Charlotte County Utilities DESCRIPTION

Similar documents
Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

1.1 GENERAL RECORD DRAWING REQUIREMENTS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

Plan Submittal and Review Checklist

Clarifications in italics added July 2018

10010 RECORD DRAWING INFORMATION

CITY OF MUSKEGO DRAFTING STANDARDS

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

Babcock Ranch Water Utilities as operated by Town & Country Utilities and Babcock Ranch Irrigation

List of Figures. List of Forms

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

CHAPTER 11. Plan Standards

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

KC Water Rules and Regulations For Water Main Extensions and Relocations

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

Plan Preparation Checklist

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

3. DESIGN SPECIFICATIONS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Record Drawing Standards for Projects Version 2.1

Washington County Road Engineering Plan Submittal/Review Checklist

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Lincoln County Public Works Water and Sewer Submittal Application

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

WATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS

GENERAL RESPONSIBILITIES, REQUIREMENTS AND PROCESSES 1.1 ENGINEER OF RECORD REQUIREMENTS & RESPONSIBILITIES. A. Requirements

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

1. Land survey Work. 2. Civil and Structural engineering services.

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Charlotte MINIMUM WATER PROJECTS. 1 of 27

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

APPENDIX D: DRAWING SUBMISSION STANDARDS

City of Massillon Site Plan Checklist

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

Chapter 13 Plan Submittals

Grease Interceptor Design Checklist

STATE UNIVERSITY CONSTRUCTION FUND

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

B17. Sewer Site Plans BULLETIN

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

Public Works City of Lebanon, Tennessee; Department of Public Works

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

Construction Documents (CDs) Checklist

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

SUBDIVISION PLAT APPLICATION

Conceptual, Preliminary and Final Site Plan Review in Holladay City

PRELIMINARY PLAT CHECK LIST

SECTION SITE SURVEYS

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Specifications for Land Surveys January 2014 Version

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

Town of Westlake Construction Plans Review Checklist

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Oil-Water Separator Design Checklist

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

CONCEPT REVIEW GUIDELINES

Porter County Plan Commission

Sewer Line Extension Permit Design Checklist

The above deliverables are to be provided as a zip file to your ILAWC Engineering Project Manager.

PART XII: TOPOGRAPHIC SURVEYS

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

Appendix C Construction Details

CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO.

City of Palmetto Florida

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

Council Policy Engineering Drawing Submission Requirements

SECTION III SUBMITTALS AND APPROVALS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

PLANNING AND DEVELOPMENT

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Minor Site Plan Review Process

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)

Transcription:

As-built Drawings / Surveyor 1. Electronic copy of survey data in tabular form of the utility assets 2. A signed and sealed letter with the following statement: "I hereby certify that the as-built location information of the water and sewer facilities shown on these drawings conforms to the minimum technical standards for land surveying in the state of Florida, Chapter 61G17-6 (Florida QAdministrative Code), as adopted by the Department of Buisness and Regulation, Board of Professsional Survayors and Mappers in September 1981, and that said as-builts are true and correct to the best of my knowledge and belief as surveyd under my direction." Record Drawings 1. Signed and Sealed by a Registered Engineer of Record 2. Record drawing includes an Engineer Of Record CAD file in AutoCAD 2006 or later and either a PDF or DWF reproducible file 3. Statement included on cover: "I certify that these record drawings have been reviewed by me or by individual(s) under my direct supervision and that these drawings incorporate the information contained in the certified as-builts." 4. If there's a one foot horzontal or one-tenth foot vertical change, the record drawing documents the changes between the design plans and final construction 5. 5% or greater horizontal locations between the contruction and as-built information was redrafted 6. Drawing clearly shows constructed information vs. the design information 7. All strike outs from As-built drawing are removed 8. Dimensions are correct 9. Complete set of drawings GENERAL PLAN REQUIREMENTS 1. Submittals include 4 paper sets and one CD 2. Drawing sheet size is 22 x 34 or 24 x 36 3. CCU project number is included on every sheet 4. Dimensioning is in English Units 5. Drawing is legible 6. Drawing contains a legend with a list of abbreviations and symbols used on that drawing 7. Drawing sheets are numbered 8. Order of Sheets: Cover, Overall Layout, Utility Plan, Conflicts, and Lift Station Details COVER SHEET REQUIREMENTS 1. Project name listed with the Section, Township and Range 2. Name of Engineering Firm 3. Engineering firm's telephone number, fax number, email, and address 4. Engineer of Record's Name and Florida Registration number 5. Sealed and signed by Engineer of Record 6. Date of plan preparation Page 1 of 5

