REPLACING FULL MOORING SYSTEM FOR COOEC IN THE SOUTH CHINA SEA

Similar documents
MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

ACTEON FLS - DECOMMISSIONING

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Ecosse Subsea Systems. Subsea Springboard 2017 David Hunt

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

Conductor Installation Services. Today s technology traditional values

Emergency Pipeline Repair Solutions and Future Contingency Planning

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher

Advances in Subsea Integrity Monitoring Systems. Ross Macleod Business Development Director, Ashtead Technology

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004

Goliat FPSO Marine Installation Execution Highlights and Learnings

Pressurised Subsea Pipeline Repair Recent Case Studies

FPSO Design and Technology

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation

Local Contribution to the Aasta Hansteen development

Offshore Construction Management Services. Capability & Experience

Well Abandonment Services. Plug into a New Approach

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

SEATRONICS TREASURE HUNT IN US WATERS STRIKES GOLD

Emerging Subsea Networks

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

SPOOLBASE & MULTIJOINT SERVICES

Capital Marked Presentation. Dof Subsea Atlantic Region

Deepwater Mooring Deeper and Leaner

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Marine Construction Support & Dimensional Control

REDUCING DEEPWATER PIPELINE INSPECTION COSTS

BRAZIL ENERGY AND POWER CONFERENCE. Americo Oliveira McDermott Brazil General Manager September 20, 2015

FLNG in Harsh Environment - Disconnectable and Relocatable Riser System

Subsea Tooling Services UK Ltd Engineered Subsea Solutions

Strategic performance in the toughest environments

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

Swiber Holdings Limited 1Q FY08 Results Briefing

HELIX ENERGY SOLUTIONS

Getting to Grips with Deepwater Handling Operations

THE GLOBAL PARTNERS FOR COMPLETE FLEX-LAY SOLUTIONS...

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

Understanding your limits

Subsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director

Evolution of Deepwater Subsea / Offshore Market

Offshore Wind Risks - Issues and Mitigations

Floating LNG facilities

Before the EPA Trans-Tasman Resources Ltd Ironsands Extraction Project

Passion at work. Renewables

Offshore Drilling Rigs

OFFSHORE SERVICES PIPELINE CONSTRUCTION

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

Richard Rickett, General Manager Engineering and Procurement - March Case Study

LIFE OF FIELD SOLUTIONS - ONSHORE AND OFFSHORE

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Subsea Positioning In deep water

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning Sep 2017, Dubai

Riser & Flowline Intervention Using New Composite Coil Tubing Technology

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Passion at work. Oil & Gas

Implementing a Deepwater- Pipeline-Management System

Floating Systems. Capability & Experience

FIELD JOINT COATING SOLUTIONS

SUBSEA INSTALLATION WITHOUT A HEAVY LIFT VESSEL A STEP CHANGE IN SUBSEA INSTALLATION

Bluewater. Industry: Upstream Oil & Gas. Bluewater Hoofddorp, Netherlands. bluewater.com

Sponsored by. Created and produced by

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

A marginal field (re-)development using several alternative methodologies 1

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Gulfstar One FPS. Nathan Davidson. February 26, 2015

ENGINEERING & INNOVATION / DESIGN & ANALYSIS / PROJECT EXPERTISE CAPABILITIES STATEMENT

Monopile Upending Tool (MP-UT)

For personal use only

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION

Energy Transition Partner. Created and produced by

ILLUSTRATI VE PICTURE. Delivering product under pressure. Pipeline & Specialty Services

CALM CALM. Our Activities

Managing Offshore Field Development & Marine Asset

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges

FPS Spending: $20 Billion a Year and Growing By Bruce Crager

Falmouth Bay Short Term Test Site for Marine Energy Converters

Emerging Subsea Networks

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

Dry trees for cost effective solution with the Wellhead Barge: WHB

Well Intervention Vessels Used in the G.O.M. Macondo Incident Response. Helix - Well Ops June 2011

marine, construction, drilling, floating production, decommissioning and renewables industries.

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed.

