APPENDIX B: Generation Interconnection Application Form

Similar documents
ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

State of North Dakota Engineering data submittal Page 1 For interconnection of distributed generation to Otter Tail Power Company

PART 1 OWNER/APPLICANT INFORMATION

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW

Distributed Generation Application Form (Generation of Greater than 20 kw to 15 MW)

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW

INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

Form B. Connection Impact Assessment Application Form Distribution System

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

Impact Assessment Generator Form

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw

Connection Impact Assessment Application Form

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form

Initial Application Form for Connection of Distributed Generation (>10kW)

Embedded Generation Connection Application Form

Connection Impact Assessment Application

Generation Interconnection Study Data Sheet Synchronous Machines

Generation Interconnection Requirements at Voltages 34.5 kv and Below

440 (12) 416 (12) 416 (12) 440 (12)

TABLE OF CONTENT

E N G I N E E R I N G M A N U A L

QUESTIONNAIRE for Wind Farm Power Stations only

Generator Advanced Concepts

Utility Interconnection and System Protection

PI734F - Winding 07. Technical Data Sheet APPROVED DOCUMENT

PI734F - Winding 28. Technical Data Sheet APPROVED DOCUMENT

Electrical Theory. Power Principles and Phase Angle. PJM State & Member Training Dept. PJM /22/2018

GENERATOR DATA JANUARY 30, 2015

Generation and Load Interconnection Standard

PM734B - Technical Data Sheet. Generator Solutions AS

PI734E - Winding 312. Technical Data Sheet APPROVED DOCUMENT

PI734C - Winding 312. Technical Data Sheet APPROVED DOCUMENT

The Connecticut Light and Power Company

PI734B - Winding 312. Technical Data Sheet APPROVED DOCUMENT

PI734C - Technical Data Sheet

Spec Information. Reactances Per Unit Ohms

WDG 12 - Technical Data Sheet

PI734A - Technical Data Sheet

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

Conventional Paper-II-2013

WDG 71 - Technical Data Sheet

S0L1-J1 - Technical Data Sheet

WDG 12 - Technical Data Sheet

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS

WDG 13 - Technical Data Sheet

WDG 61 - Technical Data Sheet

WDG 07 - Technical Data Sheet

WDG 51 - Technical Data Sheet

PM734D - Winding 312. Technical Data Sheet APPROVED DOCUMENT. Generator Solutions AS

PM734F - Winding 312. Technical Data Sheet APPROVED DOCUMENT

WDG 12 - Technical Data Sheet

WDG 12 - Technical Data Sheet

S4L1D-G41 Wdg Technical Data Sheet

S4L1S-D4 Wdg.17 - Technical Data Sheet

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

WDG 83 - Technical Data Sheet

Thyristorised Automatic Power Factor

Industrial Electrician Level 3

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Do Capacitor Switching Transients Still Cause Problems?

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Transformer Factory Testing

Welcome to the rd. Annual Northern Ohio. 3 rd Energy Management Conference September 30, 2008

Spec Information. Reactances Per Unit Ohms

LSA R & LSA H 49.1 Low Voltage Alternators - 4 pole

INVESTIGATION INTO THE POWER QUALITY AND RELIABILITY OF SUPPLY IN THE INDUSTRIAL NETWORKS WITH DISTRIBUTED GENERATION

SECTION 1 INTRODUCTION

PAPER-II (Subjective)

Generation and Load Interconnection Standard

TECHNICAL GUIDELINE FOR THE INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES TO EPCOR DISTRIBUTION AND TRANSMISSION INC. S DISTRIBUTION SYSTEM

TAL 044 Low Voltage Alternator - 4 pole

Time constants ( s ) Resistance. Other data - Class H /6600 V kva. Efficiencies ( % )(3 phase - Classe H V kva)

WHITE PAPER. Medium Voltage On-Site Generation Overview. BY MIKE KIRCHNER Technical Support Manager at Generac Power Systems

