Stirling Bridge. Card Model Kit

Similar documents
Note. One - point Advice. To begin. Basic working method and markings. Fold along these lines. The printed surface should be

Inventor s House (Alternate Version)

Trebuchet Construction Instructions

Assembly Instructions

The Hearse Carriage Assembly Instructions Page 1.

Assembly Instructions

Assembly Instructions

DARC MANSION ASSEMBLY INSTRUCTIONS page 1.

THE FLOATING CANDELABRA ASSEMBLY INSTRUCTIONS page 1.

Assembly Instructions

Cardboard Model Buildings

Sci-fi MiniWorld 10 + EASY TO BUILD PAPER CRAFT ROBOTS. Cut, assemble and play

Assembly instructions: Nine A4-sized sheets. Paper craft: Four A4-sized sheets with 21 parts in all

Paper Toys The Easter Story Assembly Instructions

The Bleak Estate Assembly Instructions - Page 1.

Please contact us at BLMAmodels.com for any spare part requests.

Paper Toys Town Accessories

Assembly instructions: Six A4-sized sheets. Paper craft: Three A4-sized sheets with 14 parts in all

BIBLE. Paper Toys. Book 2 The Nativity House. The Nativity Story

Assembly instructions: Seven A4-sized sheets. Paper craft: Three A4-sized sheets with 9 parts in all

BUILDING INSTRUCTIONS

Hubble Space Telescope Paper Model Directions Downloads, patterns, and other information at:

Assembly instructions: Ten A4-sized sheets. Paper craft: Three A4-sized sheets with 22 parts in all

Assembly instructions: Six A4-sized sheets. Paper craft: Three A4-sized sheets with 9 parts in all

Read This Before Printing Anything!

c Fold the two outer flaps inside and then fold in half so it so it looks like this. While it is folded cut along the red lines to create a notch.

Shopping List:- Shopping List:- How to make a... Sue Wilson Striplet Card How to make a... Strictly Dancing Tri Fold Box

Building the Gothic Church

Hubble Space Telescope Expert Model Interior Directions Downloads, patterns, and other information at:

Assembly instructions: Seven A4-sized sheets. Paper craft: Three A4-sized sheets with 15 parts in all

SASKATOON, Saskatchewan

There are three primary units to this box: two three-sided trays (one made to fit over the other) and one case that wraps around the trays.

Assembly instructions: Nine A4-sized sheets. Paper craft: Two A4-sized sheets with 9 parts in all

LEGAL COPY & LICENSE AGREEMENT


Assembly instructions: Seven A4-sized sheets. Paper craft: Three A4-sized sheets with 13 parts in all

RACETRACK BLEACHERS PHOTO REAL BUILD KIT

Little Briana Cottage Dollhouse assembly instructions

Pocket Album. Supplies Needed: CS Bookbinding Glue CS Grid Ruler Bone Folder Foam Brush Pencil Scissors

Airport Terminal Building #1 (AD-TB01-0A)

Assembly instructions: Nine A4-sized sheets. Paper craft: Three A4-sized sheets with 13 parts in all

Elementary School Supply List, Grades K 6

Assembly instructions: Nine A4-sized sheets. Paper craft: Three A4-sized sheets with 13 parts in all

andy Cane Pop-Up Card

Ben Franklin 5&10 Store

Tools: Scissors, hand held single-hole punch, metal ruler or other good straight-edge, sharp knife or Exacto-knife.

Big Oz. Rocket. User Guide V0313

TheSorceres. (FantasyVersion)

Percy Pumpkin Head Light A KraftyBlok project.

Engineering Directive

Rocket Fabrication. Preparation. Fin Fabrication and Assembly. Materials. Tools

Basic Scrapbook Cover

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

PROJECT PLANS WOODEN GIFT BOX

SUGAR CREEK HOTEL PHOTO REAL BUILD KIT

Note: shown is the Nate Saint Piper PA-14 kit. With small changes/omissions, all of the GoFly gliders will follow a similar assembly sequence.

the wire, less is better. And make sure the bends on each truss wire are in line with the other. See the next photo.

Assembly instructions: Seven A4-sized sheets. Paper craft: Three A4-sized sheets with 15 parts in all

Drop Spine Box. Tricia Morris. Design by: 2006 Craft TV Weekly, Inc.

Assembly instructions: Seven A4-sized sheets. Paper craft: Three A4-sized sheets with 16 parts in all

Vol.3 Yellow Footed Tortoise

PINWHEEL STAR WORKSHOP QUILT

Enterprise 1701D STNG

Sky Eagle. User Guide. Cautionary and Warning Statements

Mousetrap Catapult. About this project:

Building the Cathedral

Articulated Ladder Truck

The Park Hotel Instructions for Assembly

Paper Flowers , Sonia C. Jensen

BUILD THE. Soleil Royal. Pack 1. The flagship of King Louis XIV.

RACETRACK BLEACHERS PHOTO REAL BUILD KIT

Statue of Liberty, U.S.A.: Assembly Instructions Canon is a registered trademark of Canon Inc. Canon Inc. Hiroshi Chiba / PAPERART-C

1:400 Scale Single Runway #1 (AD-SR01-0B-400)

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

The Papernator 2003 created and designed by Clive Davis, NAR #80412

FIRE STATION PHOTO REAL BUILD KIT

BABYLON CARD MODELS KIT

Play Scale Doll Accessories Products hfd008a, hfd008b, hfd008c, and hfd008d Designed by Ann Lenore Vanture

John Rumming. Making Custom Foam Inserts.

AR-15 Armorer s Essentials Kit. Product # Instructions # Revision: B

Hubble Space Telescope Expert Model Exterior Directions Downloads, patterns, and other information at:

CA to each one. You may have to hold the end down while to glue sets or use an accelerator like I did.

Project 19496EZ: Rocking Horse. Rocking Horse Materials List

Flash Coving. Chapter 8 Flash Coving 8. 1

Osborne School

Do-It-Yourself Bleeding Control Prop for Tourniquet Practice

The Ballistic Blaster Rocket Kit should contain the following items. If anything is missing, call Customer Service at

Assembly Instructions for the Link Trainer

Option 1: False Frame Bent

Kitchen Step Stool. Premium Plan. In this plan you ll find: America s leading woodworking authority

KINDERGARTEN FIRST GRADE

Spandrel Information and Installation Guide

INSTRUCTIONS TRAMP STEAMER

Avenger Holster: Assembly Instructions

HARRISON S HARDWARE PF5891

École Mountain View School Basic Supply List

Visual Verbs: Using Manipulatives to Teach Verb Tenses

Installation for Full Size Polaris Ranger Crew Doors

Aerospace Speciality Products

MILL LANE SIDINGS MLS052 Stock Storage Cassette System Kit For Peco Code 80 Flexible Track (not included)

Transcription:

Stirling Bridge Card Model Kit On September 11, 1297, a Scottish Army led by William Wallace and Andrew de Moray defeated the English at the Battle of Stirling Bridge. In the briefest of descriptions, the Scots attacked the English army as it attempted to make the crossing. As the lead elements of the English Army stalled on the far side of the bridge, the main body of heavy horse bunched up behind. Unfortunately for the English, the bridge was built primarily for foot and light wagon traffic and not for massed heavy horse. Consequently, sections of the bridge collapsed turning the battle into a disastrous rout for the English, and a great victory for the Scots and Wallace. I m a big fan of Ebob Miniatures Rebellion line of 28mm Scottish Rebellion miniatures. In an email exchange with Ebob, I explained to him that I created card models, and he suggested I try making a replica of Stirling Bridge. I thought it was a great idea. 1

It is difficult to know exactly what Stirling Bridge looked like in 1297. There are a number of artists renditions that depict various types of wooden construction, but I have been unable to find a definitive image or specific description. So, I chose to replicate the design depicted in the engraving below, both because it looks right, and because I felt it would translate into a paper model that would be easy to construct, and durable enough to actually use on the wargame table. I also wanted the bridge to be modular so it could be built to a variety of lengths, and to have the ability to break down for storage and transportation. I think I have come up with a reasonable enough solution. Thank you for purchasing Stirling Bridge. I hope you enjoy building and fighting over it as much as I did creating it. I would love to see your comments, and any tips, feedback, or other information concerning Stirling Bridge that you might be able to provide. Please leave your post in the Ebob Forums. Thank you. Toshach 2

