شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

Similar documents
SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

شركة كهرباء محافظة القدس المساهمة المحدودة JERUSALEM DISTRICT ELECTRICITY CO. LTD.

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

Group F : Sl. No. - 1) 33/0.403 KV, 100 KVA Station Transformer GUARANTEED & OTHER TECHNICAL PARTICULARS. Table : A

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

save energy, it is precious SYNERGY transformers Mfg. of all types of Distribution / Power & Furnace Transformers

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED (SOUTHCO UTILITY)

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

APDRP SCHEME, WESCO. Technical Specification for Distribution Transformers ( 11/0.4KV ) PART 1: GENERAL

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

Basic Principles and Operation of Transformer

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS

VI 3 - i TABLE OF CONTENTS

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS

DISTRIBUTION TRANSFORMER kv

PUBLIC POWER CORPORATION ENGINEERING & CONSTRUCTION OF TRANSMISSION PROJECTS DEPARTMENT

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

Substation Preventive Maintenance

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

PRESENTATION ON IS 1180 (Part 1): 2014 DISTRIBUTION TRANSFORMERS SHYAM KUMAR SCIENTIST B ELECTROTECHNICAL BUREAU OF INDIAN STANDARDS

DISTRIBUTION TRANSFORMER 11 / kv

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

51-SDMS-02 SPECIFICATIONS FOR DISTRIBUTION TRANSFORMERS UP TO 36KV 400/230 VOLTS

CONDITIONS FOR A TENTATIVE APROVAL FOR CONNECTION OF TRANSFORMERS

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

51-SDMS-04 SPECIFICATIONS FOR. DISTRIBUTION TRANSFORMERS UP TO 36 kv WITH ALUMINUM WINDINGS FOR DUAL SECONDARY 400/230 V AND 230/133 V

Transformer Protection

General Electricity Company of Libya

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

Prolific Systems & Technologies Pvt. Ltd. CORE DETAILS. CENTRE Figure - II L-2 X Y Wt-2

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation Equipment

TECHNICAL SPECIFICATION OF ELECTRICAL MATERIALS CT & PT GROUP C

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

SECTION VI TECHNICAL SCHEDULES

SPECIFICATION No SS-88/5 630 kva, 30 / 0.4 kv THREE-PHASE TRANSFORMERS WITH ON-LOAD TAP CHANGER

S. C. Electric Cooperative s Specification for a Single-Phase, Single Bushing Overhead Distribution Transformer (Revised 10/2013)

POTENTIAL TRANSFORMER

Introduction. Centrado leading-edge transformer. Introduction

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

Pomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers

7. INSPECTION AND TEST PROCEDURES

HOW TO SAFE GUARD THE TRANSFORMER..???

MESP TECHNICAL SPECIFICATION FOR A 1500V DC RECTIFIER TRANSFORMER

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class

No. COA/BHL/2018/293 Dated: REQUEST FOR QUOTATIONS

1ZSC AAJ en, Rev. 1. Vacuum on-load tap-changers, type VUBB Technical guide

TECHNICAL DATA TYPE CMD OIL-IMMERSED ON-LOAD TAP CHANGER

Hands-On Transformer Testing and Maintenance

SPECIFICATION No SS-135/ kv METAL OXIDE SURGE ARRESTERS WITHOUT GAPS

Liquid-Filled Transformers

Commissioning Manual Distribution Transformers - Three-phase Oil Filled

SPECIFICATION GUIDE. ABB Power Technology, S.A. Zaragoza, SPAIN. ABB Power Technologies Distribution Transformers

SPECIFICATION FOR 11 KV CLASS, 24/15.7, 30/19.7 & 45/29.5 AMPS SPECIAL DESIGN TRANSFORMERS.

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

Mechanical Design. Brian Brinson Mechanical Design Manager.

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR TESTING & COMMISSIONING OF TRANSFORMERS AND RELATED SWITCHGEARS

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

012: 2015 CEB SPECIFICATION GALVANIZED STEEL WIRE (EXCEPT SHIELDING WIRE FOR TOWER LINE APPLICATION)