APPENDIX A MATLAB CODE FOR CALCULATION OF MOTOR TORQUE

TAL 049 Low Voltage Alternator - 4 pole

PARTNER ALTERNATORS LSA 40-4 Pole

TAL 047 Low Voltage Alternator - 4 pole

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

LOAD BEHAVIOUR DURING VOLTAGE DIPS: A VOLTAGE QUALITY STUDY IN LOW VOLTAGE DISTRIBUTION SYSTEM

Wind Power Facility Technical Requirements CHANGE HISTORY

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

P. O. BOX 269 HIGHLAND, ILLINOIS, U.S.A PHONE FAX

Upgrading Your Electrical Distribution System To Resistance Grounding

Sizing Generators for Leading Power Factor

ALTERNATOR TECHNICAL DESCRIPTION 1. LSA 53.2 XL13 / 4p. Chargé d'affaire : Karthikeyan GN 1 Moteurs Leroy-Somer +33 (0) xx

Transcription:

2 APPENDIX B: Generation Interconnection Application Form WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect with Xcel Energy (Local electric utility) This application should be completed and returned to the Generation Interconnection Coordinator, in order to begin processing the request INFORMATION: This application is used by Xcel Energy to perform a preliminary interconnection review The Applicant shall complete as much of the form as possible The fields in BOLD are required to be completed to the best of the Applicant s ability The Applicant will be contacted if additional information is required The response may take up to 15 business days after receipt of all the required information COST: A payment to cover the application fee shall be included with this application The application fee amount is outlined in the State of Minnesota Interconnection Process for Distributed Generation Systems OWNER/APPLICANT Company / Applicant s Name: Representative: Phone Number: FAX Number: Title: LOCATION OF GENERATION SYSTEM INTERCONNECTION Street Address, legal description or GPS coordinates: PROJECT DESIGN / ENGINEERING (if applicable) Company: Representative: Phone: FAX Number: ELECTRICAL CONTRACTOR (if applicable) Company: Representative: Phone: FAX Number: (Continued on Sheet No -3) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 2doc

3 APPENDIX B: Generation Interconnection Application Form (Continued) GENERATOR Model: Type (Synchronous Induction, Inverter, etc): Phases: 1 or 3 Rated Output (Prime kw): (Standby kw): Frequency: Rated Power Factor (%): Rated Voltage (Volts): Rated Current (Amperes): Energy Source (gas, steam, hydro, wind, etc) TYPE OF INTERCONNECTED OPERATION Interconnection / Transfer method: Open Quick Open Closed Soft Loading Inverter Proposed use of generation: (Check all that may apply) Peak Reduction Standby Energy Sales Cover Load Duration Parallel: None Limited Continuous Pre-Certified System Yes / No (Circle one) Exporting Energy Yes / No (Circle one) ESTIMATED LOAD INFORMATION The following information will be used to help properly design the interconnection This Information is not intended as a commitment or contract for billing purposes Minimum anticipated load (generation not operating): kw: kva: Maximum anticipated load (generation not operating): kw: kva: ESTIMATED START/COMPLETION DATES Construction start date: Completion (operational) date: DESCRIPTION OF PROPOSED INSTALLATION AND OPERATION Attach a single line diagram showing the switchgear, transformers, and generation facilities Give a general description of the manner of operation of the generation (cogeneration, closed-transition peak shaving, opentransition peak shaving, emergency power, etc) Also, does the Applicant intend to sell power and energy or ancillary services and/or wheel power over Xcel Energy facilities? If there is an intent to sell power and energy, also define the target market (Continued on Sheet No -4) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 3doc

