Pacifica / DLG-52(E) Shower Cabin Installation and User s Guide

Similar documents
Sector Shower Enclosure Installation Instructions

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

FLEX SHOWER DOOR INSTALLATION INSTRUCTIONS

FLEX ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

FLEX 48 x 72 / 60 x 72

CAVALIER. Shower Door Installation Instructions

UNIDOOR (STYLE B & C)

CORNERVIEW / FRENCH CORNER

FLEX 28 / 32 / 42 x 72

MIRAGE-X / BELLA. Shower Door Installation Instructions

AQUA ULTRA SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

SHOWER ENCLOSURE INSTALLATION

ENIGMA AIR ENCLOSURE

Thank you for your order

ASSEMBLY INSTRUCTION CONTENT

SHOWER DOOR INSTALLATION & CARE GUIDE

PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

UNIDOOR (STYLES B&C)

CORNER ENTRY ENCLOSURE

PRISM SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

TD10A INSTALLATION GUIDE TUB DOOR

UNIDOOR X (STYLE L1)

UNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##

OSBORNE SHOWER DOOR INSTALLATION

TETRA SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

1 p

ASSEMBLY INSTRUCTIONS

ESSENCE. Shower / Tub Door Installaion Instructions

Installation Instructions. Walk-in Shower Screen. with 180 Return Panel

ELEGANCE SHOWER DOOR INSTALLATION INSTRUCTIONS. For more information on DreamLine TM Shower Doors please visit

SHOWER DOORS INSTALLATION INSTRUCTIONS SHOWER DOORS: LBSDD Version 4.0

Installation Instructions

UNIDOOR LUX (STYLE E)

INSTALLATION INSTRUCTIONS

FRENCH LINEA PANEL SHOWER PANEL INSTALLATION INSTRUCTIONS

SHOWER ENCLOSURES INSTALLATION INSTRUCTIONS SHOWER ENCLOSURES:

Cleaning. This instruction will cover installation of the following units Codes:

VANITY CABINET + MIRROR VANITY SET: LV1-30 INSTALLATION INSTRUCTIONS. Version 1.1

LUXURY CURVED QUADRANT SINGLE DOOR

Elegance Shower Door & Base Kit

ESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

INFINITE RANGE - HINGE DOOR

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

MIRAGE-X / BELLA SHOWER AND TUB DOOR INSTALLATION INSTRUCTIONS

ALLURE SHOWER DOOR INSTALLATION INSTRUCTIONS

Visions Tub Door & Backwall

Assembly Instructions Pivot Door

Step-by-Step Installation Instructions for

Pressure Balance Shower Only Dual Control (Volume & Temperature) Ceramic Disc Cartridge Platinum Shower Trim Kit

MIRAGE SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

SEBASTIAN TUB FAUCET INSTALLATION

Step-by-Step Installation Instructions for

INSTALLATION INSTRUCTIONS

*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.

Deauville Installation Guide

DESIGN QUADRANT SINGLE DOOR

PARAGON BATH SHOWER DOOR/ BATH TUB SCREEN INSTALLATION INSTRUCTIONS. DR-584b

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

Portofino Case2 Installation Guide

QUADRANT SHOWER ENCLOSURE

Installation Instructions

B A T H R O O M G L A S S

Deauville Installation Guide

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

QUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

MIRAGE-X SHOWER AND TUB DOOR INSTALLATION INSTRUCTIONS

Acrylic Claw Foot Tub

ELEGANCE MODEL: STYLE: SELECTOR: Please choose your door model, style and selector according to your order for easy installation.

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

ENCORE / BRAVO SHOWER AND TUB DOOR INSTALLATION NSTRUCTIONS

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Portofino Installation Guide

ONASSIS SHOWER SET INSTALLATION

UNIDOOR/UNIDOORLUX/UNIDOOR PLUS

SHELTON THERMOSTATIC SHOWER PANEL

UNIDOOR PLUS (STYLE F)

CALLAS THERMOSTATIC SHOWER SET

INFINITE RANGE - CENTRE FOLDING DOOR

Assembly Instructions Sliding Shower Enclosure

Monaco Installation Guide - Surface Profiles

INFINITE RANGE - CENTRE FOLDING DOOR

VANITY SET: LV4 INSTALLATION INSTRUCTIONS VANITY CABINET + VANITY TOP + MIRROR. DRAWER BASE SINK BASE LV4-24 LV4-30 LV4-36

ENIGMA. 60 wide 72 wide

CAELI THERMOSTATIC SHOWER PANEL

INSTALLATION INSTRUCTIONS

Frameless Inline Door With Return QCI5263

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

NEPAL Installation procedure

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

UNIT No FRAMELESS PIVOT SHOWER DOOR

Frameless Hinged Door Enclosure. These instructions must be left with the user. Installation Guide W2-B

Infinity-Z Tub Door & QWALL-TUB Kit

ENIGMA. 60 wide 72 wide

Slider Door Installation Instructions

Installation Instructions

Transcription:

