DIY MODELS THRALL 5-UNIT ARTICULATED WELL CAR W. Canyon Creek Dr. Maricopa, AZ

Similar documents
1. Underframe/Tank Bottom

Instructions: GSC 60 Flatcar Kit with or without bulkheads Tangent Part Number: and /2016

Instructions: PS-2CD 4000 Model Kit Revised 7/2008

Instructions: Bethlehem 70 ton Riveted Gondola Kit

CONCEPT MODELS SP DOUBLE STACK CONTAINER CARS INSTRUCTIONS Sheep Ranch Rd. Mountain Ranch, CA Web Address:

40 & 50 Foot PS-1 Box Car Assembly Instructions

Scratch Build a Water Tower

Scratchbuild A Backwoods Water Tank Part V - Making the Frost Box and Hanging the Water Spout

CONCEPT MODELS INSTRUCTIONS FOR PRODUCT 60,000 GALLON TANK CAR El Toro Way Stockton, CA 95210

Precision Steel Car s 100 T Steel Coil Car

PS 5077 cu. ft. Boxcar with EOC device. 1:29 scale resin craftsman kit. by Burl Rice

CONCEPT MODELS INSTRUCTIONS FOR THE KASGRO KRL SPECIAL DEPRESSED CENTER FLAT CARS El Toro Way Stockton, CA 95210

Peter Krause ABN

20 ORE CAR INSTRUCTIONS. Kit )rv \M TAURUS PRODUCTS P.0. BOX 6534 ORANGECA m WeWWW. Dronerty efi N456 Inc.

Kit 6.00 ACF Type 27, Class ,000 Gallon Insulated Tank Cars

28 ft. Ventilated (Combination) Box Car

CONCEPT MODELS UTLX 80006,80020 CRYOGENIC TANK CAR KIT INSTRUCTIONS Sheep Ranch Rd. Mountain Ranch, CA 95246

SE5a Instrument Board part 2 - rev 1.1

Southern Pacific C-30-4/6 Bay Window Caboose N-Scale & HO-Scale

HOn3-118 Denver, Boulder & Western Box Car

Tools and Tips: ( 1 )

Tools and Tips: ( 1 )

After the glue dries, trim the trussrod ends with your cutting pliers

Instructions For Corrugated End Van

Lima XPT/HST Re-Powering Conversion

EXTREME LOAD no. TWO

Trim down the piece of casting being pointed to with the tip of the pencil in the first picture. It is only the 'inboard casting that needs to be

Dura-Lock Roof System

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

MobileTrak5 Installation Instructions

129 KITCHEN BASE CABINET 480

INSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Nanton Grain Mill Assembly

Installation Instructions For Slider Casement Air Conditioners

VICTORIAN RAILWAYS GY WAGON

Installing Body Mounted Kadee Couplers on LGB Housecars

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

CA to each one. You may have to hold the end down while to glue sets or use an accelerator like I did.

THE SWALLOW. An interesting, simple, all-balsa speedster of crashproof design. by MALCOLM J. ABZUG

Precision Steel Car s 40 Ft. Stock Car

CONCEPT MODELS INSTRUCTIONS FOR UP DC-10 WING CAR El Toro Way Stockton, CA Web Address:

After the glue dries, trim the trussrod ends with your cutting pliers.

VICTORIAN RAILWAYS QR BOGIE OPEN WAGON

SCHWERE PLATTFORMWAGON TYPE SSY 60TON

Tortoise Switch Machines, Mounted Horizontally

the wire, less is better. And make sure the bends on each truss wire are in line with the other. See the next photo.

C-180 Builder s Manual

O-Aust Kits. QR Class CLF Louvred Wagon Kitset in O Scale 1:48

Clearview Railing System Installation Instructions

FINNEY7 4500G May17 SR 4500G TENDER. Fig 1. Original Appearance. Side raves Sanding gear Front water fillers TIA Water treatment system

CUT OUT FLARES INSTALLATION INSTRUCTIONS FOR 20017, 20018, F100-F150 F250-F350 P.U. & BRONCO CUT OUTS

Application Note. Con-Cor Goose Tsunami Digital Sound Decoder Installation Notes

The Rubley Building Instructions for Assembly of the N scale kit. v1.1

NSWGR Class SRC Refrigerated Wagon Kitset in 7mm Scale

Installation Instructions

Removing and Replacing the Y-truck

Application Note. Bowser-Stewart VO-1000 Tsunami Digital Sound Decoder Installation Notes

CHEVY/GMC SuperRail Mounting Kit #3117

Leafy Greens Spinner Construction Manual

Kentucky 4H Wood Science Plans Notebook. Plans Level 3

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design.

