PLAN SUBMITTAL REQUIREMENTS

Similar documents
Single-Family Dwelling Submittal Requirements

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

Residential Room Addition / Remodel Submittal Requirement Checklist

Residential Construction Checklist Single and Two Family Construction

TO WHOM IT MAY CONCERN:

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Residential Room Additions

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

BUILDING PLANS. BUILDING DEPARTMENT

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Non-Residential and Multi-Family Plan Check Submittal Requirements

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

NEW SINGLE FAMILY HOMES

City of Thousand Oaks

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

TOWN OF NORTH BRANFORD

What Plans Do I Need for a Building Permit?

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

BERKELEY COUNTY ENGINEERING AND

Commercial Infill Project Guide

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Required Documents for Commercial Permits Permit Types 1. New Structure 2. Addition 3. Remodel 4. Tenant Finish 5. Change of Tenant/Use 6.

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Tri-County Commercial Application Checklist

Tenant Improvement. Training in the fundamentals of Commercial Construction

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

ADDENDUM #2 September 12, 2018

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

WALKS AND SIDEWALKS REQUIREMENTS:

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Information package for obtaining a building permit

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

Minor Site Plan Review Process

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

BUILDING PLAN REVIEW REQUIREMENTS

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

SITE PLAN APPLICATION

Checklist for Tentative Subdivision Map

For Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT:

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Architectural Design Process

PLANNING AND DEVELOPMENT

SIGN PERMIT APPLICATION

Checklist for Minor Plan Modification

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

Conceptual, Preliminary and Final Site Plan Review in Holladay City

City of Santa Paula Planning Department

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Commercial Building Permit Process

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

DECK PERMIT APPLICATION PACKET

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

ADMINISTRATIVE DESIGN REVIEW Information

OAK RUN BUILDING PERMIT

TOWN OF FLEMING 2433 Dublin Road, Auburn, NY Phone (315) , Fax (315)

Last Name: First Name: M.I:

City of Keizer Floodplain/Greenway Development Application

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

City of Massillon Site Plan Checklist

PROJECT ADDRESS: PERMIT #

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

ARCHITECTURE CADD Course Syllabus

CITY OF BURLINGAME - PLANNING COMMISSION SUBMITTAL REQUIREMENTS RESIDENTIAL DESIGN REVIEW

INFORMATION FOR OBTAINING A BUILDING PERMIT

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

APPLICATION FOR COMMERCIAL/OFFICE/INDUSTRIAL DEVELOPMENT PERMITS

Residential Plot Plans

Architectural Review Board Application For Modifications & Renovations

SPARTAN DAY CAMP 4814 FREEDOM RING RD

FEMA Elevation Certificate

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

Transcription:

DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing this handout to assist you in preparing your submittal for plan check. Section A below lists the minimum information required for most plan submittals. Additional plan information that may be needed is listed in Section B. The scope of your project should be reviewed with Building Division Staff and the appropriate items will be marked. To initiate the plan review process, a building permit application must be completed and submitted. Based on the project valuation, a plan check fee will be collected at the time of submittal. SECTION A: FIVE (5) COMPLETE SETS OF PLANS FOR COMMERCIAL; THREE (3) COMPLETE SETS OF PLANS FOR RESIDENTIAL ARE REQUIRED TO BE SUBMITTED WITH ALL APPLICATIONS FOR BUILDING PERMITS (NOTE: IF YOU ARE SUBMITTING PLANS FOR AN ALTERATION THAT INCLUDES ADDITIONAL PLUMBING FIXTURES AND YOUR ADDRESS IS SERVICED BY THE WESTBOROUGH WATER DISTRICT, PLEASE SUBMIT 3 SETS OF PLANS TO THE WESTBROROUGH WATER DISTRICT); Minimum paper size is 18 x 24, maximum size is 30 X 42. You need only provide two (2) copies of soils reports, structural calculations, energy calculations, and other supporting documentation. *We accept electronic submittals for Commercial only by email:digitalpc@ssf.net and karen.kinahan@ssf.net. Please be sure to attach the completed plan check application. Contact the office with any questions (650-829-6670). All PLAN SETS SHALL INCLUDE THE FOLLOWING: (Minimum 12 Pt. Font (1/8 ) 1. TITLE BLOCK: This should include such information as Owner s name, Design professional or engineer s name, project address, type of construction, occupancy group, applicable code editions, sheet index, and any other relevant information. *Note: All text to be horizontal in order to search the field 2. A PLOT PLAN: Fully dimensioned, showing property lines, contour lines, streets, driveways and locations of all buildings, easements and any off-street parking. For commercial projects show disabled access parking, curb ramps and signage and path of travel to primary entrance.

