INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

Similar documents
INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE

ELEPHANT DOOR SYSTEMS SERIES E1200

SERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES

INSTALLATION INSTRUCTIONS SERIES 3600 SUNSHADE SYSTEM

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

4500 Series. Fabrication and Installation Instructions

Storefront Installation Guide

14000 Series. Fabrication and Installation Instructions

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

14000 Series. Fabrication and Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

Installation Instructions

SERIES BW3250 BLAST WALL TABLE OF CONTENTS INSTALLATION INSTRUCTIONS GENERAL NOTES

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

e-lite fabrication/assembly and Installation instructions

Storefront Installation Guide INSTALLATION INSTRUCTIONS

Sun Control-Solar Eclipse-Solar Shelf

Table of Contents. Typical elevation & cut lengths. General construction notes. General installation notes. Typical jamb assembly

Design Considera ons & Installa on Guidance

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS TRIFAB 451UT SCREW SPLINE ASSEMBLY TRIFAB 451UT. AUGUST, 2010 (Part No. 452T-CG-970) EC

Series Advanced and alternate. Installation Instructions

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! May 2015

INSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T

SECTION C1 INSTALLATION INSTRUCTIONS

Versatrac R-System Stock Extrusions, Clips and Accessories

INSTALLATION MANUAL STOREFRONT DOORS

YSD 400 Sliding Door System Installation Manual

SERIES 8100 FIXED WINDOW BLOCK OR FIN FRAME

YES 40 FS/FI Storefront System Installation Manual

Versatrac R-System Stock Extrusions, Clips and Accessories

YOW 225 TU Window System

SERIES CF450 INSTALLATION INSTRUCTIONS. SERIES CF450 1¾ x 4½ - B1. Fabrication for Panel Assembly. High Performance Non-Thermal Storefront System

INSTALLATION INSTRUCTIONS SERIES 8000 SINGLE HUNG WINDOW BLOCK OR FIN FRAME

SECTION HOLLOW METAL DOORS AND FRAMES

YES 45 TU Thermal Storefront System Installation Manual

INSTALLATION INSTRUCTIONS

Versatrim Side-Snap Frame

YCW 752 Outside Glazed Curtain Wall System Installation Manual

SERIES CF451T INSTALLATION INSTRUCTIONS. SERIES CF451T 2 x 4½ - B2. Fabrication for Panel Assembly. High Performance Thermal Storefront System

ARCHITECTURAL STICK SYSTEMS

INTERIOR ALUMINUM DOORS AND FRAMES

Swing Door Installation Manual

Series Exterior glazed curtain wall. Installation Instructions

SECTION BULLET- RESISTANT DOORS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

YES 45 FS/FI Storefront System Installation Manual

SPLIT FRAME INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS 2 1/2 x 7 for 1 Glass

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

INSTALLATION INSTRUCTIONS

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

TCR 250 THERMAL COMPOSITE RIBBON WINDOW

Installation Instructions

SERIES 2100/2200 CURTAIN WALL

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

YES 600 Thermal Clip Storefront System Installation Manual

INSTALLATION INSTRUCTIONS

YES 45 XT High Performance Thermal Storefront System

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

SERIES 2100/2200 CURTAIN WALL

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Frameless Inline Door With Return QCI5263

YSG 40/50/50T Window Wall System Installation Manual

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! FEBRUARY 2012

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

INSTALLATION INSTRUCTIONS. EnCORE CAPTURED & SSG SCREW SPLINE SHEAR BLOCK TYPE B LITHO IN U.S.A. JANUARY KAWNEER COMPANY, INC

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Heavy Wall Applied Stop Tube Frame and Door Installation

Method of Build 1. General

SECTION B INDEX STOREFRONT FRAMING SYSTEMS

YVS 400 TU Window System

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Sun Windows General Information New Construction Hinged Door Installation Instructions

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

YWE 40 T Window Wall System Installation Manual

Table of Contents F Series Frames

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Series 406 storefront. Installation Instructions

C-Series & S-Series Classic Frame with Transom (Single or Pair)

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Frameless Inline Door QCI5254

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! OCTOBER Phone: OLDCASTLE ( ) Web Address:

Frameless Inline Door QCI5248

Installation Recommendations for Finless Frame Doors

Transcription:

INSTALLATION INSTRUCTIONS SERIES 87 CENTER GLAZED WITH -/" TRIM OFFICE PARTITIONS Phone: (800) -6 Fax: (800) 58-7 crlaurence.com usalum.com crl-arch.com M056_Rev_D

