Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations using air-tugger.

Similar documents
Standards and Competencies

WELDING FABRICATION NYS

Pembroke Hopkins Park Construction Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815)

WELDING FABRICATION. First, download and review the General Regulations at: updates.skillsusa.org.

NCCER Progress Blvd, Alachua, Florida Phone: (888)

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

West Sound Technical Skills Center 101 National Avenue N. Bremerton WA Welding Trades Course Syllabus updated October 2012

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Welding Symbols. Faculty of Engineering Mechanical Dept.

Slide 1. Slide 2. Slide 3. The Knack. Background Information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S. INDUSTRIAL BOILERMAKER - MAINTENANCE V4 RBLMK34_04 October 2014

Triple Bypass System

Heavy Duty I-Beam Trolley

Welder Harmonization Transition Plan

Drill Line Tension Guide User Procedure Manual

NL Curriculum Standard Sheet Metal Worker

FALCQ'NBRIDG'E NICKEL MINES LIMITED. Nickel Division - Sudbury Operations TIMBERING

Plating. Level 3 - International Competence: Engineering-Construction (Blue Card)

Credentials for Career Technical Education Teachers and/or Students

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

Chapter 33: Other Welding Processes, Brazing and Soldering

Doc #: 2100-AD Revision: - Installation of the DESI Zenith Work Platforms. Author(s): Derek Guenther, Miranda Saucedo, Tammie Lavoie

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC

RADIO ANTI TWO-BLOCK SYSTEM

Trade of Metal Fabrication. Module 3: Plate Fabrication Unit 7: Sloping Chute Phase 2

INSTALLATION INSTRUCTIONS

Spring Loaded All Season Roll-Up Doors

Industrial Mechanic (Millwright) On-the-Job Training Guide

Inspection Kit Alignment, Measurement & Weld Measuring Gauges Model: IK-BACT13. Welders, CWI Inspectors, Instructors

INSPECTION AND REMOVAL CRITERIA

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Manufacturing Process:

AUTOMATIC CIRCLE BURNING AND WELDING

2019 Welding- Individuals Secondary & Post-secondary

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

CHAPTER 1. Easy Patterns For Kids to Crochet

INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R

Field Instruction. This instruction outlines the safe method for joining/assembling and lifting in-ground mounted two piece steel power poles.

Gared Pro Portable Backstop

Guidance for producing centre devised tasks for 2660

Construction Guide: Spiderbeam 40m Add-On Dipole

External Motor Driven SCREEN-PRO. All Season Roll-Up Doors WALL MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Inspecting a Barges Towing Rig

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

Fig. 9 Different weld positions. There are five basic types of common joints. They are

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Heavy-Duty Bypass Track System

Plumbing Part II - Hand Pump

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

Gared Pro-S Portable Backstop

Copper Tubing Hangers Clevis Hangers. Copper Tubing Hangers

Basic terms of a welded joint are shown in Fig and the five basic types of joints are shown in Fig

Next generation offshore wind tools

Installation Instructions. Oakmont Folding Doors

Down Stage Right -Theatrical and Entertainment Rigging Supplies

SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method

Pipefitting. or fuel. that are. ICE Level 2. as; to meet specification. Support the. n pipework. positioning. Page 1 of 5

M2 Antenna Systems, Inc. Model No: 20M6-125

The Festival Assembly Instructions

Hy-gain. Method 1 : Completely assemble the antenna on the ground then hoist it into position using a setup as shown in Figure 1.

Basic Welding Symbols and Their Location Significance

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

WELDER ONTARIO PRACTICAL ASSESSMENT

Assembly Instructions

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Save time! Read the entire manual before beginning Hoister installation.

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

Doc #: 2100-AD Revision: - Declination Work Platform Installation. Author(s): Derek Guenther, Miranda Saucedo

Index Pipe Hangers and Straps

MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

MIG - TIG - PLASMA - MMA

SECTION 9.0 MAINTENANCE

RUBBISH CHUTE TECHNICAL NOTE

EMB MANUFACTURING INC.

One-sided rack, hot-dip galvanized Space between bicycles 350 mm length approx.kg Part-No. Two-sided rack, hot-dip galvanized

ACF Maintenance Bulletin. TC-200 Revision B. ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement

ANTENNA EXPERTS. Website: AP MHz. 2.4 Meters 30dBi. Gain

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Ceiling Tile Installations Part 1. Sheetrock Installations Part 2. WolfVision Support 2055 Sugarloaf Circle, Suite 125 Duluth, GA 30097

Sport-Thieme. Full-Size Goal. Assembly instructions. 7,32x2,44 m, Portable

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

Make a Pencil Holder. Description. Lesson Objectives. Assumptions. Terminology

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Sheet Metal Worker A Guide to Course Content

Fryer's Trebuchet Paper Kits

Welding 2 go. alhuzaim_af [Type the company name] 8/2/2012

Hex Head Bolt Set N - Includes lock nut. Used to connect male and female T connectors. Galvanized. 3/4" x 3-1/2". Standard Grade (f) Part #24279