The Next Generation of Reeled Pipe Lay Vessels: for Ultra Deep Water Field Developments in Remote Locations

Oil & Gas Offshore. Industry challenges in deepwater discover

Solutions for Floating Production Units

ALWAYS SWITCHED ON TO YOUR SUBSEA CABLES

Oil & Gas T T S O I L & G A S.

SUBSEA LIFETIME EXTENSION OF A WELLHEAD PLATFORM

Marine integrity monitoring. Offshore oil and gas

Statement of Experience. Ocean driven. OFFSHORE VESSELS ONSHORE LOGISTICS ROPES & MOORINGS COMMERCIAL DIVING

Marine integrity monitoring Offshore oil and gas

ENGINEERING & INNOVATION / DESIGN & ANALYSIS / PROJECT EXPERTISE CAPABILITIES STATEMENT

Transcription:

REPLACING FULL MOORING SYSTEM FOR COOEC IN THE SOUTH CHINA SEA

Project summary COOEC required the replacement of a full mooring system in Panyu 4-2/5-1 oil field. Utilising the specialisms of three Acteon companies, we were able to undertake detailed procedures and SIMOPS documentation to allow replacement mooring components to be deployed less than a meter from existing moorings. The challenge: This project presented multiple challenges. The client supplied vessel (a pipe laying vessel to be used for pile installation) was unconventional for this work. Additionally, 2 large vessels in close proximity (less than 1 meter apart) meant increased risks and complexities. Lastly, the chain in use wasn't specified so contingency planning was necessary. The Acteon FLS approach: The conventional approach would have been to disconnect the FPSO and move it away before commencing the work, however, stopping production is very expensive. Our expertise and thorough planning allowed for simultaneous operations using tailor made methodologies whilst safely managing risks and constraints. The results: Employing a pragmatic approach allowed us to successfully manage risks and safely deliver the project without disrupting operations. We did this by applying our specialist expertise to build in contingencies which were required by project complexities. As a result, the project saved an estimated 7 weeks of NPT (non-productive time) with a potential value in excess of USD 40m.

Scope of work Site details Location Region Water depth Panyu 4-2/5-1 oil field is located in block 15/34 South China Sea South China Sea 345ft (105m) Date Q1-Q2 2014 Full mooring system replacement Onshore and offshore project management, installation engineering, installation procedures and offshore personnel Installation of nine suction pile anchors and pre-set moorings for an APL buoy system within existing mooring pattern Assist COOEC with FPSO hook-up FPSO to remain connected and in service throughout Suction piles: 7.5m Ø 13m length 130t

Key parties and assets Client(s): COOEC Acteon Group contractors: Key assets: Maersk Attender AHTS SK1200 crane barge Aquatic: Modular drive system, tensioner solution, offshore support personnel InterMoor: Onshore and offshore project management, installation engineering and procedures development,installation of suction piles and pre-set moorings Seatronics: Subsea suction pumps, offshore support personnel

Challenges FPSO s existing moorings remained in place resulting in tight tolerances for installing the system and SIMOPS in close proximity to FPSO (less than one metre). Client-supplied vessel was a pipe laying vessel requiring detailed planning and procedures to allow piles, wire and chain to be deployed simultaneously. At the last minute, the lengths of the upper chain sections were found to be different from those specified.

Solutions Detailed procedures and SIMOPS documentation were developed to allow mooring components to be deployed less than a meter from existing moorings and allow vessel to work safely in close proximity to the FPSO and offtake tankers without any interruption to production. Client-supplied vessel was a pipe laying vessel requiring detailed planning and procedures to allow piles, wire and chain to be deployed simultaneously, saving time and cost. A method was developed whereby each pile could be installed with its lower chain section and the wire section attached, which eliminated the associated subsea connections and saved time and money. InterMoor developed new procedures to deploy chain from deck rather than gypsy to overcome delays.

Outcomes Deployment of up to five suction piles in a single run offshore. Installation was completed safely and on schedule with minimum disruption, despite the last-minute changes required when the lengths of the upper chain sections were found to be different from those specified. The pre-set mooring system was successfully completed by InterMoor in May 2014 with zero LTIs. Client was able to maintain production on the FPSO throughout the installation with no downtime.

E: WILL.ROWLEY@ACTEONFLS.COM T: 01603 513696 ACTEONFLS.COM