Instructions Tools & Materials To build Stirling Bridge, you will need the following tools and materials. Card Stock - 80# card stock minimum; 100# is better. X-Acto or Utility Knife Cutting Surface Metal Straight-edge or Ruler Scribe - this can be any pointed tool that will crease, but not cut through the cardstock. Some like to use a fine-point ball point pen that has run out of ink. Burnisher - Smooth plastic or wooden tool for creasing your folds to make them sharp and crisp. You should be able to purchase these at any art supply store. The barrel of a Sharpie works pretty well too. Glue stick, and Liquid Glue I prefer a glue stick for surfaces that can be easily pressed together. For surfaces where pressure can not be applied I use a liquid glue like Uhu Office Pen, or Elmer s Glue Pen. Both dry quickly and if used properly do not wrinkle the paper. Crayons, colored pencils, markers, or paint for edging. General Instructions Printing I have access to two HP inkjet printers, and find that I get the best results by printing on the default (normal) quality, and plain paper settings. Basic Assembly Guidelines and Advice 1. Start by scoring along the dashed fold lines. I generally prefer to score the back, non-printed side of the paper. 2. Cut out each component along the solid cut-lines using your straight-edge and knife. 3. Fold along your score lines. 4. Color the edges of the component. 5. Glue as indicated. 6. Apply pressure and allow the glue to dry thoroughly before moving on. 3

Bridge Components Road Surface This is probably the easiest of the components to assemble, so we will begin here. 1. Fold along the dotted lines/scores and burnish to create a sharp crease. 2. Run a line of glue along the non-printed area as shown here (Figure 1). 3. Press the glued area to the bottom of the road surface as shown, forming a square tube support beam along the edges of the road surface. Press together and allow it to dry (Figure 2). Be careful that the outside of the support beam is perpendicular to the road surface (Figure 3). Each Road Surface component is a single span of the bridge. Print as many of these as you need to make your bridge as long as you like. Important Note: If you are using cardstock that is 80# or lighter, you will want to reinforce your Road Surface. Otherwise once you place your heavy horse on your bridge you run the risk of replicating the actual disaster. To prevent this, you can use the Road Surface Reinforcement piece provided, pieces of Balsa wood, or ice cream sticks to make your road surfaces more rigid. Figure 1 Figure 2 Figure 3 Glue along this edge. 4

Railings You will need two Railings for each road surface component. 1. Cut the railings out and fold along the dotted line. Apply glue to the narrower of the two sides and press together. Allow time for the glue to dry (Figure 4). 2. If you wish, cut out the spaces between the rails. 3. Apply glue to the overlapping side of the railing, and press against the side of the support beam on the Road Surface. 4. Align the bottom of the railing with the bottom of the support beam (Figure 5). Figure 4 Figure 5 The Road Surface is complete. 5

Trestle Base The Trestle Base forms the core of the Trestle. This is the component that will support your road surface Spans. The Trestle Base is constructed like a box. 1. Fold along the dotted lines/scores and burnish to create a sharp crease (Figure 6). 2. Glue the long tab to the inside of the opposite edge of the Trestle Base, and allow it to dry (Figure 7). 3. Apply liquid glue to the tabs on the end-pieces as shown and close the ends like the lid of a box (Figure 8). Figure 6 The Trestle Base is complete. Figure 7 Figure 8 6

Buttress You will need two Buttresses for each Trestle Base. The Buttress is constructed like a box. 1. Fold along the dotted lines/scores and burnish to create a sharp crease (Figure 9). 2. Glue the long tab to the inside of the opposite edge, and allow it to dry (Figure 10). 3. Apply liquid glue to the tabs on the end-pieces as shown and close the ends like the lid of a box (Figure 11). The Buttress is complete. Figure 9 Figure 10 Ramp Buttress The Ramp Buttress is constructed in exactly the same fashion as the Buttress. You will need two Ramp Buttresses for your bridge. The Ramp buttress forms a slightly slanting road surface to accommodate the slope of the ramp. Figure 11 7

Trestle End-piece You will need two Trestle End-pieces for each Trestle Base. The Trestle End-piece is constructed like a box. 1. Fold along the dotted lines/scores and burnish to create a sharp crease (Figure 12). 2. Glue the long tab to the inside of the opposite edge as shown, and allow it to dry (Figure 13). 3. Apply liquid glue to the tabs on the end-pieces as shown and close the ends like the lid of a box (Figure 14). Figure 12 The Trestle End-piece is complete. Figure 13 Figure 14 8

Ramp You will need two Ramps for your bridge. If you only wish to replicate fighting at one end of the bridge, one Ramp is sufficient. 1. The first three steps for construction of the Ramp, as shown in Figure 15, are identicle to thse of the Road Surface. 2. Make a slight fold across the Road Surface at the end of the ramp, as indicated in Figure 16. This will compensate for the slope of Figure 15 the Ramp when it is attached to the Trestle. Figure 16 9