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM GENERAL INSTALLATION NOTES Recommended Guidelines For All Installations:. REVIEW CONTRACT DOCUMENTS. Check Shop Drawings, installation instructions, architectural drawings, and shipping lists to become thoroughly familiar with the project. The Shop Drawings take precedence and include specific details for the project. Note any field verified notes on the Shop Drawings prior to installing. The installation instructions are of a general nature and cover most conditions.. INSTALLATION. All materials are to be installed plumb, level, and true. Install operable windows preglazed only.. BENCH MARKS. All work should start from bench marks and/or column lines as established by the architectural drawings and the general contractor with guaranteed accuracy. Working from these datum points and lines determine: a) The plane of the wall in reference to offset lines provided on each floor. b) The finish floor lines in reference to bench marks on the outer building columns. c) Mullion spacing from both ends of masonry opening to prevent dimensional build-up of daylight opening.. FIELD WELDING. All field welding must be adequately shielded to avoid any splatter on glass or aluminum. Results will be unsightly and/or structurally unsound. Advise general contractor and other trades accordingly. All field welds of steel anchors must receive touch-up paint (zinc chromate) to avoid rust. 5. SURROUNDING CONDITIONS. Make certain that construction which will receive your materials is in accordance with the contract documents. If not, notify the general contractor in writing and resolve differences before proceeding with work. 6. ISOLATION OF. Aluminum to be placed in direct contact with uncured masonry or incompatible materials should be isolated with a heavy coat of zinc chromate or bituminous paint. 7. SEALANTS. Sealants must be compatible with all materials with which they have contact, including other sealant surfaces. Consult with sealant manufacturer for recommendations relative to joint size, shelf life, compatibility, cleaning, priming, tooling, adhesion, etc. It is the responsibility of the Glazing Contractor to submit a statement from the sealant manufacturer indicating that glass and glazing materials have been tested for compatibility and adhesion with glazing sealants, and interpreting test results relative to material performance, including recommendations for primers and substrate preparation required to obtain adhesion. The chemical compatibility of all glazing materials and framing sealants with each other and with like materials used in glass fabrication must be established. This is required on every project. 8. FASTENING. Within the body of these instructions "fastening" means any method of securing one part to another or to adjacent materials. Only those fasteners used within the system are specified in these instructions. Due to the varying perimeter conditions and performance requirements, perimeter and anchor fasteners are not specified in these instructions. For perimeter and anchor fasteners refer to the Shop Drawings or consult the fastener supplier. 9. BUILDING CODES. Due to the diversity in state/provincial local, and federal laws and codes that govern the design and application of architectural products, it is the responsibility of the individual architect, owner, and installer to assure that products selected for use on projects comply with all the applicable building codes and laws. U.S. Aluminum exercises no control over the use or application of its products, glazing materials, and operating hardware and assumes no responsibility thereof. 0. EXPANSION JOINTS. Expansion joints and perimeter seals shown in these instructions and in the Shop Drawings are shown at normal size. Actual dimensions may vary due to perimeter conditions and/or difference in metal temperature between the time of fabrication and the time of installation. Gaps between expansion members should be based on temperature at time of installation.. COORDINATION WITH OTHER TRADES. Coordinate with the general contractor any sequence with other trades which offset curtain wall installation (i.e. fire proofing, back-up walls, partitions, ceilings, mechanical ducts, converters, etc.). CARE AND MAINTENANCE. Final cleaning of exposed aluminum surfaces should be done in accordance with AAMA 609. for anodized aluminum and 60. for painted aluminum.

