installation guide ICON classic benching

Similar documents
Footer & Base Plate Assembly. installation guide. ILINE power/data beam

installation guide Footer & Base Plate Assembly KINEX Installation Guide SINGLE RUN

KINEX benching Installation Guide

compile system INSTALLATION GUIDE Updated January 2019

OXYGEN INSTALLATION. Revision date

Assembly Instructions

Assembly Instructions & General Overview

bridges Installation Manual

STAKS BENCHING ASSEMBLY INSTRUCTIONS

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

INSTALLATION MANUAL VERITY. friant.com/verity

Bridges II Installation Guide. Effective June 2017 DESIGN GUIDE

Figure A. Figure B. Figure C. Figure D

ELEVEN COLLABORATIVE. CONFERENCE TOPS Assembly Instructions

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

RANGE DIGITAL HANDSET OPERATION. 1. Panel. 2. Initialization Procedure. 3. Move Up & Down. 4. Set Memory Positions. 5. Move to the Memorized Positions

Range height adjustable assembly

Compile Installation Manual

a.k.a. casegoods instructions

Hover. Installation Instructions. Raised Panel. Version

INSTALLATION MANUAL DASH. friant.com/dash

Interra Installation Manual

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

ROS-APT Caucus Plinth Table with Trough Note: Details apply, however the actual configuration of your table may vary from what is depicted here.

Assembly Instructions. Table of Contents

TrendWall Floor-To-Ceiling Panels Installation Instruction

Topo Freestanding Applications - Private Office

STAKS. Crossover Casegoods ASSEMBLY INSTRUCTIONS

Castle Frame Assembly Table AT-8. Diagnostics Manual. Castle, Inc. Petaluma, CA

ACTIV Pro3 height adjustable base Installation Guide

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

MAG-CONV Basic, 48, 48R & Midline Front Mount

User Instructions Multiline Otter Scoreboard Caddy Assembly

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

Workbench Instructions for Assembly

Series 4 HV Single Monitor Lift Assembly Instructions

Continuum Frame Assembly Instructions

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Angled Side Flush with Panel Face

Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV

Lead Screw Cover Installation

Art Rack Assembly Instructions:

PROFILE Flat Panel Console System Installation Manual

Mounting Accessories. Installation Guide. VIVOTEK SD83XXE Speed Dome

Pergola Installation Instructions

Glass Front Sauna Room Assembly Manual

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

FlexFrame - Storage Components and Skins

Ford Pick Up Rear leaf Spring Kit Installation Instructions

ZAPF PANEL SYSTEM ASSEMBLY INSTRUCTIONS. It is recommended that the components be installed in the sequence of this assembly manual.

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

Revised

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

Parts List. U-DS92ST Ashley Creative Center With Padded Stool Assembly Instructions. [15] - Plastic Thick Washer (2 - pieces) [22] - Wrench (1 piece)

Boat Lift Canopy Frame Assembly Instructions

EPPA2-KIT DUAL MONITOR ARM CONVERSION

Deck Mount Installation with Bench

Setup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

Commercial Wine & Liquor Display. Double Displays

Assembly Instructions

Note: This assembly instruction will cover all configurations of Alloy adjustable height double bases.

TIP FOR GETTING STARTED

LEGENDS RETRACTABLE DOOR SCREENS

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

Shetland Stalls Installation Instructions

Height Adjustable Benching End Panel and Utility Pole

HQ Studio Frame Two-Foot Section Assembly Instructions From Twelve-Foot to Ten-Foot

CABINETRY Assembly Instructions

LEGENDS RETRACTABLE DOOR SCREENS

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Qwik-Fence Installation Instructions

Replacing the Reciprocator on an SWF Multi-head.

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

Assembly Instructions

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

The Festival Assembly Instructions

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

ESA-200 Fixed Sidelite

Series Adjustable Height Tables

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Spring Loaded All Season Roll-Up Doors

Multiples EM_ 1.4. Install 1X1/1X2/1X3/1X4 Housings. Installation Instructions for. This product is suitable for indoor locations.

LIGHT FIXTURES MUST BE COMPLETELY INSTALLED PRIOR TO CEILING CONSTRUCTION

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

GroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property.

