Owner s Manual Capecod 10 x 12 Mural Hardtop Gazebo. Vendor Code: Product Code: D71 M18996 UPC Code: Date of purchase: / /

Similar documents
Owner s Manual Pompano 10 ft. x 12 ft. Mural Sun Shelter. Sojag code: UPC code: Date of purchase: / /

Owner s Manual Roxton 10 x 12 Fabric Roof Gazebo. Sojag Code: Product Code: D71 M12187 UPC Code: Date of purchase: / /

Owner s Manual Venetia 10 ft. x 12 ft. Hardtop Gazebo. Vendor Code: Product Code: D71 M80921 UPC Code: Date of purchase: / /

2. Some parts may contain sharp edges, wear protective gloves if necessary. At least four or more people are recommended for safe assembly.

WARNING KEEP ALL FLAME AND HEAT SOURCES AWAY FROM TENT FABRIC.

Parkside Wicker Gazebo. Product Code: D71 M20516 KSN: UPC Code: Date of purchase: / /

2. Some parts may contain sharp edges, wear protective gloves if necessary. At least three or more people are recommended for safe assembly.

USE & CARE GUIDE 9 x 10 Pergola With Heavy Duty Posts

Grandview 4 seat Glider. Product Code: D71 M KSN Code: UPC Code: Date of purchase: / /

Mission Creek 10x12 Hardtop Gazebo. KSN Code: UPC Code: Date of purchase: / /

MISSION CREEK 10X12 HARDTOP GAZEBO WITH NETTING

USE AND CARE GUIDE 1

OWNER S MANUAL LONG BEACH 13 HEX GAZEBO WITH NET. Product code: D71 M34593 UPC code: Vendor Item: SS-K-138-2NGZ13. Date of purchase: / /

OWNER S BAY WINDOW GAZEBO

Sean Conway Gazebo. Style # G-GZ107PST-06 DPCI # CONGRATULATIONS You ve purchased a fine item from Target.

DASHLEY COLLECTION GAZEBO

Assembly Instructions

Sonoma Hardtop Gazebo 10 X 12. Owner s Manual

garden USE AND CARE GUIDE Mission Creek 10x12 Hardtop Gazebo with netting Product Code: UPC Code: Date of purchase: / /

10 x 12 LED & AL ROOF TOP WITH NETTING

SUNSET BEACH HARDTOP BAR WITH GRANITE AND 2 STOOLS. Product Code: D71 M34473 UPC Code: Date of purchase: / /

Assembly Instructions. Item# L-GZ704PST

OWNER S MANUAL. Clayton Hex Gazebo with Netting. Product code: D71 M80928 UPC code: Vendor Item: SS-I-138-2NGZ. Date of purchase: / /

Lakeside Gazebo. Assembly Instructions. Product No

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO

Octagon Gazebo. Assembly Instructions. Product No

garden USE AND CARE GUIDE Ridgeway Gazebo Product Code: UPC Code: Date of purchase: / /

Summer Veranda Gazebo

Steel Pergola With Open Roof. Product Code: D71 M KSN Code: UPC Code: Date of purchase: / /

Pergola YJSG-108C Assembly Instructions

Assembly Instructions GARDENA GAZEBO

Essex Gazebo. Assembly Instructions. Model No

OWNER S MANUAL. Grandview Hex Gazebo with Netting. Product code: D71 M12207 UPC code: Vendor Item: SS-I-138-2NGZ. Date of purchase: / /

Assembly Instructions. Item#: L-GZ472PST-C-A

x12 GAZEBO ASSEMBLY INSTRUCTIONS

USE & CARE GUIDE. Solar Umbrella. Product Code: D71 M20521 KSN: UPC Code: Date of purchase: / /

x12 GAZEBO ASSEMBLY INSTRUCTIONS

USE AND CARE GUIDE. Sears Caitlyn 7pc Dining set * Dining Table. Product Code: D71 M UPC Code: Date of Purchase: / /

