SUBMITTAL REVIEW Submittal: No. 016.00 Spec Section: 3 113 Underground Natural Gas Piping Reviewed By: Laura Landon, Comma-Q Architecture Date: June 1, 01 Project: BPS Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following: NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted 1. 16.00-3 113 Underground Natural Gas Piping Data Sheets GCAN Notes: 1. See engineer s comments. END OF REVIEW
101 E. Broadway, Ste. 410 Missoula, MT 5980 406.549.4160 (phone) 406.549.406 (fax) SUBMITTAL REVIEW To: Scott Dean From: Andy Hanson Date In: 5/5/01 Date Reviewed: 6/4/01 Job: Belgrade Elementary School Job # 11BZ3758 Number of Copies Returned: Electronic Submittal Title: Plumbing Submittal ASSOCIATED CONSTRUCTION ENGINEERING, INC. Change as noted No re submittal required X Revise & Resubmit per comments on required models only No Exception Taken Reviewed By: Andy Date: 6/4/01 Review is for conformance with design concept & compliance with contract documents only. Contractor shall check & verify all quantities, field measurements & shall be responsible for all errors in shop drawings. Contractor shall be responsible for deviations from contract documents unless he has called attention to such deviation and secured written approval. All in accordance with the general conditions. Notes about this submittal review: Any costs associated with electrical modifications required due to substituted materials shall be the responsibility of the contractor. No exceptions are taken with items in the submittal that are not specifically noted below. COMMENTS/REMARKS: EDF 1 Reviewed EDF Reviewed FD 1 Reviewed Page 1
FS 1 Revised & Resubmit. Provide Square Top & Basin with proper drain size. HB 1 Reviewed HB Reviewed MS 1 Reviewed MS Reviewed S 1 Reviewed S Reviewed. Architect to verify depth of fixture with casework. Provide with ADA Piping Guard as required. S 3 Reviewed. Architect to verify depth of fixture with casework. Provide with ADA Piping Guard as required. S 4 Reviewed. Architect to verify depth of fixture with casework. Provide with ADA Piping Guard as required. UR 1 Reviewed WC 1 Reviewed WC Reviewed WC 3 Reviewed WC 4 Reviewed CAR 1 Reviewed LB 1 Reviewed WS 1 Reviewed Underground PVC Spiral Duct Reviewed SP 1 Reviewed TP 1 Reviewed Page
RPBF 1 Reviewed PRV 1 Reviewed VB 1 Reviewed TG 1 Reviewed Floor Cleanouts Reviewed. Verify pipe size prior to ordering. Cleanouts Reviewed ORD 1 Reviewed RD 1 Reviewed DS 1 Reviewed WH 1 Reviewed MV 1 Reviewed RP 1 Reviewed Below Grade Natural Gas Piping Reviewed Page 3
TRANSMITTAL May 9, 01 To: Associated Construction Engineers Attention: Andy Hanson From: Laura Landon Project: BPS Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03 Copy to: File we are sending you : Attached Under separate cover the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other: these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment: date qty description 5/5/01 1 (elec) Submittal 14.00 3 113 Underground Natural Gas Piping Remarks: Andy, please review the attached submittal. Please return an electronic version to our office with your comments. Thanks
MARTEL CONSTRUCTION, INC. 103 South Church Avenue Bozeman, MT 59715-5801 LETTER OF TRANSMITTAL Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/5/1 JOB NO. 1-001 TRANSMITTAL/SUBMITTAL NO. 16.00 TO: Comma Q Architects RE: Underground Gas Piping 109 North Rouse Ave #1 Bozeman, MT 59715 ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL We are hand delivering We are sending via Email X ATTACHED UNDER SEPARATE COVER TheThe following items: Shop drawings Prints Plans Samples Specifications Copy of letter Change order X Product Data COPIES DATE DWG NO. DESCRIPTION 1 5/4/1 3 113 - Facility Natural Gas Piping - Underground Gas Piping THESE ARE TRANSMITTED as checked below: X For approval Approved as Submitted Resubmit Copies for Approval For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment REMARKS: FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US COPY TO File Andy Hanson - ACE SIGNED: Mike Wilkinson - Project Engineer If enclosures are not as noted, kindly notify us at once.
