Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

Similar documents
INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

Quick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails

UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails

BLACK WIDOW COMPOSITE

SolarMount (E)volution

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

May 14, Installation Manual

Rayport G Eco Ballasted

Installing Quick Mount PV Products on. Metal Shingle Roofs RESPECT THE ROOF

orientation Conergy SunTop Instructions for professional installation

Installation Instructions - Model V4JSD 1

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Installation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)

Rayport G Eco Dealer Kit

Solar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

INSTALLATION GUIDE FRAME MICRORAIL PUB2017JUL18

SILVERBACK INSTALLATION MANUAL

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

compile system INSTALLATION GUIDE Updated January 2019

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type D

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

CSS Central Mount System

Flush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

TABLE OF CONTENTS REQUIRED TOOLS

Advancing the Future of Rooftop Solar

Dura-Lock Roof System

SmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide

RBP-1215B-RX DODGE RAM QUAD CAB RX3

SILVERBACK INSTALLATION MANUAL

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

SunPower Installation Manual

LOCKN LOAD FIRST TIME INSTALLATION

ASSEMBLY & INSTALLATION GUIDE

STRATUS SHELTER. Take bike parking to new heights

ALL SEASON PATIO COVER

π H-4408 ALUMINUM BLEACHERS 5-ROW x 15' PARTS uline.com TOOLS NEEDED

HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)

Assembly & Installation Instructions FOR VEHICLE MOUNT KIT USING VEHICLE CENTER MEMBER

Flush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing

Desk/Wall-Mount Rack

Rayport G Eco Dealer Kit

Installation Instructions for the AlphaDeck Staging System

EZ Tile Hook System. SunModo PV Rack Mount System UL2703 Compliant

55000/55010 Installation Instructions

1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

ASSEMBLY INSTRUCTIONS

3 wide x 3 deep Video Wall Display Installation Guide

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

Assembly Instructions

User Instructions Multiline Otter Scoreboard Caddy Assembly

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

ASSEMBLY INSTRUCTIONS

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Eraser Conveyor Belt Cleaning System IWARNING Always obey all applicable safety rules. Be sure all power to the conveyor has been disconnected and con

LOCKN LOAD FIRST TIME INSTALLATION

ASSEMBLY INSTRUCTIONS

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

8x12 SpaceMaker Garden Shed Assembly Manual

00108/00110 INSTRUCTION MANUAL

GV Standard Sliding Over Roof Installation Instruction Manual

ATLANTIS RAIL Contact Information

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

Topo Freestanding Applications - Private Office

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System

Pickup Box Utility Rack Package Installation (Instruction ID: )

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

INSTALLATION INSTRUCTIONS KK-K9-F14-K K9 KIT FOR FORD EXPEDITION

9 ft Naramata Spa Shelter Assembly Manual Outdoor Living Today

Kai Installation Instructions

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS

Range height adjustable assembly

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

Workbench Instructions for Assembly

SINGLE TRACK BYPASS (patent pending) barn door hardware

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

12ft Octagon Bayside Gazebo Assembly Manual

Installing The Aliens Extermination Deluxe 50" Cabinet with Sintra Marquee

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

27APR18 U.S. RACK, Inc Falcon Drive, Madera, CA

AR-15 Armorer s Essentials Kit. Product # Instructions # Revision: B

Bumper Sign INSTALLATION INSTRUCTIONS

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL

US RACK, Inc Falcon Drive, Madera, CA

PV MOUNTING SYSTEM INSTALLATION MANUAL

Barricade Trail Force HD Rear Bumper w/ Tire Carrier installation (07-16 Wrangler JK)

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

START HERE BEFORE YOU BEGIN FIG 1 STEP 2

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

BX2173 Installation Instructions Ford Focus (including the 2.3L engine) 2003 Ford Focus SVT

Transcription:

Quick Start Guide Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs R ESPECT T HE R OOF

Quick Rack Components & Tools Components are pre-assembled and ready for installation right out of the box. 1 2 Base Mount Featuring Quick Mount PV s patented Elevated Water Seal. Panel Clamp Available in two sizes (2" & 8") for both mid- and end-clamping that works with standard module frames. 3 4 Optional Grounding Lug Only one Ilsco GBL-4DBT grounding lug per system is needed. Lug replaces cap screw in base mount top slider. Skirt Snaps right into place for an elegant, streamlined finish. Minimal tools are needed to install Quick Rack. They include: Drill with 1/2"deep socket and 1/8" x 6" drill bit (optional: may use T-30 Torx Bit for Base Mount Lag Bolt) Socket Wrench with same 1/2" deep socket 1/2" Box Wrench Flat Head Screw Driver Wire Clips Appropriate Sealant Chalklines Important! This guide is not intended to replace the full Quick Rack Installation Manual. This is a brief overview of the standard installation process of the Quick Rack Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs. It is important to carefully read the full Quick Rack Installation Manual prior to installing your first Quick Rack System. See the last page of this document for more information.