OWNER S MANUAL GRANDVIEW HEX GAZEBO WITH NETTING. Product code: D71 M12207 UPC code: Vendor Item: SS-I-138-2NGZ. Date of purchase: / /

x16 GAZEBO ASSEMBLY INSTRUCTIONS

x16 GAZEBO ASSEMBLY INSTRUCTIONS

USE AND CARE GUIDE. Rochester Rectangular Dining Table. Product code: UPC code: Vendor Item: SM-K-750T-66

USE AND CARE GUIDE. Sears Charlotte 4pc Seating Set Red. Product Code: D71 M UPC Code: Date of Purchase: / /

STANTON 5PCS DINING SET. Product code: D71 M12200 UPC code: Vendor Item: SC-K-032N/4. Date of purchase: / /

10 Ft. x10 Ft. Hard Top Garden House

Gazebo GZ3584 Aluminum Composite Roof Panels

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

USE AND CARE GUIDE. Sears Scarlett Chaise Lounge. Product Code: D71 M UPC Code: Date of Purchase: / /

20 x 20 / 3.35M x 6M EVENT CANOPY Assembly Manual

11 x 20 ALL SEASON GARAGE / 3.35M x 6M Carport Assembly Manual

USE AND CARE GUIDE. Sears Madeline 3pc Bistro Set * Swivel Rocker. Product Code: D71 M UPC Code: Date of Purchase: / /

OUTDOOR GAZEBO ITM./ART MODEL#L-GZ682PCO-I ASSEMBLY INSTRUCTIONS

W1610 1/2 10 X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Assembly by more than one person is suggested.

Osborn 3pc Bistro - Neutral

USE AND CARE GUIDE. Sears Quinn 7pc Dining Set * Stationary Dining Chair. Product Code: D71 M UPC Code: Date of Purchase: / /

12 X 18 SOLARIUM ASSEMBLY INSTRUCTIONS

Use and Care Guide PALMETTO 4PCS SEATING SET. Product code: D71 M20306 UPC code: Vendor Item: SC-K-233NSFSET. Date of purchase: / /

For assistance with assembly, please contact Customer Care Center

12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.

ASSEMBLY ASSEMBLY. Step 3 Requires D, E

LAWN AND GARDEN GREENHOUSE

X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

W X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

W1610 1/ X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

10 x 20 / 3.35M x 6M Carport Assembly Manual

LM600 Landmark Permanent Blind

USE AND CARE GUIDE BRAMFORD GAZEBO

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

LAWN AND GARDEN GREENHOUSE

12 X 18 SOLARIUM ASSEMBLY INSTRUCTIONS

W1209 1/2 10 X 12 SOLARIUM ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS

Hip Roof Canopy Instructions

Item # L-DN1856SST-E-SFLS SKU# Loveseat:

OnBoard Bass Drum/Gong Cart

garden USE AND CARE GUIDE HARLEY 10PCS DINING SET Product code: UPC code: Vendor Item: SS-K-660T/2 Date of purchase: / /

11 x11 Pergola. Assembly Instructions. Paragon Group USA cm cm cm

WOOD GAZEBO. Installation and Operating Instructions YM12705Z. with ALUMINUM ROOF. HEIGHT: 10 6 or 3.2m. Revised

ITEM# L-GZ407PST-2 10 x10 Gazebo with mosquito netting

GroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property.

Owner s Manual Mobile Flat-Panel Floor Stand

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

Stop! Read This Important Information.