3. A FOUNDATION PLAN: Provide a fully dimensioned plan view of foundations and or piers showing existing conditions if they apply and connections at new to existing. Also include details regarding of the width, depth, reinforcement, etc. For slabs on grade show minimum 3½ thickness, gravel or sand sub-base, and vapor barrier. 4. A FLOOR PLAN: Show the size and intended use of all rooms, show type, sizes and locations of all doors and windows, furnace, water heater, kitchen details, bathroom fixtures, electrical outlets, switches and lighting; and smoke a n d C O detectors. For additions and alterations show an existing floor plan and all rooms adjoining the addition shall be fully dimensioned. 5. STRUCTURAL DETAILS AND SECTIONS: Clearly showing construction materials, sizes and attachments. If standard plan is used (ICC, SPA, etc), include copies of plan or report. A standard plan may not be modified. 6. TWO (2) EXTERIOR ELEVATIONS, indicating general appearance, windows, doors, finishes, roof covering, finish grade, etc. 7. IN GENERAL: Detail any special features, such as; stairway construction, attic ventilation, guardrails, fireplaces, balconies, bay windows, post and beams, trusses, etc. Provide notes for any specification which cannot be detailed. 8. FOR ALL BUILDINGS, OTHER THAN ACCESSORY BUILDINGS AND RESIDENTIAL OCCUPANCIES, LESS THAN 5 UNITS, AND 2 STORIES OR LESS IN HEIGHT: Plans shall be prepared and signed on each page by a licensed architect or a civil engineer. 9. FOR SINGLE-FAMILY RESIDENCES AND ACCESSORY BUILDINGS: The person who drew the plans must sign all sheets. SECTION B: OTHER ITEMS WHICH MAY BE REQUIRED: SOILS REPORT ROOF PLAN: Show roof pitch, roofing materials, equipment, and skylights. TRUSS CALCS: Must be from the truss manufacturer. FRAMING PLAN WALL CONSTRUCTION: provide details and describe materials used, note floor / ceiling attachments, finishes and wall insulation. STAIR, HANDRAIL, AND GUARDRAIL DETAILS.

STRUCTURAL CALCULATIONS: Wet stamped by the engineer. REFLECTED CEILING PLAN: Include all new relocated or existing lights, and switches for lighting, HVAC supply and return grilles, and exit signs. ACOUSTICAL CEILING DETAILS ENERGY DOCUMENTATION/GREEN BUILDING. ICC REPORTS: on materials, equipment, or manufacturer s product installation requirements. MECHANICAL PLAN: System locations, distribution and HVAC specs. PLUMBING PLAN: DWV isometric and calcs, Dimensioned gas isometric and calcs, Water isometric and calcs. ELECTRICAL PLAN: Single line schematic showing panels, conduit sizes, conductor sizes and grounding. Panel schedules and load calcs DISABLED ACCESS COMPLIANCE HARDSHIP APPLICATION FORM: Provided by our office. SPECIAL INSPECTION AND TESTING AGREEMENT FORM: Provided by our office. ADDITIONAL NOTES: PRIOR TO APPLICATION FOR BUILDING PERMITS: Applicant must have an approved Site Development Planning file with the City of South San Francisco Planning Division for any multiple, commercial or industrial developments. Applicants whose projects include food service facilities, must file a separate plan submittal with the San Mateo County Health Department; Environmental Division. *Verifiable approval required by Health Department prior to permit issuance. Unless the work is done exclusively by the property owner or his immediate family, proof of workers compensation insurance coverage will be required. All contractors must have current State Contractor s license and City Business License. All plan sheets shall be signed by the architect or engineer as applicable. If a front addition is proposed, the owner shall confirm all setbacks and a licensed surveyor shall provide a letter to the city stating that the proposed addition will be built in compliance with the setbacks. If the proposed addition is greater than 25% of the original floor plan, then the developer

needs to have the sewer lateral videoed per City Ordinance No. 1453-2012 to determine if any repairs need to be done.

City of South San Francisco Plan Check Application Project Address: Submittal Date: Permit # Revision # Scope of work: Residential Commercial Addition Alteration Tenant Imp. New Detailed description of work: Total Project Valuation $ PC $ Project Valuation of: Mechanical: $ Plumbing: $ Electrical: $ Office Use Only: New Submittal: Due Not d 1 st Resubmittal: Due Not d 2 nd Resubmittal: Due Not d 3 rd Resubmittal: Due Comments: Not d Property Restrictions: Encroachment Permit Required Code Enforcement Other Redline Plans Included Original Plans Included Special Inspection Required School Fees Required Owner Architect Contractor Other Owner Architect Contractor Other Contact Name: Address: Contact Name: Address: City: St: Zip: City: St: Zip: Telephone: Fax: E-mail: Telephone: Fax: E-mail: