DYNAMIC PERFORMANCE OF THE EAGLE PASS BACK-TO-BACK HVDC LIGHT TIE. Å Petersson and A Edris ABB Power Systems AB, Sweden and EPRI,USA

Similar documents
Improving the performance of electrical grids

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

High Voltage DC Transmission 2

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years

Introduction to HVDC Transmission. High Voltage Direct Current (HVDC) Transmission

Assessment of Saturable Reactor Replacement Options

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS

ATC s Mackinac Back to Back. Summary

CERN - ST Division THE NEW 150 MVAR, 18 KV STATIC VAR COMPENSATOR FOR SPS: BACKGROUND, DESIGN AND COMMISSIONING

Power Conditioning Equipment for Improvement of Power Quality in Distribution Systems M. Weinhold R. Zurowski T. Mangold L. Voss

Investigation of D-Statcom Operation in Electric Distribution System

Wind Power Facility Technical Requirements CHANGE HISTORY

ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for Michigan s Eastern Upper and Northern Lower Peninsulas

East-South HVDC Interconnector II, India : in commercial operation since 2003

Joe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation

OVERVIEW OF SVC AND STATCOM FOR INSTANTANEOUS POWER CONTROL AND POWER FACTOR IMPROVEMENT

Design and Simulation of Passive Filter

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

Arvind Pahade and Nitin Saxena Department of Electrical Engineering, Jabalpur Engineering College, Jabalpur, (MP), India

U I. HVDC Control. LCC Reactive power characteristics

Tab 2 Voltage Stresses Switching Transients

Excitation Systems THYRIPART. Compound-Excitation System for Synchronous Generators. Power Generation

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

Application of SVCs to Satisfy Reactive Power Needs of Power Systems

Improvement of Rotor Angle Stability and Dynamic Performance of AC/DC Interconnected Transmission System

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

C1-207 TRANSMISSION CAPACITY INCREASE BY RETURNING POWER SYSTEM STABILIZERS

IMPORTANCE OF VSC IN HVDC

EH2741 Communication and Control in Electric Power Systems Lecture 2

PRECISION SIMULATION OF PWM CONTROLLERS

Fundamental Concepts of Dynamic Reactive Compensation. Outline

Power Quality enhancement of a distribution line with DSTATCOM

CHAPTER 2 A SERIES PARALLEL RESONANT CONVERTER WITH OPEN LOOP CONTROL

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

HVDC High Voltage Direct Current

New HVDC Interaction between AC networks and HVDC Shunt Reactors on Jeju Converter Stations

SIMULATION OF D-STATCOM AND DVR IN POWER SYSTEMS

[Mahagaonkar*, 4.(8): August, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785

ABB Power Systems AB Sweden

Voltage Source Converter modeled in RTDS experiences and comparison with field results

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS

Long lasting transients in power filter circuits

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two

Great Northern Transmission Line: Behind the (Electrical) Design

Utility Interconnection and System Protection

ELEMENTS OF FACTS CONTROLLERS

CHAPTER 3 COMBINED MULTIPULSE MULTILEVEL INVERTER BASED STATCOM

Enhancement of Voltage Stability & reactive Power Control of Distribution System Using Facts Devices

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre.

PUBLICATIONS OF PROBLEMS & APPLICATION IN ENGINEERING RESEARCH - PAPER CSEA2012 ISSN: ; e-issn:

ANALYSIS OF VOLTAGE TRANSIENTS IN A MEDIUM VOLTAGE SYSTEM

CHAPTER 4 PI CONTROLLER BASED LCL RESONANT CONVERTER

VSC Transmission. Presentation Overview. CIGRE B4 HVDC and Power Electronics HVDC Colloquium, Oslo, April LCC HVDC Transmission

INSTANTANEOUS POWER CONTROL OF D-STATCOM FOR ENHANCEMENT OF THE STEADY-STATE PERFORMANCE

2. Current interruption transients

A cost effective hybrid HVDC transmission system with high performance in DC line fault handling

International Journal of Emerging Technology in Computer Science & Electronics (IJETCSE) ISSN: Volume 8 Issue 1 APRIL 2014.