Electrical Description

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

220/132 kv, 150 & 100 MVA; 132/66 kv, 50 MVA AUTO TRANSFORMER

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

On-Load Tap Changer Type M

EARTHING TRANSFORMER

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

PPC TECHNICAL SPECIFICATION D/ NCMD / THREE-PHASE DISTRIBUTION TRANSFORMERS

SECTION TRANSFORMERS

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

TECHNICAL SPECIFICATION

Problems connected with Commissioning of Power Transformers

TECHNICAL SPECIFICATION FOR 22 KV CURRENT TRANSFORMERS

TRANSFORMER TECHNOLOGY GPT

WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

Arc Suppression Coils

OIL-IMMERSED ARC-SUPPRESSION COILS

TECHNICAL DESCRIPTION ND-387. THREE-PHASE TRANSFORMERS, 150 / 21kV, 40/50MVA AND 20/25 MVA, Dyn1

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

POWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

TECHNICAL DATA TYPE CV & SV OIL-IMMERSED ON-LOAD TAP CHANGER

User s Manual For CT Model IMB

220/11 kv, 50 MVA and 25 MVA POWER TRANSFORMER

ISSN: [IDSTM-18] Impact Factor: 5.164

S&C Series 2000 Circuit-Switchers Outdoor Transmission (69 kv through 230 kv)

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Distribution/Substation Transformer

1ZSE en, Rev. 6. On-load tap-changers, type UBB Technical guide

Powering Your Business

TECHNICAL SPECIFICATION OF 11 KV AND 22 KV THREE PHASE FOUR WIRE, THREE

SYRIAN ARAB REPUBLIC MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION THE ELECTRICITY (PEDE) SPECIFICATIONS FOR

CUSTOMER SUPPLIED HIGH VOLTAGE METERING UNIT SPECIFICATION FOR 11, 22 & 33 kv

Maharashtra State Electricity Distribution Co. Ltd.

TAP CHANGER SELECTING MANUAL TECHNICAL DATA

POWER/DISTRIBUTION TRANSFORMER PERFORMANCE EVALUATION.

Transcription:

Our Ref : 2/2018- Date : Messrs: Dear Sir, Tender 2/2018 Main Transformers You are kindly requested to quote for the supply and delivery DDP to our stores the transformers detailed in the attached schedules and conditions stated in this tender. The transformers will be required to operate satisfactory at altitudes varying from 400 meters below sea level to 850 meter above sea level and in max. Temp. of 50C and min. temp. of 5 C below Zero. All transformers shall be of low losses type, the winding material shall be made from high grade electrolytic copper. Formula for losses is attached, and this will be applied in evaluation. The design and construction of the transformers shall be in accordance with the latest IEC recommendation. All materials should be of the best quality and suitable for tropical conditions. The on-load tap changer type should be MR or ABB Europe manufactured and must be suitable for daily operation on the load during the transformer life. Every tender should be accompanied with three copies of catalogues and detailed drawings. After the awarding of this tender, the contractor should undertake to submit details plans, wiring diagrams, installation instructions, etc. for our formal approval and later execution. Bidders can offer materials which are slightly different from the requirements specified, if it forms more modern or advanced improvement. The company shall be at liberty to order part of this tender, or change the quantities required and does not bind itself to accept any or the lowest prices.

Essential Bidding Requirements: - A bank certified check or a bank guarantee of 5% of the total tender valid for 90 days, to be submitted as a bid bond, otherwise, quotation will be neglected. - Quotation should be enclosed in a sealed envelope or package and handed over to the Tender Committee by the representative of the bidder or their agent not later than February 15 th, 2018 at 11:00 AM. - TENDER DOCUMENTS FEES: 1500 US$. A proof of payment should be sent by email to : rnashashibi@jdeco.net. - The main offer envelope or package should include three separate envelopes as follow : a. The financial offer in a separate sealed envelope. b. The technical offer & catalogues placed in a separate sealed envelope. c. Your bid bond in a separate envelope. - Technical offer will be studied separately from the financial offer. The financial offers for bidders whose technical offers do not meet JDECO s technical requirements will not be opened. - In case offers are submitted by an agent on behalf of a certain supplier, a copy of the agreement between the agent and the supplier must also be submitted. Such copy has to be authenticated and certified by the chamber of commerce at the supplier s country of origin. - Offers have to be attached with a letter confirming the authorized persons signing on behalf of the bidder. Any bid package not according to the above will not be considered. Payment method: 30 days after delivery of goods through cash against documents. Yours faithfully, Hisham Omari Managing Director

