Introduction to Substation Design TADP 542

Similar documents
STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/028 Guidance On Substation Design: Drawing Submission Requirement

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

Utility Interconnection and System Protection

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

FACILITY RATINGS METHOD TABLE OF CONTENTS

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Customer Connection Guide Updates Effective May 2017

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

APPENDIX 4D SUBSTATION POWER TRANSFORMERS

ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems

Reference Number PDS 04 (RIC Standard: EP SP)

RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS. experience matters

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV

KENYA ELECTRICITY GENERATING COMPANY LTD

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Functional Specification Revision History

Notes 1: Introduction to Distribution Systems

ELPT 1429 RESIDENTIAL WIRING

One line and Three line diagrams Schematics Wiring Diagrams Logic ladders Ancillary prints Pictorial instructions

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance

INTRODUCTION. General Design Criteria o (include charts from Section 2 of TSS) Functional Criteria o (from TSS section 3) Accessibility and Layout

EE Lecture 15 (recorded Feb 9, 2011) Fri Feb 15, 2013

Electric Service Guide. Residential Subdivision

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT

138kV / 13.8kV Substation Protection and Control Design Project

ATTACHMENT - AESO FUNCTIONAL SPECIFICATION

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

Transmission Facilities Rating Methodology for Florida

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

Dairyland Power Cooperative June Transmission to Transmission (T-T) Interconnection Guidelines

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

Standard Prices for Generators 2010

Substation: From the Outside Looking In.

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems

6B.6 Substation Grounding

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009

PART 1 OWNER/APPLICANT INFORMATION

MidAmerican Energy Company 100 kv and Above Facility Ratings Methodology

Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES

SECTION PANELBOARDS

Single Line Diagram of Substations

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE

Autodesk Revit MEP Fundamentals

Transmission to Distribution/ End-User Interconnection Guidelines for the Dairyland Power Cooperative Transmission System

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems

Southern Company Interconnection Requirements for Inverter-Based Generation

Facility Ratings Methodology

kv AC substation

VI 3 - i TABLE OF CONTENTS

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

TRANSMISSION FACILITIES...7

UNIFIED FACILITIES GUIDE SPECIFICATIONS

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT OFFICE

Update: July 20, 2012

GENERAL TECHNICAL SPECIFICATION

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

Manual: Distribution Substation Manual (DSM) Section D: Substation Drawing Revision List

Autodesk Revit MEP Learning Essentials Training Course Outline

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

Transmission Facilities Rating Methodology

Clark County Fire Prevention Las Vegas Nevada

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Automated Fault Detection With PQ Monitors

Unit 2. Single Line Diagram of Substations

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering

Ecological Restoration Drafting & Design Guidelines

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

AL AQTAAR AL ARBAAH EST. COMPANY PROFILE. Panel Boards, Substation, Instrumentation, Automation.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

GENERAL TECHNICAL SPECIFICATION (Turnkey Work)

CITY OF MORTON RESERVOIR NO. 1 REPLACEMENT - REBID

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

ECP HV INSULATION TESTING

Drawing Management Standard

SECTION - II BID DATA SHEET

Guide and Requirements for Service. at 69,000 to 287,000 Volts R 0.2

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

Survey Data and TOPO Checklist

Transcription:

Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program

Drawings Drawings are prime method for communicating information about a substation project. Drawings for a new substation will usually be CAD drawings. Drawings should be created in accordance with substation owner s drafting standards.

Drawings Drawings for a substation project can range from a few to over a hundred depending on owner s preferences and size and type of substation project. More drawings will be included for a project that will be constructed by a contractor than for a project constructed by the substation owner s personnel.

Mead Drawing List

PD-00.00 Drawing Index

Essential Drawings Certain drawings or groups of drawings will appear in all new substation projects. Drawing List One-Line Diagram General Arrangement Plan Site Plan, Sections and Details

Essential Drawings (cont.) Substation Plan, Sections and Details Foundation Plan and Details Structure Plan and Details Grounding Plan and Details Raceway Plan and Details

Essential Drawings (cont.) Control Building Plan, Sections and Details Relay, Control and Metering Panel Layouts and Wiring Diagrams AC and DC Schematics Material List

Drawing Lists Examples of Drawing Lists shown on Slides 4 and 5 of this presentation.

