Frameless Inline Door QCI5248

Similar documents
Frameless Inline Door With Return QCI5263

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Frameless Inline Door QCI5254

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Frameless Inline Door QCI5250

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Frameless Heavy Glass Door with Wall Mount Hinges

Double Frameless Swing Door QCI5247

FIXED PANEL SLIDER QCI5241

Frameless Door QCI5284

A-935 RODA WALL MOUNT HINGES

Frameless Heavy Glass Door with Header

Frameless Fixed Panel Slider

Frameless Inline Door QCI5288

Frameless Fixed Panel Slider QCI5279

Frameless Inline Door With Return QCI5128

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

INSTALLATION INSTRUCTIONS FIXED PANEL SLIDER FRAMELESS DOOR / PANEL. QCI0280 Page 1 Cer fied 6/27/14

Frameless Bypass Slider

Frameless Bypass Slider

FRAMELESS FIXED PANEL SLIDER with 90 RETURN

950 RODA WALL MOUNT HINGES PRECERIA INSTALLATION INSTRUCTIONS. NEED INSTALLATION HELP? Call BASCO ( ) FRAMELESS DOOR

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

Double Swing Door With Header QCI5114

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

UNIT No FRAMELESS PIVOT SHOWER DOOR

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

TUB SHOWER Framed Sliding Enclosure

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Continuous Hinge Frameless Single Swing Shower Enclosure QCI-5214

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Unit No. 1400, 1700, 1800 Infinity Continuous Hinge Frameless Swing Door Shower Enclosure

UNIT No. 15 & 16 SHOWER DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

INSTALLATION INSTRUCTIONS. Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure

UNIT No. 135/735 THIN-LINE SHOWER ENCLOSURE

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

INSTALLATION INSTRUCTIONS

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

Unit No. 1413NP, 1713NP, 1813NP Infinity Continuous Hinge Frameless Door & Inline Panel with No Post Shower Enclosure

Framed Single Swing Shower Enclosure Steam Continuous Hinge

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

UNIT No. 8150/9150 SHOWER ENCLOSURE

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Unit No. 6150, 7150 Deluxe Framed Sliding Tub/Shower Enclosure

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS

STEAM TIGHT. Installation Instructions 200S/250S. SCFMDPP Parts Pak Includes: Letters C,D,E,J,S,V,W,X,Y,BB,CC,DD

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

STEAM TIGHT. Installation Instructions 400S. SCFMDPP Parts Pak Includes: Letters B,C,F,G,H,T,W,X,Y,AA,BB,CC,DD,EE

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

890 SERIES PIVOT STEAM DOOR

ProLine PL80 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

794 SERIES STIKSTALL TM SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

340D & 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

340D / 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

1040 & 1050 SERIES HEAVY FRAMELESS BYPASS BATH ENCLOSURE

794 series stikstall tm shower enclosure

791 SERIES STIKSTALL TM SHOWER ENCLOSURE

738 SERIES PIVOT SHOWER DOOR

1038 SERIES DELUXE FRAMELESS PIVOT SHOWER DOOR

ProLine PL60 - PL70 - PL80 RETURN PANEL SUPPLEMENT

Two Panel Frameless Bypass Door

Model 5400H / 7000H Illustrated Installation Instructions

392CV SERIES Stickstall

394 SERIES STIKSTALL TM SHOWER ENCLOSURE

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

391 SERIES STIKSTALL TM SHOWER ENCLOSURE

Series----SP3600A SHOWER DOOR

ESSENCE. Shower / Tub Door Installaion Instructions

QUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

ENIGMA AIR ENCLOSURE

SHOWER ENCLOSURE INSTALLATION

SHOWER DOOR INSTALLATION & CARE GUIDE

PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

792 SERIES STIKSTALL TM SHOWER ENCLOSURE

UNIDOOR LUX (STYLE E)

UNIDOOR X (STYLE L1)

INSTALLATION INSTRUCTIONS

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Installation Instructions with 90 Degree Return Panel -- Model E-DP9. Model Semi-Frameless Door & Panel

MIRAGE-X / BELLA. Shower Door Installation Instructions

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

Transcription:

INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016

Parts List with glass to glass hinges *Quantities may vary. **Support Bar only included if necessary. QCI5248 REV. 0 Page 2 Certified 06/16/2016