Installation Instructions

American Car and Foundry Type 27 ICC Class 103A & B 7000 and 8000 Gallon Acid Tank Cars

Installation Instructions for Vista Air Vertically Folding Walls

Bowser Baldwin AS-16 Tsunami Digital Sound Decoder Installation Notes

Adding Buffers to the SEM Z van

Application Note. Athearn RTR AC4400CW Tsunami Digital Sound Decoder Installation Notes

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

-1- Coach Instructions.

FUSELAGE CONSTRUCTION

Athearn RTR AMD103/P42 Tsunami Digital Sound Decoder Installation Notes

Flat Style Fender Flares Front Pair. Jeep. Included in Hardware Kit:

V4 Premium Kit. Prusa i3 Build Guide

CHEVY/GMC SuperRail Mounting Kit #4423

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

The Festival Assembly Instructions

N Scale Concrete Coal Dock Instruction Manual

Installation Instructions

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

Ford Cut-Out Fender Flares Rear Pair

Series 1500 Aluminum Door Canopy

Kits SE #1.1 and SE #1.2 GATX Type 30 Class 103 8,000 Gallon Tank Car

Woodchip Loader All Scales

The Virgo/Libra Steam Engine

You can print these instructions by downloading the PDF here: Boxcar Assembly PDF

FORWARD FUSELAGE SIDES & REAR TOP SKINS

INSTALLATION AND CARE INSTRUCTIONS

Ford Ranger / Bronco II Set Part # Rev B 5-04

Shay Tender Frame Fabrication

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

136 PLYWOOD DESK 522

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Tools and Tips: ( 1 )

Field of Armor. 1/6th SCALE TIGER 1 MODEL TANK INSTRUCTIONS

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

PITTS S2S CONSTRUCTION

Building Instructions Diva cabin boat

Transcription:

THRALL 5-UNIT ARTICULATED WELL CAR DIY MODELS 44609 W. Canyon Creek Dr. Maricopa, AZ 85139-5019 DIMENSIONS Length End Units 56 2-5/16 Width (Inside Well at Bottom) 8-1 3/4 Length, Inter. Units 50 13-3/4 9 2-1/2 Over Top Chords Length Over Coupler Pulling Faces 268 8 2-1/2 Between Top Chords Length Over Strikers 265 3-7/8 Length (Inside Well at Bottom) 40-2 WEIGHT Light Weight (Inter. Unit) 31,400 lbs. Capacity Per Unit 126,100 lbs. DAVID ALLEN Page 1 04/24/10

2 DIY MODELS THRALL 5-UNIT ARTICULATED WELL CAR Trailer-On-Flat-Car (TOFC) and Container-On-Flat-Car (COFC) have become a large business for the transportation industry. Shipping lines and truckers as well as the railroads have worked to make this an effective way to handle and transport goods. Containers especially lend themselves to intermodal transport since they are rectangular, have no wheels or other external components; therefore they can be stacked in multiple layers aboard ship. Railroads adapted 89-foot flatcars to carry this cargo inland from ports. This is often done with the unit train concept direct from point A to point B with a minimum of yard switching. In search of greater efficiency, shippers and railroads worked together to find a better method. Southern Pacific designed and American Car and Foundry (ACF) built a group of 5-unit cars articulated to become one car as the railroads look at it. These cars are capable of carrying 35 or 40- foot containers in a stack of two per unit, hence the trade name Double Stack. These cars have an empty weight of about 40,000 lbs. per platform. Since APL was seeking to maximize the efficiency of container carrying railcars, they pursued methods of weight reduction. It was apparent that if they eliminated the bulkheads of the ACF car, a significant weight reduction would be obtained. The only purpose of the bulkheads on the ACF cars was to keep the upper container on the car. Through the use of a prototype car designed and built by the Budd Co. (Lo-Pac 2000) to be used as TOFC and COFC both, APL was able to test the practicality of stacking containers two high by using inter-box connectors which are similar to the ones in use for stacking containers above deck aboard ship. Once this method was determined to be successful, APL in conjunction with Budd and the Thrall Car Co. designed a lightweight well-type railcar, which has become the APL Liner Train of today. The end platforms are capable of carrying two 20 foot containers in the well with a 40 or 45 foot container on top. The intermediate platforms are built to accommodate only a 40 foot container in the well with either a 40 or 45 foot container on top. These cars have an empty weight of about 31,000 lbs. per platform. Initially, 3 trains were obtained with 2 of them operating from Los Angeles to Chicago via UP and CNW and the other from Seattle to the East Coast via Conrail east of Chicago.. Other trains have since been obtained and are running from Los Angeles through Houston and New Orleans via SP and on to Atlanta via the Southern Railway. Trailer Train Corporation has recently acquired Thrall units and will run from the Northwest toward the East. Another modification to the Thrall unit is to add a diesel engine, generator and fuel tank to one of the end units with electrical connections to the other units to provide power for refrigerated containers. These units are painted red as compared to blue for the standard units. All have white lettering. Each unit of a car carries the same road number with a letter suffix (A through E). The relationship of the units is B-C-D-E-A so the railroad practice of an A and B end is maintained. Units A and B have conventional couplers and units A,B and D have air brake equipment. On the reefer units, the power equipment is on the A unit.