4 APPENDIX B: Generation Interconnection Application Form (Continued) SIGN OFF AREA: With this Application, we are requesting Xcel Energy to review the proposed Generation System Interconnection We request that Xcel Energy identifies the additional equipment and costs involved with the interconnection of this system and to provide a budgetary estimate of those costs We understand that the estimated costs supplied by Xcel Energy, will be estimated using the information provided We also agree that we will supply, as requested, additional information, to allow Xcel Energy to better review this proposed Generation System interconnection We have read the State of Minnesota Distributed Generation Interconnection Requirements and will design the Generation System and interconnection to meet those requirements Applicant Name (print): Applicant Signature: Date: SEND THIS COMPLETED & SIGNED APPLICATION AND ATTACHMENTS TO THE GENERATION INTERCONNECTION COORDINATOR (Continued on Sheet No -5) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 4doc

5 APPENDIX C: Engineering Data Submittal Form WHO SHOULD FILE THIS SUBMITTALL: Anyone in the final stages of interconnecting a Generation System with Xcel Energy This submittal shall be completed and provided to the Generation Interconnection Coordinator during the design of the Generation System, as established in the State of Minnesota Interconnection Process for Distributed Generation Systems INFORMATION: This submittal is used to document the interconnected Generation System The Applicant shall complete as much of the form as applicable The Applicant will be contacted if additional information is required OWNER / APPLICANT Company / Applicant: Representative: Phone Number: FAX Number: Title: PROPOSED LOCATION OF GENERATION SYSTEM INTERCONNECTION Street Address, Legal Description or GPS coordinates: PROJECT DESIGN / ENGINEERING (if applicable) Company: Representative: Phone: FAX Number: ELECTRICAL CONTRACTOR (if applicable) Company: Representative: Phone: FAX Number: (Continued on Sheet No -6) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 5doc

6 TYPE OF INTERCONNECTED OPERATION Interconnection / Transfer method: Open Quick Open Closed Soft Loading Inverter Proposed use of generation: (Check all that may apply) Peak Reduction Standby Energy Sales Cover Load Duration Parallel: None Limited Continuous Pre-Certified System: Yes / No (Circle one) Exporting Energy Yes / No (Circle one) GENERATION SYSTEM OPERATION / MAINTENANCE CONTACT INFORMATION Maintenance Provider: Phone #: Pager #: Operator Name: Phone #: Pager #: Person to Contact before remote starting of units Contact Name: Phone #: Pager #: 24hr Phone #: GENERATION SYSTEM OPERATING INFORMATION Fuel Capacity (gals): Engine Cool Down Duration (Minutes): Start Time Delay on Outage (Seconds): Full Fuel Run-time (hrs): Start time Delay on Load Shed signal: ESTIMATED LOAD The following information will be used to help properly design the interconnection This Information is not Intended as a commitment or contract for billing purposes Minimum anticipated load (generation not operating): kw: kva: Maximum anticipated load (generation not operating): kw: kva: (Continued on Sheet No -7) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 6doc

7 REQUESTED CONSTRUCTION START/COMPLETION DATES Design Completion: Construction Start Date: Footings in place: Primary Wiring Completion: Control Wiring Completion: Start Acceptance Testing: Generation operational (In-service): (Complete all applicable items Copy this page as required for additional generators) SYNCHRONOUS GENERATOR (if applicable) Unit Number: Total number of units with listed specifications on site: Type: Phases: 1 or 3 Serial Number (each) Date of manufacture: Speed (RPM): Freq (Hz); Rated Output (each unit) kw Standby: kw Prime: kva: Rated Power Factor (%): Rated Voltage(Volts): Rated Current (Amperes): Field Voltage (Volts): Field Current (Amperes): Motoring Power (kw): Synchronous Reactance (Xd): % on kva base Transient Reactance (X'd): % on kva base Subtransient Reactance (X d): % on kva base Negative Sequence Reactance (Xs): % on kva base Zero Sequence Reactance (Xo): % on kva base Neutral Grounding Resistor (if applicable): I 2 t or K (heating time constant): Exciter data: Governor data: Additional Information: (Continued on Sheet No -8) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 7doc

