rio odes INSTW2 REV - JN 18 Weatherfold 5c 80 rio ustralia P: +61 2 87186718 W: brio.com.au E: brio.sales@allegion.com rio UK P: +44 191 2291224 W: briouk.com E: brio.sales.uk@allegion.com rio US P: +1 585 3195599 W: briousa.com E: brio.sales.usa@allegion.com W 4-80 S H SS rio Weatherfold 5c Finish: SS (Satin Stainless) Hinge Type: See section Hinge Installation (page 5) earing Type: S (Stainless Steel earing) Load apacity: 80kg Set No.: 1(Pivot Set), 2 (End Roller Set), 4 (Intermediate Roller Set), 3 (Hinge Handle Set), 5 (Hinge Set), 6 (Offset Hinge Set), 7 (Offset Hinge Handle Set) Sets all sets shown with hinge type H except W2L/R-80SR. No finishes shown. W1-80H W2L-80SH W2R-80SH W2L-80SR W2R-80SR W3-0H W5-0H W6-0H W7-0H W4-80SH 1
oor Hardware Set Orientation L = ual Point Lock, LK = Lock, L = Left, R = Right OUTWR OPENING 3 3 7 7 7 L L LK L LK L L LK 1 2L 1 2L 1 1 4 1 4 4 1 3 7 L L L LK L 3 7 L 7 L L 3 1 2L 2R 1 1 4 2R 1 1 4 2L 2R 1 7 7 7 7 3 L L LK L L LK L L L LK 1 4 1 1 4 2L 1 1 4 4 1 7 7 7 7 7 7 7 L L L L LK L L L 1 4 2L 1 4 4 1 4 4 2L Opening Preparation outward opening system shown, dimensions shown in mm OPENING IN RIKWORK RETE HEOR 23.6 [0.93] 23 PKING TTEN RETE 27 F = FRME WITH W = FINISHE OPENING WITH H = FINISHE OPENING HEIGHT JT = THIKNESS JW = WITH PT = PNEL THIKNESS R = RETE WITH 98 31.0 24 H JT HEOR F W LEVEL +3 M -0 MIN R = JW - (PT + 6) JW W 23 RETE R ±3 M H ±3 M 39 2 SILL 98HSE
Sill and hannel Preparation Frame. ut timbers to length = F - 6 (Frame Width - 6) 39 JW - 82 4 23,, = W (Finished Opening Width) JW - (PT + 6) a b c a=12 b=6 c= 2.7 24 31 3.5 JW - 59 9 24 Sill supplied with access notch. Frame Width - 6 (F - 6) JT 15 F - 6 ESS NOTH Fix timber to sill with building adhesive PIVOT EN ut hannel to length W (Finished Opening Width). rill 2 x Ø3.5mm holes for the pivot holes Ø3.5, then drill and countersink. Insert PS16 polypile 5 70 50 50 400 50 50 70 5 LEFT PIVOT RIGHT PIVOT Frame ssembly 1. Pin to headboard 2. Screw fix 98 3. Pin to headboard 4. Pin to 5. Screw fix head to jamb HEOR HEOR HEOR 98 1. Pin to sill 2. Screw fix jamb to sill 3. Screw fix end caps to sill 45 49 (JT+3)/2 SILL - 98HSE * * SEL ROUN SREW IN THE SILL 3
Seal Preparation left, outward opening system shown Frame - Q21 (perimeter seals to butt against each other in all corners) Panel - Q63 = 12 = 6 = 2.7 PIVOT PNEL = 7.5 NOTH RETE RETE Lintel and Timber to be notched as shown Panel Size alculation rio Weatherfold 5c allows for equal size panels PH (Panel Height) = H - 44 W 24 P PW PW PW PW PH H J N = No. of Panels PW = Panel Width J = Jamb learance = 6 P = Panel learance = 4 PW = W-[P(N-1) + 2(J)] N Meeting oor Selection 2 Meeting square doors 2 Meeting rebate doors 6 SWING OOR SWING OOR SET2-H SET2-R 11 6 12 18 HLF PT SET2-H SET2-H 4 11 11 For more rebate detail contact rio
Hinge Installation pilot hole of Ø2.5mm recommended Non-mortice H 38-68 Panel Thickness Mortice Radius orner T 44.5-68 Panel Thickness Rebate R 3 50 45 7.7* 8.1* 15.6* 8.8 12.5.3 6 9.1 16.6 12.5 17.5 R16 12 31 12.5 37.5 8.5 64 19 19 0 37.5 0 12 31.7 30.7* R16 EQ EQ 3.5 = on Set 4 =60 min on Sets 3, 5, 6 & 7 *=44.5 panels only On other panel = on Set 4 =60 min on Sets 3, 5, 6 & 7 *=44.5 panels only On other panel 286 ual Point Lock see 286 dual point aluminium lock instructions (INST286) for further details Non-Locking 8 Locking 8 WT 4x Ø4.5 OUNTERSINK x 90 34 WT 4x Ø4.5 OUNTERSINK x 90 34 Ø18 Ø18 22 + WT 85 122 Ø 18 17 LESS 141 34 34 = Handle pivot centre = PT - 30 8 = Handle pivot centre WT = Wall thickness = PT - 30 8 5
286 ual Point Lock see 286 dual point timber lock instructions (INST286T) for further details leat support & Lock recess Locking handle Non-locking handle 1 1 1 345 345 345 Lock recess S W leat support Ø18 122 85 Ø18 PNEL ENS 90 3 PT = Panel thickness = Handle pivot centre. 18 17 Y PT PT PT 38 8.4 44.5 15.2 54 58 S W 35 51 45 61 PT = Panel thickness = Handle pivot centre. PT 38 44.5 54 58 8.4 15.2 Y 32 32 41 45 PT = Panel thickness = Handle pivot centre. PT 38 44.5 54 58 8.4 15.2 Handing Sets type H only etermining system orientation Handing bottom pivot (left to right hand shown) 1. 2. 3. Fit washers, hinge and cap P Left, outward opening system 4. 5. 6. HINGE WSHERS LOK OFF GRU SREW Right, outward opening system 6 Right hand shown