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM HANDLING, STORAGE, AND PROTECTION OF The following precautions are recommended to protect the material against damage. Following these precautions will help ensure early acceptance of your products and workmanship. A. HANDLE CAREFULLY. All aluminum materials at job site must be stored in a safe place, well removed from possible damage by other trades. Cardboard wrapped or paper interleaved materials must be kept dry. B. CHECK ARRIVING MATERIALS. Check for quantities and keep records of where various materials are stored. C. KEEP MATERIALS AWAY FROM WATER, MUD, AND SPRAY. Prevent cement plaster or other materials from damaging the finish. D. PROTECT THE MATERIALS AFTER ERECTION. Protect erected frame with polyethylene or canvas splatter screen. Cement, plaster, terrazzo, other alkaline solutions, and acid based materials used to clean masonry are harmful to the finish. If any of these materials come in contact with the aluminum, immediately remove with water and mild soap. IMPORTANT: READ THIS MANUAL THOROUGHLY BEFORE BEGINNING INSTALLATION. SYSTEM REQUIREMENTS Maximum wall thickness: -7/8" ( mm). Maximum unsupported total load on each sill: 50 lbs. ( kg) each. Note: Additional shim support under the sill member is required for any loads over 50 lbs ( kg). Interior use only. TABLE OF CONTENTS SYSTEM REQUIREMENTS... INTRODUCTION... EXTRUSION IDENTIFICATION... PARTS LIST... - 5 ROUGH OPENING FORMULA SHEET... 6 DRYWALL PREPARATION... 7 DRYWALL INSTALLATION... 8 INSTALLATION NOTES... 8-9 CLIP ASSEMBLY CHART (For Use with Pages -7)... 0 SINGLE FRAME... WITH SIDELITE... WITH MULTIPLE SIDELITES AND HORIZONTAL MULLIONS... WITH TRANSOM... TRANSOM WITH SIDELITE... 5 BORROWED LITE... 6 CASED OPENINGS... 7 GLASS SIZING AND GLAZING... 8 GLAZING SEQUENCE... 8 -/" TRIM STRIP NOTCHING AND INSTALLATION (CLIPS ONLY)... 9

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM INTRODUCTION Thank you for your purchase of the C.R. Laurence Co., Inc. 87 Office Partition System. It has been engineered to install easily and efficiently. Please take the time to review this manual before you begin. The 87 Office Partition System is an interior product that allows you to add finished doorways, sidelites and windows (borrowed lite) to conventional drywall construction walls with maximum -7/8" ( mm) thickness. Each 87 System has been custom prepared in our factory to the job site specifications with minor to no field fabrication required. Be sure to have the Shop Drawings handy for reference. Technical support is available online at crlaurence.com and by phone at (800) 6-55. Please have your Sales Order Number for easy reference. EXTRUSION IDENTIFICATION Your order has been carefully fabricated, inspected, and packaged to the work order specifications. We have placed an Indicator Label on the inside or back side of each part before final packaging. Use the Identification numbers found on the order specific drawings that accompany this set of instructions. They will help you to organize and layout each opening before proceeding with the assembly process. PARTS LIST PART NUMBER PART NUMBER PART NUMBER PART NUMBER 87RBP 87RBP 87RBP 87RBP DJ87 WB5 NP600C NP5 NP8 NP56 SB5 SB5 87C 87C 87C 87C 87C5 8X58HWSMS 00660 6X58DWSD

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM PARTS LIST (CONTINUED) PART NUMBER PART NUMBER 87X 506 Door Frame Cap Shallow Pocket Insert 87X 508 Deep Pocket Cap Door Frame Insert 87X 50 87X 509 Sill Cap Casing Cap 87X 50 87X 55 Horizontal Mullion Deep Pocket Insert 87X 05 Glazing Stop Trim Strip 87X 505 Sub Sill 5

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM ROUGH OPENING FORMULA SHEET A B C D E BORROWED LIGHT FRAME DOUBLE FRAME W/SIDELIGHT W/TWO SIDELIGHTS MW TH MH F G H I DW SW TRANSOM FRAME TRANSOM FRAME W/SIDELIGHTS TRANSOM FRAME W/TWO SIDELIGHTS A B C D E F G ROUGH OPENING FORMULAS Width = DW + -/" Height = DH + /" Width = DW + DW + -/" Height = DH + /" Width = DW + MW + SW + -/" Height = DH + /" Width = DW + MW + SW + MW + SW + -/" Height = DH + / REPEAT FOR EACH SIDELIGHT Width = BW + -/" Height = BH + -/" Width = DW + -/" Height = DH + MH + TH + /" Width = DW + MW + SW + -/" Height = DH + MH + TH + /" Width = DW + MW + SW + MW + SW + -/" H Height = DH + MH + TH + /" I Height = SH + -/" DW DH MW MH SW SH BW BH DH MH SH Door Opening Width (D.L.O.) Door Opening Height (D.L.O.) Mullion Width (-/") Mullion Height (-/") Sidelight Opening Width (D.L.O.) Sidelight Height (D.L.O.) Borrowed Light Width (D.L.O.) Borrowed Light Height (D.L.O.) 6