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

Stability Enhancement for Transmission Lines using Static Synchronous Series Compensator

Southern Company Interconnection Requirements for Inverter-Based Generation

Bhavin Gondaliya 1st Head, Electrical Engineering Department Dr. Subhash Technical Campus, Junagadh, Gujarat (India)

Facilitating Bulk Wind Power Integration Using LCC HVDC

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme

Voltage Source Converter Modelling

Solid State Transformers (SST)

COOPERATIVE PATENT CLASSIFICATION

Fundamentals of Power Quality

A new control scheme for an HVDC transmission link with capacitorcommutated converters having the inverter operating with constant alternating voltage

How Full-Converter Wind Turbine Generators Satisfy Interconnection Requirements

Magnetization System of Magnetically Controlled Shunt Reactors

HVDC CAPACITOR COMMUTATED CONVERTERS IN WEAK NETWORKS GUNNAR PERSSON, VICTOR F LESCALE, ALF PERSSON ABB AB, HVDC SWEDEN

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

Introduction to HVDC in GB. Ian Cowan Simulation Engineer 12 March 2018

Modelling of VSC-HVDC for Slow Dynamic Studies. Master s Thesis in Electric Power Engineering OSCAR LENNERHAG VIKTOR TRÄFF

Voltage Control and Power System Stability Enhancement using UPFC

A NEW APPROACH FOR MODELING COMPLEX POWER SYSTEM COMPONENTS IN DIFFERENT SIMULATION TOOLS

Reactive Power Compensation Technologies: State-of-the-Art Review

Insulation Co-ordination For HVDC Station

Chapter 10: Compensation of Power Transmission Systems

Dynamic Performance Comparison of Conventional and Capacitor Commutated Converter (CCC) for HVDC Transmission System in Simulink Environment

Generation and Load Interconnection Standard

Acknowledgements Introduction p. 1 Electric Power Quality p. 3 Impacts of Power Quality Problems on End Users p. 4 Power Quality Standards p.

System Protection Schemes in Power Network based on New Principles

Quanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES

1400 MW New Zealand HVDC Upgrade: Introducing Power Modulation Controls and Round Power Mode

International Journal of Advance Engineering and Research Development

Analysis the Modeling and Control of Integrated STATCOM System to Improve Power System

Power Quality Basics. Presented by. Scott Peele PE

Auxiliary DC Voltage

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

DISTRIBUTION SYSTEM VOLTAGE SAGS: INTERACTION WITH MOTOR AND DRIVE LOADS

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar

Mitigation of Voltage Sag and Swell using Distribution Static Synchronous Compensator (DSTATCOM)

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Transcription:

DYNMI PERFORMNE OF THE EGLE PSS K-TO-K HVD LIGHT TIE Å Petersson and Edris Power Systems, Sweden and EPRI,US INTRODUTION Eagle Pass ack-to-ack (t) Tie is a Voltage Source converter (VS) -based tie interconnecting the transmision grid of Texas with the Mexican Power system, at the EP s Eagle Pass Substation in the State of Texas. The Tie was put in operation in July 2. s the VS takes advantage of Gate-Turn-Off type of power semiconductors, the dynamic performance and capability are significantly improved compared to the conventional thyristor based technologies. This paper focuses on highlighting the performance of the VSbased technology, using representative computer simulations and comparable field tests. The presented performance covers dynamic voltage support, operational mode changes and energizing of islanded networks. The influence on the ratings of the VS main components is discussed, as well as the engineering tools used for simulations and validation of design. KEYWORDS: HVD, ack-to-ack, Voltage Source onverters, Pulse Width Modulation, Dynamic Performance. PROJET KGROUND The Eagle Pass substation is located in a peripheral area of the Texas transmission grid, it is operated by EP- PL. Figure illustrates the location on the US Mexico border. The Eagle Pass load area is supplied over two 38 kv transmission lines. The grid structure and the relatively large distance to significant generation, results in weak voltage support to the Eagle Pass area. Eagle Pass also has a 38 kv transmission line that cross-border ties into the Mexican transmission grid, operated by FE. This tie is normally open and is mainly used in emergency conditions to transfer load from the US to the Mexican grid. However, load being transferred needed firstly to be interrupted since it was not possible to interconnect the two asynchronous power systems. With a significant foreseen load growth for the load area it was eminent that voltage stability problems would in the near future be encountered at single contingencies. Studies performed indicated that a facility providing 36 Mvar of dynamic reactive power support at Eagle Pass substation would provide years of relief from single contingency situations. VS type of installation, i.e. a STTOM, would provide needed reactive support instantaneously and could maintain full reactive output at even lower voltage levels than what could result from the single contingency outage. Installation of a VS would be ideal for weak systems whereas the reactive support provided by shunt capacitors is not very effective as it decreases with the square of the voltage. Expanding the installation to a ack-to-ack would enable also uninterrupted bidirectional active power transfer between the US and Mexican grids, enhancing the reliability of the power supply. Thus a two-fold mission is accomplished by the dual VSs. dditionally the tie can be used to energize the Eagle Pass load area from the Mexican grid as the VS technology has an inherent black-start capability. TEHNOLOGY PPLIED simplified one-line diagram of the T tie in Eagle Pass is shown in Figure 2. Eagle Pass Piedras Negras VS VS Figure. Eagle Pass location. Figure 2. T simplified single line diagram.

