*Patent Pending. *Trademarked. Series II. Glass Conversion Kit. (888) One-Products (888)

Similar documents
One Piece Products. Series III El Camino ( ) One Piece Door Glass Conversion Manual.

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

Assembly Instructions 10 X 10 Aluminum Frame Building

Jeep. Flat Style Fender Flares Front Pair. Included in Hardware Kit:

Metroboard Pulley Replacement Procedure

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

PROVEN WORLDWIDE SNORKEL FOR CHEVY COLORADO NEW PRODUCT

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Included in Hardware Kit. Jeep Cut-Out Fender Flare Set of 4 Set Part # Rev STEP 1 PRIOR TO INSTALLATION

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

Assembly Instructions

HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

All Terrain Flares 2014 Chevy Silverado

Assembly Instructions 10 X 10 Aluminum Roof Support

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Bushwacker Jeep Flat Style Fender Flares Front Pair

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

INSTALLING YOUR NEW SPRING LIFT ARM KIT

INSTALLATION AND CARE INSTRUCTIONS

RZR 4 Doors Part # Polaris RZR XP & Turbo ( ) Black

Jeep. Flat Style Fender Flares Set of 4. Included in Hardware Kit: STEP 1 PRIOR TO INSTALLATION. Set Part # Rev-3 1/11/2016

968 Side Cladding Rubber Beading Replacement

Parts and tools needed for installation- Cleaning and Painting -

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INOVO 2-LITE SLIDING PATIO DOOR

STYLE BAR & TONNEAU COVER INSTALLATION

WPS crew Doors Installation instructions

FENDER FLARE INSTALLATION

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

D. Drill Bolt Holes Through Topper Shell and Bed Rails

Contractors Rack Assembly and Installation Instructions

INSTALLATION INSTRUCTIONS

SINGLE TRACK BYPASS (patent pending) barn door hardware

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

3 D Printer Enclosure Assembly Instructions

Installation for Full Size Polaris Ranger Crew Doors

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

How To Measure Your Finished Opening

Frameless Inline Door With Return QCI5263

Jeep Wrangler JK & 4-Door Front Pair Part # Revision H

UNIT No FRAMELESS PIVOT SHOWER DOOR

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Jeep Cherokee Door XJ Set Part # Revision J

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

POWER PET. Low-E Automatic Patio Pet Door Installation and Operating Instructions

Low Headroom Rear Mount TorqueMaster

Installation And Care Instructions. Vertical Honeycomb Shades

MMD Convertible Styling Bar Customer Installation Guide

UNIT No. 15 & 16 SHOWER DOOR INSTALLATION INSTRUCTIONS

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Atrium Patio Door Field Service Manual

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

INSTALLATION INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS

Bushwacker Jeep Flat Style Fender Flares Rear Pair (JK Wrangler 2dr)

Medium HoneyBadger Chase Rack Installation Instructions

Series----SP3600A SHOWER DOOR

FENDER FLARE INSTALLATION

Adjusting, Changing and Maintaining The Latches and Catches on Your Airstream

Frameless Inline Door QCI5254

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

INSTALLATION INSTRUCTIONS

4-lite Patio Door. Installation Instructions

Jeep Cherokee 4-Door XJ Set Part # Rev

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

Ford F150 Rear Flares Set Part # Revision

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

CUT OUT FLARES INSTALLATION INSTRUCTIONS FOR 20017, 20018, F100-F150 F250-F350 P.U. & BRONCO CUT OUTS

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

RBP-1215B-RX DODGE RAM QUAD CAB RX3

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Cut-Out Fender Flares Rear Pair. Jeep. Included in Hardware Kit:

Model 209 Fireback Replacement

INSTALLATION INSTRUCTIONS KK-K9-C12-K CHEVY IMPALA

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Rubber Grommet, 36 pcs. 3/4 Screw, 10 pcs. Nut, 10 pcs

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS MANUAL

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

Install Instructions. NewAge Steel Welded Tall Locker

INSTALLATION INSTRUCTIONS FOR A&L PRODUCTS

RangerWare Fiberglass Door System Installation Instructions P/N

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

Frameless Bypass Slider

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

Jeep. Cut-Out Fender Flares Set of 4. Included in Hardware Kit: Set Part # Rev-8 06/29/16 STEP 1 PRIOR TO INSTALLATION

Greenhouse Assembly Instructions

Frameless Inline Door QCI5248

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

SINCE 1922 P UBLICATION N O

Melamine Plastic Laminate. Toilet Partition Installation Manual

INSTALLATION INSTRUCTIONS

TrendWall Floor-To-Ceiling Panels Installation Instruction

Chapter 18. Interior Doors

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Transcription:

