ICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents

Similar documents
ICT LIBRARY UPDATE. Bi-monthly Jan. April 2017 Vol. 15 : No Contents

06 March Day Date All Streams. Thursday 03 May 2018 Engineering Mathematics II. Saturday 05 May 2018 Engineering Physics

Maintenance of Traffic sequence of operations including any phasing and detour maps;

2. The re-examination application link on the portal will be active during the below mentioned period:

BAY MEADOWS SPECIFIC PLAN

B.E CIVIL ENGINEERING (PART TIME) Subject Name. Exam Date. Session

CONTROLLER OF EXAMINATIONS. B.E CIVIL ENGINEERING (PART TIME) Subject Name. Exam Date. Session

CHAPTER 11 SURVEY CADD

STATE UNIVERSITY CONSTRUCTION FUND

Proven precast solutions for every application

580 - NOISE BARRIERS OPSS 580 INDEX

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CITY OF DANA POINT DEVELOPMENT REVIEW

Phase 2 Silver Line Update

B.E CIVIL ENGINEERING (PART TIME) Subject Name. Exam Date. Session

Union Station Tunnel Overall DBE Goal Calculation

State College Area School District

Scope of work of Architect (as per the agreement signed by the Architect)

END EXAMINATION TIME TABLE OF II-B.TECH-I-SEM-R07-SUPPLE-NOV-DEC 2016 Examination Timings: A.M. To P.M.

Fundamentals of Industrial Control

TOWN of LAKESHORE SITE PLAN CHECKLIST

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Exploration Beyond Expectation. Geo-Carte Radar Technology Pvt. Ltd.

Preface... Acknowledgments... Glossary Introduction Management Systems and the Management of Chemical Process Safety...

Turning the wheels of your success

Deep Creek Canyon US Highway 12

Shape Analysis of Bituminous Mixes With SBR

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Jointed Precast Concrete Pavement

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Survey Control Point Observations

LETTING : CALL : 029 COUNTIES : GOODHUE

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

2018 District 1 Highway Construction Program

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Theory Examination Date Sheet for Diploma Courses Session Nov-Dec, Time: 11:00AM (Friday Timing: 10:00AM)

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

Attachment #2 PPW133-07

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Accelerated Bridge Construction (ABC) and the Utah Experience

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

Technical Memorandum# TM2

Guide Sign Policy for Secondary State Highways Edition

ISSN TITLE PUBLISHER FREQUENCY ASIAN JOURNAL OF WATER, ENVIRONMENT AND POLLUTION.

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

adopted in Hong Kong

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

This page is intentionally left blank

CHAPTER F IVE ROBOTIC TOTAL STATION

Plan Preparation Checklist

Office use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

CONTROL AND RESEARCH LABORATORIES IN THE ASPHALT INDUSTRY

CONVEYANCE PIPELINE AND PUMP STATION

THE TRANSPORTATION ISSUE

Communications Design Challenges for the Edmonton North LRT Extension

An Experimental Study on Effect of Scrap Tyre Crumbed Rubber on 80/100 Grade Bitumen

Automated Machine Guidance

REQUEST FOR PROPOSAL

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

Class: 2 nd Semester (New Scheme)

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Protection from electromagnetic environment effects

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

The $13.2 billion Central Artery/Tunnel Project (CA/

PERFORMANCE MEASUREMENT AND MONITORING

BRIDGE TYPE CONCEPT EVALUATION

Survey Data and TOPO Checklist

The Electronic Equipment Stewardship Regulations

MESSAGES. International Society for Soil Mechanics and Geotechnical Engineering

CTA Blue Line Forest Park Branch Feasibility/Vision Study

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

SATHYABAMA INSTITUTE OF SCIENCE AND TECHNOLOGY (DEEMED TO BE UNIVERSITY)

State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations

SECTION 1 - GENERAL REQUIREMENTS

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

GUJARAT TECHNOLOGICAL UNIVERSITY PDDC Semester: 1 Civil Engineering

How will city infrastructure and sensors be made smart?