One-Line Diagrams Examples of One-Line Diagrams were shown in Presentation 2.1, Slide 10; in Presentation 2.2, Slides 14 and 16 and in Presentation 5.1, Slides 26, 30 and 39. The next two slides will show two of these one-line diagrams again.

Mead One-Line Diagram

PD One-Line Diagram

General Arrangement Plan Next slide shows an example of a General Arrangement Plans.

Mead Initial/Ultimate Plan (E-35481, Sheet 50)

Site Plan, Section and Details The next seven slides show examples of Site Plans, Sections and Details.

Mead Grading and Erosion Control Plan (E- 35481, Sheet 48)

Mead Landscape Plan (E-35481, Sheet 46)

PD Site Plan (PD-1.00)

PD Grading Plan (PD-2.01)

PD Plan and Profile Sections (PD-2.02)

PD Surfacing Plan (PD-2.04)

PD Fence Plan (PD-1.12)

Substation Plan, Section and Details The next seven slides show examples of Substation Plan, Elevation and Section drawings for two substations.

Mead General Plan (E-35481, Sheet 03)

Mead 115 & 13.8 kv Elevations (E- 35481, Sheet 08)

Mead General Plan (E-35481, Sheet 09)

PD Arrangement Plan (PD- 5.00)

PD Strain Bus Elevation (PD- 5.01)

PD Arrangement Plan (PD- 5.02)

PD Elevation C-C (PD-5.03)

Foundation Plan and Details The following two slides are examples of a Foundation Plan drawing and a Foundation Details drawing. The third slide shows a Foundation Plan for another substation.

Foundation Plan and Details

Mead Transformer Foundation and Oil Containment (E-35481, Sheet 44)

PD Foundation Plan (PD- 1.01)

Structure Plan and Details There isn t a separate Structure Plan unless it is a very large substation. Structures are usually identified on other drawings such as Slide 33. Structure Detail drawings are used for fabrication and assembly. Structure Drawings for first substation are listed on Slide 4. Second substation are listed in PD-7.xx series on Slide 5.

Grounding Plan and Details Grounding Plan is usually shown on one drawing unless it is a very large station. Grounding Details may be shown on one or more drawings. Next two slides show a Grounding Plan drawing and a Grounding Details drawing.

Mead Grounding Plan (E-35481, Sheet 05)

Mead Grounding Details (E-35481, Sheet 06)

Raceway Plan and Details The two slides that follow are examples of a Conduit Plan drawing and a Conduit and Cable Schedule drawing. When many conduits occupy the same trench, they are usually installed in one or more layers with several conduits in each layer (duct bank configuration). Some owners use a Cable List to provide cable information.

PD Conduit Plan (PD-8.00)

PD Conduit and Cable Schedule (PD- 8.01)

Control Building Plan, Sections and Details A Control Building may have many drawings associated with it. These may include a Plan view, Section views and Detail drawings of some of the equipment located with the Control Building. Several utilities use a different name for this facility instead of building. This is to avoid difficulties with local government building departments when a prefabricated structure is utilized.

Mead Panelhouse, Plan &Sections (E- 35481, Sheet 12)

Relay, Control and Metering Panel Layouts and Wiring Diagrams The next two slides are examples of a Panel Layout drawing and a Panel Wiring diagram.

Mead Control and SCADA Panel (E-35481, Sheet 25)

Mead Control and SCADA Panel (E-35481, Sheet 26)

AC and DC Schematics These can include three-line diagrams and AC and DC breaker panel drawings. CT and PT Schematic Diagrams may also be included.

Mead Wiring Diagram (E-35481, Sheet 02)Aa

Mead AC Station Service Wiring Diagram (E-35481, Sheet 33)

Mead DC Breaker Panel Wiring Diagram (E- 35481, Sheet 32)

Mead CT & PT Schematic Diagram (E- 35481, Sheet 34)

Material Lists Some owners place Material Lists on drawings. It is usually more difficult to update lists on drawings. A Control Building Material List may appear on the Control Building Plan drawing. Material Lists are often contained in either word processing documents or spreadsheet documents instead of on drawings.

Additional Drawings Additional drawings or groups of drawings may appear in a substation project. SCADA Equipment and Wiring Diagrams Major Equipment Physical and Electrical Oil Containment Property Fence Plan

SCADA Equipment and Wiring Drawings Most new substations have some form of a SCADA system. Many existing substations also have a SCADA system. Many different SCADA systems are employed and the drawings and wiring diagrams are very diverse. No example drawings will be shown here.

Major Equipment Physical and Electrical Drawings Manufacturer s drawing for transformers, circuit switchers and circuit breakers may be included in the drawing package. Some owners may keep the major equipment drawings separate from the substation drawings. The electrical drawings are usually needed for connecting power and control cables to the equipment.

Oil Containment Drawings One or more drawings may be created if extensive oil containment is required. It may be a part of another drawing if limited oil containment is required. See Slide 33 where it was combined with the transformer foundation.

Property Fence Plan Drawings A property perimeter fence may be required when the substation property extends some distance beyond the substation enclosure. This may require a separate drawing or it may be shown on the Site Plan drawing.

Additional Substation Drawing Information Refer to Appendix A of Chapter 3 of the RUS Design Guide for Rural Substations for further information regarding substation drawings.

Documentation In addition to the substation drawings, the following documents should be retained as part of the substation design record: Project Plan including revisions Project Schedule Project Cost Estimate Geotechnical Study

Documentation (cont.) Ground Resistivity Study Grounding Grid Design Structure and Foundation Design Bus Work Design Calculations Equipment Ampacity Determinations

Documentation (cont.) Insulation Coordination Design Construction Contract Change Orders Other Engineering Calculations as appropriate

Image Acknowledgements Mead Drawing List Avista Utilities PD Drawing List Grant County Public Utility District Mead One-Line Diagram Avista Utilities PD One-Line Diagram Grant County Public Utility District

Image Acknowledgements (cont.) Mead Initial/Ultimate Plan Avista Utilities Mead Grading and Erosion Control Plan Avista Utilities Mead Landscape Plan Avista Utilities PD Site Plan Grant County Public Utility District

Image Acknowledgements (cont.) PD Grading Plan Grant County Public Utility District PD Plan and Profile Sections Grant County Public Utility District PD Surfacing Plan Grant County Public Utility District PD Fence Plan Grant County Public Utility District

Image Acknowledgements (cont.) Mead General Plan Avista Utilities Mead 115 kv Elevation & 13.8 kv Elevation Avista Utilities Mead 13 kv Plan and Elevations Avista Utilities PD Arrangement Plan Grant County Public Utility District

Image Acknowledgements (cont.) PD Strain Bus Elevation Grant County Public Utility District PD Elevation B-B Grant County Public Utility District PD Elevation C-C Grant County Public Utility District Mead Ground Plan Avista Utilities

Image Acknowledgements (cont.) Mead Transformer Foundation and Oil Containment Avista Utilities PD Foundation Plan Grant County Public Utility District Mead Grounding Plan Avista Utilities Mead Grounding Details Avista Utilities

Image Acknowledgements (cont.) PD Conduit Plan Grant County Public Utility District PD Conduit and Cable Schedule Grant County Public Utility District Mead Panelhouse Layout, Plan & Sections Avista Utilities Mead Control and SCADA Panel Avista Utilities

Image Acknowledgements (cont.) Mead Panel 1 Wiring Diagram Avista Utilities Mead Wiring Diagram Avista Utilities Mead AC Station Service Wiring Diagram Avista Utilities Mead DC Breaker Panel, Batteries & Charger Wiring Diagram Avista Utilities

Image Acknowledgements (cont.) Mead CT & PT Schematic Diagram Avista Utilities