*Patent Pending *Trademarked Series II Glass Conversion Kit www.onepieceproducts.com (888) One-Products (888) 663-7763

Installation Manual Full One Piece Door Glass Conversion Kit Series II 1967-1972 Chevy Trucks 2

First and foremost, we wanted to Thank You on your purchase of our newly designed Full One Piece Door Glass conversion kit for the 1967-72 Chevy Truck bodies. This kit is designed to be a direct bolt on kit with very little modifications required. Our kit is designed to fit the Electric-Life Power window upgrade kit, as well as the original Manual Regulator. In the next following pages you will find a detailed description on the installation process of our one piece door glass conversion kit. The pictures will include a short one or two sentence description of the step mentioned. If for any reason you have difficulties during the installation process please feel free to contact us at (888)663-7763 or email us at info@onepieceproducts.com. You can call during normal business hours 9:00 a.m. to 4:00 p.m. Pacific Standard Time. 3

Kit Contents 1. Standard tempered 3/16 comes in three options (Clear), (Green), (Medium Gray). Quantity(2) Left & Right 2. Glass run Channel- used to seal the perimeter of the door glass and also used as an antirattle. Quantity (2) 4

3. Roller Channel (Used to replace the old roller channel, has two holes one on each end including fold down tabs.) Mounts between door glass brackets and the rollers on the regulator. Quantity (2) 4. New Inner & Outer scraper set. Used as anti-rattle channels for the glass, also prevents water from coming into the door area. Quantity (4) 5. New front vertical roller guide. Used in replacement of the old vent glass assembly. Quantity (2) 5

6. Bag of ¼ Nuts, bolts& washers. Including black round vinyl hole covers. 7. New Rollers included, for our New Roller channel. Quantity (4 per door, 8 per kit) 8. Weather-strip adhesive. Used for gluing various components to this kit. Quantity (1 Tube) 9. 1 x1 x2 New Rubber Door Stop. Replaces the hinge check link between door and cab, Used to keep door from opening and damaging the outside door skin. (Very Very Important!!) Quantity (2 pcs) 6

10. Felt tape. Used on preventing front edge of glass on scraping the inside of the skin of the sheet metal. Place on the corner of the inside hump. Quantity (2 pieces) Hammer Tools needed 1 ½ hole saw with Drill. 1/4 drill bit Hand screwdriver with Phillips head tip. Flat thin screwdriver. 10mm, 7/16 nut driver or ratchet, 10mm & 7/16 socket w extensions. 7/16 wrench Metal hacksaw to cut sheet metal brace. Thin 1/8 center punch to remove door check stop. 1 masking tape. Grinder. 100% Mineral spirits, for cleaning glued surfaces. Lawn chair w/ six pack for a break!! 7

Disassembling the door Remove the eight Phillips tipped screws and remove the vent glass (as shown by the white arrows in the picture.) Remove the old glass run channels and scrapers first to make removing the glass easier. Slide the original door glass back closer to the latch assembly. This should enable you to slide the vent glass assembly away from its cavity. (Make sure the 5 screws are removed first connecting the door to the vent assembly.) Twist the vent assembly gently so you can slide it out easier. (Watch out with the lower vent bracket so you won t get stuck.) Roll up the door glass and slide it out of the rollers on the regulator. 8

Make sure to completely remove the rear door glass channel next to the latch assembly, you will not be using it. New Roller Replacement Take out the manual regulator; you need your Phillips screw driver for that. You will be changing the two older smaller rollers to the larger New ones supplied in the kit. Simply grind the expanded part opposite side of the roller and use your center punch to punch it out the old Roller. Simply slide the new larger Roller on and flare the aluminum with a hammer. After you done, make sure the stud of the New Roller DOES NOT SPIN, (it should be hammered solid.) 9

Now bolt the old regulator with the new Rollers back on the door. Run Channel Installation Installing THE KIT 1. Locate the notch on the new Run channel furthest from the edge. You will need to cut it 10 from the end. So it dangles in the door next to the latch. 10

2. The Slots are for the curve of the rubber so you won t get any kinks on the turn. 3. You will have to slot the back of the Run channel. Only cut half of the height 11

where you mark it on angled cavity of the original vent glass. 4. Use a long flat screw driver to wedge the new run channel all the way into its slot. Adjusting Lock assembly 12

5. Locate the top of the latch assembly; you will need to bend flat the slot where the latch spring is. You will also need to give the old spring a 90 degree elbow for the new location of the same spring. Refer to pictures provided. 13

6. Take note of the 90 degree angle on the spring and how the slot is flush now. (This needs to be done because the glass will need to pass very close to this Latch assembly.) The glass comes close and doesn t hit the Latch assembly. 14

7. Bolt this modified latch assembly back onto the truck. Place a bit of weather-strip adhesive on the Bell looking portion of the latch assembly where the New Run channel and Latch assembly meet. After it has been bolted on first of course! Check Link Removal & Replacement 15

8. Take you thin center punch and hammer down the pin that holds your check link in place. Hit it down until the check link clears away from the pin. Slide the old Check Link inside the door and remove it. Be extremely careful at this point, The Door can swing open and damage your door on the outside of the skin. You kinda don t want that!! Here is the pin half out, Push the old check link towards the inside of the door and let it drop into the door. Here is the Old check link completely removed. 16

9. Here you will install the New Rubber Bumper Door Stops. It will take the place of the Old Check Link setup and prevent you door from flying open and creasing your outer door skin. Here is a view from above of the new Bump stop, Notice the hole that was previously punched in with the center 1/8 center punch 17

Put some weather-strip adhesive between the New Bump stop and the hinge; Make sure to clean the hinge first with some rubbing alcohol to have a clean surface for the glue. New C-Roller Channel install 18

10. Insert the New C-Roller Channel that is provided in the Installing Tempered Glass kit. Bend the end tabs so it won t slide out on you. 11. Take your 1 ½ Hole Saw and Drill yourself an access hole for the 10mm nut you will be bolting on. 19

Drilling Vertical mounting holes Uppper Mounting hole. 12. Drill ¼ hole where the Red arrow is on the picture. For reference Notice the Original Regulator mounting position marked by the white arrow. Measure 6 ¾ across from the vertical edge of the fold on the door, and Measure 1 ¼ down from the horizontal fold on the door skin as marked on the picture. 20

Lower Lower Mounting hole. Drill ¼ hole where the red arrow is marked on the picture. For reference Notice the two holes right above, they are the original holes for the old vent glass assembly. Measure 5 across from the vertical fold on the door skin, and Measure 2 ½ up from the bottom fold of the door skin as shown in the picture. (Please do not forget to Slot the bottom hole for future adjustment.) 21

13. This is an inside view of the door looking at the inside upper hinge bolts, and the slot left from removing the check Link behind the New Run Channel. Take note in the position of the Felt Tape on the inside door hump. 22

Use the weatherstrip adhesive provided and put a moderate amount on the circular part of the latch assembly, Give it about a minute to start becoming tacky and press the New Run channel firmly on the glued area until it has fully dried, Which should roughly take about 5 Minutes 14. Tape the edge of the body with masking tape so you won t scratch the paint or the glass, but since I am a 23

professional I just do it carefully. Bring it in on a angle to make the install easier. Once inside, attach the two 10mm nuts that are provided in the kit and tighten them up. You may have to push the glass towards the outside so it can pass the inside hump with the new felt. 24

Roll the New Door Glass all the way to the top with some help because REMEMBER it does not have the Main Vertical Channel bolted on. 15. This is how the Main vertical channel looks from the outside of the door. 25

Slide in the side with the bigger mounting bracket first. From the inside make sure that the New rollers from the glass slide into the New Vertical channel and push up so the nut on the new bracket meets with the New hole made on the door and bolt it ON. Take note that on getting the new rollers to slide into the new channel, you will need to wiggle the bracket a little 26

bit so it may pass the shape of the door from the inside. Bolt on lower part of the New Vertical Guide. Pay attention how close the New Vertical guide is. This gives us the angle needed to successfully have the glass pass right along the side of the sheet metal hump inside the door. If for any reason the angle is not correct 27

on the glass SIMPLY elongate the holes made for the new vertical guide bracket and tighten as necessary. Roll it up and down a couple of times before installing the inner and outer scrapers. The glass should roll up and down nice and firm without any binding. Once your satisfied with the movement begin preparing the new Inner and Outer Scrapers by scuffing the inside contact point 16. Before installing make sure to scuff the inside part of the scraper. Scuff the shiny part NOT the felted part. 28

Apply the Glue and place it in between the glass and the inner or outer door skin, which ever one you are working on. Tape the glass to the side you are not installing the new scraper on. This will give you a little more clearance. 29

With the window in the down position, push the new scraper down to the edge of the door. The weatherstrip adhesive will dry in roughly 15-20 minutes. Make sure the new scraper sits flush to the inside edge of the door were the glue was applied. Slide you hand along the scraper to make sure the scraper make full contact to the lip of the door skin. 30

HOOOORAAYYYYY!!!! You re Done!! Give the new glued on scrapers time to dry then, about 1 hour, then you could roll your window up and down making sure that there is NO binding of any sort!! GREAT JOB!!!! DOESN T THAT LOOK BETTER!!! 31

Thank you for Purchasing our 1967-72 Chevy truck Full One Piece Door Glass. We hope you found this kit to be an easy install, and would gladly appreciate any comments you have. 32