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

GrowSpan Series 500 Roll-Up Ends

VPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

CONVEY-ALL TCH-1070, TCH-1075, TCH-1080 & TCH-1085 MODEL CONVEYOR WITH SCISSOR LIFT UNDERCARRIAGE ASSEMBLY MANUAL

AGRICULTURE COMPETENCIES

Anti-Chattering Retrofit Assembly

Patented Track Rail 450 Series

Transcription:

TASK: Set up and Operate an Air Tugger 101 AIR TUGGER CHECKLIST following tasks in actual on-the-job situations using air-tugger. Tugger Task 1. Mount tugger Company 2. Unwind wire rope from spool 3. Anchor wire rope onto drum 4. Determine fleet angle 5. Rig fair lead block 6. Operate tugger

TASK: Utilize Come-a-longs and Chain Hoists 102 COME-A-LONG AND CHAIN HOIST CHECKLIST Apprentice has demonstrated satisfactory skill in setting up and operating the following types of hoisting equipment in actual on-the-job situations Type of Equipment 1. Come-a-long Company 2. Chain Hoist

TASK: Utilize Pneumatic and Electric Hoists 103 PNEUMATIC AND ELECTRIC HOIST CHECKLIST Apprentice has demonstrated satisfactory skill in rigging and operating the following types of power-operated hoisting equipment in actual on-the-job situations Type of Equipment 1. Pneumatic Hoist Company a. Safety Checks b. Set-up c. Operate 2. Electric Hoist a. Safety Checks b. Set-up c. Operate

TASK: Set Up and Operate Cable Climbers 104 CABLE CLIMBER CHECKLIST following tasks required for Cable Climber setup in actual on-the-job situations Cable Climber Task 1. Set up overhead rigging 2. Assemble the scaffold platform 3. Connect the Cable Climbers 4. Reeve the Cable Climbers 5. Operate the Cable Climbers in a scaffold installation 6. Operate the Cable Climbers with a work basket or bosun's chair

TASK: Set up Scaffolds 105 SCAFFOLDING CHECKLIST Apprentice has demonstrated satisfactory skill in performing the following tasks required for scaffolding setup in actual on-the-job situations Scaffold Task 1. Tubular Scaffolding 2. Bracket Scaffolding 3. Needle Beam Scaffolding

TASK: Inspect and Care for Rigging Accessories 106 INSPECTION AND CARE CHECKLIST following tasks required for inspection and care of rigging accessories in actual on-the-job situations Rigging Accessory 1. Blocks 2. Sheaves 3. Cable clips 4. Chains 5. Chain Falls 6. Come-a-longs 7. Tirfor jacks 8. Drums 9. Fiber rope 10. Wire rope 11. Hooks 12. Jacks 13. Ladders 14. Rigging/safety belts 15. Shackles 16. Slings 17. Spreader bars and beams 18. Tuggers 19. Turnbuckles

TASK: Tie Knots 107 ROPE TYING CHECKLIST Apprentice has demonstrated satisfactory skill in tying the following knots, hitches, and splices in actual on-the-job situations Knot, Hitch, or Splice 1. Square Knot 2. Bowline 3. Triple Bowline 4. Bowline on the Bight 5. Triple Sliding Hitch 6. Barrel Hitch 7. Timber Hitch 8. Clove Hitch 9. Short Splice 10. Long Splice 11. Eye or Side Splice 12. Crown or Back Splice

TASK: Reeve Blocks 108 REEVING CHECKLIST Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations Reeving Task 1. Two-Part Line 2. Three-Part Line 3. Four-Part Line 4. Five-Part Line 5. Six-Part Line 6. Seven-Part Line 7. Eight-Part Line

TASK: Change Crane Booms 110 CRANE BOOM CHECKLIST following tasks in actual on-the-job situations Crane Boom Task 1. Add Boom Sections 2. Remove Boom Sections 3. Add Jib

TASK: Use Hand Signals to Control Crane and Hoist Operations 111 HAND SIGNAL CHECKLIST following hand signals in actual on-the-job situations Hand Signal 1. Hoist 2. Lower 3. Use Main Hoist 4. Use Whipline 5. Raise Boom 6. Lower Boom 7. Move Slowly 8. Trolley Travel (for Overhead Cranes) 9. Swing 10. Stop 11. Travel 12. Dog Everything 13. Travel (both tracks) 14. Travel (one track) 15. Extend Boom (telescoping boom) 16. Retract Boom (telescoping boom) 17. Stop (one hand) 18. Boom up and Lower the Load (one hand) 19. Boom Down and Raise the Load (one hand)

TASK: Shielded Metal Arc Welding 201 SHIELDED METAL ARC WELDING CHECKLIST following SMAW tasks in actual on-the-job situations. SMAW Task 1. Weld a Double-V Butt Joint. a. Flat b. Horizantal c. Vertical d. Overhaed 2. Weld a Singal-V Butt Joint with Backing. a. Flat b. Horizantal c. Vertical d. Overhaed 3. Weld a Singal-V Butt Joint without Backing. a. Flat b. Horizantal c. Vertical d. Overhaed 4. Weld a Double-Fillet Lap Joint. a. Flat b. Horizantal c. Vertical d. Overhaed 5. Fillet Weld Tube to Plate (4F). 6. Butt Weld Tube at 45 Angle (6G). 7. Butt Weld Tube in 6G Position using Chill Ring.