The T scheme comprises two 36 MV Voltage Source onverters coupled to a common D capacitor bus. The VSs are of the NP, Neutral Point lamped, type. The VSs are equipped with IGTs, Insulated Gate ipolar Transistors, operated with PWM, Pulse Width Modulation. The power semiconductor equipment and the D capacitor bank are of indoor design. The IGTs are water cooled, utilizing a closed loop cooling system with water-to-air heat exchangers. Each VS is then on the respective ac terminal connected to phase reactors, which each in turn is connected to a conventional step-up transformer, interfacing the t to respective grid. The ac output voltage from the VSs has a nominal value of 7.9kV, which is stepped up to 38kV. Harmonic filters, tuned to the 2 th and 39 th harmonic respectively, and with high pass characteristic, are shunt connected to the 7.9kV bus. Total filter rating is approximately 6 Mvar on each side. Due to the high frequency PWM switching applied, the filters can be kept small in rating and their respective tuning is not critical. The whole t installation is located on the US side at the Eagle Pass substation. The substation is located in a residential area and specific consideration has been taken to control audible noise produced by some of the components. The layout of the t installation is shown in Figure 3. ooling towers Pump room Pump room Valve hall Phase reactors ontrol room Filters Spare transformer Figure 3. Eagle Pass t layout. To FE Power transformers To EP-PL The t is designed to operate in two control modes. The primary mode is reactive power support for voltage control of the Eagle Pass bus and the secondary mode is active power flow across the tie. The t has the capability, within its MV rating, of providing independent control of the voltages at the US and Mexican grids, as well as the real power transferred between the two grids. In voltage control mode, the t operates with a control slope to supply reactive power for voltage support. To transfer power in either direction the t operates in power control mode, it will continue to transfer power if the voltage at Eagle Pass is within a dead-band. For conditions outside the dead-band the t switches into the Voltage control mode. The dead-band is designed so that local capacitor switching or changes in remote generation which causes slight voltage swings do not cause the t to switch to voltage control mode. VERIFYING DYNMI PERFORMNE The final verification of the dynamic performance characteristics was realized as part of the t tie commissioning. Then using adequate data acquisition equipment, real time recordings are taken of both main circuit parameters and internal tie controller variables. The Eagle Pass tie controller includes a built-in powerful Transient Fault Recording module with submillisecond resolution, which is capable of capturing also the inner control loop dynamics. This functionality also enables stored data to be digitally transferred to a remote user, e.g. the design engineer can have direct just-in-time access to the tie controller. In the design phase of the t installation, extensive digital simulations were performed, as part of the development of the tie controller, and specifically the tuning of its important parameters. These simulations also to some extent verify the configuration of the main power circuit, e.g. the interaction between the main VSs and the harmonic filters can be studied. The simulations have covered a large number of cases and events, out of which only a few could be conducted in the field. When modeling electrical systems involving power semiconductor converters and extensive networks, the user interface becomes a critical factor. User friendly interfaces built around functional block representation is today a proven technique. For the Eagle Pass project a comprehensive model was developed using the EMTD program. The complete model was built up with a number of functional blocks, such as: ac network, stepup transformer, phase reactor, harmonic filters, VS bridge, D capacitor and tie controllers. The ambition with the model was to represent the transmission grids accurately with respect to prospective resonances in the lower frequency range. The circuits within the t was modeled such that magnetic saturation phenomena could be identified. The representation of the IGT converters was accurate with respect to the chosen NP-topology and PWM switching at 26Hz, The digital tie controller was modeled with sampling rates of critical control loops exceeding 7kHz. When the individual models had been validated, the actual simulations were performed with different parameter set-ups for different cases. Using a high performance personal computer, and an on-screen control panel, very effective execution of the simulation can be achieved although the model becomes extensive. The design engineer can observe the behavior of the model as the simulation progresses and initiate actions accordingly. There are typically a large number of dynamic events needing analysis and verification. mong those the following are illustrated below in an attempt to highlight the t tie unique and promising performance:

