installation guide ICON classic benching
Index ICON Installation Guide Single Run Frame Assembly... Worksurfaces and Electrical... Attaching Worksurfaces to Frame...6 Installing optional accessories...7 Installing Screens...8 Jumpers...9 Power Pole...0 Double Run Frame Assembly... Worksurfaces and Electrical... Attaching Worksurfaces to Frame... Installing optional accessories... Installing Screens and Remaining Worksurfaces...6 Jumpers...7 Power Pole...8 Modesty Panel...9 P
ICON installation guide SINGLE RUN P
Phase Frame Assembly ICON Single Run Installation Guide Screw the outer-to-inner horizontal beams (H-bar) to the top of each outside leg (O-Leg) using the M8* screws. Then screw the outer-to-inner H-bars to the bottom of each O-Leg using the M6*0 screws. Adjust the glides to level the frame as needed. We suggest using a leveling glide for best accuracy. Rest the outer-to-inner H-bars on the top of the inner legs (U-Leg). Then rest the inner-to-inner H-bars on top the U-legs. Screw the horizontal beam connectors and H-bars to the frame using the M6*0 screws. Bottom screws should be installed first on all frame bars. NOTE: For 60 or 7 ICON frame bars the bars should be aligned so that the large oval hole is located on the inside of the bench to accommodate future returns. P
Phase Assembling Worksurfaces and Electrical ICON Single Run Installation Guide Lay the worksurfaces face down in a row. Screw the troughs onto all the worksurfaces using lath screws. It is recommended that troughs be placed in the center inches from the back edge of the worksurface. Snap duplexes into each of the junction blocks. Clip H-brackets to each of the junction blocks. Then snap the junction blocks into each of the trough cut outs. Screw the H-brackets directly into the troughs and worksurfaces using self-tappers. Place in center, from the back edge of the worksurface. P
Phase Attaching Worksurfaces to Frame ICON Single Run Installation Guide Rest the completed worksurfaces on top of the frame, starting from the outer worksurfaces working towards the center. Use a clamp to temporarily hold the worksurfaces together until they are ready to be permanently screwed to the frame. If needed, adjust the frame width to open or close the gap between the worksurfaces using a rubber mallet. 6 Screw all worksurfaces to the H-bars along the center of the frame using counter-sunk screws. Screw the worksurfaces together using a mending plate using counter-sunk screws. 6 Once everything is properly aligned, screw the outer worksurfaces to the frame using the counter-sunk screws. Make sure worksurfaces are evenly flush to the frame. P6
Phase Installing Optional Accessories ICON Single Run Installation Guide Power Box: Take the Power Box and place it on the desired location on the back edge of the worksurface. Secure to worksurface using tightening bolt. Monitor Arm Installation: We recommend to install a monitor arm equipped with clamp mount along the back edge of the worksurface. Please follow the recommended manufacturer instructions provided with your monitor arm. P7
Phase Installing Screens ICON Single Run Installation Guide STOP If you are installing a glass screen skip Step and continue on to Step. Take the fabric screens and measure the desired location of the screen clips and tighten using tightening screws. Be sure to use leveling guide to make sure the clips are leveled on each side. Make adjustments as needed. Skip Step and continue on to Step. * Clip kit includes fit-sleeve for glass screen. Insert glass fit-sleeve into the screen clips. Attach the clips to the glass screen with the tightening screws. Slide the screen clips onto the worksurface. Tighten to the worksurface using the hand-knob screw. To tighten screens, tighten the inside screw using an allen wrench. Fabric Screen Glass Screen P8
Phase 6 Installing Jumpers ICON Single Run Installation Guide Connect junction blocks to jumpers. Screw conduit mounting brackets to the worksurfaces using the counter-sunk screws STOP The remaining installation of electrical must be installed by a professional electrician. If you are installing a Power Pole continue on to Phase 7. P9
Phase 7 Installing a Power Pole ICON Single Run Installation Guide Make sure ceiling is prepped for the power pole location. You can use the ceilng cover as a guide to determine how big a cut out you need. Screw the power pole (pp) brackets to the top and bottom of the O-leg using self-tappers. Lay your pp on the floor and feed the ceiling feed through the bottom cutout of the pp. Loose wires should be at the top. Place the ceiling cover on the top of the pp. Lift the pp up and screw into pp brackets. Connect jumper to ceiling feed. Use the ceiling cover to secure pp to the ceiling. STOP The remaining installation of electrical must be installed by a professional electrician. * Use ceiling cover to secure pole to the ceiling. * Use self-tapping screw for attaching pole to leg beams. P0
Phase Frame Assembly ICON Single Run Installation Guide ICON installation guide DOUBLE RUN P