Exploded View with glass to glass hinges QCI5248 REV. 0 Page 3 Certified 06/16/2016

Tools: To install your New Shower Enclosure, you may need the following: Pencil Drill Hack Saw Low Tack Tape 1/8 & 3/16 Drill Bit Caulk Gun Tape Measure Center Punch Clear Silicone Caulk 4 & 6 Levels Files Suction Cups #2 Phillips Screwdriver Safety Notes: This unit is best installed by two people. Handle the glass panels carefully and protect the edges. Safety tempered glass is very resistant to breakage, but the sharp corners of the panels can damage tile and flooring surfaces. The glass can break if unequal pressure is applied during installation. Please wear safety glasses whenever drilling or cutting. When drilling holes in ceramic tile or marble, use a center punch and hammer to carefully break the glazed surface to prevent skidding when drilling. Installation Notes: Proper blocking is required for every Heavy Glass unit prior to installation. At minimum 2x4 blocking is required at the location of any structural member of the unit including, but not limited to: hinges, clamps, and header brackets. All fasteners at these locations are required to be installed into the blocking. A minimum of 1 1/4 thread engagement is required of all fasteners into the blocking at these locations. Depending on the application the customer maybe required to supply the proper fasteners to ensure adequate engagement. U-Channel maybe installed using wall plugs where no backing is found. Use caution to not pierce plumbing or electric lines while installing door hardware. Cover the drain with tape prior to installation to prevent loss of small parts. Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using the instruction sheet as a reference. Before discarding the carton, check to see that no small hardware parts have fallen to the bottom of the box. If any parts are damaged or missing, refer to the description noted in the instructions when contacting your dealer for replacements. Maintenance: NOTE: Tempered glass cannot be cut. Two primary materials are used to manufacture your new shower enclosure: tempered glass and anodized aluminum. To assure a long lasting finish on the enclosure, wipe it down with a towel after each use. For occasional, more concentrated cleaning efforts, we find that Lysol Non-Abrasive Bathroom Cleaner works extremely well. Be sure that any over spray falling on the aluminum frame is rinsed thoroughly and dried. Many over-the-counter cleaners, if applied to the aluminum and left on, will harm the metal finish and cause permanent damage even though their directions indicate safe use on shower doors. Never use a scouring agent to clean the aluminum. For units with AquaglideXP please use Maintain spray from the maintenance on the glass. Please contact customer service for details and to purchase the maintenance kit. QCI5248 REV. 0 Page 4 Certified 06/16/2016

If a continuous unit centerline does not exist from the original measuring process, it will be necessary to create one. Referencing the Measuring Guide included with this unit, lightly mark a continuous unit centerline on the threshold. Next, mark a continuous unit centerline up each wall, starting where the threshold centerline meets the wall. Use a level to ensure the wall centerline is plumb and straight. The wall centerlines should be a minimum of the unit height from the threshold. Note: Centerline (CL) is a term used to describe the center or mid-point of the unit. The position of the unit centerline can be located anywhere in the width of the threshold, as long as adequate structure exists beneath the centerline for fastening and the outer edges of the unit will not overhang the threshold. The most common unit centerline position is the middle of the threshold. Note: It is extremely important the unit centerline be continuous and straight to ensure proper installation. Remove u-channels from the hardware box and countersink holes in the u-channels. Each piece of u-channel requires a minimum of two (2) screws, 3 from each end for lengths less than 18. Lengths 18 or greater also require screws approximately every 18-24. Each piece of u-channel is cut to length and mitered as necessary. Position each piece of u-channel along the threshold centerline and use low-tack tape to hold in place. Check that each piece of u- channel fits in location along the marked centerlines and mitered joints fit tightly. In the event the u-channel doesn t fit properly, contact Technical Support. If your unit was ordered with a notch panel, please see appendix A for supplemental installation instructions. Repeat the steps associated w/ installing the stationary Glass Panels for each stationary panel. Reference the unit drawing shipped with the unit to determine where each stationary glass panel is to be located. With a pencil, carefully mark each hole position on the threshold centerline. Remove the U-Channel and drill a 3/16 diameter hole, approximately 1-1/2 deep, at the marked locations. Note: It is critical that the threshold U-Channel is centered on the centerline. QCI5248 REV. 0 Page 5 Certified 06/16/2016