. t power reversal 2. apacitor bank switching 3. lack start capability 4. Nearby fault on the US side. 5. Remote line fault on the US side For some of the cases below, the EMTD simulations are presented together with field recordings with similar set-up.. t Power Reversal The VS converter technology applied in Eagle Pass, allows for the transferred active power to be dynamically controlled over the full available range. s an example of this, Figure 4 illustrates the performance after ordering a power reversal. This case is illustrated in the shape of a plot from an EMTD simulation and the power order is changed from close to 36MW import to US, to 36MW export. lthough locally significant, this transient is absorbed by the respective power systems representations. Looking at the traces of Figure 4, the sub-cycle reversal of active power appears well controlled without any overshoot, an example of the very high performance that can be achieved with PWM controlled VS installations. The active power reversal is executed without any action needed by the voltage control. 2. apacitor ank Switching One possibility to check the transient response of the t was to switch on one of the capacitor banks at the Eagle Pass substation. In the actual case, the reactive power from the T before the switching was equal to 8 Mvar. s the capacitor bank was switched on, the T had to reduce its output by 5 Mvar, corresponding to the capacitor bank rating, down to 3 Mvar. The t controller responded in a well damped manner within a cycle as shown in subplots 2, 3 and 7 of Figure 5..5.5 -.5.5 5 25-25 -5.5.5 -.5.5.5.5 -.5.5 4 2-2 -4.4.2 U+ U- PI 29 4;34;23 Uac Primary Sys PI 29 4;34;23 Iac P PI 29 4;34;23 Iac Sys PI 29 4;34;23 Uac Sys PI 29 4;34;23 Uac S PI 29 4;34;23 Udc Sys.8.5 P Q PI 29 4;34;23 PQ Ref Sys -.5..2.3.4.5.6.7.8.9 Figure 4. Power reversal at Eagle Pass (EMTD simulation) Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer secondary Subplot 3. ack-to-ack power reference; EP-PL and FE reactive power reference Subplot 4. EP-PL active and reactive power. Subplot 5. FE active and reactive power Figure 5. apacitor bank switched on at Eagle Pass Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer secondary Subplot 3. EP-PL Phase reactor Subplot 4. EP-PL 7.9 kv voltages. Subplot 5. EP-PL 7.9 kv phase-to-ground Voltages in kv. Subplot 6. D voltages. Subplot 7. EP-PL converter ctive (bottom curve) and Reactive Power. It should be noted in Figure 7 that the switching causes also a ms transient in the active power. lthough not significant, the switching produces a small angular

deviation in the bus voltage, relative the VS output voltage. s a consequence a transient in the active power/d voltage appears. On the other hand it is obvious that the t tie completely isolates the Mexican power system from the switching transients. 3. lack Start apability Next, to illustrate the lack Start function, the FE side of the T tie was first energized as during normal energization. On the EP-PL side the line breaker, connecting the t tie to the EP-PL network, was open but was in the control system simulated as if it had been closed. In this way, a small islanded network consisting mainly of the EP-PL transformer was created. ny larger islanded network was not possible to create, as this would have forced a power outage in parts of the city of Eagle Pass. lack Start was then initiated. For comparison Figure 6 shows the result of an EMTD simulation where the black start is performed against a load of approximately 25MW. oth the EMTD simulation and the field recording (in Figure 7) show that the t energizes and picks up load in a controlled way without noticable transients..5.5 -.5.5 5 25-25 -5.5.5 -.5.5.5.5 -.5.5 4 2-2 -4.4.2.8.5 U+ U- P Q PI 29 7;7;56 Uac Primary Sys PI 29 7;7;56 Iac P PI 29 7;7;56 Iac Sys PI 29 7;7;56 Uac Sys PI 29 7;7;56 Uac S PI 29 7;7;56 Udc Sys PI 29 7;7;56 PQ Ref Sys -.5..2.3.4.5.6.7.8.9 Figure 7. lack start. Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer secondary currents Subplot 3. EP-PL Phase reactor Subplot 4. EP-PL 7.9 kv voltages Subplot 5. EP-PL 7.9 kv phase-to-ground Voltages Subplot 6. D voltages. Subplot 7. EP-PL converter ctive (top curve) and Reactive Power (bottom curve) Reference. s shown in Figure 7, The EP-PL 38 kv voltage was ramped from kv, at a slower pace than in the digital simulation (Figure 6). The ramp ended at 38 kv although the plot, due to TFR limitations, does not show more than the part up to about 6 kv. On the FE side, the voltages and currents remained undisturbed during the ramping phase. The only load on the EP-PL side consisted of the harmonic filters rated totally 6 Mvar. The system was anyhow observed to perform well. The modulation on the D voltage in Subplot 6 is due to the frequency difference between EP-PL side, having constant frequency, and the FE side. On the FE side, the system operated as normal. Figure 6. lack Start with 25 MW load (EMTD simulation) Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer secondary Subplot 3. ack-to-ack power reference; EP-PL and FE reactive power reference Subplot 4. EP-PL active and reactive power. Subplot 5. FE active and reactive power 4. Nearby Fault on the US side Near-by -phase to ground faults on the US side was simulated in EMTD. For such a fault the primary voltage to be controlled, drops significantly. In order to avoid raising the voltage at fault clearing, the throughfault capacitive action is inhibited and the t stays at close to no load conditions during the fault. The post fault overvoltage reaches.3 p.u. in one phase, however