Heavy Duty Ceiling Tilt Mount Installation Manual

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

Linear Hook- on Worksurfaces

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

END FEED INSTALLATION

INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R

model tsa-sa48 Sliding Crosscut Table installation guide

Answer Power Beam and Boundary Screen

Transcription:

installation guide ICON classic benching

Index ICON Installation Guide Single Run Frame Assembly... Worksurfaces and Electrical... Attaching Worksurfaces to Frame...6 Installing optional accessories...7 Installing Screens...8 Jumpers...9 Power Pole...0 Double Run Frame Assembly... Worksurfaces and Electrical... Attaching Worksurfaces to Frame... Installing optional accessories... Installing Screens and Remaining Worksurfaces...6 Jumpers...7 Power Pole...8 Modesty Panel...9 P

ICON installation guide SINGLE RUN P

Phase Frame Assembly ICON Single Run Installation Guide Screw the outer-to-inner horizontal beams (H-bar) to the top of each outside leg (O-Leg) using the M8* screws. Then screw the outer-to-inner H-bars to the bottom of each O-Leg using the M6*0 screws. Adjust the glides to level the frame as needed. We suggest using a leveling glide for best accuracy. Rest the outer-to-inner H-bars on the top of the inner legs (U-Leg). Then rest the inner-to-inner H-bars on top the U-legs. Screw the horizontal beam connectors and H-bars to the frame using the M6*0 screws. Bottom screws should be installed first on all frame bars. NOTE: For 60 or 7 ICON frame bars the bars should be aligned so that the large oval hole is located on the inside of the bench to accommodate future returns. P

Phase Assembling Worksurfaces and Electrical ICON Single Run Installation Guide Lay the worksurfaces face down in a row. Screw the troughs onto all the worksurfaces using lath screws. It is recommended that troughs be placed in the center inches from the back edge of the worksurface. Snap duplexes into each of the junction blocks. Clip H-brackets to each of the junction blocks. Then snap the junction blocks into each of the trough cut outs. Screw the H-brackets directly into the troughs and worksurfaces using self-tappers. Place in center, from the back edge of the worksurface. P

Phase Attaching Worksurfaces to Frame ICON Single Run Installation Guide Rest the completed worksurfaces on top of the frame, starting from the outer worksurfaces working towards the center. Use a clamp to temporarily hold the worksurfaces together until they are ready to be permanently screwed to the frame. If needed, adjust the frame width to open or close the gap between the worksurfaces using a rubber mallet. 6 Screw all worksurfaces to the H-bars along the center of the frame using counter-sunk screws. Screw the worksurfaces together using a mending plate using counter-sunk screws. 6 Once everything is properly aligned, screw the outer worksurfaces to the frame using the counter-sunk screws. Make sure worksurfaces are evenly flush to the frame. P6

Phase Installing Optional Accessories ICON Single Run Installation Guide Power Box: Take the Power Box and place it on the desired location on the back edge of the worksurface. Secure to worksurface using tightening bolt. Monitor Arm Installation: We recommend to install a monitor arm equipped with clamp mount along the back edge of the worksurface. Please follow the recommended manufacturer instructions provided with your monitor arm. P7

Phase Installing Screens ICON Single Run Installation Guide STOP If you are installing a glass screen skip Step and continue on to Step. Take the fabric screens and measure the desired location of the screen clips and tighten using tightening screws. Be sure to use leveling guide to make sure the clips are leveled on each side. Make adjustments as needed. Skip Step and continue on to Step. * Clip kit includes fit-sleeve for glass screen. Insert glass fit-sleeve into the screen clips. Attach the clips to the glass screen with the tightening screws. Slide the screen clips onto the worksurface. Tighten to the worksurface using the hand-knob screw. To tighten screens, tighten the inside screw using an allen wrench. Fabric Screen Glass Screen P8

Phase 6 Installing Jumpers ICON Single Run Installation Guide Connect junction blocks to jumpers. Screw conduit mounting brackets to the worksurfaces using the counter-sunk screws STOP The remaining installation of electrical must be installed by a professional electrician. If you are installing a Power Pole continue on to Phase 7. P9

Phase 7 Installing a Power Pole ICON Single Run Installation Guide Make sure ceiling is prepped for the power pole location. You can use the ceilng cover as a guide to determine how big a cut out you need. Screw the power pole (pp) brackets to the top and bottom of the O-leg using self-tappers. Lay your pp on the floor and feed the ceiling feed through the bottom cutout of the pp. Loose wires should be at the top. Place the ceiling cover on the top of the pp. Lift the pp up and screw into pp brackets. Connect jumper to ceiling feed. Use the ceiling cover to secure pp to the ceiling. STOP The remaining installation of electrical must be installed by a professional electrician. * Use ceiling cover to secure pole to the ceiling. * Use self-tapping screw for attaching pole to leg beams. P0

Phase Frame Assembly ICON Single Run Installation Guide ICON installation guide DOUBLE RUN P