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM DRYWALL PREPARATION When framing, position all metal studs so that the open side faces the rough opening. Use two sets of studs, back to back for horizontals. The icons in the illustrations below show the correct orientation. Refer to the CRL Shop Drawings for overall layout and to confirm dimensions. Rough Opening Calculation Orientation + / (9 mm) + / (9 mm) + -/ (57 mm) + -/ (8 mm) OR + -/ (8 mm) OR + -/ (8 mm) Door Cased Opening to Floor Borrowed Lite to Floor + / (9 mm) + -/ (8 mm) OR + / (9 mm) + -/ (8 mm) Door with Sidelites Transom Door with Sidelites + -/ ( mm) + -/ (8 mm) OR + -/ ( mm) + -/ (8 mm) Cased Opening (Above Floor) Borrowed Lite (Above Floor) 7

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM DRYWALL INSTALLATION Ensure drywall thickness finishes at a standard -7/8" ( mm). Cut the wallboard flush with the metal stud. Ensure the drywall is square and plumb. Note: The critical limitation for the finished wall is -7/8" ( mm). Wallboard Cut Flush Critical Dimension -7/8 ( mm) Finished Open Side Faces Rough Opening INSTALLATION NOTES The 87 Office Partition system requires that all rough openings have a maximum -7/8" ( mm) finished wall thickness. Maintaining a /" (9 mm) nominal gap allows plus or minus adjustments for leveling and plumbing jamb members. NOTE: For sill on not-to-floor sidelite or borrowed lite, allow " (5. mm) nominal gap. Check Measurements. If needed, shave wallboard to finish wall at -7/8 ( mm). Critical Dimension -7/8 ( mm) Finished 87x 87x Maintain / (9 mm) Nominal Gap / (9 mm) NOTE: 87x shown. Others similar. 8

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM INSTALLATION OVERVIEW NOTE: For general reference only. Refer to detailed instructions for your configuration before beginning. Anchor Type and Spacing Space All Fasteners (5 mm) at Ends (05 mm) On Center 50 Glazing POUND See Page 9. MAX 50 lb. maximum load on Sill without additional support. Door Installation Full Instructions on Page. Do NOT install before glazing. Trim Notch and install on Page 0. Fit Tabbed Jambs into Slotted Header. 00660 SIDELITE Fastener Part Numbers 6X58DWSD Fasteners Supplied by Others. 87x 87x 87x Transom Door Installation B Full Instructions on Page. A 87x50 87x508 00660 Assembly Clip Installation Install Clips as you level and secure each section. Refer to layout icons on the installation page for each configuration. Match letters on icon to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. 5 6 NOTE: If applicable, measure and cut Scribe from bottom (straight end) of Jambs, Vertical Intermediates and vertical Trim before installing. Sidelite Installation Full Instructions on Page. Multiple Sidelites on Page. Install Door Header and Jambs. Install, level and secure 87x Sidelite Header with 6X58DWSD Drywall Screws. Install 87x Sidelite Jamb at wall. Level and secure with 6X58DWSD Drywall Screws. Install 87x506 Sidelite Jamb at Door and secure with 00660 Screws. Install, level and secure 87x505 Floor Track with fasteners suitable for substrate. Install 87x50 Sill and secure to Floor Track with 00660 Screws. 87x 00660 00660 5 87x50 00660 87x506 00660 87x 87x505 6 Shim as Needed 00660 9

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM CLIP ASSEMBLY CHART (For Use with Pages -7) The instructions in this manual pertain to installation using clips to secure the members. Refer to the letters shown on each installation page and match them with the illustrations on this page to find the correct clip and orientation. All clips are installed on BOTH sides of the frame with 00660 Screws. A B C C C C 506 C 506 D C E5 506 ()50 F 6 506 ()50 ()50 C 50 G7 H8 9I C5 C5 ()50 50/50 50 C5 C 50 506 C 50/50 50 505 508 0 J 506 K L 50/50 ()50 506 50/50 50/50 50/50 50 508 C C 506 505 C5 C 505 C M N 5 O 509 506 C 506 C 50/50 50/50 50/50 509 505 C 0

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM SINGLE FRAME All vertical members are cut with an additional -5/8" (. mm) Scribe length for field cutting to allow for varying unlevel floor conditions. Fabricated frames can be ordered to exact dimensions for "cut-free" installation. NOTE: If applicable, measure and cut Scribe from bottom (straight end) of Jambs and vertical Trim before installing. Lift 87x Door Header into place and adjust to proper height. Do not secure. Insert tabbed Jambs into slotted Header. Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. A A 5 6 7 Level and secure Header with 6X58DWSD Drywall Screws. Install C Corner Clips at top corners on both sides of frame. Plumb, square and secure Hinge Jamb with 6X58DWSD Drywall Screws. Plumb, square and secure Strike Jamb with 6X58DWSD Drywall Screws. Install factory-prepped Trim on both sides of frame. 5 Trim -5/8 maximum Scribe if applicable. NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. 6 00660 87C 87C 00660 7 7 87x05 Trim 87x05 Trim