3 DIY MODELS GENERAL CONSTRUCTION NOTES Construct the two end units, A and B, which is the minimum possible configuration. You may also construct any inner unit( C,D or E). In the instructions, which follow, references will be made to end units and inner units as there are some slight differences in detailing. The Bill of Material list the sizing of most pieces are easily cut with a chopper or with a hobby knife. Slight trimming may be necessary to insure a close neat fit with a file or sandpaper. Since there are many small parts, fit the parts before cementing. Study all drawings and written instructions carefully before you start construction so you have a good overall idea of the car and its construction. Liquid plastic cement is strongly recommended; do not use the tube type plastic cement as it does not dry rapidly and could also spoil some areas of fine detail. Some type of super glue is also suggested to bond metal parts to the styrene. Observe all caution notices on any type of cement or solvent. A good work surface for working with styrene is Formica, wood, or glass since the solvent does not affect those surfaces directly. A straight edge fastened to the work surface is handy in squaring joints such as fastening the side panels to the bottom frame assembly. CONSTRUCTION 1. Assemble the bottom frame from two pieces of (A) and two cross pieces (B) using the plan view on Dwg. 1 fig A. Next, insert the other crosspieces as per the plan. When this assembly is thoroughly dry, sand all surfaces lightly. 2. Attach side panels(d) to the side sills ( C ) for end units or (L) for inner units). The narrower edge of the side sill should attach to the edge of the side panel as in Dwg. 1 fig D. The lengthwise positioning of the sill to the panel is shown in Dwg.. 1 fig C. When dry sand surfaces lightly. 3. Fasten the side panel assemblies to the outer edges of the bottom frame. Make sure the ends of the side panels are flush with the ends of the bottom frame. Insert the box ends ( G) between the side panels so they sit on.top. of the bottom frame and form a flush fit with the ends of the side panels. Trim to fit as necessary. Attach the two bottom plates (J) as per Dwg.. 1 fig 13. A semi-exploded view of the basic car body is shown in Dwg. 2 fig A. 4. Insert the end platforms (E) for a short end or (F) for long end) between the protruding side sills so the top of the platform is flush with the tops of the side sills and butting up against the previously installed box ends. When thoroughly dry, trim or sand the tops of the box ends flush with the platform tops. Then sand or trim the ends of the side sills and platforms to the same 1ength. 5. Create the male and female link components from.080 x.250 strips per the layout drawing. Cut the pieces to length and drill a hole in the male end for tapping for a 2-56 screw. Drill a clearance hole for a 2-56 screw in the female link. Each male link will have a truck attached with a long 2-56 screw provided with the screw protruding through the link so the opening in the female link will fit over it to act as the articulation joint. 6. Build up a bolster and draft gear support from.080 x.250 styrene. Attach coupler pockets to each long casting so the hole in the pocket lines up with the hole near the end of the casting. Kadee #5 couplers so the ears of the pocket must first be trimmed off. Sand the back of the pocket smooth and glue. Next sand the bottom of the black plastic bolster and fasten it to the cylinder on the long casting with super glue.