Tender 2/2018 Technical Details Item 1 : Two units of 15 MVA 33/11 kv 50 Hz outdoor T/F with on load tap changer operated automatically by an automatic voltage regulator mounted in an indoor cabinet to keep the secondary voltage within pre-selected limits. Details of on load tap changer (OLTC), Motor Drive & Voltage Regulator (AVR):: 1/1 Transformer should be supplied with an on load tap changer (OLTC) type MR or ABB Europe. The bidder should supply details of the tap changer offered, together with catalogues and drawings. 1/2 Accessory equipment for tap changer should include the following on the transformer: a- Operation counter b- Safety switch interlocked with hand crank c- "Remote-Local" selector switch d- Local "raise-lower" control switch e- Buchholtz relay f- Pressure relief valve g- h- Oil level indicator Indoor cabinet for tap changer relay and auxiliary control circuits (Tap changer position meter, L/R switch, indication lamps, etc) The motor drive unit of the OLTC must be installed in a rigid control cabinet, protection class IP 66, made of 4 mm thick aluminum alloy and equipped with padlock facility. The transmission gear of motor drive shall be of belt-type drive. After the door of the motor drive unit is opened, no voltage-carrying components must be able to be touched. A rigid aluminum pocket for storing the concerned circuit diagram shall be securely fixed on the inner side of the front door. An innovative LED hand lamp for the illumination on the internal side of the motor drive must be provided, which lights up when the panel door is opened.

Details of Automatic Voltage Regulator (AVR): Each transformer should be supplied with (AVR) controller to control the driving mechanism of each (OLTC) operation to keep the secondary terminal voltage within pre-selected limits irrespective of loading. The input voltage of the AVR from The potential transformer is 110 V AC. The power supply for the AVR relay is 110V DC The tap changer motor supply voltage is 400V L-L three phase AVR should have abnormal control response functionality. The (AVR) with its accessories should be enclosed in a cabinet made from 2mm sheet galvanized steel and to be designed for indoor floor mounted installations with the following facilities: 1- Tap changer position indicator 2- Automatic Manual Operation Selector Switch Raise Lower 3- Raise Lower for Tap-Changer Working 4- Main Power Supply for A.C & D.C and other facilities you find necessary to be added. 5- Selector switch for master, slave, independent working 6- Facilities shall also be provided to prepare the transformer for operator with one or more transformers on the master-slave principle. 2. Accessories: Each transformer must have the necessary fittings and accessories which must include the following: a- Conservator tank complete with all accessories. b- Silicia Gel dehydrating breather in a convenient floor height. A stainless steel filter at the bottom shall protect the silica gel chamber against external environment influences. c- Double gap arcing horns on both sides d- Bucholz relay device with "Gas-Alarm" and "Surge-Trip" contacts and arrangement. e- Pressure relief device. The trip contacts (IP65) with an operating time within 2ms - must be directly activated by a self locking pin. All important parts like trip contacts, springs must be mounted inside (under the aluminum cover). f- Winding temperature indicator with alarm and trip contracts and max rest pointer. The view glass must be laminated safety glass with a UV-filter.

g- Oil temperature indicator as in Item f. h- Connection box all the pilot cable termination. i- Remote tap position indicator, thermometer pocket, oil level indicator, lifting, jacking haulage, facilitate, tank earthing mark, oil fitting facilities. j- Outdoor metal cover to protect the bushings from being short circuited by any animal. A solid cover made from non-corrosive aluminum must be used as the protection against accidental touch of the drive shaft arrangement between motor drive unit and OLTC. k- HV bushings insulation should be at least 40kV. LV bushings insulation should be at least 20kV. 3 Loading, Site, Altitude and Weather: Transformer should be capable of continuously operating at 112% of nominal rating with 60C rise of resistance without any loss of its life. Transformer should operate satisfactory in the following conditions: a- Site Jerusalem Area b- Altitude above sea level 850 meter c- Weather Lowest Temp. 5C below zero. Highest Temp. in shade 50C taking in mind that the transformer will be in open air and exposed to the sun. 4 Tests: As shown on the attached sheets of schedule (B) the company demands to witness testing of these transformers. Transformer Design: 1. Electrical systems and fault levels: The transformers shall be suitable for continuous operation on a three phase 50 Hz, at the nominal voltages specified: 33 kv, 11 kv The system highest voltages are 10 percent in excess of the nominal voltages 36 kv, 12 kv. The nominal design 3-phase fault levels of the systems will be 33 kv : 16 KA 11 kv : 20 KA

2. Insulation Levels: The impulse withstand levels of transformers shall be designed according to IEC standards and not lower than the following when tested in accordance with IEC. 33 kv : 195 kv 11 kv : 95 kv Losses and Evaluation: The bidder shall state in the schedule of particulars and guarantees guaranteed values for component losses (i.e. no load loss, load loss at CMR) Tenders will be assessed on the basis of the least "Present-Worth" of capital cost plus guaranteed losses, being the sum of the installed tender price of the transformers plus: 6000$/kW for No load loss, and 4000$/kW for load loss. The maximum allowed No-load loss is 11kW The maximum allowed Load loss is 80kW Impedance voltage is: 10% Maximum allowed magnetizing current at HV side is 0.3% Transformers exceeding the maximum allowed losses metntioned above will be rejected. No tolerance is allowed. Temperature rise: The temperature rise of the transformers must not exceed 50/55C deg as a result of temperature rise test according to IEC standards. Noise level: The noise level of the transformers should not exceed 60dB at 0.3 meter when tested according to IEC standard. Transformer bushings cover and cable glands: The HV and LV bushings of the transformers must be covered with two separate boxes to prevent access to transformer bushings and cable terminations. a- HV side cover:

