Weatherfold 4s 50 & 100 Brio Australia P: W: brio.com.au

Similar documents
Weatherfold 4s 50, 75 & 100

Interfold 35 With or Without Guide

Brio. Weatherfold 4s 150. Codes B WS S H PR. Sets note codes do not show finish, hinge sets not shown to same scale. Brio Weatherfold 4s

Brio. Weatherfold 5c 80. Codes B WC 4-80 S H SS. Sets all sets shown with hinge type H except BW2L/R-80SR. No finishes shown. Brio Weatherfold 5c

Brio. Weatherfold 5c 80. Codes B WC 4-80 S H SS. Sets all sets shown with hinge type H except BW2L/R-80SR. No finishes shown. Brio Weatherfold 5c

Weatherfold 4s 50 & Guide to Quantities For Top Hung Exterior Folding Systems. Non Mortice Timber & Aluminium

HENDERSON. Securefold Bottom Rolling. Fitting Instructions For Bottom Rolling External Doors with Morticed hinges SYSTEM CAPACITY.

where ideas unfold Exterior folding window hardware systems for sashes up to 35kg

CoFold Non-Mortice. Fitting Instructions for top hung exterior folding doors SYSTEM CAPACITY. Diagram 1. Diagram 2. Diagram 3.

HENDERSON. Securefold R-Loc Non-Mortice 100kg. Fitting Instructions for top hung exterior folding doors with NON-MORTICE HINGES SYSTEM CAPACITY

How To Measure Your Finished Opening

DOOR BiFOLD DOOR SET (3 + 1)

EURO (3876) Euro-C2 Installation Instructions Euro-Wall Systems, LLC

Lift-off hinge. Rising hinge. Standard hinge. Heavy duty hinge. Parliament hinge. Spring hinge. Double action spring hinge. Concealed mortise hinge

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

WELLINGTON FOLDING SLIDING PATIO FITTING & FIXING GUIDELINES

where ideas unfold brio.com.au Brio Timberoll 100/200 Exterior bottom roller sliding door hardware for panels up to 200kg

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Installation Instructions

Sliding Folding Patio 6 Door Set

Installation Manual Flat Track Series

EURO (3876) Euro-C3/C5 Installation Instructions Euro-Wall Systems, LLC

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

where ideas unfold brio.com.au Brio 6000 Mortice Lock Series Locking solutions for sliding & folding doors

1. TOOLS + MATERIALS REQUIRED

How to operate (folding)

SUPREME. Sliding Folding Patio 6 Door Set. Assembly Instructions. T14 Set - (Approx. 14ft) T16 Set - (Approx. 16ft)

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Hardware Fitting Accessories Bolts

INSTALLATION AND CARE INSTRUCTIONS

COBURN SLIDING SYSTEMS

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY

Section 1 Cubicles. Section 2 IPS Duct Panel Systems. Section 3 - Vanity Units Components & Assembly 12. Section 4 Basic Maintenance.

where ideas unfold Exterior folding hardware for panels up to 150kg

Assembly Instructions Please keep for future reference Inspire 40

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

UNIT No FRAMELESS PIVOT SHOWER DOOR

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

aluminium profile system

briousa.com where ideas unfold Brio Single Run Top hung straight sliding architectural systems for panels up to 350kg (770lbs)

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Door Hinges Drill-in Hinges

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Wooden Frame Type Instruction Manual

Privacy Wall Glass Selections - Polished Edge Slider Door

TECHNOLOGY IN MOTION MACO TILT AND TURN FITTINGS. MULTI POWER fully concealed fittings INSTALLATION INSTRUCTIONS

Vanity Cabinets and Mirrors Installation and User Guide

Euro-C3/C5 (Euro Vista Fold Aluminum Door System) Installation Instructions

ESSENCE. Shower / Tub Door Installaion Instructions

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

southpaw enterprises, inc.

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

Mounting Instructions Item No.: xxx

ENIGMA AIR ENCLOSURE

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

INOVO 2-LITE SLIDING PATIO DOOR

FLEX 28 / 32 / 42 x 72

CRL JACKSON 900 SERIES

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

HOME GYM Owner s Manual

INSTALLATION INSTRUCTIONS

YSD 400 Sliding Door System Installation Manual

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

Side Light Frame Pack Assembly Instructions

ED5800 (A) Series. Installation Instructions. Concealed Vertical Rod. Exit Device WARNING

ICU TRACKLESS SLIDING DOOR

Life Care Recliner

INSTALLATION INSTRUCTIONS

Frameless Hinged Door Enclosure. These instructions must be left with the user. Installation Guide W2-B

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

Adjustment Has adjustment strike block screw for sealing action adjustment.