Letter of Transmittal To: MARTEL CONSTRUCTION, INC. 103 SOUTH CHURCH AVE. BOZEMAN, MT 59715 Ph: (406)586-8585 Fax: (406)586-8646 Transmittal #: 15 Date: 5/3/01 Job: 1-0194 Belgrade Elementary Subject: Submittal WE ARE SENDING YOU Attached Under separate cover via the following items: Shop drawings Prints Plans Samples Copy of letter Change order Specifications Submittal Document Type Copies Date No. Description Submittal 1 3113-1 Rev 0 Below Grade Natural Gas Piping THESE ARE TRANSMITTED as checked below: For approval For your use As requested For review and comment FOR BIDS DUE Approved as submitted Approved as noted Returned for corrections Other PRINTS RETURNED AFTER LOAN TO US Resubmit copies for approval Submit copies for distribution Return corrected prints Remarks: Copy To: From: CORN; GREG (Central Plmg & Htg, Inc.) Signature: If enclosures are not as noted, kindly notify us at once. Page 1 of 1
USPoly UAC 000 PE406 PE708 Submittal and Data Sheet Coils Product Code UAF3-01 UAF-01 UAF8-01 UAG1-01 UAA-01 UAA1-0 UAA4-01 UAA7-01 UAA9-01 UAB1-05 UAB5-01 UAB6-01 UAB7-01 UAC4-01 UAC5-01 UAC7-01 Nominal Size 1/ CTS (5/8 OD) 1/ CTS (5/8 OD) 1 CTS (1-1/8 OD) 1 CTS (1-1/8 OD) 1/ 1/ 3/4 1 1-1/4 1-1/ 3 3 3 SDR* 7.0 7.0 1.5 9.3 9.3 10.0 Weight Lb./100 Ft. 6.4 6.4 14 13 9 9 1 19 34 40 63 63 63 131 131 131 PIPE DATA Min. Wall In. 0.090 0.090 0.099 0.090 0.090 0.090 0.095 0.10 0.166 0.173 0.16 0.16 0.16 0.304 0.304 0.304 Average O.D. In. 0.65 0.65 1.15 1.15 0.840 0.840 1.050 1.315 1.660 1.900.375.375.375 3. 3. 3. Feet/ Coil 1,000 1,000 50 1, 315 1,000 Coils/ Pack 1 10 7 7 7 10 7 6 1 10 1 7 6 4 PACKAGING DATA Silo Packs Feet/ Pack 1,000 5,000 3, 3, 7,000 5,000 3, 3,000 6,000 5,000 3,000 3, 3,000 1,890,000,000 Nominal ID 4 4 4 4 3 4 5 10 5 10 5 10 Coil Dimensions Max OD 6 8 6 8 6 8 6 8 6 8 8 8 8 Width 5-1/ 5-1/ 11 11 1 7-314 11 14-1/ 7 8 8 1 41 16 3 46 Large Diameter Coils Product Code UAD1-06 UAD1-06B UAD1-07 UAD1-09A UAD3-0 UAD5-05 Nominal Size 4 4 4 4 6 6 SDR* 13.5 13.5 13.5 Feet/Coil 1000 1000 450 450 Coils/Pack 3 3 PACKAGING DATA Silo Packs Feet/Pack 1,,000 1,,000 900 900 Coil Dimensions Nominal ID Width 70 31 70 45 70 31 70 45 84 45 84 45 Truckload Quantity 7, 10,000 7, 10,000 4, 4, 4501 W. 49th St. Tulsa, OK 74107 1-800-96-1514 Fax (918) 445-8709 www.uspolycompany.com USP-D000-0108
Central Plastics Company 39605 Independence Shawnee, OK 74801 PH: 800.654.387 FX: 800.733.5993 www.centralplastics.com ANODELESS RISER Available Sizes: ¾ MPT x ½ CTS ¾ MPT x ½ IPS ¾ MPT x ¾ IPS 1 MPT x 1 CTS 1 MPT x 1 IPS 1 MPT x 1 ¼ IPS 1 ¼ MPT x 1 ¼ IPS 1 ½ MPT x 1 ½ IPS MPT x IPS Central Plastics is proud to offer a complete line of high performance, high quality Anodeless Risers that are safe and economical. Our line of compression fittings reflect over 50 years of common-sense engineering for the gas utility industry. Since 1965 Central Plastics has been providing the Natural Gas Industry with Risers, Transitions and Meter Connections that meet or exceed the most stringent industry standards. Today, Central Plastics continues to live up to this standard by maintaining the most extensive Research & Development, Quality Assurance and manufacturing systems available to the industry. AVAILABLE FEATURES PE to Steel transititon joint is many times stronger than the PE pipe. The transition