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted

PRECASTADVANTAGETO PRADHANMANTRIAWASYOJANA

GEOTECHNICAL SERVICES

ORDINANCE LIST ORDINANCE LIST 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

MANuFACturers industry QuALity statement.

TABLE OF CONTENTS 1200 PLAN PREPARATION

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

The Shell Bitumen Handbook

Transcription:

1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Nov. Dec. Vol. 15 : No. 6 Contents - Articles - Pages (Subject wise Alphabetically Indexed) - 2-3 - Addition of Books - 4 - Reports - 5-15 Prepared by : Neeru Saini Librarian

2 Articles Architecture 1 Self Growing Buildings : (Architecture + Design Nov. ). 2 Designing Urban Plans : (Architecture + Design Nov. ). Concrete 1 Strength improvement studies of bacterial concrete : (Indian Concrete Journal : Oct. ). 2 An investigation on the behavior of metakaoline based hybrid fiber reinforced concrete when subjected to acid attack : (Indian Concrete Journal : Nov. ). 3 Improving strength of recycle fine aggregate concrete using metakaolin : (Indian Concrete Journal : Nov. ). Earthquake 1 Residential masonry constructions and their earthquake safety in the rural area on Mandi District : (Indian Concrete Journal : Dec. ). 2 Earthquake Resilient Building construction.. (The master Builder : Nov. ) Human Resource Management 1 The leadership Exponential : (Human Capital : Sept. ). 2 HR : 2020 A transformational challenge? (Human Capital : Nov. )

3 Metro 1 Metro Rail Projects of Utter Pradesh : (Urban Railways : Oct. ). 2 New Metro Rail routes for Mumbai : (Urban Railways : Nov. ). Structures 1 An Innovative connection systems for cross laminated timber structures : (Structural Engineering International : (Contents Nr. 4/). Tunnel 1 Chennai Metro Tunneling : (Urban Railways : Oct. ) Water 1 Chemical used in water and wastewater treatment process an overview : (Water Today : Nov. ). 2 Recycling of industrial side stream wastewater.(water Today : Dec. ). 3 Multi-Media Filtration for RO : Selecting Coagulants and dosing optimization (Water Today : Dec. ).

4 BOOKS S. No. Acc. No. Title 1 20903 Souvenir International seminar on Innovations and Aesthetics in Design and 2 20913 / 20914 IRC : 121 : Guidelines for use of construction and demolition waste in road set. 3 20915 / 20916 IRC : 122 : Guidelines for construction of precast concrete segmental box culverts 4 20917 / 20918 IRC : 123 : Guidelines on geophysical investigation for bridges 5 20919 / 20920 IRC : 125 : Guidelines on dozers for highways works 6 20983 / 20984 Intelligent transport system. 7 21014 /21015 IRC : 126 : Guidelines on wet mix plant 8 21016 / 21017 IRC : SP : 93 - Guidelines on requirement for environmental clearance for road project 9 21018 / 21019 IRC : SP : 111 : Capacity building of road agencies in charge implementation of road projects in urban area. 10 21020 / 21021 IRC : SP : 112 : Manual for quality control in road & bridge works 11 21022 IRF World road statistics data 2010-2015

5 Reports Sl. No. 1 2 Projects Name Acc. No. Title of the Report (Hard Copy) Soft Copy 20976 Final Feasibility Report Vol. I : Main Report : Nov. 20977 Final Feasibility Report Vol. II : Technical specifications : Nov. 20978 Final Feasibility Report Vol. III : Bill of Rajasthan (Bikaner-Elevated) : Consultancy services for Quantities : Nov. feasibility study and preparation of detailed project report for 20979 Final Feasibility Report Vol. IV : Rate construction of elevated road in Udaipur city and on Railway Analysis : Nov. level crossing in Bikaner city in the state of Rajasthan.. 20980 Final Feasibility Report Vol. V : Cost Estimate : Nov. 20981 Final Feasibility Report Vol. VI : Appendix to main Report : Nov. 20982 Final Feasibility Report Vol. VII : Drawings : Nov. NH-88 (Shimla to Mataur) : Consultancy services for preparation of feasibility and detailed project report for upgradation to 4 lane of Shimla to Mataur section (Km.0.000 to Km 223.700) of NH-88 in the state of Himachal Pradesh through BOT/Hybrid Annuity/EPC mode 20985 Final feasibility study report including option study report : Vol. I Main Report : Nov. 20986 Final feasibility study report including option study report : Vol. I (A) : Annexures to main report : Nov. 20987 Final feasibility study report including option study report : Vol. II : Appendices to main report (Part 1 of 4) : Nov. 20988 Final feasibility study report including option study report Appendices to main report (Part 2 of 4) : Nov. Year