7. Revision block to note all revisions 8. A large scale map illustrating major roads with the location Identified 9. A small scale map illustrating the property and all local existing roads 10. Indicate ownership of utilities 11. An index if plans exceed five pages 12. Statement: "Construction and Materials shall be in accordance with (CCU) standards and Specifications. Plans are in accordance with CCU minimum drawing requirements dated. State plane Coordinates (meters) will be supplied for the record drawings." 13. Tally Blocks: Water Demand Tally Block, Wastewater Discharge Tally Block, Water Meter Tally Block, and Reclaim Water Usage Tally Block: 14. Developer Projects include statement: "This project has been accepted containing private sewers. Private sewers may severely limit the ability to sell portions of this property in the future. All water meters for this project must be in the name of the one entity that is responsible for maintaining the private sewers." OVERALL LAYOUT SHEET REQUIREMENTS 1. Title block 2. Engineer of Record's Name and Florida Registration number 3. Sealed and signed by Engineer of Record 4. Project name 5. Scale 6. Date of plan preparation 7. Revision block to note all revisions 8. North arrow 9. Drawing set has an overall layout of proposed project on one sheet. This will have a north arrow and all phases of construction with existing and proposed mains SITE PLAN PROJECTS 1. Perimeter boundary of property is shown 2. Block and lot numbers are shown for the property in question and adjacent properties 3. Street address is listed 4. Outline of each serviced building is shown 5. Building square footage is shown 6. Restaurants indicate the number of seats 7. Hotels indicate number of rooms 8. Parking areas, pavement, and sidewalks are shown SUBDIVISION PROJECTS 1. Boundary lines are shown 2. Block and lot numbers are shown for the property Page 2 of 5

3. Outline of each serviced building is shown 4. The square footage and use of non-residential buildings are shown 5. Number of units and unit numbers are shown for multi-family buildings 6. Existing and proposed roadways are shown 7. Existing and proposed utility easements are shown with dimensions GENERAL UTILITY PLAN SHEETS 1. Title block 2. Engineer of Record's Name and Florida Registration number 3. Engineer's Seal and Signature 4. Project name 5. Match lines to assist sheet navigation 6. Horizontal and vertical Scale (on profile sheets) 7. Date of plan preparation 8. Revision block 9. North arrow 10. Horizontal Scale Range Between 1" = 10" and 1" = 50" 11. All existing utilities are shown 12. All public and private roadways are shown 13. All easements are shown with dimensions PIPING PLAN VIEW 1. Incremental measurements are shown for valve to valve, valve to fitting, manhole to manhole etc 2. Proposed utilities are shown 3. Mains are marked with size, type, and class of pipe 4. Gravity mains indicate pipe length and slope 5. Fittings indicate size, type, and material (if different from main) 6. Valves indicate size and type 7. Service lines and laterals indicate size, length, material, class, and slope (sewer laterals) 8. Horizontal deflection points are indicated 9. Test points are indicated 10. Water, irrigation, and reclaim meters are indicated by type and size Page 3 of 5

11. Locations of Air/Vacuum, blow offs, hydrants, fittings, and thrust blocks are indicated 12. Manholes/Pumping stations are numbered and include elevations 13. Piping in conflict with proposed utilities are shown with elevations 14. Conflicts are identified and numbered 15. Conflict detail shows pipe elevations, material, class, and size 16. All existing and abandoned utilities are shown Elevations are to the nearest tenth of a foot 17. Mains every 100 feet have an elevation 18. All fittings have an elevation 19. Connection points have an elevation 20. All valves have an elevation 21. Elevations at top of pipe on water and sewer utilities where they cross other facilities Elevations are one hundredth of a foot 22. Elevations on manholes including rim and inverts 23. Elevations on top of slab, bottom of wet well, and influent pipe invert State Plane Coordinates 24. Coordinates are provided for all property corners. 25. Mains every 100 feet have coordinates 26. Manholes, fittings, valves, blow offs, hydrants, meters, cleanouts, lift stations etc.. All have coordinates 27. Water main taps for all service lines have coordinates 28. Service lateral wyes and tees on gravity mains have coordinates 29. Connection to existing facilities have coordinates 30. Lift Station top of slab, bottom of wet well, influent pipe and control set points 31. Coordinates provided for all CCU maintained facilities PIPING PROFILE 1. Gravity, water, force, and reclaim mains include profile 2. Profile shows grade line, size, material, and class of pipe 3. Manholes include pipe inverts and rim elevation 4. Doghouse / cored bored manholes indicate length of pipe between appurtenances with pipe slope 5. Wet wells included rim and invert elevations of all pipes Page 4 of 5

6. Vertical deflection points are shown 7. Plan and profile views are aligned 8. Horizontal directional drilling and boring locations are shown 9. Vertical scale is between 1" = 1" and 1" = 5" 10. Conflict details were added to profile DELIVERY OF ELECTRONIC METADATA 1. One CD labeled with CCU Project number, Submittal date, and set label 2. Data is in State Plane, Florida West, NAD83 3. Horizontal accuracy meets National Mapping Standards AutoCAD 1 CCU layer standards used 2. All layers included 3. All layers are frozen except for 4 Horizontal accuracy meets National Mapping Standards 5. Model space scaled to 1:1 6. Axis is set to 0 7. Only state plane coordinate drawing in model space 8. Plot Configuartion set to ArchD 9. Xrefs are included 10. Point data is in the format of ASCII, MS Excel, or DBF 11. Hard copy of readme file included 12. Readme file included and contains: file name, drawing name, drawing number within the set, drawing scale, drawing date, and the xref listings with their path GIS 1. Metadata is submitted in xml format 2. Data format is in shapefile or geodatabase 9.x 3. GIS data named in the form of: XxxxxxXxxxXxxxx 4. Aerial named: ex: Aerial_[200710] [yearmonth] 5. Attribute Table is formatted properly Page 5 of 5