Constable Oak Extension Dining Table

8mm x 25mm "Z" Bolt Plates. (2) Tube Spacers. (2) 12mm Bolt Plates w/ Nut

Titan - Double Skin Steel Partitioning. Installation Pack

Side Light Frame Pack Assembly Instructions

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

ESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

SPIDA SAW OPERATIONS MANUAL

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

IMPACT DOOR 3000 SERIES. This Manual Covers All Doors Shipped To Date, Except For Revised Jamb Guards.

33/3547A. Special tools needed: #10-24 tap Drill bits: #25, 5/16, 13/32, 1/2

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

2300 BI-FOLD INSTALLATION GUIDE

DO35 MAINTENANCE INSTRUCTIONS

INFITTING & OVERLAP HINGED DOORS

Stuff-Your-Stuff Platform Bed (Twin and Full)

Installation Manual For ToddPod Outdoor Shower Enclosures

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

Installation Instructions - Model V4JSD 1

Side Winder R o u t e r L i f t.

PRL GLASS PANIC HANDLES DOOR MANUAL PL100 PANIC HANDLE PL100-A SERIES. For all glass doors

GRILLE GUARD SPRINTER VAN (EXCLUDES X4) INCLUDES MERCEDES, FREIGHTLINER AND DODGE PARTS LIST:

LifeGear G1 /HOME GYM ITEM NO.: 63100

MODEL 2EA/2EB DOOR INSTALLATION INSTUCTIONS

Please read these instructions before use and keep for future reference

Transcription:

Codes INSTBWS2 REV J - MAR 2017 Weatherfold 4s 50 & 100 Brio Australia P: +61 2 87186718 W: brio.com.au E: brio.sales@allegion.com Brio UK P: +44 191 2291224 W: briouk.com E: brio.sales.uk@allegion.com Brio USA P: +1 585 3195599 W: briousa.com E: brio.sales.usa@allegion.com B WS 1-50 S H PB Finish: PB (Physical Vapor Deposition Brass), PR ( Brio Weatherfold 4s Physical Vapor Deposition Black), SS (Satin Stainless), PS (Polished Stainless) Hinge Type: See section Hinge Installation (page 5) Bearing Type: S (Stainless Steel Bearing) Load Capacity: 50kg (110lbs) and 100kg (220lbs) panels Set No.: 1(Pivot Set), 2 (End Hanger Set), 4 (Intermediate Hanger Set), 3 (Hinge Handle Set), 5 (Hinge Set), 6 (Offset Hinge Set), 7 (Offset Hinge Handle Set) Sets all sets shown with hinge type H. No finishes shown. BWS1-100H BWS2-50SH BWS2-100SH BW3-100H BW5-100H BW6-100H BW7-100H BWS4-50SH BWS4-100SH 1

Door Hardware Set Orientation FB = Flush Bolt, FP = Flush Pull, LK = Lock, left systems shown OUTWARD OPENING INWARD OPENING 2

Opening Preparation outward opening system shown, dimensions shown in mm[inches] 180 Track for 50kg(110lbs) 250 Track for 75kg(165lbs) & 100kg(220lbs) HEADBOARD 180 REBATE LINTEL PACKING BATTEN FASCIA 43[1.69] W PB180 47[1.85] OPENING IN BRICKWORK LEVEL +3[0.12] MA - 0[0.00] MIN HEADBOARD 250 HEADBOARD 23[0.91] LINTEL 23[0.91] SILL REBATE PACKING BATTEN PB250 FASCIA 48[1.89] 50[1.97] 19[0.75] 21[0.83] H ±3 [0.12] MA H W W = FINISHED OPENING WIDTH H = FINISHED OPENING HEIGHT PT = THICKNESS PB = PACKING BATTEN THICKNESS PB 180 = PT - 9.5[0.37] 250 PB = PT - 11.0[0.43] ±3 [0.12] MA 20[0.79] Track Preparation track and chanel cut to length W (finished opening width) OPTION A - Allows access to hangers through notch in track 56[2.21] 40[1.58] OPTION B - Allows access to hangers by removing track section 27.6[1.09] 40[1.58] 56[2.21] CUT 9.7[0.38] 42[1.65] 2 x Ø5[0.2] Use cover as a jig and align to edge of the track to drill 2 x Ø5.0[0.2] holes COVER ALIGN Install Track & Channel Insert Polypile Fix track with 10G screws. After initial 6 fixings, fix screws at 400[15.75] intervals. Secure polypropylene channel with adhesive. HEADBOARD PS13B POLYPILE 180/250 19[0.75] PIVOT END 100 [3.94] 100 [3.94] 100 [3.94] 400 [15.75] 400 [15.75] 94P CHANNEL = 20[0.79] Install polypile on inside of system If installing 94PA, recess into sill 23[0.91] deep by 25[0.95] wide then countersink and screw fix at 400[15.75] intervals. Install 94P last. 3

Panel Size Calculation free leaf width calculator available from Brio (includes BOM & pricing) Brio Weatherfold 4s allows equal size panels W PH = Panel Height PC 45[2.95] 50[1.97] PW PW PW PW 7[0.28] H N = No. of Panels PW = Panel Width JC = Jamb Clearance = PC = Panel Clearance = 4[0.16] JC 9[0.35] PH PW = W-[PC(N-1) + 2(JC)] N JC based on panels 850[33.47] wide and 38[1.50] thick PH 180 = H - 61[2.40] PH 250 = H - 66[2.60] Seal Preparation left, outward opening system shown Frame - AQ21 perimeter seals to butt against each other in all corners A = 12[0.47] B = C = 2.7[0.11] Panel - AQ63 D = 7.5[0.30] PIVOT A A B C A B C NOTCH SILL REBATE REBATE SILL REBATE REBATE D B C Meeting Door Selection Lintel and sill rebate to be notched as shown 2 Meeting square doors SWING DOOR SET2-T SET2-T SET2-T 12[0.48] SWING DOOR SET2-H SET2-H SET2-H 4

Hinge Installation pilot hole of Ø2.5mm[0.12"] recommended Non-mortise H 35[1.38]-68[2.68] Panel Thickness 20[0.79] =20[0.79] on Set 4 =60[2.36] min on Sets 3, 5, 6 & 7 Drilling jig available for H Sets 8.8[0.35] 12.5[0.49] 10.3 [0.41] 12[0.47] 64[2.52] 12[0.47] 31[1.22] 19[0.75] 19[0.75] ON OTHER Mortise Radius Corner T 44[1.73]-68[2.68] Panel Thickness 20[0.79] =20[0.79] on Set 4 =60[2.36] min on Sets 3, 5, 6 & 7 9.1[0.36] 16.6[0.65] 12.5[0.49] 100[3.94] 3[0.12] 31.7[1.25] R16[0.63] 5

Flush bolt Position see page 2 for flush bolt location for all configurations, router available Install flush bolt to panel FLUSH BOLT PH 2200[86.6] 456R 2200[86.6] PH 2440[96.1] 456RL 2440[96.1] PH 2740[107.9] 456RL-600 2740[107.9] PH 3300[129.9] 456RL-1000 60 [2.36] Install flush bolt keeper to sill PIVOT FLUSH BOLT FLUSH BOLT 456R 190[7.48] 456RL 450[17.72] 456RL-600 600[23.62] 456RL-1000 1000[39.37] For square flush bolts chisel out corners 8[0.32] KEEPER DUST BO 2.5[0.10] 41[1.61] 24[0.95] 24[0.95] Ø24[0.95] Counter bore for lockable flush bolts 30[1.81] Extended keeper available Mark where flush bolt throw strikes and notch out hollow for dust box Optional Security Aligner 199SS aligns panel to seal perimeter, secures against lifting Installation Adjustment PIVOT END MOUNT NOSE PIVOT 3[0.12] MOUNT SOCKET PIVOT CENTER 42 [1.65] 65 [2.56] REBATE PIVOT PT 28[1.10] PT 29[1.14] = ½(PT) + EQ EQ Can be installed on either pivot or end panel, Minimum PT = 38[1.50] ROUTE DETAIL Wind nose of jamb mount away from jamb until panel is pulled in to seal perimeter when closed Optional Jamb Pivot BW189H_ non mortice type H shown but all hinge types available Installation Hinge assembly aligned with other center hinges Adjustment PIVOT END MOUNT 28[1.10] 11.5 [0.45] 6.5 [0.26] REBATE PIVOT PT PIVOT PIVOT BOLT 6 Ø12[0.47] PIVOT = PT + 14[0.55] 8[0.32] Wind jamb pivot bolt in or out until it aligns with hinge on panel after top and bottom pivot are set

End Guide when viewed from outside doors folding left need a left end guide and vice versa for right Handing End Guide Determining System Orientation Handing end set hinge For Right: Flip hinge LEFT Left, outward opening system ANTI-SHAKE SCREW RIGHT Back off cap screw and rotate guide arm into left or right position Right, outward opening system LEFT RIGHT Lock off anti-shake set/grub screw Bottom Pivot when viewed from outside doors folding left need a left pivot and vice versa for right Handing Bottom Pivot For Right: Interchange pivot arm Handing pivot set hinge Push in cap For Right: Flip hinge LEFT RIGHT Flip base over Secure assembly by locking off cap screws ANTI-SHAKE SCREW LEFT RIGHT Lock off anti-shake set/grub screw System Security type H hinge shown but security set/grub screw applicable in hinge types T and M too Hanger security Guide security HE DRIVE PIN ANTI-SHAKE SCREW ANTI-SHAKE SCREW ANTI-SHAKE SCREW SCREW POSITION ON END SET & PIVOT S Anti-shake set/grub screw prevents pin being removed from hinge Lock off both set/grub screws 7

