BIM Involvement of Manufacturers Project Examples for complete Life Cycle Support

Similar documents
ETH INDUSTRY DAY. Zürich, Dr. Andreas Bong Head of Corporate Research & Technology

STRABAG ZÜBLIN 5D Initiative, BIM, 5D Design Konstantinos Kessoudis

Anchor Fastening Technology Manual 09 / 2012

MagiCAD Cloud The World s Largest BIM Content Platform for MEP

UK Government Building A New World

Ridgefield Hardware. Step by Step Installation Instructions. Customer Service or visit us online at smithnoble.com

Commission initiatives for the modernisation of construction

NOW and NEXT BIM THE CONSTRUCTION PUZZLE- HOW TO MAKE EVERYONE WORK COLLABORATIVELY?

DATA AT THE CENTER. Esri and Autodesk What s Next? February 2018

OWNER S MANUAL STORAGE SHED MODELS: STOR-96-G-W-1RH & STOR-912-G-W-1RH

BIM+Blockchain: A Solution to the "Trust" problem in Collaboration?

Masonry & Specialty Drilling

Role of BIM. in Plumbing System -K Chandrakanth and M Vinay Kumar. Abstract. 3 Dimension. Introduction: Collaborative Design:

C6 Corvette Rear Spoiler Kit CDC #

Enterprise ISEA of the Future a Technology Vision for Fleet Support

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

Esri and Autodesk What s Next?

Masonry & Specialty Drilling

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Peter Caplehorn Deputy Chief Executive and Policy Director Construction Products Association

Hidden Point Document /Installation Manual

ClearSpan Hydroponic Table Kit

installation instructions

ART CONSULTANT CAREER GUIDE

3. Health and safety Operator safety Fastening safety Functional safety 3.1 Operator safety Hilti DX/GX piston principle

DC-EX125 Bedienungsanleitung 1 4 Operating instructions 5 8 Mode d emploi 9 12 Istruzioni d uso Gebruiksaanwijzing 17 20

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

1 Introduction. M.Rajabi a, T.Bigga b and M.A.Bartl c.

Application Tooling Specification Sheet

Masonry Drill Bits

Max-Secure Wall Mount Desk and Round Stool Installation Instructions Wall Mount Desk and Round Stool (EN and EN )

Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects.

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

Leading in drainage. Made in Germany

Convertable Binimi Top Assembly and Instruction Guide

Products & Services Manufacture & Distribute New & Used Equipment Hire Repairs & Refurbishment Consumables: Blades & Core Bits Tel:

A compact, integrated solution for medium voltage connection, transformer and low voltage distribution

BIM Design Services/ Introduction. T: E:

Session 3 _ Part A Effective Coordination with Revit Models

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

Industry 4.0: the new challenge for the Italian textile machinery industry

INTELLIGENT ENGINEERING

Digitalization in Aker BP

APPLYING 5D ON CONSTRUCTION PROJECTS Konstantinos Kessoudis, Ed. Züblin AG, Zentrale Technik

Fluid Technology Automation Technology smart buildings Technology

Who we are. What we do. Company Profile Harsco Corporation. All Rights Reserved.

Rugged Ridge 2 Receiver Hitch Kit (J21068)

Grid Radar Installation Manual

Jet-trac triplo Drill Bit, SDS-Plus, 3-cutter

How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia.

Assembly Instructions

The power behind a Leader

MONTRANO. Continuous monitoring system for power transformers

GROWTH THROUGH DIGITAL TURNING TECHNOLOGY INTO BUSINESS TRANSFORMATION

Included in Hardware Kit: Jeep Pocket Style Fender Flare Set of 4. Set Part # Rev-0 3/15/2013 TOOLS FOR EASY INSTALLATION:

Your partner for solutions tailored to your needs. Connectors Advanced connection solutions

European Technical ETA-13/1038 Assessment of 26 January 2018 General Part

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer

Mile Marker Installation Guide 2015

ADJUSTING RING INTERFERENCE ON VEHICLES EQUIPPED WITH ARVIN MERITOR REAR-REAR RT SERIES AXLE

Rusty s JL Winch Mount RR-WM55-JL INSTALLATION INSTRUCTIONS

Rethinking learning in the new digital age

CHAPTER 20 CRYPTOLOGIC TECHNICIAN (CT) NAVPERS K CH-64

BIM/VDC on TAA Projects:

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

Integrating Design using BIM and IFC

YGR-LO-8 GUARD RAILING YGR-TP18 & YGR-TP42 POSTS Installation Manual

COMPANY PRESENTATION. engine for life

Field Construction Management Application through Mobile BIM and Location Tracking Technology

Closing the Life Cycle loop

Innovation. UNLOCKING VALUE

INSTRUCTION MANUAL J23232GK


Installation Instructions Hinged Roof Rack

Active Push Bar. Safety glasses Measuring tape Level Pencil Power drill Drill bits: 5/32, 3/4 Center punch Phillips screw driver

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

Ford Cut-Out Fender Flares Front Pair

Deep learning for INTELLIGENT machines

Mini-Mac Applicator Specification Sheet Order No

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Ford Cut-Out Fender Flares Front Pair

POLARION ALM EXPERIENCES AT SANDVIK: MINING AND CONSTRUCTION POLARION DAY

BIM4Water case study template

V I S I O N South Wolf Road, Wheeling, IL

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

INSTALLATION GUIDE FTX FLOOR Ford Transit ( 148" Extended Wheelbase )