Ramp Support Piling Assembly 1. Carefully cut out two long and two short Ramp Support Pilings. Roll them around a pencil or similar object to give them a cylindrical shape. 2. Glue the tab to the opposite edge and let dry. 3. Glue the end of the Piling over the tabs to form the top. (Figure 17). 4. Now cut out two Piling Connectors, one large, and one short. 5. Cut out one large, and one small Piling Connector and fold each along the dotted line (Figure 18). Apply glue to one of the two sides and press together (Figure 19). Allow time for the glue to dry. Note: Be sure that the end tabs are not glued together and remain folded open as shown in the figure. 6. Now glue a long Piling to each end of the Piling Connector as shown in Figure 20. The notches on the Piling connector should be oriented up. The Pilings should be attached so that the bottom of the Piling is flush with the bottom of the Piling Connector. 7. No assemble the short Pilings and small Piling Connector in exactly the same manner. Figure 17 Figure 18 Figure 19 Figure 20 10

Constructing the Bridge Components To build a complete bridge you will need a minimum of the following components: two Ramps, two Ramp Trestles and one Road Surface. You can vary the length of your bridge by constructing additional Road Surfaces, and Trestles. Assembling the Trestle 1. Apply glue to the non-printed areas on the long sides of the Trestle Base. Fit a Buttress to either surface, being careful to align the center-marks. Be certain that the road surfaces of the Buttresses are flush with the road surface of the Trestle Base. Also take care that the entire assembly is as level as you can make it. This will insure a flat, even join with the Road Surface component (Figure 21). 2. Allow to dry thoroughly. 3. Apply glue to the ends of the Trestle Base. Fit the Trestle End-pieces to the glued area being certain that the bottoms of both components are flush (Figure 22). The Trestle is complete Figure 22 Figure 21 Assembling the Ramp Trestle The Ramp Trestle is assembled in the same fashion as a normal Trestle except that one of the Buttresses is a Ramp Buttress. Note the slight downward angle of the right-hand (Ramp) Buttress in Figure 23. This is to accommodate the slope of the Ramp. Figure 23 11

Assembling a Span 1. Attach your Road Surface to a Trestle (Figure 24). Notice how the road Surface extends between the Trestle End-pieces, and how the support beams of the road surface fit on either side of the Trestle Buttress. 2. Connecting a Road Surface to two Trestles in this manner creates a Span (Figure 25). If you wish your bridge to be extra stable and secure, it is a good idea to permanently attach the Road Surface to the Trestles of each Span. Figure 24 Figure 25 Assembling the Ramp Exactly how your Ramps are constructed depends on how your terrain is depicted on your battle board. The Ramp assembly is designed to accommodate a variation in height between the land and the river. 1. Attach your Ramp to the Trestle (Figure 26). Figure 26 2. Put your Ramp/Trestle in place on your battleboard. The Ramp Trestle should be in the river, just off riverbank (see Figure 25). 3. You might need to fold the lower end of the Ramp a little so that it meets flush to the ground. 4. Now carefully fit the small Piling Assembly under the Ramp. The Ramp s side support beams should fit snuggly into the notches of the Piling Assembly. Adjust the position of 12

the assembly by sliding it up or down the Ramp until it supports the Ramp without lifting it off the ground (see Figure 27). 5. Now do the same with the large Piling Assembly (Figure 28). If you intend to use your Stirling Bridge on the same battleboard all of the time, you might want to glue the Piling Assemblies to the Ramp in order to save yourself some time and hassle. It will also make your bridge sturdier. Figure 28 Figure 27 13

Building Your Bridge Each Span of the bridge consists of a Road Surface, and its supporting Trestles. You can change the length of your bridge by adding or taking away Spans. Figure 29 illustrates the shortest, complete bridge that you can build it has only one Span. Figure 30 shows a twospan bridge, created by inserting an additional Trestle and Road Surface. Your bridge can be easily lengthened by adding Spans, and connecting them with Road Surfaces. Figure 29 Figure 30 Though I designed Stirling Bridge so that it could be broken into pieces for storage and transportation, it is sturdiest when the components are glued together. This is especially so if you want a longer, multi-span bridge. One way to do this and still retain some of the modular flexibility is to build a number of Spans and then connect these on the gaming table with unglued Road Surface spans. In this way, your bridge sections will be sturdy, but can still be broken down into manageable parts for storage or transport. The 28mm figures in this photo are from Ebob Miniatures, and are not included. The 28mm figures in this photo are from Games Workshop, and are not included. 14