Installation Manual XRL Solar Rail System

COMPETITOR CB-610 STANDARD BENCH

STOP 36" SPIKE AERATOR. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

Assembly Manual. OLM Retractable Canopy for 12X16 Breeze Pergola by Outdoor Living Today. Revision #12 October 4, 2017

INSTALLATION INSTRUCTIONS CJ-5 M38A PART # With Doors

12 X 15 SOLARIUM ASSEMBLY INSTRUCTIONS

WARM SHAKER / NORFOLK / LEXINGTON TV MEDIA STAND

Dunkirk Grill Gazebo

10' W x 8' H or 10' H Round Style Shelter Assembly Instructions

PLANISHING HAMMER STAND OWNER S MANUAL

GearBoss II High Density storage

2-Door EXO-Top Roof Rack System

USE & CARE GUIDE Printed 9Ft Umbrella - Red Stripe

26 GARDEN CART ASSEMBLY & OPERATING INSTRUCTIONS. Rev 07/03

Use and Care Guide PALMETTO 7PCS DINING SET. Product code: D71 M20309 UPC code: Vendor Item: SS-K-233NR/6. Date of purchase: / /

MERRY GO ROUND ITEM NO: 8030

PRODUCT MANUAL 5-IN-1 MITER SAW STATION *SAVE THIS MANUAL FOR FUTURE REFERENCE

Transcription:

Owner s Manual Capecod 0 x 2 Mural Hardtop Gazebo endor Code: 999-345052 roduct Code: D7 M8996 UC Code: 77283045052 Date of purchase: / /

Table of Contents Safety Information...2 Warranty...3 What is Covered...3 What is Not Covered...3 Operation...3 Maintenance...3 Care and Cleaning...3 re-installation...4 lanning Installation...4 Tools required...4 Hardware Included...5 ackage contents...6 Installation... 7-27 Safety Information WARNING: KEE ALL FLAME AND HEAT SOURCES AWAY FROM THIS TENT FABRIC. This tent meets the flammability requirements of CAI-84. The fabric may burn if left in continuous contact with any flame source. The application of any foreign substance to the tent fabric may render the flame-resistant properties ineffective. It is very important to read and follow the safety precautions before assembly and during the use of the product.. Keep all children and pets away from assembly area. 2. When assembling and using this product, basic safety precautions must always be followed to reduce risk of personal injury and damage to product or surroundings. 3. Ensure that all the parts are in the box before starting the assembly. Some parts may contain sharp edges, wear protective gloves. 4. This unit will take at least 5 hours to set up. You must schedule enough time to complete the assembly. You cannot leave it unattended if not fully assembled, even if bolted to the ground. At least 3 people are required for safe assembly. 5. Always install your unit on a level platform. The unit must be anchored to either wood or concrete using the appropriate screws for that flooring. 6. Check all screws for tightness before and during usage. 7. Your shelter has been created for all four seasons and will resist to snow accumulations of 2000 lbs. However, you must remove any snow accumulation on the roof. The mosquito nets must also be removed for winter storage. 8. Do not place any type of heat conductor under the sun shelter or within 5 feet of the unit including but not limited to a barbeque or space heater. 2

Warranty WHAT IS COERED The Capecod is guaranteed against defective materials for 3 years on the frame and it s finish and 2 years on the fabric and roof panels based on normal use of the product. Limited warranty applicable on parts only. WHAT IS NOT COERED Damages due to vandalism, abuse or wrong use of the product. Damages due to extreme weather conditions such as thunderstorm, windstorm and hailstorm. Rust, water infiltration, holes in polycarbonate roof panels, fabric and structure discoloration are not covered under warranty. Contact the SOJAG customer service team at -866-90-649. Operation The unit is a 4 season sun shelter, meaning it may be left up year round. However, any accumulation of snow must be removed from the roof of the unit at all times. Mosquito netting must be removed for storage during the winter. The unit must be anchored using the appropriate screws based on the flooring which it is be anchored to. Roof panels must be installed with the U protected side facing the sun. Failure to follow any of the previously mentioned requirements will void the warranty. Maintenance If this shelter needs repairs, DO NOT RETURN THE RODUCT TO SEARS. In case of a defective part or if a problem occurs while using the product, please contact SOJAG Customer Service at -866-90-649. Use the part number on the parts list to order replacement parts. Care and Cleaning For cleaning: Use a domestic soap or detergent and wash with warm water using a sponge or fabric. Rinse with clean water. Check all screws on a regular basis to maintain the solidity of the structure. 3