8 INDUCTION GENERATOR (if applicable) Rotor Resistance (Rr): Rotor Reactance (Xr): Magnetizing Reactance (Xm): Design Letter: Exciting Current: Rated Output (kw): Stator Resistance (Rs): Stator Reactance (Xs): Short Circuit Reactance (Xd): Frame Size: Temp Rise (deg C ): Reactive Power Required: kvars (no Load) kvars (full load) If this is a wound-rotor machine, describe any external equipment to be connected (resistor, rheostat, power converter, etc) to rotor circuit, and circuit configuration Describe ability, if any, to adjust generator reactive output to provide power system voltage regulation Additional Information: PRIME MOVER (Complete all applicable items) Unit Number: Type: Serial Number: Date of Manufacture: HP Rated: HP Max: Inertia Constant: lb-ft 2 Energy Source (hydro, steam, wind, wind etc): INTERCONNECTION (STEP-UP) TRANSFORMER (If applicable) kva: Date of Manufacture: Serial Number: High Voltage: kv Connection: delta wye Neutral solidly grounded? Low Voltage: kv Connection: delta wye Neutral solidly grounded? Transformer Impedance (Z): % on kva base Transformer Resistance (R): % on kva base Transformer Reactance (X): % on kva base Neutral Grounding Resistor (if applicable) (Continued on Sheet No -9) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 8doc

9 TRANSFER SWITCH (If applicable) Model Number: Type: Rating (amps): INVERTER (If applicable) Model: Rated Power Factor (%): Rated Voltage (Volts): Rated Current (Amperes): Inverter Type (ferroresonant, step, pulse-width modulation, etc): Type of Commutation: forced line Minimum Short Circuit Ratio required: Minimum voltage for successful commutation: Current Harmonic Distortion Maximum Individual Harmonic (%): Maximum Total Harmonic Distortion (%): Voltage Harmonic Distortion Maximum Individual Harmonic (%): Maximum Total Harmonic Distortion (%): Describe capability, if any, to adjust reactive output to provide voltage regulation: NOTE: Attach all available calculations, test reports, and oscillographic prints showing inverter output voltage and current waveforms POWER CIRCUIT BREAKER (if applicable) Model: Rated Voltage (kilovolts): Rated Ampacity (Amperes): Interrupting Rating (Amperes): BIL Rating: Interrupting Medium (vacuum, oil, gas, etc) Insulating Medium (vacuum, oil, gas, etc) Control Voltage (Closing): (Volts) AC DC Control Voltage (Tripping): (Volts) AC DC Battery Charged Capacitor Close Energy (circle one): Spring Motor Hydraulic Pneumatic Other Trip Energy (circle one): Spring Motor Hydraulic Pneumatic Other Bushing Current Transformers (Max ratio): Relay Accuracy Class: CT S Multi Ratio? (circle one); No / Yes: (Available taps): (Continued on Sheet No -1) Docket No E002/GR-05-1428 Order Date: 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 9doc

Northern States Power Company, a Minnesota corporation 1 MISCELLANEOUS (Use this area and any additional sheets for applicable notes and comments) SIGN OFF AREA This Engineering Data Submittal documents the equipment and design of the Generation System We agree to supply Xcel Energy with an updated Engineering Data Submittal any time significant changes are made in the equipment used or the design of the proposed Generation System The Applicant agrees to design, operate and maintain the Generation System within the requirements set forth by the State of Minnesota Distributed Generation Interconnection Requirements Applicant Name (print): Applicant Signature: Date: SEND THIS COMPLETED & SIGNED ENGINEERING DATA SUBMITTAL AND ANY ATTACHMENTS TO THE GENERATION INTERCONNECTION COORDINATOR (Continued on Sheet No -111) E002/GR-05-1428 09-01-06 S:\General-Offices-GO-01\PSF\RA\Rates\Current\Mn_elec\Me 1doc