Bringing the revolution to SMEs. Report for stakeholders August 2018

Industrial Use of Mixed Reality in VRVis Projects

Continuing Education Credit

Agenda 1 Introduction 2 Navisworks Overview

Hilti HIT-HY 200 with HIT-Z

Application Tooling Specification Sheet

DANVER MOBILE KITCHEN CART AND COCINA ASSEMBLY INSTRUCTIONS PARTS LIST Description Qty. A. Top* 1 B. Front/Back Skirt 2 C. Towel Bar Skirt** 1 D. Uten

Jeep. Flat Style Fender Flares Front Pair. Included in Hardware Kit:

Impactful Health & Safety Trainings March, 2017

BIM & Emerging Technologies. Disrupting Design process & Construction

/ PRODUCT BACKGROUNDER // SEPTEMBER 2018

The company founded in Sweden in 1982 with the radical vision of developing the world s most effective bolt locking system.

EZ-Grow Professional Greenhouse Bench

Transcription:

BIM Involvement of Manufacturers Project Examples for complete Life Cycle Support

This is Hilti Lake Constance 5D-Conference 2016 Founded 1941 in Schaan, Liechtenstein Family owned company All shares and participation certificates are held by the Martin Hilti Family Trust Construction technology World market leader for professional fastening and demolition technology Global reach Present in more than 120 countries International team Some 23,000 worldwide employees Unique characteristic Direct sales model

System solutions for construction professionals Engineering Measuring and aligning Drilling and demolition Cutting and grinding Fastening and installation Firestop and insulation Services Design Specifications Consulting Software Distance measuring Leveling and aligning Detection Drilling and chiseling Diamond systems Cutting and grinding Diamond systems Direct fastening Screw fastening technology Anchor technology Installation Construction chemicals Firestop Fleet management Repair service Lifetime service Delivery service Training and consulting

Manufacturers: Driver or supporter for BIM? Hilti will not be the driver of BIM. But the supporter for the driver.

Hilti BIM solutions Design Execution Operation Architectural Design Engineering Design Tendering Detailing Purchasing Construction Validation Facility Management Demolition Planning and Design Transfering Execution Validation Hilti BIM Solution - Design Hilti BIM Solution - Operation Hilti BIM Solution - Execution PROFIS, Content Library Total Station Firestop Documentation Engineering & Modelling Support JIT; Kitting/Cutting/Preassembly Maintenance Support

Calculation Tools: PROFIS Software Step 1: Calculate according to your specs Step 2: Generate BIM export Step 3: Integrate into BIM software PROFIS Software is a free design software provided by Hilti for easy design of the required products. The benefits are: Proven calculation and optimization for correct product selection Develop specific BIM elements based on detailed calculations Direct population and transfer of BIM information Verified usage by state of the art elements Intelligent BIM elements are now part of the regular engineering process

Jobsite support by manufacturers During execution manufacturers can provide a big support by: Model based quantity-takeoff Just-In-Time logistics Cutting, Kitting, Pre-assembly

Total Station BIM to Field / Field to BIM The Total Station brings the BIM model to the site. Easy BIM data conversion to Field information Use of field proofed technology Augmentation of your construction site But also verifies the installation Storing of the actual measurement Compare actual location with planned location The Hilti Total Station is the BIM Link of the design and the construction.

Total Station BIM to Field / Field to BIM The BIM-model can be prepared for the jobsite and builds the foundation for the execution. This includes detailed product data for the specific application.

Jobsite Documentation of installed products

BIM project examples from Hilti

Stroomversnelling Unique renovation project CO2 ambition for NL 111.000 houses to 0 2020 ready Minimum onsite time Industrial / scale

Hilti was selected by products, services 1. Engineering services a) Pull-out tests on site b) Consultancy c) BIM modelling d) Field-2-BIM & BIM-2-Field prep + support 2. Products a) HIT270 / mech.anch / installation system b) Kitting just in time logistics c) Container management (consumables) 3. Tool management a) Fleet Management b) Asset Management

Pull-out testing

Calculation/Modelling Modelling according to engineering advice

Communication and clash detection Communication and clashing within project collaboration platform

BIM-to-field to set-out all anchors

Support jobsite logistic Kitting just-in-time

BIM project examples from Hilti

Hilti involvement for support systems (CH) Project description: Design the supports for all MEP Consult and coordinate with the MEP designers to find the best support Result is a coordinated 3D model for the supports including information for construction Hilti is part of the design team and works onsite in the project design office

Model use-cases 3D-Modell Space testing Sampling Concept design Design Coordination Bill of material

ICE-Session (Integrated Concurrent Engineering)

Development of Support System Basic/Concept Design Detailed Design

ICE-Session for Support Systems

Modelling of Support Systems Final concept/calculation Model development

Modelling of Support Systems Model development Integration into building model

BIM-to-Field process Measuring points can be integrated into the model. The export of the point list includes also the product information which will be also displayed on the Robotic Total Station (RTS). Export of the points PtID N(y) E(x) H(z) Level Item Naming DIE_1 2.587 3.269 3.200 Level 1 HAC-30 68/800 F DIE_2 3.390 3.275 3.200 Level 1 HAC-30 68/800 F Measuring points in the model RTS on the jobsite

BIM information for Logistic and Installation The installation information within the model can be used to support logistics Building model 3D views Assembly drawings Bill of material

Thank you for your attention Dr. Nils Krönert Dr. Oliver Geibig