6 3 NH-68/27 (Sanchore) : Consultancy services for project management phase-1 including preparation of DPR for up gradation of junction with NH-68 at Sanchore connecting Dhanera and terminating at its junction with NH-27 near Deesa+Junction with NH-68 near Tharad connecting Dhanera, Panthawada section of NH-168 A and NH-168 in the state of 20989 Final feasibility study report including option study report Appendices to main report (Part 3 of 4) : Nov. 20990 Final feasibility study report including option study report Appendices to main report (Part 4 of 4) : Nov. 20991 Final feasibility study report including option study report : Vol. III : Drawings (Part-1 of 3) Road drawings : Nov. 20992 Final feasibility study report including option study report Vol. III : Drawings (Part-2 of 3) Road drawings : Nov. 20993 Final feasibility study report including option study report Vol. III : Drawings (Part-3 of 3) Road drawings : Nov. 20994 Final feasibility study report including option study report : Vol. IV : Technical Specification : Nov. 20995 Final feasibility study report including option study report : V : Rate Analysis : Nov. 20996 Final feasibility study report including option study report : Vol. VI : Cost Estimate : Nov. 20997 Final feasibility study report including option study report : Vol. VII : Bill of Quantities : Nov. 20998 FDPR : Vol. I : Main Report : Oct. 20999 FDPR : Vol. I (A) : Appendix to Main Report : Oct. 21000 FDPR : Vol. II : Design Report (Part-1 Road features and pavement composition) :Oct.

7 Gujarat to two/four lane with paved shoulder configuration (Package No. NH/IAHE/19) 21001 FDPR : Vol. II : Design report (Part-II : Design of bridges and cross drainages.) : Oct. 21002 FDPR : Vol. II (A) : Bridge design calculation (Part- 1 of 3) : Oct. 21003 FDPR : Vol. II (A) : Bridge design calculation (Part- 2 of 3) : Oct. 21004 FDPR : Vol. II (A) : Bridge design calculation (Part- 3 of 3) : Oct. 21005 FDPR : Vol. II Design Report : (Part- III) Traffic survey and analysis report : Oct. 21006 FDPR : Vol. II (B) : Geotechnical investigation report : Oct. 21007 FDPR : Vol. III : Material Report : Oct. 21008 FDPR : Vol. V : Technical specification : Oct. 21009 FDPR : Vol. VI : Rate analysis : Oct. 21010 FDPR : Vol. VII : Cost estimate : Oct. 21011 FDPR : Vol. VIII : Bill of Quantities :Oct. 21012 FDPR : Vol. X : Civil work contract agreement : Oct. 21013 FDPR : Vol. XI : Project clearance : Oct. 21031 FDPR : (Pack - II) : FDPR : Vol. I : Main Report : Oct. 21032 FDPR : Vol. I (A) : Appendices to main report : Oct. 21033 FDPR : Vol. II : Design Report (Part -1 Road features and pavement composition) : Oct.