Three cable openings with cable glands suitable for cable of type N2XS(F)2Y 150mm 2 cross section b- LV side cover: 7 cable openings with cable glands suitable for cable of type N2XS(F)2Y 300mm 2 cross section.

Tender 2/2018 Table "A" General particulars & Guarantees Blanks to be filled by Bidders No. Description Details 01. Continuous Max. Rating MVA 15 02. Normal Transformation Ratio KV 33/11 03. H.V. Side KV 33 04. L.V. Side KV 11 05. Frequency HZ 50 06. Mounting Arrangement Outdoor, Floor 07. No. of Phases 3 08. Phase a- H.V. Winding. b- L.V. Winding. c- Vector Group of Main Winding Delta Star DYn 11 09. Cooling ONAN 10. Voltage Control On Load 11. Range of Voltage Control ±15% 12. Size of Step 2.5% 13. Voltage of Star Point to Earth Full Line Voltage 14. Line Terminal: a- H.V. (3ph). b- L.V. (3ph & N) 15. Supply Voltage Available Ac Dc 16. Type of core material 17. Method of core clamping 18. Max. Flux Density Cores Yoke Tesla Tesla 19. Magnetizing Current H.V. Side % 20. No. load losses at normal ratio KW 21. Load Losses at full Load and Ratio 33/11 KV KW Porcelain Bushings

22. Load for Max efficiency 33/11 KV MVA 23. Max Efficiency % 24. Regulation at full load a- unity p.f. b- 0.8 p.f. 25. Impedance Voltage at full load & 75C Bet H.V. & L.V. 33/11 KV (around 10%) 26. Min. crepage path of H.V. Bushing (around 100 ) % % Cm 27. Min. crepage path of L.V. Bushings Cm 28. Max and min. air gap of the double gap Cm arcing horns on H.V. 29. - Ditto but for L.V. Side Cm 30. Thickness of transformer tank Cm 31. Dimentions: Height, Length, Width Cm 32. Weights: a- Core b- Windings c- Oil d- Transformer for transport. e- Total weight. 33. a- volume of conservator (liters). b- volume of oil in conservator (liters). 34. Size of dehydrating breather Ton Ton Ton Ton Ton

The following tests are to be conducted. WORK TESTS: 1. Summary of Tests: Tender 2/2018 Schedule "B" Tests A- Transformers Routine and type tests. B- Voltage Control Equipment Routine and Type Tests. C- Magnetic Circuit Routine Tests. D- Cable Boxes and disconnecting Chambers Routine Tests E- Porcelain Insulators Routine, Sample and Type Tests to IEC. 168. F- Complete Outdoor Bushing Assemblies Routine, Sample and Type to IEC 137. G- Tanks routine Testes and Type Tests. H- Cooling Plant Routine and Type Tests. I- Gas and Oil Actuated Relays Routine and Sample Tests. J- Galvanizing Routine Tests. 2. Transformers A- Routine Tests: All transformers shall be subjected to the following routine testes in accordance with IEC. 76. 1- Measurement of Winding Resistance. 2- Ratio, polarity and phase relationships. 3- Impedance Voltage. 4- Load Loss. 5- No load loss and no load current. 6- Induced over voltage withstand. 7- Separate source voltage withstand. 8- Insulation resistance. B- Type Tests: Temperature Rise Test: The test shall be in accordance with IEC. 76 and shall be carried out on one main power transformer. Temperature Rise Tests shall be conducted on the tapping corresponding to the maximum losses.