re-installation IMORTANT: Do not remove the protective film on the polycarbonate roof panels before installation (step 0, 6 & 7). Make sure to put the U protected side facing the sun. It is a very important procedure; if not followed as described, your roof will not be covered by the warranty. LANNING INSTALLATION It is the consumer s responsibility to comply with any building codes, ordinances, zoning limitations, or local homeowner s restrictions and obtain any required permit, before purchase and installation of the products. Ensure that all the parts are in the box before starting the assembly. Some parts may contain sharp edges, wear protective gloves. This unit will take at least 5 hours to set up. You must schedule enough time to complete the assembly. You cannot leave the sun shelter unattended if not fully assembled, even if bolted to the ground. At least 3 people are recommended for assembling the unit. Follow all instructions to assure the strength of the shelter. In order to avoid damage to the shelter and its components, use appropriate tools. Do not use the structure as a support; a stepladder is recommended. Keep instructions and parts list for further reference. TOOLS REQUIRED Not included in the box. Safety GoGgles Safety Hat hillips Screw Driver Gloves Stepladder level 4

HArdware Kit NOTE: arts not shown to actual size and not to scale. N N X4 O 2 X6 Q Q Q2 X4 Item Description Qty U X4 06 N Bases 2 N Anchoring Support 4 O Iron angle 2 Iron angle 2 Iron angle 6 W X6 X X32 Q Finishing End Q Finishing End Q2 Finishing End 4 Y 2 Y 2 U Screws & Nuts M60 4 Screws M66 06 W Screws M60 6 X Screws M65 32 Z Y Nuts 2 Y Nuts 2 Z Z Wrench Z Bases 2 Z2 Z2 Allen Key 5

Arts List Item Description NOTE: arts not shown to actual size and not to scale. A D2 A B F2 B2 X4 B3 C G3 K 0 C D Ka D F K2a F G G G2 H Kb X4 K2b H I I I2 L J J 6 M R X38 J2 X4 M X5 S X4 Qty A Column A Column B Column 2 B2 Winter Solidifying Column B3 Winter Solidifying Column C Track C Track D Track D Track D2 Junction Bar F Structure Bar F Structure Bar F2 Junction Bar 4 G Structure Bar G Structure Bar G2 Solidifying Bar 4 G3 Junction Bar 2 H Roof Finishing Bar (back) H Roof Finishing Bar (back) I Roof Finishing Bar (front) I Roof Finishing Bar (front) I2 Roof Finishing Bar (back) J Roof Bar (corner) J Roof Bar (corner) J2 Roof Bar (middle) 4 K Roof anel 0 Ka Roof anel K2a Roof anel Kb Roof anel K2b Roof anel L Roof Support Bar 5 M Side Finishing End M Side Finishing End R Hooks 38 S Mosquito Netting 4

Step. Install Anchoring Supports (N) on the Column (A) and Column (A) using Screws (U)..2 Install Column (A) and Column (A) on Bases (N) using Screws ()..3 Make sure that the rim of the Bases (N) faces the front of the columns as illustrated..4 Install Columns (B) on Bases (Z) using Screws (). A A N N U N N U A A N B N N B A B Z N Z Z N Z A 6 N X4 U X4 A B 7

NOTE: Ensure the ends of the hooks are facing away from the tracks. Step 2 2. Insert 2 Hooks (R) in Track (C) and 2 Hooks (R) on Track (C) by sliding them in the track. 2. Insert 7 Hooks (R) in Track (D) and 7 Hooks (R) on Track (D) by sliding them in the track. C & C C & C R 2 D & D D & D R X7 R X38 D D C C 8

Step 3 3. Insert the junction bar (D2) half way into the track (D) and insert screws (). 3.2 Insert the other half of the junction bar (D2) into the track (D) and insert screws (). Make sure that the screws are tightened. D D2 D D D D D X8 D D2 D 9