Attaching Hardware to Panels recommended before installation Ensure doors are level and square from top 16 [0.63] 12.5 [0.49] Set 1 Set 4 Set 2 Set 7 Set 7 PIVOT 1ST INT. 2ND INT. END Installing Hardware and Hanging Panels clean down inside of track and channel Viewed from outside, insert rollers through access notch in correct order Fix top pivot into position with machine screws supplied MACHINE SCREWS Place bottom pivot in channel Loosen locking screws and adjust bottom pivot so that hinge is touching the jamb. Lock off when in position. Loosen locking screw and adjust top pivot so that hinge is touching the jamb Lock off when in position. ADJUST LOCKING SCREWS TOUCHING TOUCHING 14[0.55] SILL or CHANNEL Screws pass through assembly ADJUST PIVOT BODY Bring pivot panel to pivot set Bring 1st int. panel to pivot panel Fix int. hanger to int. panel CHANNEL Hinge set 7 attached to panel Middle hinge of int. set attached Attach int. guide to int. panel Bring 2nd int. panel to the int. hanger with hinge set 7 Fix end panel to end hanger 8 Bring end panel to hinge set 7 Attach end guide to end panel, close all panels

Installation when using F hinge types or Set 8 Hinges & pins remain on end panel O-RING Push fit plastic jig onto end hanger and insert into track Bring end panel to system FIED TO COVER SLIDES ON PIN & WASHERS HANGER & PIN GUIDE & PIN Flip jig dependent on system 180 250 Jig keeps hanger stable and static Align hanger pin with end hanger and rest panel on blocks in position Depress button (see adjustment below) engage bolt into hanger Attach guide to bottom hinge pin Close all panels CHANNEL Remove jig from hanger Adjustment hinge pin locking mechanism applied to all hangers and top pivot Now that the doors are in place, open doors and loosen locking screws. Adjust all hangers and top pivot until panels are parallel with 7mm gap between the track To adjust height, depress button and wind bolt. Bolt locks off automatically on flats. Viewed from inside 7[0.28] depress button CHANNEL With the panels closed, loosen top pivot locking screw and adjust to centralise door panels. Then lock off top pivot and mark the position of the bottom pivot = = Open the panels and adjust the bottom pivot to the mark. Then tighten locking screws CHANNEL Close doors & fix cover into pivot to cover notch. 3. 1. COVER Mark the position of the bottom pivot MARK ALIGN TO MARK 2. 9

Care and Maintenance Hardware is subject to deterioration from everyday use and from the environment that it is in. In particular, it is important that routine maintenance be carried out in harsh coastal or marine environments and industrial applications. General Inspect all fixing bolts for tightness every six months, including those securing brackets. Tighten if necessary. Routinely check for wear and if excessively worn, the part should be replaced. To help prevent surface corrosion, Brio recommends washing regularly; even stainless steel finishes in coastal environments may show signs of surface corrosion If not washed regularly. Sheltered areas that are not rain washed are particularly susceptible. Wash with soap or mild detergent and warm water followed by rinsing with clean cold water and wipe dry. As a guide, if a window or door requires washing then wash the hardware, however Brio recommend for marine and industrial environments washing a minimum of every 3 months and 6 months for general environments. In coastal or marine environments Brio recommends applying a light application of corrosion preventative such as CRC Marine 66 or Inox for Marine, to all surfaces and using a dry cloth to remove excess. When using lubricant or corrosion protection compounds, be careful to avoid the adjacent surfaces and always follow the manufacturer's instructions. Track Keep track free from obstruction and excessive dirt or water. Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. Where fitting to the outside of the building, it is recommended that the appropriate track is specified. Hangers & Pivots All hangers are fitted with lubricated ball-bearings or plain bearings, requiring no greasing. If doors 'settle' and door clearance is reduced causing friction, raise the door by the hanger adjustment nuts. Wash as per the above recommendation and apply a light application of corrosion preventative to all surfaces, using a dry cloth to remove excess. Guides Guide roller and guide channel must be kept clear and free of obstructions. Wash as per the above recommendation and apply a light application of corrosion preventative to all surfaces, using a dry cloth to remove excess. Rollers All bottom rails should be free from obstruction and excessive dirt or water. Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. All rollers are fitted with sealed precision bearings requiring no maintenance. Hinges Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. Apply a light application of corrosion preventative to all surfaces, using a dry cloth to remove excess. Repeat at intervals no greater than 3 months. Flush Bolts Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. Apply a light application of lubricant to internal mechanisms and bolt using a suitable nozzle-spray. 10