joint relies on the smooth ID of the PE pipe. The riser design utilizes an O-Ring design for added protection. No gas carrying welds are utilized. All products are protected with electrostatically applied fusion bonded epoxy powder coating specifically designed for the exterior of Gas Petroleum pipelines. Can be manufactured to meet custom specifications. No Cathodic protection required. Customize installations. Factory Pre-Assembly and bundling options available. Specialized programs available. AVAILABLE OPTIONS Standard Pre-Bent Riser Flex Riser Pre-Bent Riser with Pigtail Product Literature Sheet RP11/004
Central Plastics Company 39605 Independence Shawnee, OK 74801 PH: 800.654.387 FX: 800.733.5993 www.centralplastics.com MOLDED PE SOCKET COUPLING Available Size Range: ½ CTS - 4 IPS At Central Plastics we are proud to be recognized as an International leader in the world of manufactured Polyethylene (PE) fittings. With manufacturing facilities located around the world, Central Plastics has been actively involved since the early 1960 s in the research and promotion of innovative joining methods for polyethylene piping systems for the natural gas, potable water, wastewater, oilfield, mining landfill, telecommunications and geothermal industries. With unparalleled expertise focusing on the design and manufacturing of polyethylene fittings, Central Plastics offers the largest, most complete line of polyethylene products, manufactured from a variety of common virgin resins, available in the market. Our substantial vertically integrated manufacturing capabilities allow Central Plastics to exercise complete control of our manufactured products. From design, to state of the art manufacturing, to shipping; Central Plastics maintains a high level of product consistency and quality throughout our manufacturing processes. Central s Molded PE406 Socket Fusion fittings are manufactured and tested to the requirements of ASTM D513 and are manufactured for use with pipe conforming to ASTM D513. Central s PE406 Socket fittings are molded from a yellow medium density pre-blended virgin resin in accordance with the material specifications listed in ASTM D3350 with a PPI designation of PE406. All Central Plastics PE406 Socket Fusion Fittings are manufactured and tested to the requirements of ASTM D683 and are compatible for heat fusion with any pipe and or fitting manufactured from a like or similar resin. Central s Molded PE3408 Socket Fusion fittings fully manufactured and tested to the requirements of ASTM D513 and are manufactured for use with pipe conforming to ASTM D513 and ASTM F-714. Central s PE3408 Socket fittings are molded from a black high density pre-blended virgin resin in accordance with the material specifications listed in ASTM D3350 with a PPI designation of PE3408. All Central Plastics PE3408 Socket Fusion Fittings are manufactured and tested to the requirements of ASTM D683 and are compatible for heat fusion with any pipe and or fitting manufactured from a like or similar resin. AVAILABLE FEATURES: PE406 fittings are engineered for use on MDPE Pipe PE3408 fittings are engineered for use on HDPE Pipe Pressure ratings up to SDR7 on most sizes. CSA Approved Can be used with all socket fusion equipment Manufactured in U.S.A. Product Literature Sheet RP11/004