4 DIY MODELS 7. Laminate end strips (I) across each long end so the end of the deck and the ends of the side sills are covered. You will have to notch these strips accordingly so the top of, the strip is flush with the top of the platform. Do the same on all short ends using (I) strips. The ends are now neatly finished. 8. The vertical braces on each side panel are strips (K) and should be attached with care. The positioning of these is critical so that custom decals will fit between them properly. This positioning is shown in Dwg. 1 fig C. Now, taper these braces down from the edge of the side sill to the bottom of the side panel where they should be down to 1/32 thick. See Dwg. 1 fig D. This can be done with a flush cutter, file or sanding block but be careful not to mar any other surfaces. Lastly trim and sand the bottom of these braces so they are flush with the bottom frame of the car. This finishes the basic car body. Further detailing instructions are next and this will give the car much of its unique appearance. DETAILING 1. Detailing consists of adding steps, grabirons, and walkways and brake gear. Tools needed are drill bits (#53,76 and 78) to be used in pin vise or variable speed motor tool, pliers, screwdriver and wire cutters. All drilling should be done at this time before adding small bits of styrene details. Dwg. 2 fig A, Dwg. 3 fig B and Dwg. 4 contain information about the holes to be drilled. 2. When drilling is complete, attach grabirons and stirrup steps and fasten with super glue if desired. 3. Attach the walkway risers to the tops of the platforms as shown in Dwg. 4. The drawing is to scale - attach risers carefully, as the walkway will be cut to fit the locations of the risers. If this an A, B or D unit, attach air tank stands. When dry attach air tank, air valve but NOT brake wheel and stand. Use.015 wire to simulate air brake piping. See reference A in the photo for details. 4. For the B end unit only: Fabricate the brake chain hangers from.015 brass wire as shown in Dwg. 3 fig B. Construct the two brake chain pulley brackets from.125 x.015 and.040 x.030 stock provided. Shape the three pulleys from the 3/32 x.040 stock or. See Dwg. 3 fig A for details. Insert the wire hangers at this time. 5. Before fastening the above constructed brackets to the underside of the sill, drill two holes with #78 bit through the side sill from top to bottom as shown in Dwg. 3 fig C. Now attach the two brackets as shown and attach the third pulley to the side of the car body, and finish with the cover plate. Cut the piece of.008 brass wire in half and form the smallest possible hook in one end of each. Thread one of these hooks through the end link of the chain provided and then insert the straight end of the wire through the #78 hole nearest the car end. Pull through all the way and bend over sharply on top of the side sill. Fix in place with a spot of super glue, being careful not to let any drip onto the chain as it will become rigid immediately. When dry snip off the excess wire from the top of the sill. 6. Thread the chain through the pulley system in the manner shown in Dwg. 3 fig C. Finally using the second.008 wire hook, run it through an appropriate link in the chain and insert in the other #78 hole and finish it as described above.

5 DIY MODELS 7. The walkway material should now be prepared. Now refer to Dwg. 4 and the photo. Note that all walkways do not span the complete width of the car body. Dwg. 5 also shows more detail about the walkways. The lateral walkways nearest the ends of all units should be in line with the grabirons. On long ends of units A and B, walkways should stop 1/16 from each side. This leaves room to attach the upright grabs. On all other walkway locations, there will be an equipment box on the left side of one end and the right side of the other end. It is suggested that these equipment boxes be constructed before attaching the walkways. Use the small pieces (.250 x.125 x.015) for inner and outer edges and (.125 x.125 x.015) for the narrow ends of these boxes. The inner edge should attach directly to the walkway riser. The opposite end of these walkways should also stop 1/16 from the edge as above. 8. Small triangular pieces of styrene are used and cut into 1/16 long pcs. and used as load guides. All units have load guides on each side sill at the ends of the box opening. Units A and B also have these at the center of each side but before these are attached, the sill stiffeners should be applied. See Dwg. 1 fig B and C. 9. Cut the ladder stock as shown in Dwg. 4 fig B and D, sand the bottom edge flat and cement in place. A strip of.100 x.020 is cut into ¼ pcs and a #53 hole drilled nearest one end of each. You might perform this more accurately by drilling a #78 or #76 pilot hole first. These are the lift rings and should be attached as in Dwg. 1 fig C. Now attach a brake stand and wheel to the long end of the B unit directly above the chain pulley nearest the end. 10. This should complete the unit(s) and painting and decaling remains. Floquil Light Blue is a very close match for the entire APL car with Floquil Platinum Mist for the tops of the walkways. Prototype decals are available from Protopower Products. One sheet will do all five units of the car.