Step 4 4. Insert two Junction Bars (F2) half way into the track (F) and insert Screws (). 4.2 Insert the other halves of the Junction Bars (F2) into the Track (F) and insert Screws (). Make sure that the screws are tightened. F2 F F2 F F F X8 F F2 F 0

Step 5 5. Insert two Junction Bars (F2) half way into the Track (G) and insert Screws (). 5.2 Insert the other halves of the Junction Bars (F2) into the Track (G) and insert Screws (). Make sure that the screws are tightened. F2 G F2 G G G X8 G F2 G

Step 6 6. Insert the Junction Bar (G3) half way into the Solidifying Bars (G2) and insert Screws (). 6.2 Insert the other half of the Junction Bar (G3) into the Solidifying Bars (G2) and insert Screws (). Make sure that the screws are tightened. Repeat twice. G2 G3 G2 G G X8 G3 G2 X4 2

Step 7 7. Install the complete Track (D & D) between two (2) Columns (B) using Screws (X). 7.2 Install the complete structure Bar (F & F) between Columns (A & A) using Screws (X). 7.3 Install Track (C) between Columns (A & B) and Track (C) between Columns (A & B) using Screws (X) so that the tracks are facing the inside of the shelter. F X F C A C D D A X B B X X X X32 C C 3

Step 8 8. Install an Iron Angle (O) on the Tracks (C) using Screws (). 8.2 Install an Iron Angle (O) on the Tracks (C) using Screws (). 8.3 Install structure Bars (G & G) onto Iron Angles (O) using Screws (). O O C G C O G O X6 4

NOTE: The longer pre-inserted screws found on Roof Bar (J) and Roof Bar (J) will be used in step 4. Step 9 9. Install Iron Angles () on each end of Structure Bars (D & D), (F & F) and (G & G) using Screws (). 9.2 Install Roof Bars (J & J) by inserting the 2 pre-installed screws found at their centers into the pre-drilled holes in Iron Angles () installed on Structure Bars (G & G). Secure with Nuts (Y). 9.3 Secure the ends of Roof Bars (J & J) with Screws () through the pre-drilled holes on the top of Iron Angles (). J F F J G G D D Y 0 Y J X6 J 5

CAUTION: One side of the roof panels is U protected. Make sure to put the U protected side facing the outside of the shelter. It is a very important procedure; if not followed as described, your roof will not be covered by the warranty. NOTE: The roof panels are covered with a plastic film identifying which side has a U protector. Once the plastic film is removed it is impossible to know which side has the U protector. We recommend removing the film one at a time just prior to installing the roof panel. Step 0 0. Insert Roof anel (Ka) and Roof anel (Kb) into the end of Tracks. 0.2 Insert Roof anel (K2a) and Roof anel (K2b) behind previously inserted roof panels until they are flush. K2b J Kb K2a J Ka J Ka K2a Ka Kb K2b 6

Step. Screw Iron Angles () on structure Bars (D, D, F, F, G & G) using Screws () D G D G F F 2 2 4 7

NOTE: The longer pre inserted screws will be used to install solidifying bars in step 3. Step 2 2. Install Roof Bars (J2) by aligning the pre-inserted short screws found at their centers with the pre-drilled holes in Iron Angles () on Stucture Bars (G & G) and secure with Nuts (Y). 2.2 Secure the ends of Roof Bars (J2) to bars (D, D, F and F) with Screws () through the pre-drilled holes in Iron angles (). Y J2 J2 J2 J2 D X4 D G G F F X8 X8 Y X4 J2 X4 8

NOTE: Make sure that the solidifying bars are well centered before tightening Nuts (Y). Step 3 3. Install Solidifying Bars (G2) using the longer pre inserted screws found along Roof Bars (J2) and securing them with Nuts (Y). G2 G2 G2 G2 G2 G2 Y 2 2 Y 2 9

Step 4 4. Install Roof Finishing Bar (H) and Roof Finishing Bar (H) using Screws (). X4 H H H X6 H 20

Step 5 5. Install Side Finishing End (M) and the Side Finishing End (M) using Screws (). M M M or M M M X4 2