Handing top pivot (left to right hand shown) 1. 2. 3. Fit washers, hinge and cap Handing indicator shown 4. 5. 6. WSHERS LEFT GUIE HINGE LOK OFF GRU SREW P Right hand shown LEFTT ROLLER Hardware Features Hardware security Guide security Screw in cap (Intermediate roller only) HINGE PIN Push in cap (ottom Pivot and End Rollers) HE RIVE NTI-SHKE SET/GRU SREW HINGE o not tighten grub screw NTI-SHKE SET/GRU SREW NTI-SHKE SET/GRU SREW Type H hinge shown End (left guide) and intermediate shown ttaching Hardware to Panels recommended before installation Ensure doors are level and square from top 16 12.5 Set 1 Set 7 Set 4 Set 7 Set 2 PIVOT PNEL 1ST INT. PNEL 2N INT. PNEL EN PNEL 7
Installing Hardware clean down inside of sill and channel ismantle top pivot and screw fix plate into channel Reassemble top pivot into channel Insert rollers through access notch in correct order Insert bottom pivot in the sill and screw fix to sill. Insert end guide into the channel Hanging Panels Left hand system shown ring pivot panel to pivot set HNNEL ring 1st int. panel to pivot panel Insert intermediate guide into the channel SILL Hinge set 7 attached to panel Middle hinge of int. set attached ttach int. roller to int. panel ring 2nd int. panel to the int. set with hinge set 7 Fix int. guide to int. panel ring end panel to hinge set 7 Fix end panel to end roller 8 ttach end guide to end panel, close all panels
djustment Loosen cap screws on the top and bottom pivot djust bottom pivot to allow 6mm approx. between panel and jamb. Partially open doors - lock off 1st cap screw. Open fully, lock off 2nd cap screw (bottom pivot only) PIVOT PNEL 6 Viewed from inside SILL lose all doors and check clearance between panels and sill Mark top pivot position MRK Partially open doors - lock off 1st cap screw HE HE Viewed from inside Viewed from inside Open fully, lock off 2nd cap screw System Overview Left hand system shown RIO WETHERFOL 5c HNNEL SILL 9
are and Maintenance Hardware is subject to deterioration from everyday use and from the environment that it is in. In particular, it is important that routine maintenance be carried out in harsh coastal or marine environments and industrial applications. General Inspect all fixing bolts for tightness every six months, including those securing brackets. Tighten if necessary. Routinely check for wear and if excessively worn, the part should be replaced. To help prevent surface corrosion, rio recommends washing regularly; even stainless steel finishes in coastal environments may show signs of surface corrosion If not washed regularly. Sheltered areas that are not rain washed are particularly susceptible. Wash with soap or mild detergent and warm water followed by rinsing with clean cold water and wipe dry. s a guide, if a window or door requires washing then wash the hardware, however rio recommend for marine and industrial environments washing a minimum of every 3 months and 6 months for general environments. In coastal or marine environments rio recommends applying a light application of corrosion preventative such as R Marine 66 or Inox for Marine, to all surfaces and using a dry cloth to remove excess. When using lubricant or corrosion protection compounds, be careful to avoid the adjacent surfaces and always follow the manufacturer's instructions. Track Keep track free from obstruction and excessive dirt or water. Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. Where fitting to the outside of the building, it is recommended that the appropriate track is specified. Rollers & Pivots ll Rollers are fitted with lubricated ball-bearings or plain bearings, requiring no greasing. Wash as per the above recommendation and apply a light application of corrosion preventative to all surfaces, using a dry cloth to remove excess. Guides Guide roller and guide channel must be kept clear and free of obstructions. Wash as per the above recommendation and apply a light application of corrosion preventative to all surfaces, using a dry cloth to remove excess. Hinges Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. pply a light application of corrosion preventative to all surfaces, using a dry cloth to remove excess. Repeat at intervals no greater than 3 months. ual Point Lock Visible surfaces should be cleaned using a damp cloth and mild detergent, then wiped dry. pply a light application of lubricant to internal mechanisms and bolt using a suitable nozzle-spray.