Array Layout & Installing the Mounts Using your engineered design, locate array layout on the roof, determine mount locations, and mark module intersections in front row. See the full Quick Rack Installation Manual for snow country requirements, span tables, wind exposure categories, cantilevers, and engineering rules. Rafters that will receive a mount Module intersection Penetration point has 3" range Module width or length plus 1" Locate rafters that will receive a mount. Mark off the locations for the bottom row of mounts, typically 3" up from the butt of the shingle. Measure from the bottom row up the module dimension plus 1" for the clamp spacing, to locate the center point of the next row of mounts penetration zone. The penetration zone is a 3" range from 11/2" above to 11/2" below the center point and helps avoid shingle cutting. These measurements translate across the roof. 3rd Course 2nd Course 1st Course Drill pilot hole into center of rafter and fill with appropriate sealant. Slide the base mount up underneath the second course of shingles, so that the bottom edge of the flashing does not overhang the butt edge of shingles. Tighten until mounting block stops swiveling. (In 65 F weather, this would equal 13 ft-lbs.) Cap mounting block with EPDM rubber cover. For engineering best practices, it is best to alternate the left-right positioning of the base mount top sliders in each column when possible.

Leveling the System The modules in the Quick Rack system are unified by rigid panel clamps into a single flush surface, so small dips and curves in the roofs surface may not require leveling of the mounts, use your own judgment about where leveling is required to maintain a smooth looking surface. However, mounts that are close together and in the front row should be leveled carefully. 3 Level in any order after 1 & 2 2 1 2 To level top sliders to the same height in the first row, run a string line between the first and last mounts in the first row. After aligning the first row horizontally, follow the same string alignment process vertically on far right and far left columns. Then align each remaining row of the array (in any order). To adjust top slider height, remove machine bolt, separate top slider from QBlock slider and reinsert at proper location. To adjust in 1/4" increments move the top slider up or down one notch. To adjust in 1/8" increments rotate the top slider 180 degrees. Repeat for the other mounts until top slider elevations are uniform across the row.

Installing the Clamps & Skirt The modules are connected to the base mounts using 2" panel clamps, which can act as both mid clamps or end clamps. 8" clamps are used to structurally bridge together modules. Panel clamps include integrated grounding pins. See full Quick Rack Installation Manual for grounding information. The bolt head underneath the clamp lines up and slides into the channel on the top of the slider of the base mount. At a module intersection that aligns with a rafter and mount location, engage either one of the bolts of the 8" panel clamp by pressing down the top clamp above the bolt, line up and slide into the channel on the top of the slider. 8" clamps are also used to structurally bridge together modules with no base mount unless a rafter or mount location lines up at a module bridge location. Clamp Leg Skirt snap channel Mid-Clamp Assembly Nut For the first row, clamp must be oriented with skirt snap channel in downslope position. When the 2" or 8" clamp is used as an end clamp in either first or last row, be sure that the long leg on the panel clamp aligns with the short leg on the panel base and is oriented away from the module. Use 1/2" box wrench on mid-clamp assembly nut to only tighten clamps on the far left and right top sliders. Align all clamps in first row using a string line. Tighten mid-clamp assembly nut on remaining loose first row clamps.

Only the front row needs to be aligned and locked down in order to assure a straight and secure skirt and array. The clamps in the rest of the rows will self align as you install the modules and do not need to be aligned or locked into the base mounts. For optional skirt attachment method see the full Quick Rack Installation Manual. Skirt snap channel Slot in clamp base Insert horizontal leg of the skirt into slot in clamp base, then snap the skirt down in skirt snap channel. Slide instead of snap the floating 8" bridge clamps halfway onto end of the skirt segments at the module intersections then slide the next segment onto the other side of the clamp making segments flush. Installing the Grounding Lug You can install the grounding lug at any time after the base mounts are installed. The system only requires one Ilsco GBL-4DBT grounding lug. Replace the cap screw in any base mount top slider with grounding lug hardware. Secure your wire to the lug by tightening the set screw. See full Quick Rack Installation Manual for system grounding specs and information.

Installing the Modules Insert the bottom edge of the module frame into the lower clamps. The top of the module sits on the lower portion of the clamp assembly for the row above. Where 2, 3, or 4 modules need to be connected, slide the 8" panel clamp over the module frame. The edge of the module frames must not sit outside the 2 1/4" allowable range indicated by the outer timing marks. Inner timing marks show the ¾" gap centered in the allowable space. When the first row of modules is in place, tighten down the panel clamps to a torque setting of 13 ft-lbs in the bottom row only using a ½" socket on a drill or a torque wrench. DO NOT USE AN IMPACT GUN. The upper row of clamps should remain loose to accept the next row of modules. Complete wire management for the first row and then continue installing modules for all rows, tightening the lower row of clamps and completing wire management for each row as it is installed. Tuck the wires inside the module frame with wire clips on each side of the connectors. See the full Quick Rack Installation Manual for more information on wire management configurations and wire clip recommendations.

For extensive information on the Quick Rack Patented Rail-Free Mounting System: The full Quick Rack Installation Manual includes span tables, snow country requirements, engineering drawings, roof attachment figures, system specs and measurements, grounding information, wire management suggestions, UL Listing requirements, and much more. You can download the full Quick Rack Installation Manual and find many other resources, including installation and Quick Tip videos, approved module list, training information, and other technical and certification documents, at www.quickmountpv.com/quickrack. R ESPECT T HE R OOF 925-478-8269 2700 Mitchell Dr. Walnut Creek, CA 94598 www.quickmountpv.com tech@quickmountpv.com UL SUB 2703 Made in USA BI 7.2.3-38 2015 by Quick Mount PV. All rights reserved. Nov-2015, Rev 1