CAUTION: One side of the roof panels is U protected. Make sure to put the U protected side facing up towards the sun. It is a very important procedure; if not followed as described, your roof will not be covered by the warranty. NOTE: The roof panels are covered with a plastic film identifying which side has a U protector. Once the plastic film is removed it is impossible to know which side has the U protector. We recommend removing the film one at a time just prior to installing the roof panel. Step 6 6. Slide one row of Roof anels (K) to upper tracks of Roof Bars. Repeat 5 times. K K K K K K X5 K X5 22

Step 7 7. Slide Roof Support Bars (L) into lower tracks of Roof Bars until flush with Roof anels (K). 7.2 Slide remaining anels (K) into lower tracks of the Roof Bars until flush with Roof Support Bars (L). L L L L L K L X5 K X5 L X5 K X5 23

Step 8 8. Slide Screw (W) in the end Roof Bar (J). Begin installing the left side of Roof Finishing Bar (I) by placing the Screw (W) into the left hand pre-drilled hole of the Roof Finishing Bar (I) and the pre-drilled hole of Finishing End (Q) and securing with Nut (Y). 8.2 Secure the center of Roof Finishing Bar (I) by using the same procedure with a Screw (W) into the first of 4 Roof Bars (J2), a Finishing End (Q2) and a Nut (Y). 8.3 Transition into the installation of Roof Finishing Bar (I2) by sliding Screw (W) into the second Roof Bar (J2), aligning the predrilled holes in Roof Finishing Bars (I) and (I2) and securing them with a Finishing End (Q2) and Nut (Y). 8.4 Transition into Roof Finishing Bar (I) by sliding Screw (W) into the third Roof Bar (J2), aligning the pre-drilled holes in Roof Finishing Bar (I) and (I2) and securing them with a Finishing End (Q2) and nut (Y). 8.5 Secure the center of Roof Finishing Bar (I) by using the same procedure with a Screw (W), the fourth Roof Bars (J2), a Finishing End (Q2) and a Nut (Y). 8.6 Finish off the installation of the Roof Finishing Bars by sliding Screw (W) in the end of Roof Bar (J). lace Screw (W) into the right hand pre-drilled holes of the Roof finishing Bar (I) and Finishing End (Q) and securing with nut(y). J W Q I Y J Draw X4 W J2 W J W W J I Q Q2 I Q2 W I2 Q2 J2 I Q2 Q Q Y Y Q2 X4 Q Y X6 I I Q Q2 X4 W X6 I2 24

Note: The 2 shorter paneld of Mosquit Netting (S) are installed next to the posts which are closest to the home. When installing long panel, make sure the corner of the mosquito net matches with Columns (B). Step 9 9. Install Mosquito Netting (S) on inner track s Hooks (R). Wrap elcro band on mosquito netting around columns (B). S S B S R S B X4 S X4 25

Note: On this picture we have removed to roof panels only to show you where the Winter Solidifying Columns (B2 & B3) go. Step 20 This next step is only to be done for the winter season. 20. Install Winter Solidifying Column (B2) and the Winter Solidifying Column (B3) under the respective cross beams (the second and fourth crossbeans) before the winter season in order to solidify the roof due to heavy snow. B3 B2 B2 B3 26

Important: Screws are not included. This step is mandatory for the warranty to apply since this is a permanent structure. Step 2 2. In order to firmly secure your structure to the ground you need to use screws, in accordance to the surface your product will be installed upon. Make sure that the shelter in well levelled and square. Install the screws is the pre-drilled holes of the Bases (N & N) of the shelter. X4 Screws for this step are not included. 27

lease refer to part numbers when reordering For questions or comments about product: Email: piece@sojag.ca or Call toll-free: -866-90-649 Made in CHINA Distributed by Sears, Roebuck and Co., Hoffman Estates, IL 6079 rinted in China See our extensive assortment of outdoor living products on-line at www.sears.com and www.kmart.com