C- Noise Level Test: The test shall be in accordance with latest IEC standard and shall be carried out on one main power transformer. C- Special Tests: Impulse voltage withstand tests: These shall be made on each transformer and shall include the following requirements: 1- The transformers shall have been subjected to the above routine tests prior to the impulse-voltage withstand test and those transformers subjected to the temperature rise test shall be impulse tested as soon as practicable thereafter. 2- The procedure shall be as required by IEC. 76-1979 clause 46 the impulse test voltages being applied successively to each line terminal. Negative polarity is to be used throughout the tests. 3- The sequence of voltage applications shall be: A Impulse calibration test at 75 percent of the specified full wave voltage. B One 100 percent full wave voltage application. C Two 100 percent minimum chopped wave voltage application. D One 100 percent full wave voltage application. - Oscilographic records of the applied voltage and neutral current and/or transferred voltage are to be taken and included in the records. - Films of the oscillographic records are to be made available to the engineer at time of the tests for his examination. - External flashover of the bushings during the chopped wave tests is NOT permitted. Zero Phase Sequence Impedance Measurement: This test shall be in accordance with IEC. 76 and shall be carried out on each transformer. 3. Voltage Control Equipment: Routine Tests: Each finished tap changer is to be subjected to the mechanical and dielectric routines tests, specified in IEC. 214. Type Tests: Shall be carried out entirely in accordance with IEC. 214. Magnetic Circuit:

4. Routine Tests: Each core completely assembled is to be tested for one minute at 2500 volts a.c. between core bolts, side plates, structural steel works and core and coils stage. After the transformer is tanked and completely assembled, a further insulation measurement test is to be applied at 500 Vd.c between the core and the earthed structural steel works to prove that the core is earthed through the removable link at one point only. 5. Cable Boxes and Disconnecting Chambers: Routine Tests: to meet the requirement. 6. Porcelain Insulators: The following tests are to be made on not less than 2 percent with a minimum of two, of the porcelain insulators of each type in the contract. A- Temperature Cycle Tests. B- Porosity Test. 7. Complete Outdoor Bushing Assemblies with Porcelain Insulators Routine tests to include: A- Oil leakage test. B- Voltage test. C- Power Factor Voltage Measurements. Type tests to include: A- Dry withstand and flashover voltage tests. B- Visible Corona test. C- Wet voltage withstand test. D- Wet flashover test. E- Impulse voltage test. F- Flashover under oil test. 8. Tanks: Routine Tests: A Oil leakage All tanks, conservators and oil filled compartments which are subjected in service or during maintenance to oil pressure are to withstand without leakage, a hydraulic pressure test equal to 69 KN/m 2 or the normal pressure plus 34 KN/m 2 whichever Type Tests: Unless Type Test Certificates can be produced for tests carried out on similar equipment, the following tests are to be included for tanks, conservators and pressure relief devices.

A. Vacuum Test The equipment is to withstand effectively full vacuum (25m bar absolute pressure) when empty of oil. The permanent deflection of plates or stiffness on removal of vacuum is not to exceed the following values. Length of Plate Permanent Deflection Less than 1300 mm 3.17 mm 1300 to 2500 mm 9.5 mm Greater than 2500 mm 12.7 mm B. Pressure Test the equipment is to withstand a pressure corresponding to 69 KN/m2 or the normal pressure plus 34 KN/m2 whichever is the greater. The permanent de-flections of plates or stiffeners on removal of pressure is not to exceed the values stated in respect of the vacuum test in the preceding paragraph. 9. Gas and Oil Actuated Relays Routine Test: A- Oil leakage when subject to an internal oil pressure of 207KN/m2 for 15 minutes. B- Gas collection. C- Oil Surge. D- Performance test under service conditions including starting and stopping of oil pumps. E- Voltage 2 kv for one minute between electrical circuits and casing. 10. Galvanizing: Routine Tests: to the requirements of ISO Recommendations.

Tender 2/2018 Schedule C Manufactured and Suppliers Item Description Type Manufactured 1. Transformer Complete 2. On Load Tap Changer 3. Bushings 4. Oil 5. Control Panels 6. Breather 7. C.T. 8. Relays 9. V.T. 10. Indicating Instruments 11. Core Plates 12. Insulating Popper 13. Insulating Cylinders 14. Copper 15. Core Plates 16. Motor Control Equipment Delivery: 1. Date of which transformer would be ready for testing. After Commencement date Weeks. 2. Date of which transformer would be ready for delivery. (DDP) weeks after commencement dated Weeks. Date: Signatures

Tender 2/2018 Schedule (D) Item Description Qty. Unit Price Total Price 1. 15 MVA 33/11 kv power T/F 2 2. Spare 44 kv Bushings 4 3. Spare 20 kv Bushings 4 4. Oil level gauge 1 5. Sets of Gaskets 1 complete set 2 for each type of transformer 6. Sets of tap changer spares 2 7. Gas/Oil relay one of each size 1 8. Winding temp. indicator 1 9. Explosion vent diaphragms 1 10. Oil Temp. device 1 11. A.V.R. relay 1 12. Tap position indicator 1 13. Additional recommended spare parts by the bidder Total Contract Value (D.D.P.)