoD. Facilitate regulatory understanding of how qualification is performed in different countries (mainly ENIQ and ASME). Provide a forum for identifying good practices. Improving the processes and effectiveness of inspection qualification. Ensure that ENIQ documents (Methodology documents and RPs) remain valid and relevant. Enable users to understand the status of all documents. To determine level of risk reduction that is achievable through ISI. Ensure that ENIQ activities are performed in a timely, accountable and professional manner. Regular workshops for recognised inspection qualification bodies. Production of recommendations for work to be taken up by other organisations. Develop a formal process of periodic review for each of the documents (even if there are no changes the review should reflect this). Amend the ENIQ website with current status of each document. Produce discussion document on the role and expectations of ISI. Role of quantitative PoD in risk reduction. Agree on the principle of a contributory ENIQ funding scheme. Develop an appropriate funding mechanism (subject to agreement). Agree payment scheme. To be considered Scope to be agreed by end of March 2011. Extensive workshop to be held in Seattle at the 9th NDE conference. Develop an appropriate review scheme by October 2011 Rolling, ongoing programme for document review. Discussion document by mid- 2012. Aim to have a funding mechanism in place by Dec 2011 9

7 8 Activity Purpose Content Timescale The ENIQ webpage is an important mechanism for disseminating the ENIQ ENIQ Webpage Seek ways of enhancing communication of work. updates (newsletter, email). Timely update of ENIQ content will Potential for different levels of access. enhance the perception of ENIQ amongst Continual users and its usefulness. Promotion of ENIQ through seminars and conferences 9 10 11 Develop a PoD Methodology Pilot Studies Engagement with Stakeholders 12 RI-PSI for European New Build Increase awareness of the benefits of participation in ENIQ. Promote ENIQ activities and developments to a wide range of stakeholders. Increase participation in ENIQ. Maintain and enhance the reputation of ENIQ. Provide quantitative NDT performance information for RI-ISI. Mechanism for meeting quantitative ISI objectives. Pilot studies are an effective way of developing practice. A regular programme of pilot studies promote active participation in ENIQ activities by a wide range of organisations. Ensure that ENIQ activities are meeting industries needs. Ensure ENIQ objectives are consistent with other organisations and networks. Improve the efficiency of generating ENIQ output. Develop consensus view on RI-PSI. Identify conferences, workshops to present ENIQ work. Make presentations at conferences and workshops. Produce specification for quantitative PoD. Review and assess approaches for producing PoD. Pilot study on application of Monte-Carlo approach for producing PoD. Identify pilot studies for TGQ and TGR. Pilot study on mutual recognition for inspection qualification. Pilot study on Monte-Carlo approach to PoD. First step: identify other relevant organisations and networks. Establish contacts and seek participation. Review development in ASME and at Olkiluoto. Produce ENIQ discussion document. Continual To be considered To be considered To be considered To be considered 10

This page is intentionally left blank.

European Commission EUR 24803 Joint Research Centre Institute for Energy Title: ENIQ Position Document: "ENIQ 2020 Roadmap" Author: Luca GANDOSSI (DG-JRC-IE) Luxembourg: Publications Office of the European Union 2010 12 pp. 21 x 29.7 cm EUR Scientific and Technical Research series ISSN: 1831-9424 (online) ISBN: 978-92-79-20072-4 (pdf) ISBN: 978-92-79-20071-7 (print) doi:10.2790/31433 (pdf) Abstract ENIQ, the European Network for Inspection and Qualification, is driven by the nuclear utilities in the European Union and Switzerland and managed by the European Commission s Joint Research Centre (JRC). It is active in the field of in-service inspection (ISI) of nuclear power plants by non-destructive testing (NDT), and works mainly in the areas of qualification of NDT systems and risk-informed in-service inspection (RI-ISI). In 2010, the ENIQ Steering Committee recognised that the European nuclear industry is at a turning point and thus initiated an internal discussion to determine its vision and objectives regarding the network's future role and activities. This exercise resulted in the issuing of the present position document.

How to obtain EU publications Our priced publications are available from EU Bookshop (http://bookshop.europa.eu), where you can place an order with the sales agent of your choice. The Publications Office has a worldwide network of sales agents. You can obtain their contact details by sending a fax to (352) 29 29-42758.

The mission of the JRC is to provide customer-driven scientific and technical support for the conception, development, implementation and monitoring of EU policies. As a service of the European Commission, the JRC functions as a reference centre of science and technology for the Union. Close to the policy-making process, it serves the common interest of the Member States, while being independent of special interests, whether private or national. LD-NA-24803-EN-N