Phase Frame Assembly ICON Double Run Installation Guide Screw the outer-to-inner horizontal beams (H-bar) to the top of each outside leg (O-Leg) using the M8* screws. Then screw the outer-to-inner H-bars to the bottom of each O-Leg using the M6*0 screws. Rest the outer-to-inner H-bars on the top of the inner legs (U-Leg). Then rest the inner-to-inner H-bars on top the U-legs. Screw the horizontal beam connectors and H-bars to the frame using the M6*0 screws. Screw in the H-bar brackets to the U-legs using the M6* screws. Screw the round supports to the O-legs using the M6*0 screws. Adjust the glides to level the frame as needed. We suggest using a leveling glide for better accuracy. Bottom screws should be installed first on all frame bars. NOTE: For 60 or 7 ICON frame bars the bars should be aligned so that the large oval hole is located on the inside of the bench to accommodate future returns. P
Phase Assembling Worksurfaces and Electrical ICON Double Run Installation Guide Lay the worksurfaces face down in equal rows. Screw the troughs onto all the worksurfaces using lath screws. It is recommended that troughs be placed in the center inches from the back edge of the worksurface. Snap duplexes into each of the junction blocks. Clip H-brackets to each of the junction blocks. Then snap the junction blocks into each of the trough cut outs. Screw the H-brackets directly into the troughs and worksurfaces using self-tappers. P
Phase Attaching Worksurfaces to Frame ICON Double Run Installation Guide Rest the completed worksurfaces on top of one side of the frame, starting from the outer worksurfaces working towards the center. Use a clamp to temporarily hold the worksurfaces together until they are ready to be permanently screwed to the frame. If needed, adjust the frame width to open or close the gap between the worksurfaces using a rubber mallet. 6 7 Screw all worksurfaces to the H-bars along the center of the frame using counter-sunck screws. Screw the worksurfaces together using a mending plate using counter-sunk screws. Screw the worksurfaces to the H-braket located on the U-legs using the counter-sunk screws. 6 Once everything is properly aligned, screw the outer worksurfaces to the frame using the counter-sunk screws. Make sure worksurfaces are evenly flush to the frame. 7 Tip: Make sure H-bracket is inches from the back edge of the center worksurface to help ensure that the frame is straight. P
Phase Installing Optional Accessories ICON Double Run Installation Guide Power Box:Take the Power Box and place it on the desired location on the back edge of the worksurface. Secure to worksurface using tightening bolt. Monitor Arm Installation: We recommend to install a monitor arm equipped with clamp mount along the back edge of the workurface. Please follow the recommended manufacturer instructions provided with your monitor arm. P
Phase Installing Screens and Remaining Worksurfaces ICON Double Run Installation Guide STOP If you are installing a glass screen skip Step and continue on to Step. * Clip kit includes fit-sleeve for Glass screen. Take the fabric screens and measure the desired location of the screen clips and tighten using tightening screws. Be sure to use leveling guide to make sure the clips are leveled on each side. Make adjustments as needed. Skip Step and continue on to Step. Insert glass fit-sleeve into the screen clips. Attach the clips to the glass screen with the tightening screws. Slide the screen clips onto the worksurface. Tighten to the worksurface using the hand-knob screw. To tighten screens, tighten the inside screw using an allen wrench. Repeat Phase ; Steps -7 for installation of remaining worksurfaces. Fabric Screen Glass Screen P6
Phase 6 Installing Jumpers ICON Double Run Installation Guide Connect junction blocks to jumpers, looping the last jumper at the end of the run to connect to opposite side and continue. Screw conduit mounting brackets to the worksurfaces using the counter-sunk screws STOP The remaining installation of electrical must be installed by a professional electrician. If you are installing a Power Pole continue on to Phase 7. P7
Phase 7 Installing a Power Pole ICON Double Run Installation Guide Make sure ceiling is prepped for the power pole location. You can use the ceiling cover as a guide to determine how big a cut out you need. Screw the power pole (pp) brackets to the top and bottom of the O-leg using self-tappers. Lift the pp up and screw into pp brackets. STOP The remaining installation of electrical must be installed by a professional electrician. Lay your pp on the floor and feed the ceiling feed through the bottom cutout of the pp. Loose wires should be at the top. Place the ceiling cover on the top of the pp. Connect jumper to ceiling feed. Use the ceiling cover to secure pp to the ceiling. * Use ceiling cover to secure pole to the ceiling. * Use self-tapping screw for attaching pole to leg beams. P8
Phase ICON Modesty Panel Installation Guide Locate the four pilot holes on the board and attach four brackets using M wood screws. Place the assembly from previous step inside the leg s opened profile. Mx0 Self tapping screw x Using M self-tapping screws, attach the assembly onto the leg frame. Connector x pcs Mx Wood screw x Isle Side Leg side P9