Quarterly Activities Report 31 January 2013

Similar documents
ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

FY19 production and capital expenditure guidance

For personal use only

Quarterly Activities Report for Quarter Ended 31 March 2010

For personal use only

Kinetiko Energy Limited ACN:

QUARTERLY ACTIVITY REPORT

For personal use only

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

For personal use only

MARCH 2009 QUARTERLY REPORT. Herewith is Tap Oil Limited s Quarterly Report for the period ended 31 March 2009.

Address to the 2018 Annual General Meeting of Cooper Energy Ltd by the Managing Director, David Maxwell 8 November 2018

For personal use only

Quarterly Exploration Activities Report

For personal use only

Q2 FY18 Quarterly Report for 3 months to 31 December 2017

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

QUARTERLY ACTIVITIES REPORT for Bandanna Energy Limited and wholly owned subsidiaries ( Bandanna ) THREE MONTHS to 30 June 2012

Stewardship. Expectations. SE-06 Production Optimisation Implementation Guide

Annual Statement of Reserves

For personal use only

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

Q4 FY18 Quarterly Report for 3 months to 30 June 2018

BUILDING VALUE THROUGH WORLD CLASS ASIAN ASSETS AGM, 5 SEPTEMBER 2018

Annual General Meeting 11 September 2017

Gas Storage and Oil & Gas Exploration in County Antrim

Leni Gas and Oil plc. Corporate Summary, July London (AIM): LGO 1

LICENCE P.691 RELINQUISHMENT REPORT

For personal use only

Q3 FY18 Quarterly Report for 3 months to 31 March 2018

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

For personal use only

Orbost Gas Plant Upgrade Project Community Information Sessions. 18 & 19 September 2018

Q1 FY18 Quarterly Report for 3 months to 30 September 2017

Phoenix project drilling update 29 June 2017

Quarterly Report 31 December 2018

Tomorrow's Energy Designed Today TECHNOVA

The Directors wish to inform you about recent exploration activities:

During the June 2012 quarter, the Company s overall JORC Resources increased by 28% to 498.5Mt.

FAR in the MSGBC Basin

Exploration Licence EL Ballarat West

3D Oil Limited Accelerated Growth Strategy

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2016

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

A Step Change in Activity

Experience, Role, and Limitations of Relief Wells

INTERNATIONAL OIL AND GAS CONFERENCE IN CHINA OPENING PLENARY SESSION OPPORTUNITIES AND CHALLENGES IN A VOLATILE ENVIRONMENT, BEIJING, JUNE 2010

Dorado-1 drilling commenced 5 June 2018

For personal use only

Company Presentation. AGM 29 th November, 2016

An Australian Company with Growing Onshore Oil Production in Indonesia

2015 Trinidad Update. Trinidad & Tobago Energy Conference

BROWSE BASIN NORTH-WEST AUSTRALIA

For personal use only

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

PROJECT LOCATION PROJECT DESCRIPTION

Queensland exploration program

Draft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

For personal use only

For personal use only

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Emerging Subsea Networks

Phoenix South-3 drilling commenced 17 April 2018

ALASKA OPERATIONS UPDATE WINX-1

RELINQUISHMENT REPORT. Centrica North Sea Gas Ltd. Trap Oil Ltd

For personal use only

For personal use only

AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015

FOCUS INTENSIFIES ON DIAMBA SUD FOLLOWING KEY APPOINTMENT

Excellent Metallurgical Recovery Results & Update on Priority Drilling at Great Western Gold Project

For personal use only

Esso offshore projects

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

HIGHLIGHTS THIS QUARTER

For personal use only

EMP Approval to Drill Next Dome Complex

MADAGASCAR OIL LIMITED ( Madagascar Oil or the Company ) Admission to AIM & First Day of Dealing

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights

Phoenix South-3 drilling update 29 June 2018

Q STRIKE ENERGY LIMITED QUARTERLY ACTIVITIES REPORT For the period ending 31 March 2013

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

For personal use only

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

Persistence, partnership and the prize

BISIE PROJECT UPDATE AND ALPHAMIN APPOINTS CHAIRMAN TO THE BOARD

Questions and Answers

Dussafu Gabon Update January, 2018

SEAM Pressure Prediction and Hazard Avoidance

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

3D Oil Limited. Annual General Meeting 26 November Stamford Plaza Collins Street Melbourne

For personal use only

MEO Australia Limited ABN ASX & Media Release

SPE Annual Caspian Technical Conference and Exhibition

How it works and Stakeholder Benefits

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Transcription:

New Hope Corporation Limited ABN 38 010 653 844 Contact Phone: +61 7 3418 0500 Fax: +61 7 3418 0355 Quarterly Activities Report 31 January 2013 Jan 13 ( 000t) Quarter Ended Jan 12 ( 000t) Change (%) Jan 13 ( 000t) 6 months ended Jan 12 ( 000t) Change (%) Raw Coal Production 2,691 2,964-9% 5,848 6,137-5% Saleable Coal Production 1,392 1,561-11% 3,040 3,206-5% Coal Sold 1,381 1,564-12% 2,740 3,164-13% QBH Export Throughput 2,047 2,031 + 1% 4,230 4,265-1% COAL OPERATIONS Saleable coal production for the quarter of 1.39 million tonnes was down on the previous corresponding period as a result of an extended scheduled shutdown at all sites over Christmas / New Year holidays combined with higher than normal rainfall across South East Queensland in January. Despite production volumes for the first six months being 5% lower than the previous year, production remains on target to meet full year estimates. Sales for the quarter and first half year were down 12% and 13% respectively on the previous corresponding period, primarily as a result of customers deferring shipments. Coal exports from Queensland Bulk Handling remained steady at 2.04 million tonnes for the quarter and 4.23 million tonnes for the first six months. The extreme weather experienced across South East Queensland in late January had minimal direct impact on New Hope operations. Operations were suspended at all sites during the peak of the weather, but were resumed quickly and without damage to equipment or site infrastructure. There was some damage to the Western Rail System at various locations between Ipswich and Toowoomba. The line was repaired and railings resumed on 18 February. This outage is not expected to have a material impact on production or sales for the full year, but may necessitate some changes to the logistics and shipping schedule over the short to medium term. Railing continued from the West Moreton operations during the outage period. Registered Office: 3/22 Magnolia Drive, Brookwater, Queensland 4300 Postal Address: PO Box 47, Ipswich, Queensland 4305 Australia Website: www.newhopecoal.com.au

Page 2 of 8 As planned, the New Oakleigh mine ceased operation on 25 th January due to resource depletion. Rehabilitation has now commenced. EXPLORATION Drilling continued at Acland, Colton and Lenton during the period, with a total of 2,042 meters of chip holes, and 557 meters of core holes drilled. New Acland (ML50216, ML50170 and MDL244) Cultural heritage surveys were undertaken in advance of the 2013 drilling program. Drilling activities recommenced in early January but were then hampered by wet weather resulting in only 116 meters being drilled. Laboratory testing for the fugitive emissions study was completed during the period. New Lenton (ML70337) During the quarter 38 holes were drilled at Lenton for a total of 2,832 meters. This completed the 2012 program. All boreholes have now been fully rehabilitated. Cultural heritage surveys have cleared the 2013 drill sites, and analysis of fugitive emissions is continuing. Bee Creek (EPC 777) The 2012 drilling program has been completed, with all holes rehabilitated. All boreholes intercepted the Fort Cooper coal measures, with one borehole possibly intercepting the Moranbah coal measures, although this will need to be verified with further drilling. Churchyard Creek (EPC 1876) No exploration activity was undertaken during the current quarter. Modelling of drilling data is underway. Colton (EPC 1082) Cultural heritage surveys were completed during the quarter, although the final archaeologists report is currently outstanding. The drilling program to support the first 3 years of mining was completed with laboratory analysis of coal quality ongoing. Rehabilitation of all holes is now underway. Ashford (EL6234) No activity was undertaken during the current quarter.

Page 3 of 8 BUSINESS DEVELOPMENT Coal-to-Liquids Construction of the Jeebropilly plant is continuing with the bulk of the liquefaction module received on site in late January. The synthetic gas generator is expected to be delivered in late February. A number of activities are nearing completion with commissioning expected in the second quarter of calendar 2013. At the Quantex plant, installation of the control and data recording system is underway. Dry commissioning of the plant has been completed with wet commissioning planned for February once the fire protection system has been installed. DEVELOPMENT PROJECTS Colton Project Work continued on the Environmental Management Plan with the Department of Environment and Heritage Protection during the quarter. Elimatta Project An updated Environmental Impact Statement was lodged in November 2012, with the assessment period extended to 16 January 2013. The Department of Environment and Heritage Protection has released the EIS for public comment, with a submissions deadline of 21 March 2013. New Acland Continuation Plan Stakeholder and community engagement continued during the quarter with several visits organised for neighbours, Toowoomba Regional Council and local Members of Parliament. A Community Reference Group has been set up to facilitate communication with key stakeholders. The draft Terms of Reference for the revised project was released by the Coordinator General during the quarter with the public comment period closing in early February 2013. Detailed work on the revised Environmental Impact Statement is now underway.

Page 4 of 8 BRIDGEPORT ENERGY Highlights New Hope Corporation completed the acquisition of Bridgeport Energy Limited on 23 August 2012 and management support systems are being upgraded following the acquisition. During the quarter, a three-well drilling campaign on the Inland field was commenced. All wells indicated good oil columns. The wells were suspended for future completion and tie-in as production wells which is expected to occur during Feb 2013. Utopia well workovers (U-2, U-8, U-10) were completed in January 2012 and are now back on production. The U-11H workover is estimated to be completed in April 2013. Acquisition of a service rig to undertake well workovers is currently being finalised Post Quarter Highlights A three-well drilling programme on the Utopia oilfield commenced in late January 2013. To date, the Utopia 13 well (undertaken sole risk), has been suspended as a future oil producer. The Utopia 14 well has intersected good oil shows and is currently being evaluated. This well has confirmed the mapping of the eastern lobe of the Utopia field. The Utopia 12 well is expected to spud on 18 February 2013. Inland field workovers (for wells I-3, 7, 8, and 11) are schedule to be completed during Feb/March 2013. Operations Summary Production was maintained over the quarter at an average rate of 183 bopd 1 net to Bridgeport. Production from the Inland field was affected when a pump failed, resulting in a reduction of 60 bopd. Net oil production from the Inland (10,249 bopd), Utopia (2,304 bopd) and Naccowlah (4,280 bopd) oil fields for the reporting period was 16,833 barrels in total. 1 bopd = Barrels Oil Per Day

Page 5 of 8 Figure 1: Map of Bridgeport Energy Production Locations A six-well drilling programme, comprising three development wells on both the Inland and Utopia oil fields was commenced in December 2012 utilising the Ensign 948 super single drilling rig under assignment from another operator. This design of rig is a semiautomated drilling unit that minimises human intervention and hence reduces safety hazards to personnel. At the end of the quarter Inland 16A and Inland 17 had been drilled, evaluated, cased and suspended. A full core was taken on Inland 16A over the lower Birkhead and Hutton reservoirs. This core will provide important information to determine the field recovery, reservoir sweep efficiency and evolution of future exploitation plans, in particular for the lower Birkhead oil sand. Post quarter, the Inland 18 well was also successfully drilled, evaluated, cased and suspended. The rig then moved to the Utopia field and had drilled, evaluated, cased and suspended two (Utopia 13 and Utopia 14) of three planned wells. Utopia 13 was fully cored and evaluated across the reservoir so that the data can be used to optimise full field development. During the quarter Bridgeport executed an agreement to acquire a service rig to enable the company to undertake well workovers. Service operations commenced just prior to the end of the quarter with workovers commencing on Utopia wells 10, 2, 8 and 11. Post quarter production had been reinstated on wells 10, 2 and 8. The Utopia 11 workover was suspended for mobilisation of specialised equipment and the rig moved to the Inland field where workovers are scheduled on Inland 3, 7, 8 and 11 and new completions for production on Inland 16, 17 and 18. The rig will then move back to Utopia for completion of the three new wells in that field.

Page 6 of 8 Subsurface Geology and Geophysics Utopia Field - PL 214 (Eromanga Basin) (60% Bridgeport Energy) 3D mapping at the Utopia field in PL 214 resulted in the selection of a number of potential drilling locations within the confines of the field area. Figure 2: Utopia Murta M2 Top Reservoir Depth Map In addition, locations were identified within the eastern lobe of the field. Following PL 214 joint venture meetings, three locations were selected; two relatively low risk production development wells (Utopia 12 and 13) and one higher risk well (Utopia 14). It was further determined that coring should take place on Utopia 13 (sole risk well) so the core could be used to determine reservoir sweep efficiency and horizontal multi stage frac potential in the Murta reservoir. Mapping and reserves will be up-dated upon completion of the current drilling program. PL 214 Exploration (Eromanga Basin) As a consequence of the 3D seismic interpretation and mapping, refinement of exploration targets within the production licence has been in progress through the quarter. Four separate prospects are being considered for drilling in the next campaign.

Page 7 of 8 Inland Field - PL 98 (Eromanga Basin) (Bridgeport Energy 100%) The Inland oil field is located on the northern flank of the Cooper-Eromanga Basin, approximately 120 km NNE of the Cook/Cuisinier oil fields and 142 km west of Windorah township. The current drilling program arose from the company s in-house interpretation and mapping of the 3D seismic data set (see depth structure map below) and detailed petrophysical analysis of well data. This work identified undeveloped oil potential in the north-eastern portion of the field area. Selection of the well locations took into account; the possibility of unswept oil above the original oil-water contact (OOWC) within the main reservoir sand (Hutton Sandstone), and oil traps within secondary reservoirs that lie above the main producing zone. Figure 3: Inland Oil Field Hutton Depth Structure Map Post Drilling All three of the new Inland wells encountered good reservoir sand quality with hydrocarbon shows while drilling, which was supported by wireline log data. The actual depths to the top Hutton oil sand and the amount of net sand in the new Inland wells were close to pre-drill prediction and as a result, the mapping (above) and the original oil in-place within the Inland field has not changed. Once the flow rates from the three new wells are available, then a revised estimate of the recoverable oil will be carried out. Exploration Permit ATP 560P (Eromanga Basin) The Utopia East 2D seismic survey was acquired in late 2012 and the data is being interpreted and integrated with the Utopia 3D seismic data.

Page 8 of 8 PL 98 Exploration (Eromanga Basin) A number of oil companies have expressed an interest and are reviewing exploration targets within PL 98 with a view to making a farm-in offer that would involve the drilling of an exploration well. Most likely this would address the Birkhead channel feature on the north west side of the main bounding fault. Exploration Permit PEP 150 (Otway Basin) (15% Bridgeport Energy) This non operated (Beach Operator) venture is progressing towards clearance of Native Title and granting of the licence by the Victorian Government by mid-2013. Exploration Permit PEP 151 (Otway Basin) (25% Bridgeport Energy) Discussions with the Department of Sustainability and Environment (DSE) and the Department of Primary Industries (DPI) were recently held regarding approvals to allow the acquisition of the Morgan 2D seismic survey, that will fulfil the permit year 2 work program commitment. Large parcels of the block are currently deemed inaccessible or extremely expensive to access by DSE. This is restricting Bridgeport s ability to access some of the plays and prospects within the permit. Discussions with the operator Cooper Energy regarding the way forward for the permit are currently underway. Figure 4: Location Plan for PEP 150 and PEP 151 Otway Basin For further information, please contact: Investors/Analysts Robert Millner Chairman, New Hope Corporation Limited (02) 9232 7166 Robert Neale Managing Director, New Hope Corporation Limited (07) 3418 0500 Media Lisa Backhouse Manager of Corporate Affairs 07 3418 0522