6 DIY MODELS

7 DIY MODELS Material for 2 End Units Des. Qty. Size Styrene sizes are for HO scale 40 Contnr. Length in scale feet 48 Contnr. Length in scale feet Description A 4.060 x.125 41 6 49 6 Bottom frame side strips B 10.060 x.125 7 0 7 0 Bottom frame cross pieces C 4.l00 x.125 57 0 64 0 Side sills D 4.040 x 2 3 42 6 50 7 Side panels E 2.040 x l-1/8 8 9 8 9 Short platforms F 2.040 x l-1/8 10 3 10 3 Long platforms G 4.040 x 3/8 9 0 9 0 Well box ends H 2.040 x.125 10 3 10 3 Long platform end caps I 2.020 x.125 10 3 10 3 Short platform end caps J 4.015 x.188 9 6 9 6 Bottom end plates inside of well K 36-44.060 x.060 2 9 2 9 Side panel braces Detail Items Refer to Drawings for Location Item Qty. Size (decimal) 40 Well in scale feet 48 Well in scale feet Description 4.080 1 1 Styrene triangular cross sect Load guides 1.030 x.040 8 3 8 3 Brake chain bracket base A/R.015 x.125 8 3 8 3 Bracket sides.040 x.080 4 7 4 7 Chain pulley material 5.040 x.250 2 2 2 2 Long walkway riser(tall) 23.040x.l00 2 10 2 10 Short walkway riser(low) 4.030 x.l00 2 3 2 3 Air tank pedestals 2 Air tanks 2 Air valves 8.015 x.125 2 10 2 10 Equipment box sides 8.015 x.125 2 0 2 0 Equipment box ends 1 Brake wheel and stand 1.020 x.l00 3 0 3 0 Lift ring plate material cut, the round end, drill hole 6 Ladder stock 4.040 x.188 9 9 9 9 See-through walkway if you re rich 4.015 x.060 33 6 33 6 Top side sill braces 4.015 x.080 34 6 34 6 Edge side sill braces 1 3/8 x 2-56 screws Used with center truck 2 ¼ x 2-56 screws Used with end trucks 3 Trucks Roller bearing type 2 Coupler box & Couplers 2.125 x.250 Truck bolsters.125 x.250 x 8 9 24 Grab irons - make from.015 music wire 12 Stirrup steps make from.015 music wire 1 8 pc.015 brass wire 1 2 pcs.008 brass wire 1 4 pcs. chain For brakes on B unit 1 Brake Stand & Brake Wheel

8 DIY MODELS Material for 3 Center Unit Frames De Qty. Size 40 Well in 48 Well in Description s. decimal scale feet scale feet A 6.060 x.125 41 6 49 6 Bottom frame side strips B 15.060 x.125 7 0 7 0 Bottom frame cross pieces C 6.l00 x.125 49 6 57 9 Side sills D 6.040 x 2 3 42 6 49 6 Side panels E 6.040 x l-1/8 8 9 8 9 Short platforms G 6.040 x 3/8 9 0 9 0 Well box ends I 2.020 x.125 10 3 10 3 Platform end caps J 4.015 x.188 9 0 9 0 Bottom end plates inside of well K 54-66 66.060 x.060 2 9 2 9 Side panel braces Detail Items Refer to Drawings for Location Item No. Qty. Size (decimal) 40 Well in scale feet 48 Well in scale feet Description 6.080 triangle? 1 1 Styrene triangular cross sect Load guides 6.040 x.250 2 2 2 2 Long walkway riser(tall) 8.040 x.l00 2 10 2 10 Short walkway riser(low) 2.030 x.l00 3/16 3/16 Air tank pedestals 1 Air tanks 1 on unit D 1 Air valves 1 on unit D 6.015 x.125 2 3 2 3 Equipment box sides 6.015 x.125 2 0 2 0 Equipment box ends 1.020 x.l00 3 0 3 0 Lift ring plate material cut, the round end, drill hole 6 Ladder stock 6.040 x.188 9 9 9 9 See-through walkway if you re rich styrene otherwise! 4.015 x.060 33 6 33 6 Top side sill braces 4.015 x.080 34 6 Edge side sill braces 4 3/8 x 2-56 Used with trucks screws 3 Trucks Roller bearing type 12 Grab irons 12 Stirrup steps 1 8 pc.015 brass wire 1 Brake Stand 1 Brake Wheel

9 DIY MODELS Drawing 1

10 DIY MODELS Drawing 2 Deck Layouts

11 DIY MODELS

12 DIY MODELS

13 DIY MODELS

14 DIY MODELS

15 DIY MODELS