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM WITH SIDELITE 5 6 Install 87x Door Header and Jambs as shown on Page. Refer to this drawing for correct Clips. Install, level and secure 87x Sidelite Header with 6X58DWSD Drywall Screws. Install 87x Sidelite Jamb at wall. Level and secure with 6X58DWSD Drywall Screws. Install 87x506 Sidelite Jamb at Door and secure with 00660 Screws. Install, level and secure 87x505 Floor Track with fasteners suitable for substrate. Install 87x50 Sill and secure to Floor Track with 00660 Screws. NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. A B D 506 N SIDELITE 50/50 NOTE: Install Clips as you level and secure each section. Match letters to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. Follow instructions on Page 8 to Glaze Sidelite. Refer to Page 9 to notch and install Trim. 505 H8 SIDELITE 87X 55 50 POUND MAX 50 lb. maximum load on Sill without additional support. SIDELITE 87X 50 87X 505 Do NOT install before glazing.

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM WITH MULTIPLE SIDELITES AND HORIZONTAL MULLIONS Follow Steps - on Page to install Door frame and Sidelite Header and Jambs. Continue with Steps 5 and 6 to install Floor Track and Sill next to Door. Install and secure 87x with 87x506 Intermediate Vertical with 00660 Screws. Repeat Step above to install and secure Floor Track and Sill next to wall. 5 Install 87x50 Intermediate Horizontals. NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. NOTE: Install Clips as you level and secure each section. Match letters to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. Follow instructions on Page 8 to Glaze Sidelites. Refer to Page 9 to notch and install 87x05 Trim. Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. A B C D SIDELITE SIDELITE 506 506 E N Repeat this section for each additional sidelite. ()50 50/50 505 F 50 50 K ()50 50/50 505 G H8 SIDELITE SIDELITE 87X 55 87X 506 50 POUND MAX 50 lb. maximum load on Sill without additional support. SIDELITE Do NOT install before glazing. 87X 50 SIDELITE 87X 50 87X 505

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM WITH TRANSOM NOTE: If applicable, measure and cut Scribe from bottom (straight end) of Jambs and vertical Trim before installing. 5 Position 87x Transom Header and Jambs in opening. Temporarily hold in place. Tape 87x50 with 87x508 Door Header together and lift into place. Adjust to proper height. Do not secure. Insert tabbed 87x Door Jambs into slotted Door Header. Square and secure Door Jambs with 6X58DWSD Drywall Screws. Square and secure Transom Frame with 6X58DWSD Drywall Screws. Secure Door Header 87x508 to 87x50 with 00660 Screws. NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. NOTE: Install Clips as you level and secure each section. Match letters to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. Follow instructions on Page 9 to Glaze Transom. Refer to Page 9 to notch and install 87x05 Trim. Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. D D I TRANSOM 50/50 508 I Trim -5/8 maximum Scribe if applicable. 87x50 TRANSOM 87x508 TRANSOM 87x508 87X 50 87x 50 POUND MAX 50 lb. maximum load on Sill without additional support. Do NOT install before glazing. 87X 508

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM TRANSOM WITH SIDELITE NOTE: Transom Header runs the length of the Sidelite. If applicable, measure and cut Scribe from bottom (straight end) of Jambs and vertical Trim before installing. Assemble Transom Door on ground. Center 87x508 Slotted Header in 87x50 and secure with 00660 Screws. Rest 87x Transom Jambs on top and insert 87x Tabbed Door Jambs into bottom of Header. Insert 87x506 Sidelite Jamb into Transom and Door Jamb. Square and secure with 00660 Screws. Install 87C Clips at both sides of Header. Position 87x Transom Header in opening and temporarily hold in place. Lift Transom Door into opening and slide into place. Level and secure with 6X58DWSD Drywall Screws. Install 87x Sidelite Jamb with 6X58DWSD Drywall Screws. Continue with Steps 5 and 6 on Page to install Floor Track and Subsill next to Door. Then install 87x50 Sidelite Header. NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. D C D I TRANSOM TRANSOM 506 50/50 J ()50 508 506 N 50 SIDELITE 50/50 NOTE: Install Clips as you level and secure each section. Match letters to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. Follow instructions on Page 9 to Glaze Sidelite and Transom. Refer to Page 9 to notch and install 87x05 Trim. 505 G H a b c TRANSOM TRANSOM a 87X 50 87X 50 SIDELITE b 87X 508 87X 50 87X 505 Do NOT install before glazing. 87X 506 50 POUND MAX 50 lb. maximum load on Sill without additional support. 87X 506 5