it is practically eliminated in one cycle. Some current transients are seen in Figure 8 below, these being the result of oscillations excited in the harmonic filters. For this severe unbalanced fault it is worth noting that the transients seen on the Mexican side is practically negligible. The remaining disturbances are caused by the need to stabilize the D voltage against the fluctuating active power caused by the unbalanced fault. Figure 8. Near-by fault on US side (EMTD simulation) Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer secondary Subplot 3. ack-to-ack power reference; EP-PL and FE reactive power references Subplot 4. EP-PL active and reactive power. Subplot 5. FE active and reactive power 5. Remote Fault on the US side The final case to be highlighted is a remote fault on the US side. Where initially the T was in operation at close to zero active power. Lightning conditions in a remote area caused a voltage dip in the US transmission grid. This case was simulated also in EMTD as is illustrated in Figure 9. The field recording is shown in figure for comparison. Following the initial voltage drop in Eagle Pass, the t current during the fault condition was increased to almost p.u. (capacitive) to support the bus voltage at Eagle Pass. When comparing the digital simulation with the field recording it can be seen that the reactive power transient in the simulation appears more exponential, indicating that the simulated fault creates a truly stepwise change in voltage. Otherwise the simulation and the field recording show good correlation. Figure 9. Remote fault on US side (EMTD simulation) Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer Subplot 3. ack-to-ack power reference; EP-PL and FE reactive power references Subplot 4. EP-PL active and reactive power. Subplot 5. FE active and reactive power.5.5 -.5.5 5 25-25 -5.5.5 -.5.5.5.5 -.5.5 4 2-2 -4.4.2.8.5 PI 293 7;;9 Uac Primary Sys PI 293 7;;9 Iac P PI 293 7;;9 Iac Sys PI 293 7;;9 Uac Sys PI 293 7;;9 Uac S PI 293 7;;9 Udc Sys PI 293 7;;9 PQ Ref Sys -.5..2.3.4.5.6.7.8.9 Figure. Remote fault case Subplot. EP-PL 38 kv voltages. Subplot 2. EP-PL step-down transformer secondary currents in mps. U+ U- P Q

Subplot 3. EP-PL Phase reactor Subplot 4. EP-PL 7.9 kv voltages. Subplot 5. EP-PL 7.9 kv phase-to-ground Voltages in kv. Subplot 6. D voltages. Subplot 7. EP-PL converter ctive (bottom curve) and Reactive Power (top curve) It is worth noting from figure 9 that the t tie isolates the Mexican transmission grid from the fault, as is indicated by the reactive power reference being stable through the simulation. ONLUSIONS The t HVD Light tie at Eagle Pass is a first-of-itskind installation, where VS technology is used for the dual purpose of transferring active power between two asynchronous transmission systems and providing dynamic voltage support to the respective grids. The dynamic performance and characteristics of the t tie have been illustrated using digital simulations and field recordings. mong the features highlighted are instantaneous voltage support, black start of islanded networks and isolation of the grids with respect to switching transients and faults. State-of-the-art simulation software enables the design engineer to perform efficient simulations of the t tie on a standalone personal computer. cknowledgements EMTD is a simulation software package owned and developed by the Manitoba HVD Research enter, Winnipeg, anada. The Eagle Pass t tie project was a joint effort between EP, EPRI and Power Systems. FE of Mexico also played an important role providing assistance in many engineering matters. Today EP operates the tie and an operation coordination with FE is established.