Pacifica / DLG-52(E) Shower Cabin Installation and User s Guide I. Mounting Preparation 1. After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for shipping damage. If the unit has been damaged or has a finishing defect, please contact your local distributor within 2 business days. Please note that DreamLine Guarantee will not cover shipping damage or such finishing defects once the unit has been installed. Your distributor s responsibility for damage in transit is limited after the shower package has been transferred to the transportation company, so you may have to contact the transportation company directly to report damage. Contact your distributor or DreamLine if you have any questions. 2. You should make sure that the floor is leveled and solid and will be able to support the total weight of the unit and its occupant. You should also consult your local building codes on questions on installation compliance standards. 3. Install all of the required plumbing and drainage before securing the shower. Use a competent and licensed (if required by local code) plumber for all plumbing installation. 4. Please insure that prior to the installation the floor is leveled and the walls are at right angles. While some adjustment in leveling of the tray is possible, irregular floor level or improper angle of side walls will result in serious problems for your installation. Please, note that there are some adjustments and drilling might be necessary during the installation process. 5. Necessary Tools: Screwdriver, Electric drill, Regular drill bits (1/8, /64 ), Phillips screwdriver, Level, Measuring tape, Pencil and Stepladder. Bear in mind that you will need at least two people to assemble the unit. 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E 1

ON OFF ON OFF GW-2232 Comfort shower CONTROLLER * II. Packing List Roof plate cover optional (1 set) Shower control panel (1pcs) Main panel (1pcs) Mirror panel (1pcs) Shower tray (1pcs) Bolt M6X16+ washer (18pcs) Bolt M6X25+ washer (40pcs) Screw M4X8+ Locating rubber stopper (8pcs) 1 Screw M4X8 (8pcs) Guide rails (2pcs) Entry doors (2pcs) Waterproof plastic strips (2pcs) Front cover profiles (2pcs) Side glass panels (2pcs) Back cover profiles (2pcs) Handles (2pcs) 3 8 9 10 11 2 12 13 4 14 6 6 16 15 5 Parts Tray pre-installation instructions Step 1 Step 2 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E 2

Step 3 Step4 1. Choose the place where you will locate the tray, mark it because you may need to move it out from the position for better assembling procedure (Step 1) 2. Unwind the legs to level the tray in case the surface is uneven (Step 2) 3. Check on the drain if it fastened tight enough to make sure it won t leak after complete tray installation (Step 3). 4. Check all the hose connections also to prevent leakage. Your plumber may want to replace the flex hose to hard PVC pipes which is also possible. One of the ways on how to change flex hose to hard PVC pipes: Disconnect the flex hose from the shower drain unit. Fasten the 1 ½ hard PVC pipe to the drain. Using the trap adaptor with washer and plastic nut fasten the PVC pipe to the adaptor from 1 ½ to 2. III. Mounting Process: 1. Clean the bottom of the main panel and the tray boarder with alcohol before applying clear silicone. Fasten the main panel to the shower tray using part #1. (NOTE: Do not over tight the bolts). Do not forget to apply silicone on the edges of the panels before fastening (Steps 1, 2, 3). 2. Clean the surface of the main panel and the tray and apply silicone on the edges. Make sure you apply enough silicone in the corners (Step 4, 5). 3. Fasten the mirror panel to the tray and to the main panel, making sure you clean the surface and apply silicone to the edges (Step 6, ). 4. Secure the control panel to the main panel and to the tray (Step 8, 9). 5. Step 10 the back panels assembly. 6. Secure the mirror to the mirror panel using part #3. Place the screw cap to cover the screw (Step 11, 12).. Clean the surface of the control panel and the stationary glass. The stationary glass has screw holes on the side of the metal profiles. Please, make sure you apply silicone to the side of the control panel and to the bottom of the stationary glass to prevent from leaking. Secure the stationary glass to the control panel using shorter bolts. It might be easier to use long nose pliers to hold the nut and secure the bolt with the drill (Step 13, 14, 15, 16). 8. To make sure the water doesn t leak through the corners and through the holes between the stationary glass and the tray, apply a thin layer on the inside part of the stationary glass (Step 1, 18). 9. Position the guide rails, clean the surface and apply silicone on the parts to be attached (Step 19). 10. Fasten the stationary glass to the guide rail using security screws (screws with chopped end) (Step 20, 21). 11. Repeat the same step with the top guide rail (step 22). 12. Fasten tight all the bolts on the back panels (Step 23). 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E 3

13. Attach the jet hose to the valve on the back of the control panel (that is the second valve from the top) (Step 24, 25). 14. Insert the metal profiles into the stationary glass metal frame (Step 26). 15. Secure the rubber stoppers using part #2 (step 2). 16. Slide the doors from the inner middle of the guide rails (Step 28). 1. Attach the waterproof plastic strips to the edges of the doors (step 29). 18. Connect the flexible shower hose (Step 30, 31) 19. Attach handles using part #4, 5 (Step 32). 20. Seal the joints between the metal profiles, guide rails and the tray. 21. According to the operating instructions, have a thorough check on the water supply pipes, and the shower enclosure. 22. Make sure all the preparation work is completed. Have a water supply test. Make sure the unit operates at its normal conditions, and then move the mounted enclosure to the right position. NOTE: Allow 24 hours for the silicone to set before testing or using the shower. NOTE: Improper application of silicone sealant may cause your shower to leak. Notes: Our products are subject to modification without further notice. Step 1 Step 2 Step 3 Step 4 Step 5 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E 4

Step 6 Step Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15 Step 16 Step 1 Step 18 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E 5

Step 19 Step 20 Step 21 Step 22 Step 23 Step 24 Step 25 Step 26 Step 2 Step 28 Step 29 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E 6

Step 30 Step 31 Step 32 2002-2006 DreamLine. All Rights Reserved Pacifica/DLG-52E