Insert a small amount of silicon into each drilled hole, then insert a wall anchor into each hole. (Note: Drill hole, then insert a wall anchor.) This must be done just before u-channel installation. Carefully cut the heads off the wall anchors with a razor blade. Place the U-Channel in correct position and secure it with #8 x 1-1/2 truss head screws. WALL ANCHORS Silicone Threshold / Showerbase Note: Do not over tighten screws. Place 1/8 setting blocks as shown or approximately every 18. DO NOT place setting blocks over screw heads. Using suction cups slide the Fixed Panel Glass into the appropriate side. Use setting blocks to make exposed edges of the glass level and plumb. Exposed edges MUST be level and plumb before moving to next step. Using the glass clamp mounting slot on the Fixed Panel Glass as a guide, make a mark on the wall on center w/ the slot. Remove the Fixed Panel Glass and carefully set aside, leaving the setting blocks in position. **Different size setting blocks may be required depending on level conditions. Various size setting blocks are provided and can be used in different combinations (stacked) to obtain the desired results. MARK ON WALL SLOT QCI5248 REV. 0 Page 6 Certified 06/16/2016

Drill one 3/16 diameter hole approximately at the mark just made. Drill through tile and backer board. Do not drill through blocking. Note: This must be done just before Wall Mount Clamp installation. Disassemble the Wall Mount Clamp, and place the cover plate and screw aside. Place the Wall Mount on the wall, with the finished side of the clamp plate toward the inside of the shower, and secure it to the wall with a #8 x 1-1/2 truss head screw. Note: Do not over tighten screw. Using suction cups, set the Fixed Panel Glass back into position. Double check exposed edges of the glass are level and plumb. Exposed edges MUST be level and plumb before moving to next step. INSIDE Place the clamp cover plate on the outside of the glass and secure from the inside w/ the screw provided. COVER PLATE INSIDE GASKET BOTH SIDES OF GLASS SCREW QCI5248 REV. 0 Page 7 Certified 06/16/2016

If a Support Bar was included w/ your package, we recommend it be installed to make the enclosure rigid. Please see the various mounting configurations and choose one that best suits your shower enclosure arrangement. First, loosen the screw on top of the Panel Mount just enough so that it is able to swivel, then place the Support Bar Panel Mount onto the Return Panel Glass within 6 of the door opening. Temporarily tighten set-screw to keep in place. Place the Support Bar in a Wall Mount or a second Panel Mount. Temporarily tighten set screws to hold it in place. Hold up the Wall Mount/Panel Mount (with bar attached) within 6 of the end of the Panel (about where it will be installed). Mark on the support bar where the bar meets the opening of the Panel Mount. NOTE: If Support Bar is too long to hold up while trying to mark it, it can be trimmed down. When trimming the bar make sure it is at least 6 longer than what you think you will need. Add 1/2 to this mark and cut the support bar. Note: It is better to have the bar longer rather than shorter because it can always be trimmed down. Now place the Support Bar into the Panel Mount and tighten set screws. Place the Wall Mount or Panel Mount on the other end. The position of the bar can be readjusted by rotating the panel mounts, moving the Panel Mounts on the Panel, or by trimming the support bar as long as ALL Panel Mounts are within 6 of the end of the panel. If using two panel mounts, once they are in the desired position tighten all screws. If using the Wall Mount find where it is flat against the wall, make sure it is level, then mark its location. Once marked, take down support bar. If possible, locate the Wall Mount such that measuring 9/16 in from the panel side of the mark lands the mounting screw on a wall stud (see illustration). Measure 9/16 toward the inside of the shower from the panel side of the trace; drill a 3/16 diameter hole approximately 1-1/2 deep at this location (see illustration). Insert a Wall Anchor into this hole. NOTE: This must be done before the Support Bar installation. Carefully cut the head off the Wall Anchor with a razor blade. Fasten the Bushing to the wall using the screw provided (see illustration). Place the Wall Mount over the Bushing such that the Wall Mount surface is flush to the wall. Holding the Mount to the wall, slide the support bar into the Wall Mount and tighten all set screws. Then place in panel mount and readjust the angle and position. Tighten all set screws Panel to Wall at 45 shown QCI5248 REV. 0 Page 8 Certified 06/16/2016

Other Configurations for the Support Bar: Panel to Panel using two Panel mounts: Panel to Wall at 45 using a Panel Mount and an angled Wall Mount: Panel to Wall at 180 using a Panel Mount and a Regular Wall Mount: QCI5248 REV. 0 Page 9 Certified 06/16/2016

