s23ss sloped bollard with reflective bands

Similar documents
s71 cycle stand description 316 grade stainless steel with a brushed polish finish.

Kent Airport Bollard KDCT-140/3

Kent Slope Top Bollard KST-101/3

KENT FLAT TOP BOLLARD KFTB101/3

Kent Fold Down Bollard

Kent Ventilated Bollard

Kent Madrid Bench KMB6000

Kent Airport Bump Rail

Kent St. George Planter KSGP-1200

Kent Light Rail Balustrade Curved

Kent Glazed Balustrade

Kent Airport Balustrade

Kent Studs & Strips Product Range

Kent Kings Cross Bench KKCB5500

Kent Angle Frame Tree Pit

Downtown Rack. Custom logo option available

QUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Kent Waterford Recessed Tree Pit

PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

S W E RV E RAC K. Simple Security. Simple Stability.

Kent Swindon Bench KSNB2000(S)

Swerve Rack CUSTOM RACKS AVAILABLE

H O O P RAC K. Simple Security

CAVALIER. Shower Door Installation Instructions

ASCOT SEAT.

AQUA ULTRA SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

H O O P RAC K. Simple Security

SHOWER ENCLOSURE INSTALLATION

UNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

SWANSEA SEAT.

ESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

ESSENCE. Shower / Tub Door Installaion Instructions

INSTALLATION INSTRUCTIONS

UNIDOOR X (STYLE L1)

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

UNIDOOR/UNIDOORLUX/UNIDOOR PLUS

SWANSEA BENCH.

ENIGMA AIR ENCLOSURE

UNIDOOR LUX (STYLE E)

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

MIRAGE-X / BELLA. Shower Door Installation Instructions

SHOWER DOORS INSTALLATION INSTRUCTIONS SHOWER DOORS: LBSDD Version 4.0

Horizontal Cable Systems

SHELDON Versatile seating

INSTALLATION INSTRUCTIONS

Street Design. BUCKLAND seating. Buckland bench product details. Buckland technical specification. Buckland accessories. Buckland material finishes

FRENCH LINEA PANEL SHOWER PANEL INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTION Square-Top gully

Visions Tub Door & Backwall

INSTALLATION INSTRUCTIONS

Street Design. MALL seating. Mall bench product details. Mall technical specification. Mall accessories. Mall material finishes

INSTALLATION INSTRUCTIONS

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

ENCORE / BRAVO SHOWER AND TUB DOOR INSTALLATION NSTRUCTIONS

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

UNIDOOR PLUS (STYLE F)

Street Design. CAMBERLEY seating. Camberley bench product details. Camberley seat product details. Camberley technical specification

Links System Installation Instructions

31 / 39 / 59 Basin 31 / 39 / 59 Basin Frame Introduction Parts supplied - basin frame

UNIDOOR (STYLES B&C)

FLEX ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT.

FLEX 28 / 32 / 42 x 72

DURASTALL SHOWER STALL ASSEMBLY INSTALLATION REPAIR PARTS FOR ONE OF THE FOLLOWING MODELS:

Telephone: Fax: Web site:

Salter Industries Spiral Stair

Quick Fit Installation Guide Retractable Screen - Double Door

SPECIFICATION SHEETS. POLARIS FRAMELESS GLASS pool fencing

NOTE: Landscape Forms is not responsible for site preparation, footings, or electrical wiring.

Sawn Baluster Sizing and Installation Guide

MIRAGE-X / BELLA SHOWER AND TUB DOOR INSTALLATION INSTRUCTIONS

CORNERVIEW / FRENCH CORNER

INSTALLATION INSTRUCTIONS

Midmark Stainless Steel Cages Setup Manual

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

TYPICAL STANDOFF GLASS RAIL ELEVATION TYPICAL SECTION RS0B20 WITH RECTANGULAR BACK PLATE TYPICAL STAIRS

1. TOOLS + MATERIALS REQUIRED

WARNING. Failure to observe these instructions could lead to severe injury or death.

FITS MUSTEE 32 X 32 SHOWER RECEPTOR

PARAGON BATH SHOWER DOOR/ BATH TUB SCREEN INSTALLATION INSTRUCTIONS. DR-584b

UNIDOOR (STYLE B & C)

MIRAGE-X SHOWER AND TUB DOOR INSTALLATION INSTRUCTIONS

Not including the type of fabric used (clear pvc or shade mesh), there are three main types of side screen.

QWALL 5.2 (2 Back Panels)

ENIGMA-X / SPARKLE* SHOWER DOOR INSTALLATION INSTRUCTIONS

1. VERIFY ALL COMPONENTS

SHOWER DOOR INSTALLATION & CARE GUIDE

New Product Release: October 2014 Boone Racks

APRON FRONT STAINLESS STEEL SINK Installation & Care Instructions

INSTALLATION INSTRUCTIONS

ALUMINUM PIPE GUIDERAIL 01/01/

STEEL PIPE GUIDERAIL 01/01/

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Hoops Installation Instructions for Adjustable Basketball Goals

INSTALLATION INSTRUCTIONS

Transcription:

s23ss sloped bollard with reflective bands Right, s23 brushed stainless steel bollards with sloped top and reflective band. Top, s23 bollard with sloped top. Above, with bespoke logo. description Brushed 316 grade stainless steel bollard with sloped top. Recessed groove with reflective vinyl band in white or yellow. Ø101/114/168 dimensions Diameter/wall thickness 101/1.5mm, 114/3mm, 168/3.4mm. Lengths 1000mm, 1200mm (standard), 1500mm. (1000mm above ground to meet NDA/ DDA recommendations). options Root fixed, below ground flange fixed, above ground flange fixed. Ground socket box for removable option, pad lock type or hidden grub screw type. Bespoke etched logo option. 1000/1200/1500 300 127 15 Ground level

s23 AGFF Fixing Instructions 1 Ensure that the surface which the bollard is to be fixed to is of sufficient size and strength for this purpose. 2 Position the bollard in the desired location and mark hole positions. 3 Drill following fixing manufacturer s instructions to suit the chosen fixing. Choose a fixing which will accept an M10 SS CSK bolt, either a mechanical anchor (such as Hilti HSC-IR M10*60) or an internally threaded fixing designed for chemical fixing (such as Hilti HIS-RN M10xL [length to suit]). IMPORTANT, the depth of the hole must be sufficient to allow the fixing to be fully embedded in the concrete rather than partially in the paver and partially in the concrete. 4 Insert the fixings into the ground following fixing manufacturer s instructions. 5 Reposition the bollard and screw in M10 SS CSK (stainless steel with countersunk head) into the 4 no. fixings. Where chemical fixing is used (such as Hilti HIT-HY 150) leave sufficient time to cure. 6 Tighten the bolts. must be to engineers specification. Omos 159 Ø195

s23 BGFF Fixing Instructions 1 Cast foundation to engineers specification where bollard is to be located. The surface of the foundation must be level and finished to 100mm +10mm, -0mm. Leave to fully cure. 2 Position the bollard in the desired location and mark hole positions. 3 Drill 12mm holes to a depth of 150mm (or more depending on thickness of paver), insert M12 through bolts (such as Hilti HSA M12). 4 Use shims if necessary to ensure the correct height and plumb. Tighten bollard in position. 5 Where necessary cut or core drill the paving slabs and reinstate. 6 Render neatly around bollard with non shrink grout, removing any grout residue. must be to engineer s specification. Omos 170 120 Ø115 100/200

s23 RF Fixing Instructions note: as an alternative to setting the bollard directly into the foundation, a plastic pipe may be set in the foundation allowing the bollard to be fixed at a later date. 1 Set out the position of the bollard/s. 2 Where the area has been paved remove sufficient pavers to facilitate excavation. 3 Excavate holes to engineer s specification. 4 Position bollard precisely ensuring correct position, height and plumb. Prop securely in position. 5 Back fill holes with concrete (35N20) leaving sufficient depth for paving slabs and bedding. 6 Once set remove props. 7 Where necessary cut or core drill the paving slabs and reinstate. 8 Render neatly around bollard with non shrink grout, removing any grout residue. 12 Ø114 must be to engineer s specification. Omos 300/500

s23 Care and Maintenance Guidelines The s23 bollard is constructed from brushed 316 grade stainless steel, a material which is highly corrosion resistant. Despite the material s corrosion resistant properties some care is required to maintain a bright appearance. The extent to which cleaning is required will depend on a number of factors including environmental conditions, construction activity and level of use. Maintaining the stainless steel Prior to shipping all our stainless steel has been passivated to ASTM A380 and ASTM 976 01-8.1 to ensure the highest standard. Clean the stainless steel bollard using warm water with a mild detergent with a non abrasive cloth or sponge. Heavier stains may require the use of a nylon scouring pad. As a rule always start with the least severe method of cleaning as the use of scouring pads or scotch bright may result in altering the surface texture. For brushed finishes the surface consists of uniform fine scratches running in one direction so where abrasive cleaning is required always use a straight back and forward rubbing action in the direction of the grain. Rust spots or tea stains can occur on the surface of the material, these are normally caused by contamination from ordinary mild steel, particularly in areas where construction work has been undertaken. Such stains can be removed using an abrasive pad as described above. In cases where the surface is severely stained as a result of severe environmental conditions or scratched due to misuse, it may still be possible to restore the original finish. Contact Omos for advise on such issues. There are many stainless steel polishes available to enhance the surface finish. Omos recommends Avesta Finishing chemicals and can advise where to purchase. Right, s23ss sloped bollard with reflective band detail.