8 21034 FDPR : Vol. II : Design Report (Part -2 - Design of bridge and cross drainage structure) : Oct. ) : Oct. 21035 FDPR : Vol. II : Design Report (Part -3 Traffic survey and analysis report) : Oct. 21036 FDPR : Vol. II(A) : Bridge design calculation: Oct. 21037 FDPR: Vol. II(B) : Geotechnical investigation report : Oct. 21038 FDPR : Vol. III : Material Report : Oct. 21039 FDPR : Vol. IV : Environmental assessment report including environmental management plan & (RAP): Oct. 21040 FDPR : Vol. V : Technical specification : Oct. 21041 FDPR : Vol. VI : Rate analysis : Oct. 21042 FDPR : Vol. VII : Cost Estimate : Oct. 21043 FDPR : Vol. VIII : Bill of Quantities : Oct. 21044 FDPR : Vol. XI : Project clearance : Oct. 21045 FDPR : Vol. X : Civil works contract agreement : Oct. 21046 FDPR : Pack- III : FDPR : Vol. I : Main Report : Oct. 21047 FDPR : Vol. I(A) : Appendices to main report : Oct. 21048 FDPR : Vol. II : Design report (Part-1 Road features and pavement composition) : Oct.

9 4 5 NH-3 (Khalghat MP) : Consultancy services for preparation of detailed project report for realignment of Bakaner Ghat of NH-3 between Indore to Khalghat in the state of MP Assam (PWD) : Consultancy services for conducting road safety audit and preparation of DPR for road safety measures and black spot mitigation on state highways and major district roads under Assam State roads project (IBRD funded) 21049 FDPR : Vol. II : Design report (Part-II : design of bridges and cross drainages structures) : Oct. 21050 FDPR : Vol. II : Design report (Part-III : traffic survey and analysis report ) : Oct. 21051 FDPR : Vol. II (A) : Bridge design calculation : Oct. 21052 FDPR : Vol. II (B) : Geotechnical investigation report : Oct. 21053 FDPR : Vol. III : Material Report : Oct. 21054 FDPR : Vol. V: Technical Specification : Oct. 21055 FDPR : Vol. VI : Rate Analysis : Oct. 21056 FDPR : Vol. VII : Cost Estimate : Oct. 21057 FDPR : Vol. VIII : Bill of Quantities : Oct. 21058 FDPR : Vol. X : Civil work contract agreement : Oct. 21059 FDPR : Vol. XI : Project clearance : Oct. 21025 Final inception report : Dec. 21026 Final quality assurance plan: Dec. 21027 DPR (Part -2) : Vol. 1 : Main Report : Dec. 21028 DPR (Part -2) : Vol. 2 : Appendices (Road safety improvement drawings) : Dec. 21029 DPR : Vol. 3 : Cost Estimate : Dec.

10 6 7 Jalandhar (MBKA) : Consultancy services for preparation of feasibility study report of Jalandhar Moga.. NH-341 : Consultancy services for project management phase- 1 including preparation of detailed project management Phase - 1 including preparation of DPR.. 21030 DPR : Vol. 4 : Bid Documents : Dec. 20911 Final Inception Report : Oct. 20912 Final Quality Assurance Plan : Oct. 20921 FDPR : (Package-1) : Vol. I Main Report : August 20922 FDPR : Vol. I(A) : Appendices to Main Report (Part-1 of 2) : August 20923 FDPR : Vol. II : Design Report (Part-2 of 2) : August 20924 FDPR : Vol. II : Design Report (Part-1 of 2) : August 20925 FDPR : Vol. II (Design of bridge and cross drainages structures) : August 20926 FDPR : Vol. II : Design Report (Part-III) : Traffic survey and analysis : August 20927 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-1 of 12) : August 20928 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-2 of 12) : August 20929 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-3 of 12) : August 20930 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-4 of 12) : August 20931 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-5 of 12) : August 20932 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-6 of 12) : August 20933 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-7 of 12) : August 20934 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-8 of 12) : August

11 20935 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-9 of 12) : August 20936 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-10 of 12) : August 20937 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-11 of 12) : August 20938 FDPR : Vol. II(A) : Bridge Design Calculation (Parat-12 of 12) : August 20939 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part-1 of 3) : August 20940 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part-2 of 3) : August 20941 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part-3 of 3) : August 20942 FDPR : Vol. III : Material Report : August 20943 FDPR : Vol. IV : EAI Report including EMP & Resettlement Action Plan. : August 20944 FDPR : Vol. V : Technical Specification : August 20945 FDPR : Vol. VI : Rate analysis : August 20946 FDPR : Vol. VII : Cost Estimate : August 20947 FDPR : Vol. VIII : Bill of Quantities : August