NOTE: If applicable, measure and cut Scribe from bottom (straight end) of Jambs and vertical Trim before installing. 5 NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. NOTE: Install Clips as you level and secure each section. Match letters to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. Follow instructions on Page 9 to glaze each lite. Refer to Page 9 to notch and install 87x05 Trim. D BORROWED LITE TO FLOOR D Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. D BORROWED LITE (Not to Floor) C 506 BORROWED LITE (Not to Floor) with fasteners suitable for substrate. Install 87x50 Sill and secure to Floor Track 50/50 50/50 with 00660 Screws. 50/50 L O BORROWED LIGHT (Not to Floor) H Follow Step above to install Header and Jambs. 505 H Then install 87x50 Sill next to one Jamb with 6X58DWSD Drywall Screws. D L 50 POUND MAX 50 lb. maximum load on Sill without additional support. Do NOT install before glazing. BORROWED LITE SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM BORROWED LITE BORROWED LIGHT TO FLOOR Position 87x Header and 87x Wall Jambs into opening. Level and secure with 6X58DWSD Drywall Screws. Install, level and secure 87x505 Floor Track Fit 87x506 and 87x Intermediate Vertical together and secure with 00660 Screws. Install next to Sill. Then install 87x50 Sill on other side. BORROWED LITE (Not to Floor) 87X 50 BORROWED LITE TO FLOOR 87X 50 87X 505 BORROWED LITE 87X 506 BORROWED LITE 6

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM CASED OPENINGS NOTE: If applicable, measure and cut Scribe from bottom (straight end) of Jambs and vertical Trim before installing. BORROWED LIGHT TO FLOOR Position 87x509 Header and 87x509 Wall Jambs into opening. Level and secure with 6X58DWSD Drywall Screws. BORROWED LIGHT (Not to Floor) Follow Step above to install Header and Jambs. Then install 87x509 Sill and secure with 6X58DWSD Drywall Screws. NOTE: Space all fasteners (5 mm) at ends and (05 mm) on center. M 509 CASED OPENING TO FLOOR 509 509 M Match Letters with Clip Chart on Page 0. NOTE: This drawing shown with Trim installed. M M 509 CASED OPENING (Not to Floor) 509 509 509 M M NOTE: Install Clips as you level and secure each section. Match letters to chart on Page 0 for correct Clip location and orientation. Install Clips on both sides of frame with 00660 Screws. Refer to Page 9 to notch and install 87x05 Trim. 87X 509 CASED OPENING (Not to Floor) 87X 509 87X 509 CASED OPENING TO FLOOR CASED OPENING 87X 509 87X 509 7

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM GLASS SIZING AND GLAZING GLASS SIZE = D.L.O. + 5/8" or 5/6" GLASS BITE EACH POCKET / Glass /8 Glass NP5 NP8 SB5 SB5 / Glass 9/6 Glass NP8 NP56 NP56 SB5 SB5 Important: Maximum 50 LB ( KG) each Sidelite. Note: Additional shim support under the sill member is required for any loads over 50 lbs ( KG). Glazing Sequence 9 8 6 7 0. Insert glass into deep pocket.. Swing into place.. Slide into shallow pocket.. Lift up into top pocket. 5. Position setting blocks. 5 6. Lower glass. 7. Install 87x 50 glass stop(s). 8. Install WB5 edge block. 9. Center glass. 0. Cut and install glazing gaskets. 8

SERIES 87 OFFICE PARTITIONS CENTER GLAZED WITH -/" TRIM -/" TRIM STRIP NOTCHING AND INSTALLATION (CLIPS ONLY) CRL fabricated frames come standard with trim that is mitered at the outer top corners of the frame. Intermediate vertical trim is straight cut to underside of header and runs through the sill. All vertical trim has an additional -5/8 (. mm) scribe added at the bottom to allow for unlevel floor conditions. Cut trim to desired length at the scribe end only. Trim for hinge and strike jambs is factory notched for hinges and strike plates (S). Customer is responsible for notching over all clips (P,Q and R). R R S Q Q R Q Q R P Q S S S S S P S P R S P R P Q S R 9