Phase Frame Assembly ICON Double Run Installation Guide Screw the outer-to-inner horizontal beams (H-bar) to the top of each outside leg (O-Leg) using the M8* screws. Then screw the outer-to-inner H-bars to the bottom of each O-Leg using the M6*0 screws. Rest the outer-to-inner H-bars on the top of the inner legs (U-Leg). Then rest the inner-to-inner H-bars on top the U-legs. Screw the horizontal beam connectors and H-bars to the frame using the M6*0 screws. Screw in the H-bar brackets to the U-legs using the M6* screws. Screw the round supports to the O-legs using the M6*0 screws. Adjust the glides to level the frame as needed. We suggest using a leveling glide for better accuracy. Bottom screws should be installed first on all frame bars. NOTE: For 60 or 7 ICON frame bars the bars should be aligned so that the large oval hole is located on the inside of the bench to accommodate future returns. P

Phase Assembling Worksurfaces and Electrical ICON Double Run Installation Guide Lay the worksurfaces face down in equal rows. Screw the troughs onto all the worksurfaces using lath screws. It is recommended that troughs be placed in the center inches from the back edge of the worksurface. Snap duplexes into each of the junction blocks. Clip H-brackets to each of the junction blocks. Then snap the junction blocks into each of the trough cut outs. Screw the H-brackets directly into the troughs and worksurfaces using self-tappers. P

Phase Attaching Worksurfaces to Frame ICON Double Run Installation Guide Rest the completed worksurfaces on top of one side of the frame, starting from the outer worksurfaces working towards the center. Use a clamp to temporarily hold the worksurfaces together until they are ready to be permanently screwed to the frame. If needed, adjust the frame width to open or close the gap between the worksurfaces using a rubber mallet. 6 7 Screw all worksurfaces to the H-bars along the center of the frame using counter-sunck screws. Screw the worksurfaces together using a mending plate using counter-sunk screws. Screw the worksurfaces to the H-braket located on the U-legs using the counter-sunk screws. 6 Once everything is properly aligned, screw the outer worksurfaces to the frame using the counter-sunk screws. Make sure worksurfaces are evenly flush to the frame. 7 Tip: Make sure H-bracket is inches from the back edge of the center worksurface to help ensure that the frame is straight. P

Phase Installing Optional Accessories ICON Double Run Installation Guide Power Box:Take the Power Box and place it on the desired location on the back edge of the worksurface. Secure to worksurface using tightening bolt. Monitor Arm Installation: We recommend to install a monitor arm equipped with clamp mount along the back edge of the workurface. Please follow the recommended manufacturer instructions provided with your monitor arm. P

Phase Installing Screens and Remaining Worksurfaces ICON Double Run Installation Guide STOP If you are installing a glass screen skip Step and continue on to Step. * Clip kit includes fit-sleeve for Glass screen. Take the fabric screens and measure the desired location of the screen clips and tighten using tightening screws. Be sure to use leveling guide to make sure the clips are leveled on each side. Make adjustments as needed. Skip Step and continue on to Step. Insert glass fit-sleeve into the screen clips. Attach the clips to the glass screen with the tightening screws. Slide the screen clips onto the worksurface. Tighten to the worksurface using the hand-knob screw. To tighten screens, tighten the inside screw using an allen wrench. Repeat Phase ; Steps -7 for installation of remaining worksurfaces. Fabric Screen Glass Screen P6

Phase 6 Installing Jumpers ICON Double Run Installation Guide Connect junction blocks to jumpers, looping the last jumper at the end of the run to connect to opposite side and continue. Screw conduit mounting brackets to the worksurfaces using the counter-sunk screws STOP The remaining installation of electrical must be installed by a professional electrician. If you are installing a Power Pole continue on to Phase 7. P7

Phase 7 Installing a Power Pole ICON Double Run Installation Guide Make sure ceiling is prepped for the power pole location. You can use the ceiling cover as a guide to determine how big a cut out you need. Screw the power pole (pp) brackets to the top and bottom of the O-leg using self-tappers. Lift the pp up and screw into pp brackets. STOP The remaining installation of electrical must be installed by a professional electrician. Lay your pp on the floor and feed the ceiling feed through the bottom cutout of the pp. Loose wires should be at the top. Place the ceiling cover on the top of the pp. Connect jumper to ceiling feed. Use the ceiling cover to secure pp to the ceiling. * Use ceiling cover to secure pole to the ceiling. * Use self-tapping screw for attaching pole to leg beams. P8

Phase ICON Modesty Panel Installation Guide Locate the four pilot holes on the board and attach four brackets using M wood screws. Place the assembly from previous step inside the leg s opened profile. Mx0 Self tapping screw x Using M self-tapping screws, attach the assembly onto the leg frame. Connector x pcs Mx Wood screw x Isle Side Leg side P9

Day Open Plan we provide exceptional experiences with reliable, easy interactions and successfully fulfilled orders in only days 9 Walsh Avenue / Santa Clara, CA 900 (877) 80-070 amqsolutions.com