12 8 Consultancy services for preparation of Detailed Project Report for the construction of New 6 lane bridge parallel to existing 2 lane bridge at phaphamau near Allahabad in U.P. 20948 FDPR : X (A) : Civil Works Contract: August 20949 FDPR : XI : Project Clearance : August 20950 FDPR : X (B) : Civil Work Contract Agreement (EPC-Mode) : August 20951 FDPR : IX : Drawings (Part-1) : Utility Relocation plan) : Optical Fibre Cable : August 20952 FDPR : IX : Drawings (Part-1) : Utility Relocation plan) : Telephone : August 20953 FDPR : IX : Drawings (Part-1) : Utility Relocation plan) : Water Supply Pipe line : August 20954 FDPR : IX : Drawings (Part-1) : Utility Relocation plan) : Gas pipe line : August 20955 FDPR : IX : Drawings (Part-1) : Utility Relocation plan) : Electrical : August 20956 FDPR : Vol. 1 : Main Report : Sept. 20957 FDPR : Vol. II: Design report (Section 2 - bridge) : Part-1 of 6 : Main Bridge - superstructure : Sept. 20958 FDPR : Vol. II: Design report (Section 2 - bridge) : Part-2 of 6 : Main Bridge - Substructure and foundation : Sept. 20959 FDPR : Vol. II: Design report (Section 2 - bridge) : Part-3 of 6 : Main Bridge - Substructure and foundation : Sept. 20960 FDPR : Vol. II: Design report (Section 2 - bridge) : Part-4 of 6 : Viaduct - Superstructure, substructure and foundation :

13 Sept. 20961 FDPR : Vol. II: Design report (Section 2 - bridge) : Part-5 of 6 : Viaduct - Substructure and foundation : Sept. 20962 FDPR : Vol. II: Design report (Section 2 - bridge) : Part-6 of 6 : Flyover : Sept. 20963 FDPR : Vol. II (A) : Appendix to Design report Part-1 of 2 : Geotechnical investigation report (Main Bridge) Sept. 20964 FDPR : Vol. II (A) : Appendix to Design reprot Part-2 of 2 : Geotechincal investigation report (Main Bridge) Sept. 20965 FDPR : Vol. I (A) : Appendices to final detailed project report : Sept. 20966 FDPR : Vol. II : Design Report (Section 1 - Road) : Sept. 20967 FDPR : Vol. III : Material Report : Sept. 20968 FDPR : Vol. IV : Environmental Assessment Report Including Environmental Management Plan (EMP) & Resettlement Action Plan (RAP) : Sept. 20969 FDPR : Vol. V : Technical specification :

14 9 Rajasthan (Bikaner-Elevated) : Consultancy services for feasibility study and preparation of detailed project report for construction of elevated road in Udaipur city and on Railway level crossing in Bikaner city in the state of Rajasthan.. Sept. 20970 FDPR : Vol. VI : Rate Analysis : Sept. 20971 FDPR : Vol. VII: Cost Estimates: Sept. 20972 FDPR : Vol. VIII : Bill of Quantities : Sept. 20973 FDPR: Vol. X : Civil Work Contract Agreement : Sept. 20974 FDPR : Vol. IX (A) : Highways Drawings : Sept. 20975 FDPR : Vol. IX (B) : Structural Drawings : Sept. 20976 Final Feasibility Report Vol. I : Main Report : Nov. 20977 Final Feasibility Report Vol. II : Technical specifications : Nov. 20978 Final Feasibility Report Vol. III : Bill of Quantities : Nov. 20979 Final Feasibility Report Vol. IV : Rate Analysis : Nov. 20980 Final Feasibility Report Vol. V : Cost Estimate : Nov. 20981 Final Feasibility Report Vol. VI : Appendix to main Report : Nov. 20982 Final Feasibility Report Vol. VII : Drawings : Nov.