TASK: Weld Using Gas Tungsten Arc 202 GTAW CHECKLIST following gas tungsten arc welding tasks in actual on-the-job situations. GTAW Task 1. Weld a Groove Joint in Tube 2. Weld a Fillet Joint in Tube and Plate

TASK: Weld Using Gas Metal Arc 203 GAS METAL ARC WELDING CHECKLIST following gas metal arc welding tasks in actual on-the-job situations. Gas Metal Arc Welding Task 1. Weld a Double-V Butt Joint. a. Flat b. Horizantal c. Vertical d. Overhaed 2. Weld a Singal-V Butt Joint with Backing. a. Flat b. Horizantal c. Vertical d. Overhaed 3. Weld a Singal-V Butt Joint without Backing. a. Flat b. Horizantal c. Vertical d. Overhaed

TASK: Cut and Gouge 205 CUTTING AND GOUGING CHECKLIST following PAC equipment setup, cutting, and gouging in actual on-the-job situations. JOB SITUATIONS VARY, SO CRITERIA BELOW ARE SUGGESTED AND DO NOT APPLY TO SPECIFIC JOBS. Cutting/Gouging Task 1. Sey up PAC Equipment 2. Cut Straight Line a. Oxyacetylene b. Air Carbon Arc c. Plasma Arc 3. Cut Circle a. Oxyacetylene b. Air Carbon Arc c. Plasma Arc 4. Cut Square a. Oxyacetylene b. Air Carbon Arc c. Plasma Arc 5. Cut Channel a. Oxyacetylene b. Air Carbon Arc c. Plasma Arc 6 Cut Bevel a. Oxyacetylene b. Air Carbon Arc c. Plasma Arc 7 Make Gouge a. Oxyacetylene b. Air Carbon Arc

TASK: Weld Using Flux-Core Arc 207 FLUX-CORE ARC WELDING CHECKLIST following flux-core arc welding tasks in actual on-the-job situations. Flux-Core Welding Test 1. Double-V Butt Joint a. Flat b. Horizantal c. Vertical d. Overhead 2. Single-V Butt Joint with Backing a. Flat b. Horizantal c. Vertical d. Overhead 3. Single-V Butt Joint without Backing a. Flat b. Horizantal c. Vertical d. Overhead

TASK: Stud Arc Welding 208 STUD ARC WELDING CHECKLIST following stud arc welding tasks in actual on-the-job situations. Stud Arc Welding Test 1. Set Up SW Equipment 2. Weld a Small Stud 1/8-1/4" Diameter Using Capacitor Discharge 3. Weld Large Stud 1/4-3/4" Diameter Using Drawn Arc (Conventional)

TASK: Align and Fit Field Components 301 COMPONENT FIT-UP CHECKLIST Apprentice has demonstrated satisfactory skill in performing the following in actual on-the-job situations. Component Fit-Up Skill 1. Align and Fit a Piece of Duct 2. Align a Steam Drum 3. Align a Mud Drum 4. Align and Fit a Precipitator Box 5. Align Base Plates for a Vessel 6. Align a Header 7. Align a Water Wall Panel * Specify Others 1. 2. 3.

TASK: Remove Tubes 401 TUBE REMOVAL CHECKLIST following tasks in actual on-the-job situations. Tube Removal Task 1. Remove Sections of Tubes 2. Remove Section of a Single Tube (Dutchman) 3. Remove Small Tubes from Sheets 4. Remove Large Tubes from Steets 5. Remove Tube Sheet

TASK: Bevel Tubes 402 STUD ARC WELDING CHECKLIST following tasks required for the beveling of tube ends in actual on-the-job situations. Beveling Task 1. Machine Beveling 2. Hand Beveling

TASK: Replace Tubes 403 TUBE REPLACEMENT CHECKLIST following tube replacement tasks in actual on-the-job situations. Tube Replacement Task 1. Replace Sections of Tubes 2. Replace Section of a Single Tube 3. Replace Small Tubes in Sheets 4. Replace Large tubes in Sheets 5. Observe and/or Participate in Testing

TASK: Roll Tubes 404 TUBE ROLLING CHECKLIST following tube rolling tasks in actual on-the-job situations. Tube Replacement Task 1. Repair Tube Holes 2. Roll Tubes Small Tubes (less than 1-1/2" diameter Large Tubes (1-1/2" diameter and above) In Confined Areas 3. Bell, Bead, or weld Tube Ends 4. Observe and/or Participate in Testing