Using alcohol pads, wipe down the hinge notches and notch gasket areas on both sides of the Fixed Panel Glass and the Door Panel Glass. Allow glass to dry before continuing. Remove the back plates from both Glass to Glass Hinges. Place a gasket on the Hinge and place the fixed part of hinge onto the Fixed Panel Glass. Note: The Hinge with the logo must be the top Hinge. Next, place another gasket against the glass and attach the back plate with the screw provided. Repeat on both Fixed Panel Glass notches and open the hinges outward. NOTE: Your hinges may differ in external shape than what s shown. However, installation procedures are the same. Place two 7/16 shims on the curb or threshold. These shims must remain in place throughout the installation process. Next, position one person on each side of the Door Panel Glass and carefully place the Door Panel Glass over the hinge notches. As the person to the outside of the door holds the Door Panel Glass, the other person installs the gaskets, hinge back plates and screws. To complete installation, repeat the same process for each hinge. Note: Use setting blocks to fill gaps between hinges and glass. Fixed panels and door should be flush Note: The screws may begin to creak when fully tightened. 7/16 SHIMS Carefully and slowly close the door and inspect the door panel gaps for interference. Do not force door closed. If interference exists, hinges can be loosened to adjust gaps. The gap should be 3/16 on each side of the door, 7/16 between the door and threshold at the highest point with the Door Panel Glass and Fixed Panel Glass flush at the top. Re-tighten all screws after final adjustment. If a hinge is scratched in the tightening process, touch up paint may be used. QCI5248 REV. 0 Page 10 Certified 06/16/2016

Place the Drip Vinyl onto the bottom of the door panel. Line it up on the hinge side of the door and cut it off flush with the strike edge of the door. NOTE: The sweep may be pulled up or down on the glass to adjust how much of the sweep contacts the threshold TIP: Run a small bead of silicone on the inside edge of the drip vinyl and the glass to secure the vinyl sweep and prevent water from collecting inside the sweep if adjusted. On the interior face of the glass, place a strip of low tack tape on the glass about 1/8 to 3/16 away from edge of the u-channel both vertically and horizontally. Run a small bead of silicone along this edge. Next, on the interior, run a bead of silicone between the u-channel and the threshold and also between the u-channel and the wall. After completing, remove the tape before silicone sets. NOTE: DO NOT USE the shower until the silicone is completely cured. Check the tube of silicone for the manufacturer recommended cure time (typically 24-48 hours). QCI5248 REV. 0 Page 11 Certified 06/16/2016

Appendix A Notch Panel If your unit has been purchased with a notch panel option, two additional pre-cut pieces of u-channel will be provided. These two pieces of u-channel will be mitered and cut to size based on the opening dimensions provided with your order. Please follow the same instructions provided for mounting threshold and wall u-channels, to mount the notch panel u-channels. Below are illustrations to clarify the mounting orientations. QCI5248 REV. 0 Page 12 Certified 06/16/2016

Installing Handles: Assemble parts as shown. Screw washers, end plates, and gaskets into one side of the handle through the glass. Then align the other side of the handle onto the bushing and tighten the set screws. QCI5248 REV. 0 Page 13 Certified 06/16/2016

QCI5248 REV. 0 Page 14 Certified 06/16/2016

Installing Towel Bars: Assemble parts as shown. Screw the threaded back plate or screw into the towel bar holding the washers, end plates, and gaskets in place. Align other side of towel bar on opposite side of glass and tighten set screws QCI5248 REV. 0 Page 15 Certified 06/16/2016

QCI5248 REV. 0 Page 16 Certified 06/16/2016

Installing Combination Towel Bars with Handle: Assemble parts as shown. Screw washers, end plates, and gaskets into the towel bar through the glass using either a screw or the threaded back plate. Then align the handle on the other side of the glass. Tighten the set screws to hold the handle in place. QCI5248 REV. 0 Page 17 Certified 06/16/2016

Installing Knobs: Assemble parts as shown. Tighten each side of the knob onto the stud or tighten one side with screw and place other side of the knob on opposite side of glass and tighten with set screws. QCI5248 REV. 0 Page 18 Certified 06/16/2016

QCI5248 REV. 0 Page 19 Certified 06/16/2016